| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 |
| | |
| | ==SUBJECT:== |
| | SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688) |
|
| |
|
| ==Dear Mr. Walsh:== | | ==Dear Mr. Walsh:== |
| | |
| By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12136A126), September 20,2012 (ADAMS Accession No. ML12271A276), and March 27, 2013 (ADAMS Accession No. ML13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook). | | By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12136A126), September 20,2012 (ADAMS Accession No. ML12271A276), and March 27, 2013 (ADAMS Accession No. ML13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook). |
| The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV. By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390: Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." Enclosure 1 was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML12270A423). | | The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). |
| The submitted information should be considered exempt from mandatory public disclosure for the following reason: | | The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV. |
| K. Walsh | | By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390: |
| * Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML12270A423). The submitted information should be considered exempt from mandatory public disclosure for the following reason: |
| Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | |
| If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information. | | K. Walsh -2 |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | * Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions, please contact me at (301) 415-3100. | | If you have any questions, please contact me at (301) 415-3100. |
| G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv K. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv |
| Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
| | |
| If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
| | ML13095A101 OFFICE LPL1-2/PM LPL 1-2/LA LPL 1-2/BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 4/30/13 4/30113 512/13 512/13}} |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
| |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
| |
| If you have any questions, please contact me at (301) 415-3100.
| |
| Sincerely, Ira! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
| |
| PUBLIC LPLI-2 R/F RidsNRRDorlLpl1 w2 Resource RidsNrrPMSeabrook Resource RidsNrrLAABaxter Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsNrrDorlResource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No: ML13095A101 OFFICE LPL 1-2/PM LPL 1-2/LA LPL 1-2/BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 4/30/13 4/30113 512/13 512/13 OFFICIAL RECORD COPY}}
| |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARSBK-L-11245, License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage2012-01-30030 January 2012 License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage Project stage: Request SBK-L-12099, Supplement to LAR 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage2012-05-10010 May 2012 Supplement to LAR 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage Project stage: Supplement ML12192A2322012-07-24024 July 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-12199, Response to Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage2012-09-20020 September 2012 Response to Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Response to RAI ML12270A4312012-10-0202 October 2012 Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Other ML12270A4232012-12-0505 December 2012 Non-Proprietary - Request for Additional Information Regarding License Amendment Request 11-04. Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-13061, Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage2013-03-27027 March 2013 Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Request ML13095A1222013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13095A0262013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13095A1012013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance ML13094A4092013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: Withholding Request Acceptance SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts Project stage: Request ML13268A4682014-01-0808 January 2014 Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage Project stage: RAI SBK-L-14018, Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for Spent Fuel Storage2014-01-29029 January 2014 Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for Spent Fuel Storage Project stage: Response to RAI ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes Project stage: Approval SBK-L-15036, Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault2015-02-25025 February 2015 Response to Request for Additional Information for License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault Project stage: Response to RAI 2013-12-20
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25
[Table view] Category:Proprietary Information Review
MONTHYEARML17088A6742018-08-17017 August 2018 Request for Withholding Information from Public Disclosure ML17017A3742017-02-27027 February 2017 Request for Withholding Information from Public Disclosure ML16230A1822016-09-0101 September 2016 Proprietary Information Determination ML15173A1202015-07-14014 July 2015 Request for Withholding Information from Public Disclosure ML15128A1482015-06-0505 June 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 ML15084A3752015-04-0303 April 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 (TAC Nos. MF4576 and MF4577) ML14168A2472014-07-17017 July 2014 Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML14078A1062014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML14078A6242014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault ML13263A1382013-10-21021 October 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML13156A1252013-06-0404 June 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station: Response to Confirmatory Action Letter - CAL No. 2012-002) ML13094A4092013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1012013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A0262013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1222013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13088A2622013-04-0303 April 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station - Response to Confiromatory Action Letter - CAL No. 2012-002) ML12270A4312012-10-0202 October 2012 Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML12256B0372012-09-26026 September 2012 Request for Withholding Information from Public Disclosure Regarding Relief Request for Service Water Piping ML1126404932011-10-0606 October 2011 Request for Withholding Information from Public Disclosure ML0722000282007-08-21021 August 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0626804622006-09-27027 September 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0625100622006-09-19019 September 2006 Westinghouse Electric Company, LLC - Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0534701812005-12-16016 December 2005 Caldon, Inc., Request for Withholding Information from Public Disclosure During NRC Meeting to Discuss Seabrook Measurement Uncertainty Recapture License Amendment Request ML0534903472005-12-12012 December 2005 Caldon Inc. Proprietary Information Package, INFO-18 ML0532601922005-11-28028 November 2005 FPL Energy Seabrook, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station ML0430803222004-11-19019 November 2004 Withholding from Public Disclosure, Westinghouse Responses to NRC Requests for Additional Information (Rais) for Seabrook Station Stretch Power Uprate (Proprietary) ML0409804772004-10-14014 October 2004 Request for Withholding Information from Public Disclosure, Stretch Power Uprate NSSS Licensing Report Supplemental Information, WCAP-16223-NP 2018-08-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)
Dear Mr. Walsh:
By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12136A126), September 20,2012 (ADAMS Accession No. ML12271A276), and March 27, 2013 (ADAMS Accession No. ML13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook).
The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).
The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV.
By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:
Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML12270A423). The submitted information should be considered exempt from mandatory public disclosure for the following reason:
K. Walsh -2
- Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3100.
G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
ML13095A101 OFFICE LPL1-2/PM LPL 1-2/LA LPL 1-2/BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 4/30/13 4/30113 512/13 512/13