ML13095A101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/02/2013
| issue date = 05/02/2013
| title = Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
| title = Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Walsh K
| addressee name = Walsh K
Line 9: Line 9:
| docket = 05000443
| docket = 05000443
| license number =  
| license number =  
| contact person = Lamb J G
| contact person = Lamb J
| case reference number = TAC ME8688
| case reference number = TAC ME8688
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
| page count = 3
| page count = 3
| project = TAC:ME8688
| project = TAC:ME8688
| stage = Other
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
 
==SUBJECT:==
SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)


==Dear Mr. Walsh:==
==Dear Mr. Walsh:==
By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML 12136A126), September 20,2012 (ADAMS Accession No. ML 12271A276), and March 27, 2013 (ADAMS Accession No. ML 13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook).
 
The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV. By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390: Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." Enclosure 1 was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML 12270A423).
By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12136A126), September 20,2012 (ADAMS Accession No. ML12271A276), and March 27, 2013 (ADAMS Accession No. ML13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook).
The submitted information should be considered exempt from mandatory public disclosure for the following reason:
The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).
K. Walsh
The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV.
* Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML12270A423). The submitted information should be considered exempt from mandatory public disclosure for the following reason:
If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
 
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
K. Walsh                                       -2
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
* Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3100.
If you have any questions, please contact me at (301) 415-3100.
G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv K. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
 
If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
ML13095A101 OFFICE     LPL1-2/PM   LPL 1-2/LA   LPL 1-2/BC       LPL1-2/PM NAME       JLamb       ABaxter     MKhanna           JLamb DATE       4/30/13     4/30113     512/13             512/13}}
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3100.
Sincerely, Ira! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 R/F RidsNRRDorlLpl1 w2 Resource RidsNrrPMSeabrook Resource RidsNrrLAABaxter Resource RidsNrrDorlDpr Resource RidsRgn1 MailCenter Resource RidsNrrDorlResource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No: ML 13095A101 OFFICE LPL 1-2/PM LPL 1-2/LA LPL 1-2/BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 4/30/13 4/30113 512/13 512/13 OFFICIAL RECORD COPY}}

Latest revision as of 05:54, 6 February 2020

Request for Withholding Information from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
ML13095A101
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/02/2013
From: John Lamb
Plant Licensing Branch 1
To: Walsh K
NextEra Energy Seabrook
Lamb J
References
TAC ME8688
Download: ML13095A101 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)

Dear Mr. Walsh:

By letter dated January 30,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12038A036), as supplemented by letters dated May 10, 2012 (ADAMS Accession No. ML12136A126), September 20,2012 (ADAMS Accession No. ML12271A276), and March 27, 2013 (ADAMS Accession No. ML13099A022), NextEra Energy Seabrook, LLC (NextEra) submitted license amendment request (LAR) 11-04, and subsequent requests for additional information (RAI) responses for Seabrook Station, Unit No. 1 (Seabrook).

The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).

The proposed amendment would revise the TSs to: (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burn up, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (kelt) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV.

By letter dated March 27, 2013, NextEra requested that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:

Enclosure 1 of the letter from NextEra to Document Control Desk (NRC) dated March 27,2013: "Response to December 2012 Request for Additional Information Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage." was in response to the U.S. Nuclear Regulatory Commission's (NRC) proprietary request for additional, dated December 5,2012, and the nonproprietary version, dated December 5, 2012 (ADAMS Accession No. ML12270A423). The submitted information should be considered exempt from mandatory public disclosure for the following reason:

K. Walsh -2

  • Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at (301) 415-3100.

G. Lamb, Senior Project Manager t licensing Branch 1-2 Di sion of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv

ML13095A101 OFFICE LPL1-2/PM LPL 1-2/LA LPL 1-2/BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 4/30/13 4/30113 512/13 512/13