| issue date = 05/13/2014
| issue date = 05/13/2014
| title = Cycle 19 Core Operating Limits Report
| title = Cycle 19 Core Operating Limits Report
| author name = Pierce C R
| author name = Pierce C
| author affiliation = Southern Co, Southern Nuclear Operating Co, Inc
| author affiliation = Southern Co, Southern Nuclear Operating Co, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Charles R.Pierce Regulatory Affairs Director MAY13 2014 Docket Nos.: 50-424 Southern Nuclear Operating Company, Inc.40 Inverness Center Parkway Post Office Box 1295 Birmingham,AL35201 Tel 205.992.7872 Fax 205,992.7601U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington,D.C.20555-0001 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Ladies and Gentlemen:
{{#Wiki_filter:Charles R. Pierce                   Southern Nuclear Regulatory Affairs Director         Operating Company, Inc.
NL-14-0753 In accordance with Technical Specification 5.6.5.d, Southern Nuclear Operating Company submits the enclosed Core Operating Limits Report(COLR)forVogtle Electric Generating Plant (VEGP)Unit1 Cycle 19, Version 1.This letter containsnoNRC commitments.Ifyou have any questions, please contact Ken McElroy at (205)992-7369.Respectfully submitted.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Tel 205.992.7872 Fax 205,992.7601 MAY 1 3 2014 Docket Nos.:        50-424                                            NL-14-0753 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Ladies and Gentlemen:
C.R.Pierce Regulatory Affairs Director CRP/GLS/
In accordance with Technical Specification 5.6.5.d, Southern Nuclear Operating Company submits the enclosed Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant (VEGP) Unit 1 Cycle 19, Version 1.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
Respectfully submitted.
C. R. Pierce Regulatory Affairs Director CRP/GLS/


==Enclosure:==
==Enclosure:==
Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1


Core Operating Limits Report,VEGPUnit1Cycle 19, Version 1 U.S.Nuclear Regulatory Commission NL-14-0753 Page 2 Southern Nuclear Operating CompanyMr.S.E.Kuczynski, Chairman, President&CEOMr.D.G.Bost, Executive Vice President&Chief Nuclear OfficerMr.T.E.Tynan, Vice President-Vogtle1&2Mr.B.L Ivey, Vice President-Regulatory AffairsMr.D.R.Madison, Vice President-Fleet OperationsMr.B.J.Adams, Vice President-EngineeringMr.S.C.Waldrup, Regulatory Affairs Manager-Vogtle RType: CVC7000 U.S.Nuclear Regulatory CommissionMr.V.M.McCree, Regional AdministratorMr.R.E.Martin,NRR Senior Project Manager-Vogtle 1&2Mr.L.M.Cain, Senior Resident Inspector-Vogtle1&2 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Enclosure Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1 VOGTLE ELECTRIC GENERATING PLANT (VEGP)UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT Version 1 February 2014 Westinghouse Non-ProprietaryClass3 APPENDIX A VOGTLE ELECTRIC GENERATINGPLANT(VEGP)
U. S. Nuclear Regulatory Commission NL-14-0753 Page 2 Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. E. Tynan, Vice President - Vogtle 1 & 2 Mr. B. L Ivey, Vice President - Regulatory Affairs Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. S. C. Waldrup, Regulatory Affairs Manager - Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Vogtle 1 &2 Mr. L. M. Cain, Senior Resident Inspector-Vogtle 1 & 2
UNIT1CYCLE 19 CORE OPERATING LIMITS REPORT (COLR)Version 1 February 2014 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 1.0 CORE OPERATING LIMITS REPORTThisCore OperatingLimitsReport(COLR)forVEGPUnit1Cycle 19hasbeen prepared in accordancewiththerequirements ofTechnicalSpecification5.6.5.
 
The TechnicalRequirementaffectedbythisreportislistedbelow:
Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Enclosure Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1
13.1.1 SHUTDOWN MARGIN-MODES 1 and 2 The TechnicalSpecificationsaffectedbythisreportarelistedbelow:
 
3.1.1 SHUTDOWN MARGIN-MODES3,4 and 5 3.1.3 Moderator Temperature Coefficient 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1HeatFluxHotChannelFactor-Fq(Z)3.2.2 Nuclear Enthalpy Rise Hot Channnel Factor-f'^ah 3.2.3 Axial Flux Difference 3.9.1 Boron Concentration Page 1 of 11 CORE OPERATING LMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 2.0 OPERATING LIMITSThecycle-specificparameterlimitsforthespecificationslistedinSection1.0arepresentedinthefollowingsubsections.TheselimitshavebeendevelopedusingNRC-approvedmethodologiesincludingthosespecifiedin TechnicalSpecification5.6.5.
VOGTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 1 CYCLE 19 CORE OPERATING LIMITS REPORT Version 1 February 2014
2.1 SHUTDOWN MARGIN-MODES1and2 (Technical Requirement 13.1.1)2.1.1TheSHUTDOWNMARGINshallbegreaterthanorequalto 1.30 percent Ak/k.2.2 SHUTDOWN MARGIN-MODES 3.4 and 5 (Specification 3.1.n 2.2.1 The SHUTDOWNMARGINshallbegreaterthanorequaltothelimitsshowninFigures 1 and 2.2.3 Moderator Temperature Coefficient (Specification 3.1.3)2.3.1 The Moderator Temperature Coefficient (MTC)limitsare:
 
The BOL/ARO/HZP-MTC shall be less positive than+0.7 x 10"^Ak/k/°F for powerlevelsupto70%RTPwithalinearrampto0 Ak/k/°F at 100%RTP.The EOL/ARO/RTP-MTC shall be less negative than-5.50 x 10"^Ak/k/°F.'2.3.2 The MTC Surveillance limits are;The300ppm/ARO/RTP-MTCshouldbelessnegativethanorequalto
Westinghouse Non-Proprietary Class3 APPENDIX A VOGTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 1 CYCLE 19 CORE OPERATING LIMITS REPORT (COLR)
-4.75 X 10-" Ak/k/&deg;F.'The 60 ppm/ARO/RTP-MTC should be less negative than-5.35 x 10"^Ak/k/&deg;F.'where:BOLstandsfor Beginning ofCycleLife ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWEREOLstandsforEnd ofCycleLife RTP stands for RATED THERMAL POWER'Applicable for full-power T-average of 584.1 to 587.1&deg;F, Page2of11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 ShutdownBankInsertionLimits(Specification3.1.5) 2.4.1 The shutdownbanksshallbe withdrawntoapositiongreaterthanorequalto225steps.ControlBankInsertionLimits (Specification 3.1.6)2.5.1The controlrodbanksshallbelimitedin physical insertionasshownin Figure 3.HeatFluxHotChannelFactor-Fn/Zt (Specification 3.2.1)2.6.1 Fo(Z)<-5 K(Z)for?>0.5 Fo(Z)<-^K(Z)for P<0.5 where:P=-THERMAL POWER RATED THERMAL POWER 2.6.2 F^'"'=2.502.6.3K(Z)isprovidedin Figure 4.KiZ)2.6.4 Fo(Z)<-2 IlJ.for P>0.5P-W{Z)F^"^-KCZ)Fo(Z)<-^forP50.50.5-W^Z)2.6.5W(Z)valuesareprovidedinTable2.2.6.6The Fq(Z)penalty factors are provided in Table 1.Page 3 of 11 CORE OPERATTNG LIMITS REPORT.VEGP UNIT 1 CYCT.F.192.7NuclearEnthalpyRiseHotChannelFactor-F(Specification3.2.2) 2.7.1 S Fi"(I+where:P=THERMAL POWER RATED THERMAL POWER 2.7.2 F^'-=\.65 2.1.3 PF^=0.3 FEBRUARY 2014AxialFlux Difference (Specification 3.2.3)2.8.1 The Axial Flux Difference (AFD)Acceptable OperationLimitsare providedinFigure5.
Version 1 February 2014
Boron Concentration (Specification 3.9.1)2.9.1 The boron concentration shall be greater than or equal to 1880 ppm.^^Thisconcentrationboundsthecondition of keii^0.95(allrodsinlessthemostreactiverod)andsubcriticality(allrodsout)overtheentirecycle.This concentrationincludesadditionalboronto address uncertainties and B'depletion.
 
Page 4 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Table 1 Fq(Z)penalty factor Cycle Bumup (MWD/MTU)Fq(Z)PenallyFactor 1.0348 1.0391 1.0417 1.0423 1.0410 1.0366 1.0308 1.0248 1.0200 1.0200 1.0204 1.0262 1.0261 1.0244 1.0214 1.0200 FEBRUARY 2014 Notes:1.ThePenalty Factor,tobe appliedtoFq(Z)in accordancewithSR3.2.1.2,isthe maximum factor by which Fq(Z)is expected to increase overa39 EFPD interval (surveillance interval of 31 EFPD plusthemaximum allowableextensionnottoexceed25%
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19                             FEBRUARY 2014 1.0   CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for VEGP Unit 1 Cycle 19 has been prepared in accordance with the requirements of Technical Specification 5.6.5.
of the surveillanceintervalperSR3.0.2)startingfromthebumupatwhichtheFq(Z)was determined.2.Linearinterpolationisadequateforintermediatecyclebumups.3.Forallcycle burnupsoutsidetherangeofthetable,a penallyfactorof 1.020shallbe used.Pages of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 Axial Point 57-61 Elevation (feet)12.072-11.267 11.066 10.865 10.664 10.462 10.261 10.060 9.859 9.658 9,456 9.255 9.054 8.853 8.652 8.450 8.249 8.048 7.847 7.646 7.444 7.243 7.042 6.841 6.640 6.438 6.237 6.036 5.835 5.634 5.432 5.231 5.030 4.829 4.628 4.426 4.225 4.024 3.823 3.622 3.420 3.219 3.018 2.817 2.616 2.414 2.213 2.012 1.811 1.610 1.408 1.207 1.006 0.805-0.000 Table 2 RAOC wrz)150 MWD/MTU 1.0000 1.3172 13162 1.3018 1.2808 1.2615 1.2467 1.2503 1.2444 L2373 1.2278 1.2168 1.2020 1.1893 1.1900 1.1889 1.1918 1.1940 1.1935 1.1914 1.1867 1.1802 1.1724 1.1633 1.1529 1.1452 1.1401 1.1344 1.1321 1.1309 1.1317 1.1386 1.1477 1.1561 1.1640 1.1710 1.1770 1.1826 1.1872 1.1925 1.1985 1.2057 1.2190 1.2337 1.2476 1.2616 1.2755 1.2893 1.3024 1.3149 1.3269 1.3380 1.0000 3000 MWD/MTU 1.0000 1.3495 1.3440 1.3350 1.3167 1.2912 1.2683 1.2431 1.2130 1.1979 1.1893 1.1763 1.166Z 1.1670 1.1724 1.1761 1.1783 1.1780 1.1761 1.1728 I.I674 1.1604 1.1523 1.1459 1.1393 1.1326 1.1279 1.1252 1.1225 1.1258 1.1378 1.1484 1.1587 1.1683 1.1775 1.1856 1.1930 1.1994 1.2065 1.2159 1.2241 1.2377 1.2562 1.2794 1.3058 1.3328 1.3595 1.3858 1.4105 1.4336 1.4550 1.4742 l.OOOO Top and Bottom 5 Points Excluded per Technical Specification B3.2.1.12000 MWD/MTU 1.0000 1.3279 1.3244 1.3164 I.30S1 1.2919 1.2775 1.2614 1.2438 1.2384 1,2286 1.2165 1.2092 1.2141 1.2230 1.2290 1.2332 1.2344 1.2336 1.2315 1.2259 1.2178 1.2083 1.1988 1.1896 1.1801 1.1696 1.1608 1.1560 1.1590 1.1643 1.1706 1.1753 1.1790 1.1815 1.1829 1.1833 1.1822 1.1795 1.1763 1.1722 I.I765 1.1889 1.2020 1.2149 1.2279 1.2399 1.2514 1.2627 1.2737 1.2843 1.2943 1.0000 FEBRUARY 20 4 20000 MWD/MTU 1.0000 1.2728 1.2665 1.2561 1.2438 1.2294 1.2189 1.2150 IJi096 1.2144 1.2272 1.2359 1.2397 1.2426 1.2438 1.2500 1.2591 1.2670 1.2800 1.2895 1.2944 1.2950 1.2931 1.2890 1.2819 1.2719 1.2596 1.2478 1.2400 1.2349 1.2349 1.2348 1.2344 1.2333 1.2302 1.2254 1.2191 1.2100 1.1985 1.1861 1.1765 1.1776 1.1890 1.2019 1.2147 1.2275 1.2386 1.2491 1.2601 1.2714 1.2828 1.2945 l.OOOOTheseW(Z)valuesareconsistentwithFigure5,andarevalidover tlie HFP Tavg temperaturerangefrom 584.1 to 587.1&deg;F.Page 6 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 1 REQUIRED SHUTDOWN MARGIN FOR MODES3AND4 (FOUR LOOPS FILLED AND VENTEDANDAT LEAST ONE REACTOR COOLANT PUMP RUNNING)"S 3-&deg;O 2.0 g m ACCEPTABLE OPERATING REGION (2400, 3.lb)I REQUIRED SHUTDOWN MARGIN (lioo, i.2b)UNACCEPTABLE OPERATING REGION (65d, 1.3^0)50010001500RCSBORON CONCENTRATION (ppm)Page?of 11 ACCEPTABLE OPERATING REGION REQUIRED SHUTDOWN MARGIN RCS BO 1250, a.8B)0 200 N (ppm)(2$00L i.9ph Page 8 of CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURES ROD BANK INSERTION LIMITS VERSUS%OF RATED THERMAL POWER (Fully Withdrawn)S 180 111 h 160 m S<S 140 O 120 H H W g 100<<80iiisaiaiaiyiigBSgS^^S SSS'Se'SSSSSSSSSSSSSSSSSSSI
The Technical Requirement affected by this report is listed below:
!i3: sB wmmmumuut S3 BaianmHHHB
13.1.1             SHUTDOWN MARGIN - MODES 1 and 2 The Technical Specifications affected by this report are listed below:
>0 30 40 50 60 70 80POWER(%of Rated Thermal Power)*Fully withdrawn shall be the condition where control rods areata position within the interval S225and<231 steps withdrawn.
3.1.1               SHUTDOWN MARGIN - MODES 3, 4 and 5 3.1.3               Moderator Temperature Coefficient 3.1.5               Shutdown Bank Insertion Limits 3.1.6               Control Bank Insertion Limits 3.2.1              Heat Flux Hot Channel Factor -Fq(Z) 3.2.2               Nuclear Enthalpy Rise Hot Channnel Factor - f'^ah 3.2.3               Axial Flux Difference 3.9.1               Boron Concentration Page 1 of 11
NOTE:TheRodBank Insertion Limitsarebasedonthe control bank withdrawal sequence A, B,C,Dandacontrol bank tip-to-tip distance of 115 steps.Page 9 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 o O 0.6 FEBRUARY 2014 FIGURE 4K(Z)-NORMALIZEDFq(Z)ASA FUNCTION OF CORE HEIGHT FQ=2.50 CORE HT.K(Z)0.00 1.00 6.00 1.00 12.0.925 4 6 CORE HEIGHT (feet)Page 10 of 11 CORE OPERATING LIMITS REPORT.VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 5 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF%RATED THERMAL POWER FORRAOC rt 80<u^70 dP 50 (+10, 100)UNACCBPTMLE(-30, 50)-40-30-20-10 0 10 20 30 AXIAL FLUX DIFFERENCE (percent Al)Page II Of II}}
 
CORE OPERATING LMITS REPORT. VEGP UNIT 1 CYCLE 19                                 FEBRUARY 2014 2.0   OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using NRC-approved methodologies including those specified in Technical Specification 5.6.5.
2.1     SHUTDOWN MARGIN - MODES 1 and 2 (Technical Requirement 13.1.1) 2.1.1  The SHUTDOWN MARGIN shall be greater than or equal to 1.30 percent Ak/k.
2.2     SHUTDOWN MARGIN - MODES 3.4 and 5 (Specification 3.1.n 2.2.1   The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures 1 and 2.
2.3     Moderator Temperature Coefficient (Specification 3.1.3) 2.3.1   The Moderator Temperature Coefficient (MTC) limits are:
The BOL/ARO/HZP-MTC shall be less positive than +0.7 x 10"^ Ak/k/&deg;F for power levels up to 70% RTP with a linear ramp to 0 Ak/k/&deg;F at 100% RTP.
TheEOL/ARO/RTP-MTC shall be less negative than-5.50 x 10"^ Ak/k/&deg;F.'
2.3.2   The MTC Surveillance limits are; The 300 ppm/ARO/RTP-MTC should be less negative than or equal to
                -4.75 X 10-" Ak/k/&deg;F.'
The 60 ppm/ARO/RTP-MTC should beless negative than -5.35 x 10"^ Ak/k/&deg;F.'
where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWER EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER
' Applicable forfull-power T-average of 584.1 to 587.1 &deg;F, Page 2 of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19                                   FEBRUARY 2014 Shutdown Bank Insertion Limits (Specification 3.1.5) 2.4.1 The shutdown banks shall be withdrawn to a positiongreaterthan or equalto 225 steps.
Control Bank Insertion Limits (Specification 3.1.6) 2.5.1  The control rod banks shall be limited in physical insertion as shown in Figure 3.
Heat Flux Hot Channel Factor- Fn/Zt (Specification 3.2.1) 2.6.1   Fo(Z)<-5         K(Z) for?>0.5 Fo(Z)<-^         K(Z) for P<0.5 THERMAL POWER where:     P = -
RATED THERMAL POWER 2.6.2 F^'"' =2.50 2.6.3  K(Z) is provided in Figure 4.
KiZ) 2.6.4   Fo(Z)<-2           IlJ. for P> 0.5 P-W{Z)
F^"^ -KCZ)
Fo(Z)<-^                 forP50.5 0.5-W^Z) 2.6.5  W(Z) values are provided in Table 2.
2.6.6 TheFq(Z) penalty factors are provided in Table 1.
Page 3 of 11
 
CORE OPERATTNG LIMITS REPORT. VEGP UNIT 1 CYCT.F. 19                                    FEBRUARY 2014 2.7    Nuclear Enthalpy Rise Hot Channel Factor - F         (Specification 3.2.2) 2.7.1           S Fi" *(I+           *{!-?))
THERMAL POWER where:     P =
* RATED THERMAL POWER 2.7.2     F^'-=\.65 2.1.3     PF^ = 0.3 Axial Flux Difference (Specification 3.2.3) 2.8.1     The Axial Flux Difference (AFD) Acceptable Operation Limits are provided in Figure 5.
Boron Concentration (Specification 3.9.1) 2.9.1   The boron concentration shall be greater than orequal to 1880 ppm.^
^   This concentration bounds the condition of keii^ 0.95 (all rods in less the most reactive rod) and subcriticality (all rods out) over the entire cycle. This concentration includes additional boron to address uncertainties and B' depletion.
Page 4 of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19                                   FEBRUARY 2014 Table 1 Fq(Z) penalty factor Cycle Bumup Fq(Z) Penally Factor (MWD/MTU) 1.0348 1.0391 1.0417 1.0423 1.0410 1.0366 1.0308 1.0248 1.0200 1.0200 1.0204 1.0262 1.0261 1.0244 1.0214 1.0200 Notes:
: 1. The PenaltyFactor, to be applied to Fq(Z) in accordance with SR 3.2.1.2, is the maximum factor by which Fq(Z) is expected to increase over a 39 EFPD interval (surveillance interval of 31 EFPD plus the maximum allowable extension not to exceed 25% of the surveillance interval per SR 3.0.2) starting from the bumup at which the Fq(Z) was determined.
: 2. Linear interpolation is adequate for intermediate cycle bumups.
: 3. For all cycle burnups outsidethe rangeof the table, a penally factor of 1.020 shallbe used.
Pages of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19                                       FEBRUARY 20 4 Table 2 RAOC wrz)
Axial         Elevation                150                  3000    12000          20000 Point           (feet)             MWD/MTU                MWD/MTU    MWD/MTU      MWD/MTU 12.072-11.267             1.0000                1.0000    1.0000        1.0000 11.066                1.3172                1.3495  1.3279        1.2728 10.865                13162                  1.3440    1.3244        1.2665 10.664                1.3018                1.3350    1.3164        1.2561 10.462                1.2808                1.3167    I.30S1        1.2438 10.261                1.2615                1.2912    1.2919        1.2294 10.060                1.2467                1.2683    1.2775        1.2189 9.859                1.2503                1.2431    1.2614        1.2150 9.658                1.2444                1.2130    1.2438        IJi096 9,456                L2373                  1.1979    1.2384        1.2144 9.255                1.2278                1.1893    1,2286        1.2272 9.054                1.2168                1.1763    1.2165        1.2359 8.853                1.2020                1.166Z    1.2092        1.2397 8.652                1.1893                1.1670    1.2141        1.2426 8.450                1.1900                1.1724    1.2230        1.2438 8.249                1.1889                 1.1761    1.2290        1.2500 8.048                1.1918                1.1783    1.2332        1.2591 7.847                1.1940                1.1780    1.2344        1.2670 7.646                1.1935                1.1761    1.2336        1.2800 7.444                1.1914                1.1728    1.2315        1.2895 7.243                1.1867                I.I674    1.2259        1.2944 7.042                1.1802                1.1604    1.2178        1.2950 6.841                1.1724                1.1523    1.2083        1.2931 6.640                1.1633                1.1459    1.1988        1.2890 6.438                1.1529                1.1393    1.1896        1.2819 6.237                1.1452                1.1326    1.1801        1.2719 6.036                1.1401                1.1279    1.1696        1.2596 5.835                1.1344                1.1252    1.1608        1.2478 5.634                1.1321                1.1225    1.1560        1.2400 5.432                1.1309                1.1258    1.1590        1.2349 5.231                1.1317                1.1378   1.1643        1.2349 5.030                1.1386                1.1484    1.1706        1.2348 4.829                1.1477                1.1587    1.1753        1.2344 4.628                1.1561                1.1683    1.1790        1.2333 4.426                1.1640                  1.1775  1.1815        1.2302 4.225                1.1710                1.1856    1.1829        1.2254 4.024                1.1770                  1.1930    1.1833        1.2191 3.823                1.1826                1.1994    1.1822        1.2100 3.622                1.1872                  1.2065    1.1795        1.1985 3.420                1.1925                  1.2159    1.1763        1.1861 3.219                1.1985                  1.2241    1.1722        1.1765 3.018                1.2057                  1.2377    I.I765        1.1776 2.817                1.2190                  1.2562    1.1889        1.1890 2.616                1.2337                  1.2794    1.2020        1.2019 2.414                1.2476                  1.3058    1.2149       1.2147 2.213                1.2616                  1.3328    1.2279        1.2275 2.012                1.2755                  1.3595    1.2399        1.2386 1.811                1.2893                  1.3858    1.2514        1.2491 1.610                1.3024                  1.4105    1.2627        1.2601 1.408                1.3149                  1.4336    1.2737        1.2714 1.207                1.3269                  1.4550    1.2843        1.2828 1.006                1.3380                  1.4742    1.2943        1.2945 57-61        0.805-0.000              1.0000                  l.OOOO    1.0000        l.OOOO Top and Bottom 5 Points Excluded per Technical Specification B3.2.1.
These W(Z) values are consistent with Figure 5, and are valid over tlie HFP Tavg temperature rangefrom 584.1 to 587.1&deg;F.
Page 6 of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19              FEBRUARY 2014 FIGURE 1 REQUIRED SHUTDOWN MARGIN FOR MODES 3 AND 4 (FOUR LOOPS FILLED AND VENTED AND AT LEAST ONE REACTOR COOLANT PUMP RUNNING)
ACCEPTABLE OPERATING REGION (2400, 3.lb)
"S 3-&deg; IREQUIRED SHUTDOWN MARGIN (lioo, i.2b)
O  2.0 gm UNACCEPTABLE OPERATING REGION (65d, 1.3^0) 500          1000          1500 RCS BORON CONCENTRATION (ppm)
Page? of 11
 
(2$00L i.9ph ACCEPTABLE OPERATING REGION REQUIRED SHUTDOWN MARGIN       1250, a.8B) 0        200 RCS BO                N (ppm)
Page 8 of
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19                                  FEBRUARY 2014 FIGURES ROD BANK INSERTION LIMITS VERSUS % OF RATED THERMAL POWER (Fully Withdrawn )
iiisaiaiaiyiigBSgS^^S S 180 111 h
160 SSS' Se'SSSSSSSSSSSSSSSSSSSI m
S<
S 140                                                    ******I O 120 H
          !i3:
g 100 s H
W                          ***SIHI
                            **a S3 B
<<    80 wmmmumuut          ********I
                  *SSSSS
        *SSSSSSSESSSSSSSSSSSSSnSSSSSS^
BaianmHHHB
[*******111!                      *************in
                            >0       30         40       50       60 70       80 POWER    (% of Rated Thermal Power)
      *Fully withdrawn shall bethe condition where control rods are ata position within the interval S 225 and < 231 steps withdrawn.
NOTE: The Rod Bank Insertion Limits are based on the control bank withdrawal sequence A, B, C, D and a control bank tip-to-tip distance of 115 steps.
Page 9 of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19         FEBRUARY 2014 FIGURE 4 K(Z) - NORMALIZED Fq(Z) AS A FUNCTION OF CORE HEIGHT o
FQ = 2.50 CORE HT. K(Z) 0.00 1.00 O 0.6                    6.00 1.00 12.0 .925 4           6 CORE HEIGHT   (feet)
Page 10 of 11
 
CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19             FEBRUARY 2014 FIGURE 5 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF % RATED THERMAL POWER FORRAOC
(+10, 100)
UNACCBPTMLE rt 80
^
  <u 70
* dP 50
(-30, 50)
            -40   -30   -20   -10     0     10     20     30 AXIAL FLUX DIFFERENCE (percent Al)
Page II Of II}}

Latest revision as of 21:08, 5 February 2020

Cycle 19 Core Operating Limits Report
ML14134A588
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/13/2014
From: Pierce C
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-14-0753
Download: ML14134A588 (16)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Tel 205.992.7872 Fax 205,992.7601 MAY 1 3 2014 Docket Nos.: 50-424 NL-14-0753 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Ladies and Gentlemen:

In accordance with Technical Specification 5.6.5.d, Southern Nuclear Operating Company submits the enclosed Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant (VEGP) Unit 1 Cycle 19, Version 1.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted.

C. R. Pierce Regulatory Affairs Director CRP/GLS/

Enclosure:

Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1

U. S. Nuclear Regulatory Commission NL-14-0753 Page 2 Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. E. Tynan, Vice President - Vogtle 1 & 2 Mr. B. L Ivey, Vice President - Regulatory Affairs Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. J. Adams, Vice President - Engineering Mr. S. C. Waldrup, Regulatory Affairs Manager - Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Vogtle 1 &2 Mr. L. M. Cain, Senior Resident Inspector-Vogtle 1 & 2

Vogtle Electric Generating Plant Unit 1 Cycle 19 Core Operating Limits Report Enclosure Core Operating Limits Report, VEGP Unit 1 Cycle 19, Version 1

VOGTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 1 CYCLE 19 CORE OPERATING LIMITS REPORT Version 1 February 2014

Westinghouse Non-Proprietary Class3 APPENDIX A VOGTLE ELECTRIC GENERATING PLANT (VEGP) UNIT 1 CYCLE 19 CORE OPERATING LIMITS REPORT (COLR)

Version 1 February 2014

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for VEGP Unit 1 Cycle 19 has been prepared in accordance with the requirements of Technical Specification 5.6.5.

The Technical Requirement affected by this report is listed below:

13.1.1 SHUTDOWN MARGIN - MODES 1 and 2 The Technical Specifications affected by this report are listed below:

3.1.1 SHUTDOWN MARGIN - MODES 3, 4 and 5 3.1.3 Moderator Temperature Coefficient 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor -Fq(Z) 3.2.2 Nuclear Enthalpy Rise Hot Channnel Factor - f'^ah 3.2.3 Axial Flux Difference 3.9.1 Boron Concentration Page 1 of 11

CORE OPERATING LMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using NRC-approved methodologies including those specified in Technical Specification 5.6.5.

2.1 SHUTDOWN MARGIN - MODES 1 and 2 (Technical Requirement 13.1.1) 2.1.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.30 percent Ak/k.

2.2 SHUTDOWN MARGIN - MODES 3.4 and 5 (Specification 3.1.n 2.2.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures 1 and 2.

2.3 Moderator Temperature Coefficient (Specification 3.1.3) 2.3.1 The Moderator Temperature Coefficient (MTC) limits are:

The BOL/ARO/HZP-MTC shall be less positive than +0.7 x 10"^ Ak/k/°F for power levels up to 70% RTP with a linear ramp to 0 Ak/k/°F at 100% RTP.

TheEOL/ARO/RTP-MTC shall be less negative than-5.50 x 10"^ Ak/k/°F.'

2.3.2 The MTC Surveillance limits are; The 300 ppm/ARO/RTP-MTC should be less negative than or equal to

-4.75 X 10-" Ak/k/°F.'

The 60 ppm/ARO/RTP-MTC should beless negative than -5.35 x 10"^ Ak/k/°F.'

where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero THERMAL POWER EOL stands for End of Cycle Life RTP stands for RATED THERMAL POWER

' Applicable forfull-power T-average of 584.1 to 587.1 °F, Page 2 of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 Shutdown Bank Insertion Limits (Specification 3.1.5) 2.4.1 The shutdown banks shall be withdrawn to a positiongreaterthan or equalto 225 steps.

Control Bank Insertion Limits (Specification 3.1.6) 2.5.1 The control rod banks shall be limited in physical insertion as shown in Figure 3.

Heat Flux Hot Channel Factor- Fn/Zt (Specification 3.2.1) 2.6.1 Fo(Z)<-5 K(Z) for?>0.5 Fo(Z)<-^ K(Z) for P<0.5 THERMAL POWER where: P = -

RATED THERMAL POWER 2.6.2 F^'"' =2.50 2.6.3 K(Z) is provided in Figure 4.

KiZ) 2.6.4 Fo(Z)<-2 IlJ. for P> 0.5 P-W{Z)

F^"^ -KCZ)

Fo(Z)<-^ forP50.5 0.5-W^Z) 2.6.5 W(Z) values are provided in Table 2.

2.6.6 TheFq(Z) penalty factors are provided in Table 1.

Page 3 of 11

CORE OPERATTNG LIMITS REPORT. VEGP UNIT 1 CYCT.F. 19 FEBRUARY 2014 2.7 Nuclear Enthalpy Rise Hot Channel Factor - F (Specification 3.2.2) 2.7.1 S Fi" *(I+ *{!-?))

THERMAL POWER where: P =

  • RATED THERMAL POWER 2.7.2 F^'-=\.65 2.1.3 PF^ = 0.3 Axial Flux Difference (Specification 3.2.3) 2.8.1 The Axial Flux Difference (AFD) Acceptable Operation Limits are provided in Figure 5.

Boron Concentration (Specification 3.9.1) 2.9.1 The boron concentration shall be greater than orequal to 1880 ppm.^

^ This concentration bounds the condition of keii^ 0.95 (all rods in less the most reactive rod) and subcriticality (all rods out) over the entire cycle. This concentration includes additional boron to address uncertainties and B' depletion.

Page 4 of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 Table 1 Fq(Z) penalty factor Cycle Bumup Fq(Z) Penally Factor (MWD/MTU) 1.0348 1.0391 1.0417 1.0423 1.0410 1.0366 1.0308 1.0248 1.0200 1.0200 1.0204 1.0262 1.0261 1.0244 1.0214 1.0200 Notes:

1. The PenaltyFactor, to be applied to Fq(Z) in accordance with SR 3.2.1.2, is the maximum factor by which Fq(Z) is expected to increase over a 39 EFPD interval (surveillance interval of 31 EFPD plus the maximum allowable extension not to exceed 25% of the surveillance interval per SR 3.0.2) starting from the bumup at which the Fq(Z) was determined.
2. Linear interpolation is adequate for intermediate cycle bumups.
3. For all cycle burnups outsidethe rangeof the table, a penally factor of 1.020 shallbe used.

Pages of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 20 4 Table 2 RAOC wrz)

Axial Elevation 150 3000 12000 20000 Point (feet) MWD/MTU MWD/MTU MWD/MTU MWD/MTU 12.072-11.267 1.0000 1.0000 1.0000 1.0000 11.066 1.3172 1.3495 1.3279 1.2728 10.865 13162 1.3440 1.3244 1.2665 10.664 1.3018 1.3350 1.3164 1.2561 10.462 1.2808 1.3167 I.30S1 1.2438 10.261 1.2615 1.2912 1.2919 1.2294 10.060 1.2467 1.2683 1.2775 1.2189 9.859 1.2503 1.2431 1.2614 1.2150 9.658 1.2444 1.2130 1.2438 IJi096 9,456 L2373 1.1979 1.2384 1.2144 9.255 1.2278 1.1893 1,2286 1.2272 9.054 1.2168 1.1763 1.2165 1.2359 8.853 1.2020 1.166Z 1.2092 1.2397 8.652 1.1893 1.1670 1.2141 1.2426 8.450 1.1900 1.1724 1.2230 1.2438 8.249 1.1889 1.1761 1.2290 1.2500 8.048 1.1918 1.1783 1.2332 1.2591 7.847 1.1940 1.1780 1.2344 1.2670 7.646 1.1935 1.1761 1.2336 1.2800 7.444 1.1914 1.1728 1.2315 1.2895 7.243 1.1867 I.I674 1.2259 1.2944 7.042 1.1802 1.1604 1.2178 1.2950 6.841 1.1724 1.1523 1.2083 1.2931 6.640 1.1633 1.1459 1.1988 1.2890 6.438 1.1529 1.1393 1.1896 1.2819 6.237 1.1452 1.1326 1.1801 1.2719 6.036 1.1401 1.1279 1.1696 1.2596 5.835 1.1344 1.1252 1.1608 1.2478 5.634 1.1321 1.1225 1.1560 1.2400 5.432 1.1309 1.1258 1.1590 1.2349 5.231 1.1317 1.1378 1.1643 1.2349 5.030 1.1386 1.1484 1.1706 1.2348 4.829 1.1477 1.1587 1.1753 1.2344 4.628 1.1561 1.1683 1.1790 1.2333 4.426 1.1640 1.1775 1.1815 1.2302 4.225 1.1710 1.1856 1.1829 1.2254 4.024 1.1770 1.1930 1.1833 1.2191 3.823 1.1826 1.1994 1.1822 1.2100 3.622 1.1872 1.2065 1.1795 1.1985 3.420 1.1925 1.2159 1.1763 1.1861 3.219 1.1985 1.2241 1.1722 1.1765 3.018 1.2057 1.2377 I.I765 1.1776 2.817 1.2190 1.2562 1.1889 1.1890 2.616 1.2337 1.2794 1.2020 1.2019 2.414 1.2476 1.3058 1.2149 1.2147 2.213 1.2616 1.3328 1.2279 1.2275 2.012 1.2755 1.3595 1.2399 1.2386 1.811 1.2893 1.3858 1.2514 1.2491 1.610 1.3024 1.4105 1.2627 1.2601 1.408 1.3149 1.4336 1.2737 1.2714 1.207 1.3269 1.4550 1.2843 1.2828 1.006 1.3380 1.4742 1.2943 1.2945 57-61 0.805-0.000 1.0000 l.OOOO 1.0000 l.OOOO Top and Bottom 5 Points Excluded per Technical Specification B3.2.1.

These W(Z) values are consistent with Figure 5, and are valid over tlie HFP Tavg temperature rangefrom 584.1 to 587.1°F.

Page 6 of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 1 REQUIRED SHUTDOWN MARGIN FOR MODES 3 AND 4 (FOUR LOOPS FILLED AND VENTED AND AT LEAST ONE REACTOR COOLANT PUMP RUNNING)

ACCEPTABLE OPERATING REGION (2400, 3.lb)

"S 3-° IREQUIRED SHUTDOWN MARGIN (lioo, i.2b)

O 2.0 gm UNACCEPTABLE OPERATING REGION (65d, 1.3^0) 500 1000 1500 RCS BORON CONCENTRATION (ppm)

Page? of 11

(2$00L i.9ph ACCEPTABLE OPERATING REGION REQUIRED SHUTDOWN MARGIN 1250, a.8B) 0 200 RCS BO N (ppm)

Page 8 of

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURES ROD BANK INSERTION LIMITS VERSUS % OF RATED THERMAL POWER (Fully Withdrawn )

iiisaiaiaiyiigBSgS^^S S 180 111 h

160 SSS' Se'SSSSSSSSSSSSSSSSSSSI m

S<

S 140 ******I O 120 H

!i3:

g 100 s H

W ***SIHI

    • a S3 B

<< 80 wmmmumuut ********I

  • SSSSS
  • SSSSSSSESSSSSSSSSSSSSnSSSSSS^

BaianmHHHB

[*******111! *************in

>0 30 40 50 60 70 80 POWER (% of Rated Thermal Power)

  • Fully withdrawn shall bethe condition where control rods are ata position within the interval S 225 and < 231 steps withdrawn.

NOTE: The Rod Bank Insertion Limits are based on the control bank withdrawal sequence A, B, C, D and a control bank tip-to-tip distance of 115 steps.

Page 9 of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 4 K(Z) - NORMALIZED Fq(Z) AS A FUNCTION OF CORE HEIGHT o

FQ = 2.50 CORE HT. K(Z) 0.00 1.00 O 0.6 6.00 1.00 12.0 .925 4 6 CORE HEIGHT (feet)

Page 10 of 11

CORE OPERATING LIMITS REPORT. VEGP UNIT 1 CYCLE 19 FEBRUARY 2014 FIGURE 5 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF % RATED THERMAL POWER FORRAOC

(+10, 100)

UNACCBPTMLE rt 80

^

<u 70

  • dP 50

(-30, 50)

-40 -30 -20 -10 0 10 20 30 AXIAL FLUX DIFFERENCE (percent Al)