|
|
(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14070A140 | | | number = ML14070A140 |
| | issue date = 03/08/2014 | | | issue date = 03/08/2014 |
| | title = RAIs Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) | | | title = NRR E-mail Capture - Salem, Unit 1 - RAIs Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) |
| | author name = Hughey J D | | | author name = Hughey J |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Duke P R | | | addressee name = Duke P |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000272 | | | docket = 05000272 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Hughey, John Sent: Saturday, March 08, 2014 4:21 PM To: Duke, Paul R. (Paul.Duke@pseg.com) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Hughey, John Sent: Saturday, March 08, 2014 4:21 PM To: Duke, Paul R. (Paul.Duke@pseg.com) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Salem, Unit 1 - RAIs Re: Steam Generat or Tube Inspection Report - Twenty-Second Refueling Outage (1R22).Paul, By letter dated November 04, 2013 (Agencywide Docu ments Access System (ADAMS) Accession No. ML13310A885), PSEG Nuclear, L.L.C., submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at Salem Nuclear Generating St ation, Unit 1 during the refueling outage 1R22. | | Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22). |
| The NRC staff has reviewed the information provided and determined that additional information is needed in order to complete our review as follows. | | : Paul, By letter dated November 04, 2013 (Agencywide Documents Access System (ADAMS) Accession No. ML13310A885), PSEG Nuclear, L.L.C., submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at Salem Nuclear Generating Station, Unit 1 during the refueling outage 1R22. The NRC staff has reviewed the information provided and determined that additional information is needed in order to complete our review as follows. |
| : 1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units. | | : 1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units. |
| : 2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g., results of inspections in the steam drum and upper bundle). | | : 2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g., results of inspections in the steam drum and upper bundle). |
| : 3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations). 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads. The NRC staff requests a response to the above questions by April 25, 2014. Please advise if PSEG would like to have a teleconference with NRC staff to clarify any of the questions above. | | : 3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations). |
| | : 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads. |
| | The NRC staff requests a response to the above questions by April 25, 2014. Please advise if PSEG would like to have a teleconference with NRC staff to clarify any of the questions above. |
| | Thank you, John John Hughey Salem / Hope Creek / TMI Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov 1 |
|
| |
|
| Thank you, John John Hughey Salem / Hope Creek / TMI Project Manager
| | Hearing Identifier: NRR_PMDA Email Number: 1158 Mail Envelope Properties (3D388D66E29B124A910BAC867C3A359D021F28002A45) |
| | |
| NRR - Division of Operating Reactor Licensing
| |
| | |
| Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 1158 Mail Envelope Properties (3D388D66E29B124A910BAC867C3A359D021F28002A45) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22). Sent Date: 3/8/2014 4:20:35 PM Received Date: 3/8/2014 4:20:00 PM From: Hughey, John Created By: John.Hughey@nrc.gov Recipients: "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com> Tracking Status: None | | Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report - |
| | | Twenty-Second Refueling Outage (1R22). |
| Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1669 3/8/2014 4:20:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Sent Date: 3/8/2014 4:20:35 PM Received Date: 3/8/2014 4:20:00 PM From: Hughey, John Created By: John.Hughey@nrc.gov Recipients: |
| | "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com> |
| | Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1669 3/8/2014 4:20:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Similar Documents at Salem |
---|
Category:E-Mail
MONTHYEARML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22285A1562022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Atlantic Sturgeon 10/11/2022 (Bottom Trawl) ML22280A1302022-10-0707 October 2022 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - Sturgeon 10/06/2022 2024-09-03
[Table view] |
Text
NRR-PMDAPEm Resource From: Hughey, John Sent: Saturday, March 08, 2014 4:21 PM To: Duke, Paul R. (Paul.Duke@pseg.com)
Subject:
Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22).
- Paul, By letter dated November 04, 2013 (Agencywide Documents Access System (ADAMS) Accession No. ML13310A885), PSEG Nuclear, L.L.C., submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at Salem Nuclear Generating Station, Unit 1 during the refueling outage 1R22. The NRC staff has reviewed the information provided and determined that additional information is needed in order to complete our review as follows.
- 1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units.
- 2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g., results of inspections in the steam drum and upper bundle).
- 3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations).
- 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads.
The NRC staff requests a response to the above questions by April 25, 2014. Please advise if PSEG would like to have a teleconference with NRC staff to clarify any of the questions above.
Thank you, John John Hughey Salem / Hope Creek / TMI Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1158 Mail Envelope Properties (3D388D66E29B124A910BAC867C3A359D021F28002A45)
Subject:
Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report -
Twenty-Second Refueling Outage (1R22).
Sent Date: 3/8/2014 4:20:35 PM Received Date: 3/8/2014 4:20:00 PM From: Hughey, John Created By: John.Hughey@nrc.gov Recipients:
"Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1669 3/8/2014 4:20:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: