ML062510062
| ML062510062 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/19/2006 |
| From: | Geoffrey Miller NRC/NRR/ADRO/DORL/LPLI-2 |
| To: | Maurer B Westinghouse |
| Miller G, NRR/DLPM, 415-2481 | |
| References | |
| TAC MC8554 | |
| Download: ML062510062 (5) | |
Text
September 19, 2006 Mr. B. F. Maurer, Acting Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company, LLC P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
WESTINGHOUSE ELECTRIC COMPANY, LLC REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR SEABROOK STATION, UNIT NO. 1 (TAC NO. MC8554)
Dear Mr. Maurer:
By FPL Energy Seabrook, LLC (FPLE) letter SBK-L-05186 dated September 29, 2005, and Westinghouse Electric Company, LLC (Westinghouse) affidavit dated September 7, 2005 (Attachment 2 to FPLE letter SBK-L-05186), FPLE requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
LTR-CDME-05-170-P, Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet at Seabrook Generating Station, dated August 2005 (Attachment 1 to FPLE letter SBK-L-05186)
A nonproprietary copy of this document (Enclosure 2 to FPLE letter SBK-L-05185, dated September 29, 2005) has been placed in the Nuclear Regulatory Commission's (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
As follows, the affidavit contained information demonstrating that the submitted information should be considered exempt from mandatory public disclosure:
(1)
The information is of the type typically held in confidence by Westinghouse, and is in fact so held.
(2)
The information was transmitted to the NRC in confidence.
(3)
The information has not been publically disclosed, nor is it available in public sources.
(4)
Public disclosure of the information would be likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors with respect to design, manufacture, installation, assurance of quality, or licensing a similar product or service without commensurate expenses.
B. F. Maurer We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-2481.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page
B. F. Maurer We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5), and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-2481.
Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrPMVNerses RidsOgcMailCenter LPLI-2 R/F RidsNrrPMREnnis RidsAcrsAcnwMailCenter RidsNrrLACRaynor RidsNrrDorlLpl1-2 RidsRgn1MailCenter ADAMS Accession Number: ML062510062 OFFICE LPLI-2/PM LPLI-2/LA LPLI-2/BC(A)
NAME GEMiller:osr CRaynor BPoole DATE 9/5/06 9/15/06 9/19/06 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
Mr. Gene St. Pierre Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Ms. Deborah Bell Federal Emergency Management Agency Region I J.W. McCormack P.O. &
Courthouse Building, Room 401 Boston, MA 02109 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Bruce Cheney, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Seabrook Station, Unit No. 1 cc:
James M. Peschel Regulatory Programs Manager Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 David Moore Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004