Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
ML12192A232
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/24/2012
From: John Lamb
Plant Licensing Branch 1
To: Walsh K, O'Keefe M
NextEra Energy Seabrook
Lamb J
References
TAC ME8688
Download: ML12192A232 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 24, 2012 Mr. Kevin Walsh Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)

Dear Mr. Walsh:

By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012 (ADAMS Accession No. ML12136A126), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04 for Seabrook Station, Unit 1. The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage, as a result of the new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP),

The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (k eff) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staff's request for additional information (RAI) is contained in the enclosed RAI. A draft of these questions was previously sent to Mr. Gary Kilby of your staff with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed. A conference call was held on July 11, 2012, and Mr. Kilby agreed that NextEra would respond to the RAI within 60 days of the date of this letter. Please note that if you do not respond to the RAJ within 60 days, the NRC staff may reject your request for relief under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108, "Denial of application for failure to supply information."

K. Walsh -2 If you have any questions, please contact me at (301) 415-3100.

G. Lamb, Senior Project Manager Pat Licensing Branch 1-2 i sion of Operating Reactor Licensing ice of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICALSPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE NEXTERA ENERGY SEABROOK. LLC SEABROOK STATION, UNIT 1 DOCKET NUMBER 50-443 1.0 SCOPE By letter dated January 30, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letter dated May 10, 2012 (ADAMS Accession No. ML12136A126), NextEra Energy Seabrook, LLC (NextEra) submitted a license amendment request (LAR) 11-04 for Seabrook Station, Unit 1. The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as the result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).

The proposed amendment would revise TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP; (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (keff) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4); and (3) revise the requirements for fuel storage within the NFV.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staft's request for additional information (RAI) is contained below.

2.0 RAI In the letter dated May 10, 2012, NextEra states that the acceptance criteria is 45 mil for the uniform void. Please clarify how the 45 mil limit was determined and why the uniform void is the conservative parameter to model the blisters. Also, please clarify how the uniform void volume is calculated including what measured blister dimensions are used in the calculations.

Enclosure

K. Walsh - 2 If you have any questions, please contact me at (301) 415-3100.

Sincerely, Ira!

John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLI-2 R/F RidsNrrLAABaxter Resource RidsNRRDor1Lp11-2 Resource RidsOgcRP Resource RidsNrrPMSeabrook Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsNrrDorlResource RidsAcrsAcnw_MailCTR Resource fl ADAMS Accession No: ML12192A232

~-""--""

/ OFFICE LPL 1-2/PM " LPL 1-2/LA i LPL 1-2/BC i LPL 1-2/PM

~AME  ! JLamb ' AB.,te,  ! MKhanna JLamb

~ATE i 07/23/12 I 07/16/12: 07/24/12 07124112 OFFICIAL RECORD COp~y:=====~====d