MONTHYEARAEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance ML24073A2342024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System IR 05000315/20230062024-02-28028 February 2024 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2023006 and 05000316/2023006) AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation ML24037A0522024-02-0707 February 2024 NRC Response to DC Cook Triennial Evaluated Force-on-Force Cycle Schedule Change Request AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 2024-09-09
[Table view] |
Text
\..~p.R REGu, _ UNITED STATES
~v "'~r
.,<~'- o.,.... NUCLEAR REGULATORY COMMISSION
~ 0 WASHINGTON, D.C. 20555-0001
<( 0
.... ii:
!/) ::
~
'1/. ~
~ June 18, 2014 1-~ ~0 Mr. Lawrence J. Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT 1 - REVIEW OF THE 2013 REFUELING OUTAGE STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS (TAC NO. MF3057)
Dear Mr. Weber:
By letter dated November 11, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook Nuclear Plant, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 steam generator inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445).
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed.
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Sincerely,
~~~
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315
Enclosure:
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv
OFFICE OF NUCLEAR REACTOR REGULATION REVIEW OF RESULTS OF 2013 STEAM GENERATOR TUBE INSPECTIONS DONALD C. COOK NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-315 By letter dated November 11, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13317A074), Indiana Michigan Power Company (the licensee) submitted information summarizing the results of the 2013 steam generator (SG) inspections at Donald C. Cook, Unit 1. The U.S. Nuclear Regulatory Commission (NRC) staff documented additional information concerning the 2013 SG inspections in a letter dated July 15, 2013 (ADAMS Accession No. ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ML14049A445).
Donald C. Cook Nuclear Plant, Unit 1 has four Model 51 R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated, Alloy 690 tubes that have a nominal outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g.,
tube plugging) taken in response to the inspection findings.
After review of the information provided by the licensee, the NRC staff has the following comments/observations:
- The number of new fan bar wear indications this outage showed a significant decrease from the prior inspection outage.
- There was a slight increase in the number of new lattice grid wear indications this outage.
Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by its technical specifications. The SG tube inspections at Donald C. Cook Nuclear Plant, Unit 1 appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
Enclosure
ML13189A226). The licensee provided additional information regarding the SG inspections on January 31, 2014 (ADAMS Accession No. ML14049A445).
The NRC staff has completed its review of the information provided and concludes that the licensee provided the information required by their technical specifications and no additional follow-up is required at this time. The staff's review is enclosed.
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Sincerely, IRA!
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-315
Enclosure:
Review of the 2013 Steam Generator Tube Inspections Results cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsOgcRp Resource AJohnson, NRR/DE RidsNrrDeEsgb Resource KKarwoski, NRR/DE GKulesa, NRR/DE RidsNrrLAMHenderson Resource RidsNrrPMDCCook Resource RidsAcrsAcnw_MaiiCTR Resource RidsRgn3MaiiCenter Resource RidsNrrDorllpl3-1 Resource ADAMS Accession No* .. ML14162A587 *Memo dated 5/22/14 OFFICE NRR/LPL3-1 PM NRR/LPL3-1/LA NRR/DE/ESGB/BC NRR/LPL3-1/BC NRR/LPL3-1/PM NAME TWengert MHenderson GKulesa* RCa rison TWengert DATE 06/13 /14 06/18/14 5/22/14 06/17/14 06/18/14