{{#Wiki_filter:FENOC" HrstEtregp t*Mr Qerrrtlrg
{{#Wiki_filter:FENOC"                                                                                       Perryl,tuclearfuwer Plant P,O.tux 97 l00enter Roe,d HrstEtregp                                                                                            tutry, Ohllo.
@nWV Perry l,tuclear fuwer Plant P,O. tux 97l00enter Roe,d tutry, Ohllo. 4408t VbAl@rfficaa, Vice President 4&2W5ffi2 Fax:440,2&tr80?9July 2, ?A13 L-l3-213 10 cFR 2.202 ATTN: Document Control Deek U,S. Nuclear Regulatory .Commission Washington, DC 20555-0001
4408t t*Mr Qerrrtlrg@nWV VbAl@rfficaa,                                                                                             4&2W5ffi2 VicePresident                                                                                        Fax:440,2&tr80?9 July2, ?A13 L-l3-213                                                                 10cFR 2.202 ATTN: Document       ControlDeek U,S.NuclearRegulatory    .Commission Washington,   DC20555-0001


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power Plant Docket No. 50-4,40, License No. NPF-58 Response to Reques! for Additional Informatiqn Reqafdinq FirstEnergv Nucle-qt Operating Company's (FFlllOC'sl Overall Inteqrated PlaE.in Rgsponse tgMaich 12.
 
2012 Commission Order l$ruance of Order to Modiry L.ige.nqes with &gard to ReliabJe SBFnt Fuel Pool Ingtrumentation (Order Nuqb.gr EA-12-051) ffAC Ne.. MFQ8,02)On March 12,2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference
PerryNuclearPowerPlant DocketNo.50-4,40,     LicenseNo.NPF-58 Response   to Reques!forAdditional  Informatiqn   Reqafdinq FirstEnergv   Nucle-qt Operating Company's   (FFlllOC'slOverallInteqrated    PlaE.inRgsponse    tg Maich12.2012Commission        Order l$ruance   of Order to Modiry   L.ige.nqeswith&gard to ReliabJe                                   (Order SBFntFuelPoolIngtrumentation Nuqb.grEA-12-051) ffAC Ne.. MFQ8,02)
: 1) to FENOC. Reference 1 was immediately effective and imposesadditional requirements to increase the capability of FENOC to mitigate beyonddesign-basis external events. Specific requirements are outlined in Attachment 2 ot Reference 1.Reference 1 required submission of an overall integrated plan by February 28, 2013.The NRC Interim Staff Guidanc,e (Reference
On March12,2012,theNuclearRegulatory          Commission   (NRC)issuedan order (Reference   1)to FENOC.Reference     1 wasimmediately    effectiveandimposes additionalrequirements  to increase thecapability  of FENOCto mitigatebeyonddesign-basisexternalevents.Specificrequirements        areoutlinedin Attachment     2 ot Reference   1.
: 2) was issued August 29,2012 andendorsed industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and eiceptions identified in Reference
Reference   1 requiredsubmission  of an overallintegrated  planby February     28,2013.
: 2. Reference 3 provides direction regarding the content of the overall integrated plan.By letter dated February 27,2013 [Agenqnride Documents Access and Management System (ADAMS) Accession No. MLl3059M951, FENOC submitted overal! integrated plans for reliable spent fuel pool instrumentation, which included an overall integrated plan for Perry Nuciear Power Plant, Unit No. 1 , By letter dated June 10, 2013 (ADAMS Accession Nb. ML19155A539), the NRC staff requested additional information to complete its review.
TheNRCInterimStaffGuidanc,e       (Reference   2) wasissuedAugust29,2012and endorsedindustry    guidance document   NEI 12-02, Revision1 (Reference     3) with clarifications andeiceptionsidentified  in Reference   2. Reference   3 providesdirection regarding the contentof theoverallintegrated    plan.
The NRC also indicated in the letter that if information is unavailable by July 5, 2013, dates as to when the additional information will be submitted are to be provided.
ByletterdatedFebruary27,2013[Agenqnride           Documents   AccessandManagement System(ADAMS)       Accession No.MLl3059M951,       FENOCsubmitted      overal!integrated plansfor reliablespentfuelpoolinstrumentation,     whichincludedan overallintegrated planfor PerryNuciearPowerPlant,UnitNo.1, ByletterdatedJune10,2013(ADAMS Accession   Nb.ML19155A539),   theNRCstaffrequested        additional information to completeits review.TheNRCalsoindicated          in the letter that if information is unavailable by July5, 2013,datesasto whentheadditional        information   willbe submitted areto be provided.As discussed     in the publicmeeting  held on JuneZO,ZO13,     providingthe responses   in thesix-month   updatereportsis acceptable.
As discussed in the public meeting held onJune ZO,ZO13, providing the responses in the six-month update reports is acceptable.
Byelectronic  miit datedJune25,2013,     the NRC   staffrequested  additional information regarding powersupplies.Theresponse        to therequestfor additionaf     information   is
By electronic miit dated June 25,2013, the NRC staff requested additional information regarding power supplies.
 
The response to the request for additionaf information is Perry Nuclear Power Plant L-13-213 Page 2attached. The applicable six-month update in which FENOC intends to provide currently unavailable information is indicated in the attachment.
PerryNuclearPowerPlant L-13-213 Page2 attached.Theapplicable    six-month updateinwhichFENOCintendsto provide currently unavailable informationis indicatedin theattachment.
There are no new regulatory commitments contained in this letter. lf there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-3156810.I decla.p under penalty of periury that the foregoing is true and correct.
Thereare no newregulatory    commitments   contained in thisletter.lf thereareany questionsor if additionalinformation is required,pleasecontactMr.ThomasA. Lentz, Manager FleetLicensing,     at 330-3156810.
Executed on July t',2013.Respectfully, il,/,/)h Il /-hl ( .r,{/rnU,{art*{-
I decla.punderpenaltyof periurythattheforegoing    is trueandcorrect.Executed   on July t',2013.
Vito A, Kaminskas
Respectfully, il l,/,/)h
  /-hl ( .r,   I
{/rnU,{art*{-
VitoA, Kaminskas


==Attachment:==
==Attachment:==


Response to Request for Information
Responseto Requestfor Information


==References:==
==References:==
: 1. NRC Order Number EA-12-051, Order Modiffing Licenses with Regard to ReliableSpent Fuef Pool Instrumentation (ADAMS Accession No. ML12054A679)
: 1. NRCOrderNumberEA-12-051,           OrderModiffingLicenseswith Regardto Reliable SpentFuefPoolInstrumentation    (ADAMS   Accession   No.ML12054A679)
NRC Interim Staff Guidance JLD-ISG -2012-03, Compliance with Order EA-12-051,Reliable Spent Fuef Pool Instrumentation, Revision 0, dated August 29, 2012 (ADAMS Accession No.
: 2. NRCInterimStaffGuidance    JLD-ISG -2012-03, Compliance   withOrderEA-12-051, ReliableSpentFuefPoolInstrumentation,     Revision 0, datedAugust29,2012 (ADAMSAccession    No.M112221A339)
M112221A339)Nucfear Energy Institute (NEl) 12-02,Industry Guidance for Compliance with NRC Order EA-1 2-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 24,2912Director, Office of Nuclear Reactor Regulation (NRR)NRC Region lll Administrator
: 3. NucfearEnergyInstitute (NEl)12-02,Industry   Guidance   forCompliance  withNRC OrderEA-12-051,"ToModifyLicenses    withRegardto ReliableSpentFuelPool Instrumentation,"Revision1,datedAugust24,2912 cc: Director,Officeof NuclearReactorRegulation      (NRR)
NRCRegionlll Administrator NRCResident  Inspector NRRProjectManager
 
Attachment L-13-213 Responseto Requestfor Information Page1 of 11 By letterdatedFebruary27, 2013[Agencynruide    Documents  Accessand Management System(ADAMS)AccessionNo.ML13059A4951,          FirstEnergy NuclearOperating Company    (FENOC)  submittedan overallintegrated  plan (OlP)in response to the March12,2012,NuclearRegulatory      Commission  (NRC)OrderEA-12-051modifying licenseswithregardto reliablespentfuelpool(SFP)instrumentation    (ADAMS Accession  No.ML12054A679)  for PerryNuclearPowerPlant(PNPP),UnitNo.1. By fetterdatedJune1A,2013(ADAMSAccession          No.ML131554539),  the NRCstaff requested  additionalinformationto completeits review.By electronic maildated June25,2013,the NRCstaffrequested      additionalinformationregarding power supplies.The responseto the requestfor additional  information(RAl)is provided below.The NRCstaffquestionis presented      in boldtype,followedby the FENOC response.
LEVELSOF REQUIRED        MONITORING The OIPstates,in part,that:
PNPPdischargesirradiatedfuel to a singlespent fuel storagepool.
With the exceptionof limitedtime periodsfor maintenanceor non' refuelingoperations,administrativecontrolsmaintaingates in the open positionbetweenthe followingpools: fuel storage& preparationpool, fuel transferpool,spent fuel storagepool, and cask pit. Thus,these pools are normallyinter-connectedand at the samewater levelwhen the water level in the spent fuel pool is greaterthan 3.5 feet abovethe top of stored fuel seated in the storage racks.
Level I - Leveladequateto support operationof the normal fuel pool cooling system Indicatedlevelon eitherthe primaryor backupinstrumentchannelof greaterthan elevation619'4" plus the accuracyof the SFPlevel instrumentchannel,which is to be determined.The highestpointon the spent fuel pool racks is at elevation591'4".
Level2 - Leveladequateto providesubstantialradiationshieldingfor a personstandingon the spent fuel pool operatingdeck.
Indicatedlevelon either primaryor backupinstrumentchannelof greaterthan 601'-4"plus the accuracyof the SFPlevelinstrument channel,which is to be determined.This monitoringlevelensuresthere is an adequatewater levelto providesubstantialradiationshieldingfor a personstandingon the SFPoperatingdeck.
 
Attachment L-13-213 Page2 of 11 Level3 - Levelwherefuel remainscoveredand actionsto implement make-upwater additionshould no longerbe deferred.
lndicatedlevelon eitherthe primaryor backupinstrumentchannelof greaterthan 594'-6"plus the accuracyof the SFP levelinstrumentation, which is to be determined.This monitoringlevelassuresthat there is adequatewater level abovethe stored fuel seated in the rack.
 
===RAI-1===
Pleaseprovidethe following:
a)  For Level1, specify how the identifiedlocationrepresentsthe higherof the two points describedin the NEI [NuclearEnergyInstitute]12-02guidancefor this level.
b)  The OIPstates,"the PerrySFPcontainsother materialscapableof providing sufficientdose such that the pool deckwould not be inhabitableshould the materialsbe uncovered." Giventhe potentialfor varied dose rates from other materialsstored in the SFP,describehow Level2 will be adjustedto other than the elevationprovidedin Section2 [Levelsof Required Monitoringlabove.
c)  A clearlylabeledsketch depictingthe elevationview of the proposedtypical mountingarrangementfor the portionsof instrumentchannelconsistingof permanentmeasurement        channelequipment(e.9.,fixed levelsensonsandlor stillingwells,and mountingbrackets).Indicateon this sketchthe datum vafues representingLevel 1, Level 2, and Level 3, as well as the top of the fuel. Indicateon this sketch the portionof the levelsensor measurement rangethat is sensitiveto measurementof the fuel pool level,with respectto the Level1, Level2, and Level3ndatum points.
 
===Response===
a) No othermeansof removing    waterfromthe SFPexistabovethe skimmers.
Therefore, the identifiedlocationis the highestpointof the two optionsdescribedin the NEI 12-02guidancefor Level1 and is the levelthat is adequateto support operation of the normalfuelpoolcoolingsystem.
b) NEI 12-02allowsthe licenseeto use 10feet(+t-l foot)abovethe highestpointof anyfuel rackseatedin the spentfuelpoolsas Level2. FENOChaschosenthis optionfor PNPP. NEI 12-02,Section2.3.2statesthat"Level2 represents        the range of waterlevelwhereany necessary      operationsin the vicinityof the spentfuelpool can be completed    withoutsignificantdoseconsequences    fromdirectgamma radiationfromthe storedspentfuel." Level2 is associated    withdoseratesfromthe fuel;therefore,it is notadjustedbasedon varieddoseratesfromotheritemsin the pool. FENOChasselectedguidedwaveradaras itstechnology,            whichprovides continuous  levelindicationfromLevel1 through  Level  3. Data  will            for be available
 
Attachment L-13-213 Page3of11 mitigationstrategies              whendeemedappropriate, to be initiated,                          basedon water levelsbetweenLevel1 and Level3. FENOCrecognizes        additional  materials  stored prior in the SFPmaycausethe areato becomeuninhabitable to the monitored Level2. FENOCalsorecognizes      thatthe locationof theseadditional  materialsis subjectto changeduringeachrefueling    outage.Therefore,  FENOC    does  notplanto adjustLevel2, but insteadaddressthe potential  doseratesassociated    withother materialthroughalternatemeans.FENOC        plans to evaluate the other materials  in the SFPfor relocation or removalin supportof mitigation strategies.Basedon fuel poolmaterielconfiguration  and  projecteddose levels, FENOC    plansto developan earlymethodto keepthosematerials      adequately coveredusingmitigation    strategies or a manualmakeupcapability    froma locationnot impactedby the doserate.
Mitigationstrategiesfor addressing  increaseddosesto personnel    in the SFParea associated withothermaterialsin the poolin a beyond-design-basis    accidentis to be addressed  via PNPPDiverseand FlexibleCopingStrategies      (FLEX)procedures, as needed.
c) As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual designinformation.Progressmade,proposedchangesin compliance            methods, updatesto the schedule,  and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated  planupdates.The information    to support responseto this requestwouldbe availableafterfinaldesignis complete.
Therefore, FENOCintendsto submitthe responseto this requestin the February 2014six-monthupdate.
INSTRUMENTATION      DESIGNFEATURES Arranqement The OIPstates,in part,that:
The planneddesignof this systemwill consist of two measurement channels,one primaryand one backup. Eachchannelwill consistof a levelsensornoh electronicsunit and an indicator.The primaryand backupinstrumentchannelsensorswill be protectedagainstmissiles that may resultfrom damageto the structureover the SFP. The sensors will be mountedat the western end of the fuel pool (the fuel preparation and storagepool),but as close to the adjacentcornersas possibleto minimizethe possibilityof a singleeventor missiledamagingboth channels. The sensor arrangementhas been proposedin a manner limitingany interferencewith existingequipmentin or aroundthe SFP.
This planneddesign is conservativeand is in compliancewith Order EA-12-051  however,it does representa minor deviationfrom the NEI Guidance.The NEIGuidancerecommendspuftinginstrumentation                  in opposite(diagonal)ends of the spentfuel      pool. Due to  the limited availablelocations(causedby interference)for installation,the instrurnentationcannot be installedon opposite(diagonal)ends of the pool. This planneddesignwill also not pose any potentialhazardto
 
Attachment L-13-213 Page4 of 11 personnelworking aroundthe pool or on the level instrumentation itself.
RAI.2 a)  Pleaseprovidea clearlylabeledsketch or marked-upplant drawingof the planview of the SFParea,depictingthe SFPinsidedimensions,the planned locations/placement  of the primaryand back-upSFPlevelsensor,and the proposedrouting of the cables that will extendfrom the sensors toward the location.ofthe read-ouUdisplay  device.
b)  Addresshow other materialstored in the SFPwill not createadverse interactionwith the fixed instrumentlocation(s).
 
===Response===
As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual    design information.Progressmade,proposedchangesin compliance      methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated  planupdates.The information  to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore,  FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.
Mountinq The OIPstates,in part,that:
Installedprimaryand back up SFPlevelinstrumentchannelequipment within the spent fuel pool shall be mountedto retainits design configurationduringand followingthe maximumseismicground motion consideredin the designof the spent fuel pool structurein accordancewith NRCJLD-ISG-2012-03      and NEI12-02Rev.1 guidance requirements.
RAI.3 Pleaseprovidethe following:
a)  The designcriteriathat will be usedto estimatethe total loadingon the mountingdevice(s),includingstaticweightloadsand dynamicloads.
Describethe methodologythat will be usedto estimatethe total loading, inclusiveof designbasismaximumseismicloadsand the hydrodynamic loadsthat could resultfrom pool sloshingor other effectsthat could accompanysuch seismicforces.
b)    A descriptionof the mannerin which the levelsensor(andstillingwell, if appropriate)will be attachedto the refuelingfloor and/orother support structuresfor each plannedpoint of attachmentof the probeassembly.
 
Attachment L-13-213 Page5 of 11 Indicatein a schematicthe portionsof the levelsensor that will serveas points of attachmentfor mechanical/mounting      or electricalconnections.
c)  A descriptionof the mannerby which the mechanicalconnectionswill attach
              'instrument permanent the level              to            SFPstructuresso as to supportthe level sensorassembly.
 
===Response===
As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual      design information.Progressmade,      proposed changesin compliance  methods, updates to the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated    planupdates.The information  to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore,    FENOCintendsto submit the response  to this request in the        2014 February    six-month update.
Qualification The OIPstatesnin part,that:
The vendorsuppliedsensorsand associatedelectronicswill be requiredto be testedand qualifiedfor shock and vibrationas a resultof a beyonddesign basis externalevent. Seismicqualificationof equipmentwill be equivalentto the maximumgroundmotionspectrum for the area in which it is to be installed.
RAI.4 Pleaseprovidethe following:
a)  A descriptionof the specific methodor combinationof methodsyou intend to apply to demonstratethe reliabilityof the permanentlyinstalledequipment under beyond-design-basis      ambienttemperature,humidity,shock,vibration, and radiationconditions.
b)  A descriptionof the testingand/oranalysesthat will be conductedto provide assurancethat the equipmentwill performreliablyunderthe worst-case credibledesignbasisloadingat the locationwherethe equipmentwill be mounted. Inctudea discussionof this seismicreliabilitydemonstrationas it appliesto (a)the levelsensor mountedin the SFParea,and (b) any control boxes,electronics,or read-outand re-transmittingdevicesthat will be employedto conveythe levelinformationfrom the levelsensorto the plant operatorsor emergencyresponders.
c)  A descriptionof the specificmethodor combinationof methodsthat will be used to confirm the reliabilityof the permanentlyinstalledequipmentsuch that followinga seismiceventthe instrumentwill maintainits required accuracy.
 
Attachment L-13-213 Page6 of 11
 
===Response===
As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual    design information.Progressmade,proposedchangesin compliance      methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswill be providedin the six-monthintegrated  planupdates.The informationto supportresponse to thisrequest wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.
Independence The OIPstates,in partnthat:
The primaryinstrumentchannelwill be independentof the backup instrumentchannel.The primaryand backupinstrumentchannelswill be physicallyand electricallyseparatedto maintainchannel independence.The sensorswill be separatedas far apartas practical within the constraintsof existingpool geometryand equipment.
Electronicsenclosureswill be separatedby a suitabledistanceor may utilizestructuralfeaturesof the room in which they are locatedas a barrierto provideprotectionagainsta single event(missile,explosionn etc.)from damagingthe electronicsof both instrumentchannels. Power will be suppliedfrom two separatepowerbusesat a minimum,with a preferenceof differentpowerdivisionsor channelsas available.
Gablingwill be run in separateconduitand/orcabletray. The same technologywill be usedfor both the primaryand backupinstrument channels.
RAI.5 Pleaseprovidethe following:
a)  A descriptionof how the two channelsof the proposedlevelmeasurement system meetthis requirementso that the potentialfor a common-cause event to adverselyaffect both channelsis minimizedto the extent practicable.
b)    Furtherinformationon how each levelmeasurementsystem,consistingof levelsensor electronics,cabling,and readoutdevicesnwill be designedand installedto addressindependencethroughthe applicationand selectionof independentpowersources,the use of physicaland spatialseparation, independenceof signalssent to the location(s)of the readoutdevices,and the independence  of the displays.
 
===Response===
As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual    design information.Progressmade,proposedchangesin compliance    methods,updatesto the
 
Attachment L-13-213 Page7 of 11 schedule,  and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated    planupdates.The information                  to thisrequest to supportresponse wouldbe availableafterfinaldesignis complete.Therefore,    FENOCintendsto submit the response  to this requestin the February2014six-monthupdate.
PowerSupplies The OIPstates,in part,that:
Eachchannelwill normallybe poweredfrom independent120VAC
[volts-alternating current]powersourcesand will havea dedicated batterybackup. A minimumbafterylife of 24 hourswill be providedto allow for power restorationfrom portableequipment.
RAI.6 a)    A descriptionof the electricalac powersourcesand capacitiesfor the primaryand backupchannels.
lf the level measurementchannelsare to be poweredthrough a batterysystem (eitherdirectlyor through an uninterruptiblepowersupply),pleaseprovidethe designcriteriathat will be appliedto size the batteryin a mannerthat ensures, with margin,that the channelwill be availableto run reliablyand continuously followingthe onsetof the beyond-design-basis      eventfor the minimumduration needed,consistentwith the      plant mitigationstrategiesfor beyond-design-basis externalevents(OrderEA-l 2-049).
 
===Response===
As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual      design information.Progressmade,proposedchangesin compliance        methods,updatesto the schedule,  and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated    planupdates.The information                  to thisrequest to supportresponse wouldbe availableafterfinaldesignis complete.Therefore,   FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.
Accuracv The OIPstates,in part,that:
The guidedwave radardesignprovidescontinuousmonitoringof the SFPwater level. The accuracyof the SFP levelinstrumentchannel, from sensorto main control room indicator,will be consistentwith the guidelinesof NRCJLD-ISG-2012-03      and NEI12-02,Rev.1. Instrument channelswill be designedto maintaintheir designaccuracywithout recalibrationfollowinga powerinterruptionor changein powersource.
 
Attachment L-13-213 Page8 of 11 RAI.7 Pleaseprovidethe following:
a)  An estimateof the expectedinstrumentchannelaccuracyperformance(e.9.,
in percentof span) under both (a) normalSFPlevelconditions (approximatelyLevel 1 or higher)and (b) at the beyond-design-basis conditions(i.e.,radiation,temperature,humidity,post-seismicand post-shock conditions)that would be presentif the SFPlevelwere at the Level2 and Level3 datum points.
b)  A descriptionof the methodologythat will be used for determiningthe maximumalloweddeviationfrom the instrumentchanneldesignaccuracy that will be employedunder normaloperatingconditionsas an acceptance criterionfor a calibrationprocedureto flag to operatorsand to technicians that the channelrequiresadjustmentto within the normalconditiondesign accuracy.
 
===Response===
As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual    design information.Progressmade,proposedchangesin compliance      methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated  planupdates.The information to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore,  FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.
Testinq The OIPstates,in part,that:
Testingwill be consistentwith the guidelinesof NRCJLD-ISG'2012-03 and NEI12-02,Rev.1. The instrumentchanneldesignwill include provisionsfor routinetestingand calibration.The instrumentationwill allow for in-situtestingand calibrationof the level instrumentationto minimizecalibrationeffort and instrumentdowntime. Calibration procedureswill be developedin accordancewith plant proceduresand vendor recommendations.
RAI.8 Pleaseprovidethe following:
a)  A descriptionof the capabilityand provisionsthe proposedlevelsensing equipmentwill enableperiodictestingand calibration,includinghow this capabilityenablesthe equipmentto be tested in'situ.
 
Attachment L-13-213 Page9 of 11 b)  A descriptionof how such testingand calibrationwill enablethe conductof regularchannelchecksof eachindependentchannelagainstthe other,and againstany other permanently-installed    SFPlevel instrumentation.
c)  A descriptionof how functionalcheckswill be performed,and the frequency at which they will be conducted. Describehow calibrationtests will be performed,and the frequencyat which they will be conducted. Providea discussionas to how thesesurveillanceswill be incorporatedinto the plant surueillanceprogram.
d) A descriptionof what preventativemaintenancetasks are requiredto be performedduring normaloperation,and the plannedmaximumsurueillance intervalthat is necessaryto ensurethat the channelsare fully conditionedto accuratelyand reliablyperformtheir functionswhen needed.
 
===Response===
As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual    design information.Progressmade,proposedchangesin compliance      methods,updates  to the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated  planupdates.The information                  to thisrequest to supportresponse wouldbe available  afterfinaldesignis completeandthe FENOCengineering  change processhasprogressed                              procedure to the pointof determining              needed details      for testing and calibration. lnerefore,FENOCintendsto submitthe responseto this requestin the August2014six-monthupdate.
Displav The OIPstates,in part,that:
The displaywill be consistentwith the guidelinesof NRC JLD-ISG-2012-03    and NEI { 2-02Rev.1. Trainedpersonnelwill, at a minimum,be able to monitorthe SFPwater levelfrom an appropriate and accessiblelocation,and will provideon demandor continuous indicationof SFPwater level. The SFPlevel instrumentationwill providefor displayof fuel pool levelusing an indicatorlocatedin the main control room. The indicatorwill be poweredby the instrument loop and will not requireadditionalpowercircuitsfrom those described above.
 
===RAI-9===
Pleaseprovidethe following:
a)  The specificlocationfor the primaryand backupinstrumentchanneldisplay' b)  lf the primaryor backupdisplaylocationis other than the main control room, then providejustificationfor promptaccessibilityto displaysincluding
 
Attachment L-13-213 P a g e1 0o f 1 1 primaryand alternateroute evaluation,habitabilityat displaylocation(s),
continualresourceavailabilityfor personnelresponsibleto promptlyread displays,and provisionsfor communicationswith decisionmakersfor the variousSFPdrain down scenariosand externalevents.
c)  The reasonsjustifyingwhy the locationsselectedenablethe information from these instrumentsto be considered"promptlyaccessible"to various drain-downscenariosand externalevents.
 
===Response===
TheSFPlevelinstrumentation,      primaryandbackupinstrument  channeldisplay,  willbe locatedin the maincontrolroom.As a result,a responseto part(b) of thisrequestis not needed.The maincontrolroomis expectedto be occupiedat all times;therefore, the locationis considered    promptlyaccessible.
PROGRAMFEATURES Procedures The OIPstates, in part, that:
Procedureswill be establishedand maintainedfor the testing, calibration,operationand abnormalresponseissuesassociatedwith the primaryand backupspent fuel pool instrumentationchannels.
RAt-l0 Pleaseprovidea descriptionof the standards,guidelinesand/orcriteriathat will be utilizedto developproceduresfor inspection,maintenance,repair,operation, abnormalresponse,and administrativecontrolsassociatedwith the SFPlevel instrumentation,as well as storageand installationof portableinstruments.
 
===Response===
As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual        design information.Progressmade,      proposed changes in compliance methods, updates  to the schedule,  and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated  planupdates.The information    to supportresponseto thisrequest wouldbe available    afterfinaldesignis completeandthe FENOCengineering      change processhasprogressed      to the pointof determiningproceduredetailsneededfor testing andcalibration,  including identification of standards,guidelinesand/orcriteriathatwill be usedto developthe procedures.Therefore,      FENOCintendsto submitthe response to this requestin the August2014six-month    update.
 
Attachment L-13-213 Page11of11 Testinsand Galibration The OIPstates,in part,that:
Per NRCOrderEA-12-051,processeswill be establishedand maintained for schedulingand implementingnecessarytestingand calibrationof primaryand backupSFPlevelinstrumentchannelsin orderto maintain the designaccuracy.
RAt-11 Pleaseprovidethe following:
a)  Furtherinformationdescribingthe maintenanceand testing programthe licenseewill establishand implementto ensurethat regulartestingand calibrationis performedand verifiedby inspectionand audit to demonstrate conformancewith designand system readinessrequirements.Includea descriptionof your plansfor ensuringthat necessarychannelchecks, functionaltests, periodiccalibration,and maintenancewill be conductedfor the level measurementsystemand its supportingequipment.
b)  Describehow the guidancein NEI 12-02,Section4.3,regarding compensatoryactionsfor one or both non-functioningchannelswill be addressed.
c)  Describewhat compensatoryactionsare plannedin the eventthat one of the instrumentchannetscannot be restoredto functionalstatuswithin 90 days.


NRC Resident InspectorNRR Project Manager 2.3.cc:
===Response===
Attachment L-13-213 Response to Request for Information Page 1 of 11By letter dated February 27 , 2013 [Agencynruide Documents Access and Management System (ADAMS) Accession No. ML13059A4951, FirstEnergy Nuclear Operating Company (FENOC) submitted an overall integrated plan (OlP) in response to theMarch 12,2012, Nuclear Regulatory Commission (NRC) Order EA-1 2-051 modifying licenses with regard to reliable spent fuel pool (SFP) instrumentation (ADAMSAccession No. ML12054A679) for Perry Nuclear Power Plant (PNPP), Unit No. 1. Byfetter dated June 1A,2013 (ADAMS Accession No. ML131554539), the NRC staff requested additional information to complete its review. By electronic mail dated June 25,2013, the NRC staff requested additional information regarding powersupplies. The response to the request for additional information (RAl) is provided below. The NRC staff question is presented in bold type, followed by the FENOC response.LEVELS OF REQUIRED MONITORING The OIP states, in part, that: PNPP discharges irradiated fuel to a single spent fuel storage pool.With the exception of limited time periods for maintenance or non'refueling operations, administrative controls maintain gates in the open position between the following pools: fuel storage & preparation pool, fuel transfer pool, spent fuel storage pool, and cask pit. Thus, these pools are normally inter-connected and at the same water level whenthe water level in the spent fuel pool is greater than 3.5 feet above the top of stored fuel seated in the storage racks.Level I - Level adequate to support operation of the normal fuel pool cooling system Indicated level on either the primary or backup instrument channel of greater than elevation 619'4" plus the accuracy of the SFP level instrument channel, which is to be determined.
As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual   design information.Progressmade,   proposed changes in compliance methods,updates to the schedule,and if needed,requestsfor reliefandthe baseswillbe  providedin the six-month integratedplanupdates. The informationto      response support       to thisrequest wouldbe availableafterfinaldesignis completeandthe FENOCengineering      change processhasprogressed  to the pointof determiningproceduredetailsneededfor testing and calibration.Therefore, FENOCintendsto submitthe responseto this requestin the August2014six-monthupdate.}}
The highest point on the spent fuel pool racks is at elevation 591'4".Level 2 - Level adequate to provide substantial radiation shielding for a person standing on the spent fuel pool operating deck.Indicated level on either primary or backup instrument channel of greater than 601'-4" plus the accuracy of the SFP level instrumentchannel, which is to be determined.
This monitoring level ensures there is an adequate water level to provide substantial radiation shielding for a person standing on the SFP operating deck.
a)b)Attachment L-13-213 Page 2 of 11 Level 3 - Level where fuel remains covered and actions to implement make-up water addition should no longer be deferred.lndicated level on either the primary or backup instrument channel of greater than 594'-6" plus the accuracy of the SFP level instrumentation,which is to be determined. This monitoring level assures that there is adequate water level above the stored fuel seated in the rack.RAI-1 Please provide the following:
For Level 1, specify how the identified location represents the higher of the two points described in the NEI [Nuclear Energy Institute]
12-02 guidance forthis level.
The OIP states, "the Perry SFP contains other materials capable of providingsufficient dose such that the pool deck would not be inhabitable should the materials be uncovered." Given the potential for varied dose rates from other materials stored in the SFP, describe how Level 2 will be adjusted to other than the elevation provided in Section 2 [Levels of Required Monitoringl above.A clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement for the portions of instrument channel consisting of permanent measurement channel equipment (e.9., fixed level sensons andlor stilling wells, and mounting brackets).
Indicate on this sketch the datum vaf ues representing Level 1, Level 2, and Level 3, as well as the top of the fuel. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect tothe Level 1, Level 2, and Level 3n datum points.Response:a) No other means of removing water from the SFP exist above the skimmers.
Therefore, the identified location is the highest point of the two options described inthe NEI 12-02 guidance for Level 1 and is the level that is adequate to support operation of the normal fuel pool cooling system.
b) NEI 1 2-02 allows the licensee to use 10 feet (+t-l foot) above the highest point of any fuel rack seated in the spent fuel pools as Level 2. FENOC has chosen thisoption for PNPP. NEI 12-02, Section 2.3.2 states that "Level 2 represents the rangeof water level where any necessary operations in the vicinity of the spent fuel poolcan be completed without significant dose consequences from direct gamma radiation from the stored spent fuel." Level 2 is associated with dose rates from the fuel; therefore, it is not adjusted based on varied dose rates from other items in the pool. FENOC has selected guided wave radar as its technology, which providescontinuous level indication from Level 1 through Level 3. Data will be available for c)
Attachment L-13-213 Page3of11 mitigation strategies to be initiated, when deemed appropriate, based on water levels between Level 1 and Level
: 3. FENOC recognizes additional materials stored in the SFP may cause the area to become uninhabitable prior to the monitoredLevel 2. FENOC also recognizes that the location of these additional materials is subject to change during each refueling outage. Therefore, FENOC does not plan to adjust Level 2, but instead address the potential dose rates associated with othermaterial through alternate means. FENOC plans to evaluate the other materials in the SFP for relocation or removal in support of mitigation strategies.
Based on fuel pool materiel configuration and projected dose levels, FENOC plans to develop anearly method to keep those materials adequately covered using mitigation strategies or a manual makeup capability from a location not impacted by the dose rate.Mitigation strategies for addressing increased doses to personnel in the SFP areaassociated with other materials in the pool in a beyond-design-basis accident is tobe addressed via PNPP Diverse and Flexible Coping Strategies (FLEX) procedures, as needed.c) As stated in letter dated February 27 , 2013, the OlPs are based on conceptualdesign information. Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this request would be available after final design is complete.Therefore, FENOC intends to submit the response to this request in the February 2014 six-month update.INSTRUMENTATION DESIGN FEATURES ArranqementThe OIP states, in part, that: The planned design of this system will consist of two measurement channels, one primary and one backup. Each channel will consist of alevel sensorn oh electronics unit and an indicator.
The primary andbackup instrument channel sensors will be protected against missilesthat may result from damage to the structure over the SFP. The sensors will be mounted at the western end of the fuel pool (the fuel preparationand storage pool), but as close to the adjacent corners as possible tominimize the possibility of a single event or missile damaging both channels. The sensor arrangement has been proposed in a manner limiting any interference with existing equipment in or around the SFP.This planned design is conservative and is in compliance with Order EA-12-051 however, it does represent a minor deviation from the NEIGuidance. The NEI Guidance recommends pufting instrumentation in opposite (diagonal) ends of the spent fuel pool. Due to the limited available locations (caused by interference) for installation, theinstrurnentation cannot be installed on opposite (diagonal) ends of the pool. This planned design will also not pose any potential hazard to a)AttachmentL-1 3-21 3Page 4 of 11 personnel working around the pool or on the level instrumentation itself.RAI.2 Please provide a clearly labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the plannedlocations/placement of the primary and back-up SFP level sensor, and the proposed routing of the cables that will extend from the sensors toward the location .of the read-ouUdisplay device.Address how other material stored in the SFP will not create adverse interaction with the fixed instrument location(s).
Response:As stated in letter dated February 27
,2013, the OlPs are based on conceptual designinformation. Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this requestwould be available after final design is complete.
Therefore, FENOC intends to submitthe response to this request in the February 2014 six-month update.MountinqThe OIP states, in part, that: Installed primary and back up SFP level instrument channel equipment within the spent fuel pool shall be mounted to retain its design configuration during and following the maximum seismic ground motion considered in the design of the spent fuel pool structure in accordance with NRC JLD-ISG-2012-03 and NEI 12-02 Rev. 1 guidance requirements.
RAI.3 Please provide the following:The design criteria that will be used to estimate the total loading on themounting device(s), including static weight loads and dynamic loads.Describe the methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that couldaccompany such seismic forces.A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly.b)a)b)
Attachment L-13-213 Page 5 of 11Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.
c) A description of the manner by which the mechanical connections will attach the level 'instrument to permanent SFP structures so as to support the level sensor assembly.Response: As stated in letter dated February 27 , 2013, the OlPs are based on conceptual design information. Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in thesix-month integrated plan updates. The information to support response to this request would be available after final design is complete.
Therefore, FENOC intends to submitthe response to this request in the February 2014 six-month update.Qualification The OIP statesn in part, that: The vendor supplied sensors and associated electronics will be required to be tested and qualified for shock and vibration as a result of a beyond design basis external event. Seismic qualification ofequipment will be equivalent to the maximum ground motion spectrum for the area in which it is to be installed.
RAI.4 Please provide the following:A description of the specific method or combination of methods you intendto apply to demonstrate the reliability of the permanently installed equipmentunder beyond-design-basis ambient temperature, humidity, shock, vibration,and radiation conditions.
A description of the testing and/or analyses that will be conducted to provideassurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will bemounted. Inctude a discussion of this seismic reliability demonstration as itapplies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and re-transmitting devices that will beemployed to convey the level information from the level sensor to the plant operators or emergency responders.
A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment such that following a seismic event the instrument will maintain its required accuracy.a)b)c)
Attachment L-13-213 Page 6 of 11 Response: As stated in letter dated February 27 , 2013, the OlPs are based on conceptual design information. Progress made, proposed changes in compliance methods, updates to theschedule, and if needed, requests for relief and the bases will be provided in thesix-month integrated plan updates. The information to support response to this request would be available after final design is complete.
Therefore, FENOC intends to submitthe response to this request in the February 2014 six-month update.Independence The OIP states, in partn that: The primary instrument channel will be independent of the backup instrument channel. The primary and backup instrument channels will be physically and electrically separated to maintain channel independence. The sensors will be separated as far apart as practical within the constraints of existing pool geometry and equipment.
Electronics enclosures will be separated by a suitable distance or may utilize structural features of the room in which they are located as a barrier to provide protection against a single event (missile, explosionn etc.) from damaging the electronics of both instrument channels.
Power will be supplied from two separate power buses at a minimum, with a preference of different power divisions or channels as available.
Gabling will be run in separate conduit and/or cable tray. The sametechnology will be used for both the primary and backup instrument channels.RAI.5 Please provide the following:a) A description of how the two channels of the proposed level measurementsystem meet this requirement so that the potential for a common-causeevent to adversely affect both channels is minimized to the extent practicable.
b) Further information on how each level measurement system, consisting of level sensor electronics, cabling, and readout devicesn will be designed andinstalled to address independence through the application and selection of independent power sources, the use of physical and spatial separation,independence of signals sent to the location(s) of the readout devices, and the independence of the displays.Response: As stated in letter dated February 27,2013, the OlPs are based on conceptual designinformation. Progress made, proposed changes in compliance methods, updates to the Attachment L-13-213 Page 7 of 11 schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this request would be available after final design is complete. Therefore, FENOC intends to submit the response to this request in the February 2014 six-month update.
Power Supplies The OIP states, in part, that: Each channel will normally be powered from independent 120 VAC[volts-alternating current] power sources and will have a dedicated battery backup. A minimum baftery life of 24 hours will be provided to allow for power restoration from portable equipment.
RAI.6 a) A description of the electrical ac power sources and capacities for the primary and backup channels.
lf the level measurement channels are to be powered through a battery system (either directly or through an uninterruptible power supply), please provide the design criteria that will be applied to size the battery in a manner that ensures, with margin, that the channel will be available to run reliably and continuously following the onset of the beyond-design-basis event for the minimum duration needed, consistent with the plant mitigation strategies for beyond-design-basis external events (Order EA-l 2-049).Response:As stated in letter dated February 27,2013, the OlPs are based on conceptual design information.
Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this request would be available after final design is complete. Therefore, FENOC intends to submitthe response to this request in the February 2014 six-month update.Accuracv The OIP states, in part, that: The guided wave radar design provides continuous monitoring of the SFP water level. The accuracy of the SFP level instrument channel, from sensor to main control room indicator, will be consistent with the guidelines of NRC JLD-ISG -2012-03 and NEI 12-02, Rev. 1. Instrumentchannels will be designed to maintain their design accuracy withoutrecalibration following a power interruption or change in power source.
a)Attachment L-13-213Page 8 of 11 RAI.7 Please provide the following:
An estimate of the expected instrument channel accuracy performance (e.9., in percent of span) under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the beyond-design-basis conditions (i.e., radiation, temperature, humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2and Level 3 datum points.A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracythat will be employed under normal operating conditions as an acceptancecriterion for a calibration procedure to flag to operators and to techniciansthat the channel requires adjustment to within the normal condition design accuracy.Response:As stated in letter dated February 27 , 2013, the OlPs are based on conceptual designinformation. Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this requestwould be available after final design is complete.
Therefore, FENOC intends to submit the response to this request in the February 2014 six-month update.TestinqThe OIP states, in part, that:Testing will be consistent with the guidelines of NRC JLD-ISG'2012-03 and NEI 12-02, Rev. 1. The instrument channel design will include provisions for routine testing and calibration.
The instrumentation will allow for in-situ testing and calibration of the level instrumentation to minimize calibration effort and instrument downtime.
Calibration procedures will be developed in accordance with plant procedures andvendor recom mendations.
RAI.8 Please provide the following:
a) A description of the capability and provisions the proposed level sensing equipment will enable periodic testing and calibration, including how thiscapability enables the equipment to be tested in'situ.b) b)c)Attachment L-13-213Page 9 of 11 A description of how such testing and calibration will enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.
A description of how functional checks will be performed, and the frequencyat which they will be conducted.
Describe how calibration tests will be performed, and the frequency at which they will be conducted.
Provide a discussion as to how these surveillances will be incorporated into the plant surueillance program.A description of what preventative maintenance tasks are required to be performed during normal operation, and the planned maximum surueillance interval that is necessary to ensure that the channels are fully conditioned toaccurately and reliably perform their functions when needed.Response: As stated in letter dated February 27,2013, the OlPs are based on conceptual design information.
Progress made, proposed changes in compliance methods, updates to theschedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this requestwould be available after final design is complete and the FENOC engineering change process has progressed to the point of determining procedure details needed for testing and calibration.
lnerefore, FENOC intends to submit the response to this request in theAugust 2014 six-month update.DisplavThe OIP states, in part, that: The display will be consistent with the guidelines of NRC JLD-ISG -2012-03 and NEI { 2-02 Rev. 1. Trained personnel will, at a minimum, be able to monitor the SFP water level from an appropriate and accessible location, and will provide on demand or continuous indication of SFP water level. The SFP level instrumentation will provide for display of fuel pool level using an indicator located in themain control room. The indicator will be powered by the instrument loop and will not require additional power circuits from those described above.RAI-9 Please provide the following:a) The specific location for the primary and backup instrument channel display'b) lf the primary or backup display location is other than the main control room, then provide justification for prompt accessibility to displays including d)
Attachment L-13-213Page 10 of 11 primary and alternate route evaluation, habitability at display location(s), continual resource availability for personnel responsible to promptly read displays, and provisions for communications with decision makers for the various SFP drain down scenarios and external events.c) The reasons justifying why the locations selected enable the information from these instruments to be considered "promptly accessible" to various drain-down scenarios and external events.
Response:The SFP level instrumentation, primary and backup instrument channel display, will belocated in the main control room. As a result, a response to part (b) of this request isnot needed.
The main control room is expected to be occupied at all times; therefore, the location is considered promptly accessible.
PROGRAM FEATURES ProceduresThe OIP states, in part, that: Procedures will be established and maintained for the testing, calibration, operation and abnormal response issues associated with the primary and backup spent fuel pool instrumentation channels.RAt-l0 Please provide a description of the standards, guidelines and/or criteria that willbe utilized to develop procedures for inspection, maintenance, repair, operation,abnormal response, and administrative controls associated with the SFP level instrumentation, as well as storage and installation of portable instruments.
Response:As stated in letter dated February 27,2013, the OlPs are based on conceptual design information.
Progress made, proposed changes in compliance methods, updates to theschedule, and if needed, requests for relief and the bases will be provided in thesix-month integrated plan updates. The information to support response to this request would be available after final design is complete and the FENOC engineering change process has progressed to the point of determining procedure details needed for testingand calibration, including identification of standards, guidelines and/or criteria that willbe used to develop the procedures.
Therefore, FENOC intends to submit the responseto this request in the August 2014 six-month update.
Attachment L-13-213 Page11of11 Testins and Galibration The OIP states, in part, that: Per NRC Order EA-1 2-051, processes will be established and maintained for scheduling and implementing necessary testing and calibration of primary and backup SFP level instrument channels in order to maintainthe design accuracy.RAt-11 Please provide the following:
a) Further information describing the maintenance and testing program thelicensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.
Include adescription of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted forthe level measurement system and its supporting equipment.
b) Describe how the guidance in NEI 12-02, Section 4.3, regardingcompensatory actions for one or both non-functioning channels will be addressed.
c) Describe what compensatory actions are planned in the event that one of the instrument channets cannot be restored to functional status within 90 days.Response:As stated in letter dated February 27 , 2013, the OlPs are based on conceptual designinformation. Progress made, proposed changes in compliance methods, updates to the schedule, and if needed, requests for relief and the bases will be provided in the six-month integrated plan updates. The information to support response to this requestwould be available after final design is complete and the FENOC engineering change process has progressed to the point of determining procedure details needed for testing and calibration. Therefore, FENOC intends to submit the response to this request in the August 2014 six-month update.}}

Latest revision as of 04:29, 6 February 2020

Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Issuance of Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML13184A019
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/02/2013
From: Kaminskas V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, L-13-213, TAC MF0802
Download: ML13184A019 (13)


Text

FENOC" Perryl,tuclearfuwer Plant P,O.tux 97 l00enter Roe,d HrstEtregp tutry, Ohllo.

4408t t*Mr Qerrrtlrg@nWV VbAl@rfficaa, 4&2W5ffi2 VicePresident Fax:440,2&tr80?9 July2, ?A13 L-l3-213 10cFR 2.202 ATTN: Document ControlDeek U,S.NuclearRegulatory .Commission Washington, DC20555-0001

SUBJECT:

PerryNuclearPowerPlant DocketNo.50-4,40, LicenseNo.NPF-58 Response to Reques!forAdditional Informatiqn Reqafdinq FirstEnergv Nucle-qt Operating Company's (FFlllOC'slOverallInteqrated PlaE.inRgsponse tg Maich12.2012Commission Order l$ruance of Order to Modiry L.ige.nqeswith&gard to ReliabJe (Order SBFntFuelPoolIngtrumentation Nuqb.grEA-12-051) ffAC Ne.. MFQ8,02)

On March12,2012,theNuclearRegulatory Commission (NRC)issuedan order (Reference 1)to FENOC.Reference 1 wasimmediately effectiveandimposes additionalrequirements to increase thecapability of FENOCto mitigatebeyonddesign-basisexternalevents.Specificrequirements areoutlinedin Attachment 2 ot Reference 1.

Reference 1 requiredsubmission of an overallintegrated planby February 28,2013.

TheNRCInterimStaffGuidanc,e (Reference 2) wasissuedAugust29,2012and endorsedindustry guidance document NEI 12-02, Revision1 (Reference 3) with clarifications andeiceptionsidentified in Reference 2. Reference 3 providesdirection regarding the contentof theoverallintegrated plan.

ByletterdatedFebruary27,2013[Agenqnride Documents AccessandManagement System(ADAMS) Accession No.MLl3059M951, FENOCsubmitted overal!integrated plansfor reliablespentfuelpoolinstrumentation, whichincludedan overallintegrated planfor PerryNuciearPowerPlant,UnitNo.1, ByletterdatedJune10,2013(ADAMS Accession Nb.ML19155A539), theNRCstaffrequested additional information to completeits review.TheNRCalsoindicated in the letter that if information is unavailable by July5, 2013,datesasto whentheadditional information willbe submitted areto be provided.As discussed in the publicmeeting held on JuneZO,ZO13, providingthe responses in thesix-month updatereportsis acceptable.

Byelectronic miit datedJune25,2013, the NRC staffrequested additional information regarding powersupplies.Theresponse to therequestfor additionaf information is

PerryNuclearPowerPlant L-13-213 Page2 attached.Theapplicable six-month updateinwhichFENOCintendsto provide currently unavailable informationis indicatedin theattachment.

Thereare no newregulatory commitments contained in thisletter.lf thereareany questionsor if additionalinformation is required,pleasecontactMr.ThomasA. Lentz, Manager FleetLicensing, at 330-3156810.

I decla.punderpenaltyof periurythattheforegoing is trueandcorrect.Executed on July t',2013.

Respectfully, il l,/,/)h

/-hl ( .r, I

{/rnU,{art*{-

VitoA, Kaminskas

Attachment:

Responseto Requestfor Information

References:

1. NRCOrderNumberEA-12-051, OrderModiffingLicenseswith Regardto Reliable SpentFuefPoolInstrumentation (ADAMS Accession No.ML12054A679)
2. NRCInterimStaffGuidance JLD-ISG -2012-03, Compliance withOrderEA-12-051, ReliableSpentFuefPoolInstrumentation, Revision 0, datedAugust29,2012 (ADAMSAccession No.M112221A339)
3. NucfearEnergyInstitute (NEl)12-02,Industry Guidance forCompliance withNRC OrderEA-12-051,"ToModifyLicenses withRegardto ReliableSpentFuelPool Instrumentation,"Revision1,datedAugust24,2912 cc: Director,Officeof NuclearReactorRegulation (NRR)

NRCRegionlll Administrator NRCResident Inspector NRRProjectManager

Attachment L-13-213 Responseto Requestfor Information Page1 of 11 By letterdatedFebruary27, 2013[Agencynruide Documents Accessand Management System(ADAMS)AccessionNo.ML13059A4951, FirstEnergy NuclearOperating Company (FENOC) submittedan overallintegrated plan (OlP)in response to the March12,2012,NuclearRegulatory Commission (NRC)OrderEA-12-051modifying licenseswithregardto reliablespentfuelpool(SFP)instrumentation (ADAMS Accession No.ML12054A679) for PerryNuclearPowerPlant(PNPP),UnitNo.1. By fetterdatedJune1A,2013(ADAMSAccession No.ML131554539), the NRCstaff requested additionalinformationto completeits review.By electronic maildated June25,2013,the NRCstaffrequested additionalinformationregarding power supplies.The responseto the requestfor additional information(RAl)is provided below.The NRCstaffquestionis presented in boldtype,followedby the FENOC response.

LEVELSOF REQUIRED MONITORING The OIPstates,in part,that:

PNPPdischargesirradiatedfuel to a singlespent fuel storagepool.

With the exceptionof limitedtime periodsfor maintenanceor non' refuelingoperations,administrativecontrolsmaintaingates in the open positionbetweenthe followingpools: fuel storage& preparationpool, fuel transferpool,spent fuel storagepool, and cask pit. Thus,these pools are normallyinter-connectedand at the samewater levelwhen the water level in the spent fuel pool is greaterthan 3.5 feet abovethe top of stored fuel seated in the storage racks.

Level I - Leveladequateto support operationof the normal fuel pool cooling system Indicatedlevelon eitherthe primaryor backupinstrumentchannelof greaterthan elevation619'4" plus the accuracyof the SFPlevel instrumentchannel,which is to be determined.The highestpointon the spent fuel pool racks is at elevation591'4".

Level2 - Leveladequateto providesubstantialradiationshieldingfor a personstandingon the spent fuel pool operatingdeck.

Indicatedlevelon either primaryor backupinstrumentchannelof greaterthan 601'-4"plus the accuracyof the SFPlevelinstrument channel,which is to be determined.This monitoringlevelensuresthere is an adequatewater levelto providesubstantialradiationshieldingfor a personstandingon the SFPoperatingdeck.

Attachment L-13-213 Page2 of 11 Level3 - Levelwherefuel remainscoveredand actionsto implement make-upwater additionshould no longerbe deferred.

lndicatedlevelon eitherthe primaryor backupinstrumentchannelof greaterthan 594'-6"plus the accuracyof the SFP levelinstrumentation, which is to be determined.This monitoringlevelassuresthat there is adequatewater level abovethe stored fuel seated in the rack.

RAI-1

Pleaseprovidethe following:

a) For Level1, specify how the identifiedlocationrepresentsthe higherof the two points describedin the NEI [NuclearEnergyInstitute]12-02guidancefor this level.

b) The OIPstates,"the PerrySFPcontainsother materialscapableof providing sufficientdose such that the pool deckwould not be inhabitableshould the materialsbe uncovered." Giventhe potentialfor varied dose rates from other materialsstored in the SFP,describehow Level2 will be adjustedto other than the elevationprovidedin Section2 [Levelsof Required Monitoringlabove.

c) A clearlylabeledsketch depictingthe elevationview of the proposedtypical mountingarrangementfor the portionsof instrumentchannelconsistingof permanentmeasurement channelequipment(e.9.,fixed levelsensonsandlor stillingwells,and mountingbrackets).Indicateon this sketchthe datum vafues representingLevel 1, Level 2, and Level 3, as well as the top of the fuel. Indicateon this sketch the portionof the levelsensor measurement rangethat is sensitiveto measurementof the fuel pool level,with respectto the Level1, Level2, and Level3ndatum points.

Response

a) No othermeansof removing waterfromthe SFPexistabovethe skimmers.

Therefore, the identifiedlocationis the highestpointof the two optionsdescribedin the NEI 12-02guidancefor Level1 and is the levelthat is adequateto support operation of the normalfuelpoolcoolingsystem.

b) NEI 12-02allowsthe licenseeto use 10feet(+t-l foot)abovethe highestpointof anyfuel rackseatedin the spentfuelpoolsas Level2. FENOChaschosenthis optionfor PNPP. NEI 12-02,Section2.3.2statesthat"Level2 represents the range of waterlevelwhereany necessary operationsin the vicinityof the spentfuelpool can be completed withoutsignificantdoseconsequences fromdirectgamma radiationfromthe storedspentfuel." Level2 is associated withdoseratesfromthe fuel;therefore,it is notadjustedbasedon varieddoseratesfromotheritemsin the pool. FENOChasselectedguidedwaveradaras itstechnology, whichprovides continuous levelindicationfromLevel1 through Level 3. Data will for be available

Attachment L-13-213 Page3of11 mitigationstrategies whendeemedappropriate, to be initiated, basedon water levelsbetweenLevel1 and Level3. FENOCrecognizes additional materials stored prior in the SFPmaycausethe areato becomeuninhabitable to the monitored Level2. FENOCalsorecognizes thatthe locationof theseadditional materialsis subjectto changeduringeachrefueling outage.Therefore, FENOC does notplanto adjustLevel2, but insteadaddressthe potential doseratesassociated withother materialthroughalternatemeans.FENOC plans to evaluate the other materials in the SFPfor relocation or removalin supportof mitigation strategies.Basedon fuel poolmaterielconfiguration and projecteddose levels, FENOC plansto developan earlymethodto keepthosematerials adequately coveredusingmitigation strategies or a manualmakeupcapability froma locationnot impactedby the doserate.

Mitigationstrategiesfor addressing increaseddosesto personnel in the SFParea associated withothermaterialsin the poolin a beyond-design-basis accidentis to be addressed via PNPPDiverseand FlexibleCopingStrategies (FLEX)procedures, as needed.

c) As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual designinformation.Progressmade,proposedchangesin compliance methods, updatesto the schedule, and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to support responseto this requestwouldbe availableafterfinaldesignis complete.

Therefore, FENOCintendsto submitthe responseto this requestin the February 2014six-monthupdate.

INSTRUMENTATION DESIGNFEATURES Arranqement The OIPstates,in part,that:

The planneddesignof this systemwill consist of two measurement channels,one primaryand one backup. Eachchannelwill consistof a levelsensornoh electronicsunit and an indicator.The primaryand backupinstrumentchannelsensorswill be protectedagainstmissiles that may resultfrom damageto the structureover the SFP. The sensors will be mountedat the western end of the fuel pool (the fuel preparation and storagepool),but as close to the adjacentcornersas possibleto minimizethe possibilityof a singleeventor missiledamagingboth channels. The sensor arrangementhas been proposedin a manner limitingany interferencewith existingequipmentin or aroundthe SFP.

This planneddesign is conservativeand is in compliancewith Order EA-12-051 however,it does representa minor deviationfrom the NEI Guidance.The NEIGuidancerecommendspuftinginstrumentation in opposite(diagonal)ends of the spentfuel pool. Due to the limited availablelocations(causedby interference)for installation,the instrurnentationcannot be installedon opposite(diagonal)ends of the pool. This planneddesignwill also not pose any potentialhazardto

Attachment L-13-213 Page4 of 11 personnelworking aroundthe pool or on the level instrumentation itself.

RAI.2 a) Pleaseprovidea clearlylabeledsketch or marked-upplant drawingof the planview of the SFParea,depictingthe SFPinsidedimensions,the planned locations/placement of the primaryand back-upSFPlevelsensor,and the proposedrouting of the cables that will extendfrom the sensors toward the location.ofthe read-ouUdisplay device.

b) Addresshow other materialstored in the SFPwill not createadverse interactionwith the fixed instrumentlocation(s).

Response

As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.

Mountinq The OIPstates,in part,that:

Installedprimaryand back up SFPlevelinstrumentchannelequipment within the spent fuel pool shall be mountedto retainits design configurationduringand followingthe maximumseismicground motion consideredin the designof the spent fuel pool structurein accordancewith NRCJLD-ISG-2012-03 and NEI12-02Rev.1 guidance requirements.

RAI.3 Pleaseprovidethe following:

a) The designcriteriathat will be usedto estimatethe total loadingon the mountingdevice(s),includingstaticweightloadsand dynamicloads.

Describethe methodologythat will be usedto estimatethe total loading, inclusiveof designbasismaximumseismicloadsand the hydrodynamic loadsthat could resultfrom pool sloshingor other effectsthat could accompanysuch seismicforces.

b) A descriptionof the mannerin which the levelsensor(andstillingwell, if appropriate)will be attachedto the refuelingfloor and/orother support structuresfor each plannedpoint of attachmentof the probeassembly.

Attachment L-13-213 Page5 of 11 Indicatein a schematicthe portionsof the levelsensor that will serveas points of attachmentfor mechanical/mounting or electricalconnections.

c) A descriptionof the mannerby which the mechanicalconnectionswill attach

'instrument permanent the level to SFPstructuresso as to supportthe level sensorassembly.

Response

As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual design information.Progressmade, proposed changesin compliance methods, updates to the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the response to this request in the 2014 February six-month update.

Qualification The OIPstatesnin part,that:

The vendorsuppliedsensorsand associatedelectronicswill be requiredto be testedand qualifiedfor shock and vibrationas a resultof a beyonddesign basis externalevent. Seismicqualificationof equipmentwill be equivalentto the maximumgroundmotionspectrum for the area in which it is to be installed.

RAI.4 Pleaseprovidethe following:

a) A descriptionof the specific methodor combinationof methodsyou intend to apply to demonstratethe reliabilityof the permanentlyinstalledequipment under beyond-design-basis ambienttemperature,humidity,shock,vibration, and radiationconditions.

b) A descriptionof the testingand/oranalysesthat will be conductedto provide assurancethat the equipmentwill performreliablyunderthe worst-case credibledesignbasisloadingat the locationwherethe equipmentwill be mounted. Inctudea discussionof this seismicreliabilitydemonstrationas it appliesto (a)the levelsensor mountedin the SFParea,and (b) any control boxes,electronics,or read-outand re-transmittingdevicesthat will be employedto conveythe levelinformationfrom the levelsensorto the plant operatorsor emergencyresponders.

c) A descriptionof the specificmethodor combinationof methodsthat will be used to confirm the reliabilityof the permanentlyinstalledequipmentsuch that followinga seismiceventthe instrumentwill maintainits required accuracy.

Attachment L-13-213 Page6 of 11

Response

As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswill be providedin the six-monthintegrated planupdates.The informationto supportresponse to thisrequest wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.

Independence The OIPstates,in partnthat:

The primaryinstrumentchannelwill be independentof the backup instrumentchannel.The primaryand backupinstrumentchannelswill be physicallyand electricallyseparatedto maintainchannel independence.The sensorswill be separatedas far apartas practical within the constraintsof existingpool geometryand equipment.

Electronicsenclosureswill be separatedby a suitabledistanceor may utilizestructuralfeaturesof the room in which they are locatedas a barrierto provideprotectionagainsta single event(missile,explosionn etc.)from damagingthe electronicsof both instrumentchannels. Power will be suppliedfrom two separatepowerbusesat a minimum,with a preferenceof differentpowerdivisionsor channelsas available.

Gablingwill be run in separateconduitand/orcabletray. The same technologywill be usedfor both the primaryand backupinstrument channels.

RAI.5 Pleaseprovidethe following:

a) A descriptionof how the two channelsof the proposedlevelmeasurement system meetthis requirementso that the potentialfor a common-cause event to adverselyaffect both channelsis minimizedto the extent practicable.

b) Furtherinformationon how each levelmeasurementsystem,consistingof levelsensor electronics,cabling,and readoutdevicesnwill be designedand installedto addressindependencethroughthe applicationand selectionof independentpowersources,the use of physicaland spatialseparation, independenceof signalssent to the location(s)of the readoutdevices,and the independence of the displays.

Response

As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updatesto the

Attachment L-13-213 Page7 of 11 schedule, and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to thisrequest to supportresponse wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the response to this requestin the February2014six-monthupdate.

PowerSupplies The OIPstates,in part,that:

Eachchannelwill normallybe poweredfrom independent120VAC

[volts-alternating current]powersourcesand will havea dedicated batterybackup. A minimumbafterylife of 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />swill be providedto allow for power restorationfrom portableequipment.

RAI.6 a) A descriptionof the electricalac powersourcesand capacitiesfor the primaryand backupchannels.

lf the level measurementchannelsare to be poweredthrough a batterysystem (eitherdirectlyor through an uninterruptiblepowersupply),pleaseprovidethe designcriteriathat will be appliedto size the batteryin a mannerthat ensures, with margin,that the channelwill be availableto run reliablyand continuously followingthe onsetof the beyond-design-basis eventfor the minimumduration needed,consistentwith the plant mitigationstrategiesfor beyond-design-basis externalevents(OrderEA-l 2-049).

Response

As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updatesto the schedule, and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to thisrequest to supportresponse wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.

Accuracv The OIPstates,in part,that:

The guidedwave radardesignprovidescontinuousmonitoringof the SFPwater level. The accuracyof the SFP levelinstrumentchannel, from sensorto main control room indicator,will be consistentwith the guidelinesof NRCJLD-ISG-2012-03 and NEI12-02,Rev.1. Instrument channelswill be designedto maintaintheir designaccuracywithout recalibrationfollowinga powerinterruptionor changein powersource.

Attachment L-13-213 Page8 of 11 RAI.7 Pleaseprovidethe following:

a) An estimateof the expectedinstrumentchannelaccuracyperformance(e.9.,

in percentof span) under both (a) normalSFPlevelconditions (approximatelyLevel 1 or higher)and (b) at the beyond-design-basis conditions(i.e.,radiation,temperature,humidity,post-seismicand post-shock conditions)that would be presentif the SFPlevelwere at the Level2 and Level3 datum points.

b) A descriptionof the methodologythat will be used for determiningthe maximumalloweddeviationfrom the instrumentchanneldesignaccuracy that will be employedunder normaloperatingconditionsas an acceptance criterionfor a calibrationprocedureto flag to operatorsand to technicians that the channelrequiresadjustmentto within the normalconditiondesign accuracy.

Response

As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updatesto the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to supportresponseto thisrequest wouldbe availableafterfinaldesignis complete.Therefore, FENOCintendsto submit the responseto this requestin the February2014six-monthupdate.

Testinq The OIPstates,in part,that:

Testingwill be consistentwith the guidelinesof NRCJLD-ISG'2012-03 and NEI12-02,Rev.1. The instrumentchanneldesignwill include provisionsfor routinetestingand calibration.The instrumentationwill allow for in-situtestingand calibrationof the level instrumentationto minimizecalibrationeffort and instrumentdowntime. Calibration procedureswill be developedin accordancewith plant proceduresand vendor recommendations.

RAI.8 Pleaseprovidethe following:

a) A descriptionof the capabilityand provisionsthe proposedlevelsensing equipmentwill enableperiodictestingand calibration,includinghow this capabilityenablesthe equipmentto be tested in'situ.

Attachment L-13-213 Page9 of 11 b) A descriptionof how such testingand calibrationwill enablethe conductof regularchannelchecksof eachindependentchannelagainstthe other,and againstany other permanently-installed SFPlevel instrumentation.

c) A descriptionof how functionalcheckswill be performed,and the frequency at which they will be conducted. Describehow calibrationtests will be performed,and the frequencyat which they will be conducted. Providea discussionas to how thesesurveillanceswill be incorporatedinto the plant surueillanceprogram.

d) A descriptionof what preventativemaintenancetasks are requiredto be performedduring normaloperation,and the plannedmaximumsurueillance intervalthat is necessaryto ensurethat the channelsare fully conditionedto accuratelyand reliablyperformtheir functionswhen needed.

Response

As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual design information.Progressmade,proposedchangesin compliance methods,updates to the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to thisrequest to supportresponse wouldbe available afterfinaldesignis completeandthe FENOCengineering change processhasprogressed procedure to the pointof determining needed details for testing and calibration. lnerefore,FENOCintendsto submitthe responseto this requestin the August2014six-monthupdate.

Displav The OIPstates,in part,that:

The displaywill be consistentwith the guidelinesof NRC JLD-ISG-2012-03 and NEI { 2-02Rev.1. Trainedpersonnelwill, at a minimum,be able to monitorthe SFPwater levelfrom an appropriate and accessiblelocation,and will provideon demandor continuous indicationof SFPwater level. The SFPlevel instrumentationwill providefor displayof fuel pool levelusing an indicatorlocatedin the main control room. The indicatorwill be poweredby the instrument loop and will not requireadditionalpowercircuitsfrom those described above.

RAI-9

Pleaseprovidethe following:

a) The specificlocationfor the primaryand backupinstrumentchanneldisplay' b) lf the primaryor backupdisplaylocationis other than the main control room, then providejustificationfor promptaccessibilityto displaysincluding

Attachment L-13-213 P a g e1 0o f 1 1 primaryand alternateroute evaluation,habitabilityat displaylocation(s),

continualresourceavailabilityfor personnelresponsibleto promptlyread displays,and provisionsfor communicationswith decisionmakersfor the variousSFPdrain down scenariosand externalevents.

c) The reasonsjustifyingwhy the locationsselectedenablethe information from these instrumentsto be considered"promptlyaccessible"to various drain-downscenariosand externalevents.

Response

TheSFPlevelinstrumentation, primaryandbackupinstrument channeldisplay, willbe locatedin the maincontrolroom.As a result,a responseto part(b) of thisrequestis not needed.The maincontrolroomis expectedto be occupiedat all times;therefore, the locationis considered promptlyaccessible.

PROGRAMFEATURES Procedures The OIPstates, in part, that:

Procedureswill be establishedand maintainedfor the testing, calibration,operationand abnormalresponseissuesassociatedwith the primaryand backupspent fuel pool instrumentationchannels.

RAt-l0 Pleaseprovidea descriptionof the standards,guidelinesand/orcriteriathat will be utilizedto developproceduresfor inspection,maintenance,repair,operation, abnormalresponse,and administrativecontrolsassociatedwith the SFPlevel instrumentation,as well as storageand installationof portableinstruments.

Response

As statedin letterdatedFebruary27,2013,the OlPsare basedon conceptual design information.Progressmade, proposed changes in compliance methods, updates to the schedule, and if needed,requestsfor reliefandthe baseswillbe providedin the six-monthintegrated planupdates.The information to supportresponseto thisrequest wouldbe available afterfinaldesignis completeandthe FENOCengineering change processhasprogressed to the pointof determiningproceduredetailsneededfor testing andcalibration, including identification of standards,guidelinesand/orcriteriathatwill be usedto developthe procedures.Therefore, FENOCintendsto submitthe response to this requestin the August2014six-month update.

Attachment L-13-213 Page11of11 Testinsand Galibration The OIPstates,in part,that:

Per NRCOrderEA-12-051,processeswill be establishedand maintained for schedulingand implementingnecessarytestingand calibrationof primaryand backupSFPlevelinstrumentchannelsin orderto maintain the designaccuracy.

RAt-11 Pleaseprovidethe following:

a) Furtherinformationdescribingthe maintenanceand testing programthe licenseewill establishand implementto ensurethat regulartestingand calibrationis performedand verifiedby inspectionand audit to demonstrate conformancewith designand system readinessrequirements.Includea descriptionof your plansfor ensuringthat necessarychannelchecks, functionaltests, periodiccalibration,and maintenancewill be conductedfor the level measurementsystemand its supportingequipment.

b) Describehow the guidancein NEI 12-02,Section4.3,regarding compensatoryactionsfor one or both non-functioningchannelswill be addressed.

c) Describewhat compensatoryactionsare plannedin the eventthat one of the instrumentchannetscannot be restoredto functionalstatuswithin 90 days.

Response

As statedin letterdatedFebruary27, 2013,the OlPsare basedon conceptual design information.Progressmade, proposed changes in compliance methods,updates to the schedule,and if needed,requestsfor reliefandthe baseswillbe providedin the six-month integratedplanupdates. The informationto response support to thisrequest wouldbe availableafterfinaldesignis completeandthe FENOCengineering change processhasprogressed to the pointof determiningproceduredetailsneededfor testing and calibration.Therefore, FENOCintendsto submitthe responseto this requestin the August2014six-monthupdate.