MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] Category:Proprietary Information Review
MONTHYEARML17088A6742018-08-17017 August 2018 Request for Withholding Information from Public Disclosure ML17017A3742017-02-27027 February 2017 Request for Withholding Information from Public Disclosure ML16230A1822016-09-0101 September 2016 Proprietary Information Determination ML15173A1202015-07-14014 July 2015 Request for Withholding Information from Public Disclosure ML15128A1482015-06-0505 June 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 ML15084A3752015-04-0303 April 2015 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 14-04 for Seabrook Station, Unit 1 (TAC Nos. MF4576 and MF4577) ML14168A2472014-07-17017 July 2014 Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML14078A1062014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML14078A6242014-04-18018 April 2014 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New Fuel Vault ML13263A1382013-10-21021 October 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology ML13156A1252013-06-0404 June 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station: Response to Confirmatory Action Letter - CAL No. 2012-002) ML13094A4092013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1012013-05-0202 May 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A0262013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13095A1222013-04-26026 April 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML13088A2622013-04-0303 April 2013 Request for Withholding Information from Public Disclosure (Seabrook Nuclear Power Station - Response to Confiromatory Action Letter - CAL No. 2012-002) ML12270A4312012-10-0202 October 2012 Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage ML12256B0372012-09-26026 September 2012 Request for Withholding Information from Public Disclosure Regarding Relief Request for Service Water Piping ML1126404932011-10-0606 October 2011 Request for Withholding Information from Public Disclosure ML0722000282007-08-21021 August 2007 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0626804622006-09-27027 September 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0625100622006-09-19019 September 2006 Westinghouse Electric Company, LLC - Request for Withholding Information from Public Disclosure for Seabrook Station, Unit No. 1 ML0534701812005-12-16016 December 2005 Caldon, Inc., Request for Withholding Information from Public Disclosure During NRC Meeting to Discuss Seabrook Measurement Uncertainty Recapture License Amendment Request ML0534903472005-12-12012 December 2005 Caldon Inc. Proprietary Information Package, INFO-18 ML0532601922005-11-28028 November 2005 FPL Energy Seabrook, LLC, Request for Withholding Information from Public Disclosure for Seabrook Station ML0430803222004-11-19019 November 2004 Withholding from Public Disclosure, Westinghouse Responses to NRC Requests for Additional Information (Rais) for Seabrook Station Stretch Power Uprate (Proprietary) ML0409804772004-10-14014 October 2004 Request for Withholding Information from Public Disclosure, Stretch Power Uprate NSSS Licensing Report Supplemental Information, WCAP-16223-NP 2018-08-17
[Table view] |
Text
November 28, 2005 Mr. B. F. Maurer Acting Manager, Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P.O. Box 355 Pittsburgh, PA, 15230-0355
SUBJECT:
FPL ENERGY SEABROOK, LLC, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR SEABROOK STATION (TAC NO. MC4907)
Dear Mr. Maurer:
By letter dated September 29, 2005, FPL Energy Seabrook, LLC (FPLE) submitted an affidavit executed by you, dated September 7, 2005, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Section 2.390:
LTR-CDME-05-170-P, Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet at Seabrook Generating Station, dated August 2005 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(1) This information is of the type typically held in confidence by Westinghouse Electric Company LLC (Westinghouse), and is in fact so held.
(2) The information is being transmitted to the NRC in confidence.
(3) The information has not been publically disclosed, nor is it available in public sources.
(4) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.), where prevention of its use by Westinghouses competitors constitutes a competitive economic advantage over other companies.
(5) The information, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
B. Maurer (6) The information reveals aspects of past, present, or future Westinghouse or customer-funded development plans and programs of potential commercial value to Westinghouse.
(7) Use of the information by a competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at Westinghouses expense.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2481.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Mr. Stephen McGrail, Director Senior Vice President, Nuclear and ATTN: James Muckerheide Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Philip T. McLaughlin, Attorney General Mr. Peter Brann Steven M. Houran, Deputy Attorney Assistant Attorney General General State House, Station #6 33 Capitol Street Augusta, ME 04333 Concord, NH 03301 Resident Inspector Mr. Bruce Cheney, Director U.S. Nuclear Regulatory Commission New Hampshire Office of Emergency Seabrook Nuclear Power Station Management P.O. Box 1149 State Office Park South Seabrook, NH 03874 107 Pleasant Street Concord, NH 03301 Town of Exeter 10 Front Street Mr. Gene F. St. Pierre Exeter, NH 03823 Station Director Seabrook Station Regional Administrator, Region I FPL Energy Seabrook, LLC U.S. Nuclear Regulatory Commission P.O. Box 300 475 Allendale Road Seabrook, NH 03874 King of Prussia, PA 19406 Mr. M. S. Ross, Managing Attorney Office of the Attorney General Florida Power & Light Company One Ashburton Place, 20th Floor P.O. Box 14000 Boston, MA 02108 Juno Beach, FL 33408-0420 Board of Selectmen Mr. Rajiv S. Kundalkar Town of Amesbury Vice President - Nuclear Engineering Town Hall Florida Power & Light Company Amesbury, MA 01913 P.O. Box 14000 Juno Beach, FL 33408-0420 Ms. Deborah Bell Federal Emergency Management Agency James M. Peschel Region I Regulatory Programs Manager J.W. McCormack P.O. & Seabrook Station Courthouse Building, Room 401 FPL Energy Seabrook, LLC Boston, MA 02109 PO Box 300 Seabrook, NH 03874 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019
Seabrook Station, Unit No. 1 cc:
David Moore Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004
ML053260192 OFFICE LPL1-2/PM LPL1-2/LA CSGB-BC LPL1-2/BC NAME GMiller CRaynor AHiser DRoberts DATE 11/23/05 11/25/05 11/21/05 11/28/05