ML14162A587: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML14162A587 | | number = ML14162A587 | ||
| issue date = 06/18/2014 | | issue date = 06/18/2014 | ||
| title = | | title = Review of the 2013 Refueling Outage Steam Generator Tube Inservice Inspection Results | ||
| author name = Wengert T | | author name = Wengert T | ||
| author affiliation = NRC/NRR/DORL/LPLIII-2 | | author affiliation = NRC/NRR/DORL/LPLIII-2 | ||
| addressee name = Weber L | | addressee name = Weber L | ||
| addressee affiliation = Indiana & Michigan Electric Co | | addressee affiliation = Indiana & Michigan Electric Co | ||
| docket = 05000315 | | docket = 05000315 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGu, _ UNITED STATES o.,. ... NUCLEAR REGULATORY COMMISSION 0 WASHINGTON, D.C. 20555-0001 | {{#Wiki_filter:\..~p.R REGu, _ UNITED STATES | ||
<( 0 .... ii: !/) :: '1/. | ~v "'~r | ||
.,<~'- o.,.... NUCLEAR REGULATORY COMMISSION | |||
~ 0 WASHINGTON, D.C. 20555-0001 | |||
<( 0 | |||
.... ii: | |||
!/) :: | |||
~ | |||
'1/. ~ | |||
~ June 18, 2014 1-~ ~0 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 | |||
==SUBJECT:== | ==SUBJECT:== | ||
DONALD C. COOK NUCLEAR PLANT, UNIT 1 - REVIEW OF THE 2013 REFUELING OUTAGE STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS (TAC NO. MF3057) | |||
==Dear Mr. Weber:== | |||
By letter dated November 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook Nuclear Plant, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 steam generator inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445). | |||
By letter dated November 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number | |||
Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook Nuclear Plant, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 steam generator inspections in a letter dated July 15, 2013 (ADAMS Accession No. | |||
The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. | |||
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed. | The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed. | ||
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov. | Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov. | ||
Docket No. 50-315 | Sincerely, | ||
~~~ | |||
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315 | |||
==Enclosure:== | ==Enclosure:== | ||
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv | Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv | ||
Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 SG inspections in a letter dated July 15, 2013 (ADAMS Accession No. | |||
The licensee provided additional information regarding the SG inspections on January 31, 2014 ( | OFFICE OF NUCLEAR REACTOR REGULATION REVIEW OF RESULTS OF 2013 STEAM GENERATOR TUBE INSPECTIONS DONALD C. COOK NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-315 By letter dated November 11, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 SG inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ML14049A445). | ||
Donald C. Cook Nuclear Plant, Unit 1 has four Model 51 R recirculating SGs designed and fabricated by Babcock and Wilcox International. | Donald C. Cook Nuclear Plant, Unit 1 has four Model 51 R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated, Alloy 690 tubes that have a nominal outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet. | ||
Each SG has 3,496 thermally | The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., | ||
tube plugging) taken in response to the inspection findings. | |||
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings. | |||
After review of the information provided by the licensee, the NRC staff has the following comments/observations: | After review of the information provided by the licensee, the NRC staff has the following comments/observations: | ||
* The number of new fan bar wear indications this outage showed a significant decrease from the prior inspection outage. | * The number of new fan bar wear indications this outage showed a significant decrease from the prior inspection outage. | ||
* There was a slight increase in the number of new lattice grid wear indications this outage. Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by its technical specifications. | * There was a slight increase in the number of new lattice grid wear indications this outage. | ||
The SG tube inspections at Donald C. Cook Nuclear Plant, Unit 1 appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Enclosure | Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by its technical specifications. The SG tube inspections at Donald C. Cook Nuclear Plant, Unit 1 appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units. | ||
Enclosure | |||
ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445). | |||
The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. | |||
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed. | The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed. | ||
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov. | Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov. | ||
Docket No. 50-315 | Sincerely, IRA! | ||
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315 | |||
==Enclosure:== | ==Enclosure:== | ||
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv DISTRIBUTION: | Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv DISTRIBUTION: | ||
PUBLIC LPL3-1 R/F RidsOgcRp Resource AJohnson, NRR/DE RidsNrrDeEsgb Resource KKarwoski, NRR/DE GKulesa, NRR/DE RidsNrrLAMHenderson Resource RidsNrrPMDCCook Resource RidsAcrsAcnw_MaiiCTR Resource RidsRgn3MaiiCenter Resource RidsNrrDorllpl3-1 Resource ADAMS Accession No* .. ML14162A587 *Memo dated 5/22/14 OFFICE NRR/LPL3-1 PM NRR/LPL3-1/LA NRR/DE/ESGB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME TWengert MHenderson GKulesa* RCa rison TWengert DATE 06/13 /14 06/18/14 5/22/14 06/17/14 06/18/14}} | |||
.. *Memo dated 5/22/14 OFFICE NRR/LPL3-1 PM NRR/LPL3-1/LA NRR/DE/ESGB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME TWengert MHenderson GKulesa* | |||
RCa rison TWengert DATE 06/13 /14 06/18/14 5/22/14 06/17/14 06/18/14 |
Latest revision as of 19:37, 5 February 2020
ML14162A587 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 06/18/2014 |
From: | Thomas Wengert Plant Licensing Branch III |
To: | Weber L Indiana & Michigan Electric Co |
Thomas Wengert, NRR/DORL 415-4037 | |
References | |
TAC MF3057 | |
Download: ML14162A587 (3) | |
Text
\..~p.R REGu, _ UNITED STATES
~v "'~r
.,<~'- o.,.... NUCLEAR REGULATORY COMMISSION
~ 0 WASHINGTON, D.C. 20555-0001
<( 0
.... ii:
!/) ::
~
'1/. ~
~ June 18, 2014 1-~ ~0 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT 1 - REVIEW OF THE 2013 REFUELING OUTAGE STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS (TAC NO. MF3057)
Dear Mr. Weber:
By letter dated November 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook Nuclear Plant, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 steam generator inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445).
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed.
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Sincerely,
~~~
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315
Enclosure:
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv
OFFICE OF NUCLEAR REACTOR REGULATION REVIEW OF RESULTS OF 2013 STEAM GENERATOR TUBE INSPECTIONS DONALD C. COOK NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-315 By letter dated November 11, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 SG inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ML14049A445).
Donald C. Cook Nuclear Plant, Unit 1 has four Model 51 R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated, Alloy 690 tubes that have a nominal outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g.,
tube plugging) taken in response to the inspection findings.
After review of the information provided by the licensee, the NRC staff has the following comments/observations:
- The number of new fan bar wear indications this outage showed a significant decrease from the prior inspection outage.
- There was a slight increase in the number of new lattice grid wear indications this outage.
Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by its technical specifications. The SG tube inspections at Donald C. Cook Nuclear Plant, Unit 1 appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
Enclosure
ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445).
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed.
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Sincerely, IRA!
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315
Enclosure:
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsOgcRp Resource AJohnson, NRR/DE RidsNrrDeEsgb Resource KKarwoski, NRR/DE GKulesa, NRR/DE RidsNrrLAMHenderson Resource RidsNrrPMDCCook Resource RidsAcrsAcnw_MaiiCTR Resource RidsRgn3MaiiCenter Resource RidsNrrDorllpl3-1 Resource ADAMS Accession No* .. ML14162A587 *Memo dated 5/22/14 OFFICE NRR/LPL3-1 PM NRR/LPL3-1/LA NRR/DE/ESGB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME TWengert MHenderson GKulesa* RCa rison TWengert DATE 06/13 /14 06/18/14 5/22/14 06/17/14 06/18/14