ML14309A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
{{#Wiki_filter:2014 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
{{#Wiki_filter:2014 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE


.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 15, 2014 Mr. Larry Weber Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 15, 2014 Mr. Larry Weber Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106


Line 33: Line 32:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents


*!
L. Weber                                        Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
* L. Weber                                        Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-7 4 cc: Distribution via LISTSER~
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-7 4 cc: Distribution via LISTSER~


..
L. Weber                                          Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Weber                                          Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSER~
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSER~
Line 64: Line 61:
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ'
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ'


, .. ' ' .
L. Weber                                                      A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The Jetter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
L. Weber                                                      A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The Jetter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Line 92: Line 88:
JUL 3 0 2012 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                                    EXPIRES: 09/3012014 (9-2011)
JUL 3 0 2012 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                                    EXPIRES: 09/3012014 (9-2011)
Estimated burden per response to comply with this \/Oiuntaty lnfonnation coDection request 1 hour. This infonnation collection is used to plan budgets and resoun:es for operator examinations. Send coovnents regarding burden esumate to the Information Services Branch OPERATOR LICENSING                        (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocollects.Resoun:e@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and EXAMINATION DATA                        Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washlngton, DC 20503. If a means used to Impose an Information collection does not display a cunently va&d OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the infonnatlon collection.
Estimated burden per response to comply with this \/Oiuntaty lnfonnation coDection request 1 hour. This infonnation collection is used to plan budgets and resoun:es for operator examinations. Send coovnents regarding burden esumate to the Information Services Branch OPERATOR LICENSING                        (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocollects.Resoun:e@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and EXAMINATION DATA                        Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washlngton, DC 20503. If a means used to Impose an Information collection does not display a cunently va&d OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the infonnatlon collection.
FACIUTY                                                                                                              Nt<CRt:GION Donald C. Cook Nuclear Plant                                                                                        3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2014            CY2016                                CY2018                            CY PROPOSED NUMBER
FACIUTY                                                                                                              Nt<CRt:GION Donald C. Cook Nuclear Plant                                                                                        3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2014            CY2016                                CY2018                            CY PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                  0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  1                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY PROPOSED NUMBER                    CY2014 CY2016 CY2018 NUMBER OF REACTOR OPERATORS                    10                10                                      10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                  6                  6                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                  5                  5                                        5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                  0                  0                                        0 PROPOSED DATES PRIMARY DATE              07/2112014        07/1112016                          07/23/2018 ALTERNATE DATE            07/28/2014          07/18/2016                          07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH        JUNE CY 2013 SEPTEMBER DECEMBER              MARCH CY 2015 JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF          16                                                      16 CANDIDATES NRC FORM 536 (9-2011)
                                              --                --                                      -                                  -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                  0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  1                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY PROPOSED NUMBER                    CY2014
                                              -
CY2016
                                                                -
CY2018
                                                                                                          -                                -
NUMBER OF REACTOR OPERATORS                    10                10                                      10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                  6                  6                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                  5                  5                                        5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                  0                  0                                        0 PROPOSED DATES PRIMARY DATE              07/2112014        07/1112016                          07/23/2018 ALTERNATE DATE            07/28/2014          07/18/2016                          07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH        JUNE
                                            -
CY 2013 SEPTEMBER DECEMBER              MARCH CY 2015 JUNE
                                                                                                              -
SEPTEMBER DECEMBER ESTIMATED NUMBER OF          16                                                      16 CANDIDATES NRC FORM 536 (9-2011)


\=  INDIANA MICHIGAN POWER*
\=  INDIANA MICHIGAN POWER*
Line 121: Line 105:
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-4131                                  EXPIRES: 09/30/2014 (09-2011)
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-4131                                  EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary infonnation collection request 1 hour. This infonnalion collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Branch OPERATOR LICENSING                        (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, OffiCe of lnfonnation and EXAMINATION DATA                        Regulatory Affairs, NEOB-10202. (315Q.0131), Office of Management and Budge~ Washington, oc    20503. na means used to impose an infonnafion coUection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation coUection.
Estimated burden per response to comply with this voluntary infonnation collection request 1 hour. This infonnalion collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Branch OPERATOR LICENSING                        (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, OffiCe of lnfonnation and EXAMINATION DATA                        Regulatory Affairs, NEOB-10202. (315Q.0131), Office of Management and Budge~ Washington, oc    20503. na means used to impose an infonnafion coUection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation coUection.
FACIUTY                                                                                                              NRCRt:l:iiUN Donald C. Cook Nuclear Plant                                                                                          3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2014            CY2016                                CY2018                            CY
FACIUTY                                                                                                              NRCRt:l:iiUN Donald C. Cook Nuclear Plant                                                                                          3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2014            CY2016                                CY2018                            CY ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  1                                      0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2014            CY2016                                CY2018                            CY NUMBER OF REACTOR OPERATORS 9                  10                                    10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                  4                6                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                  5                  5                                        5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                0                0                                        0 PROPOSED DATES PRIMARY DATE              07/21/2014        07/1112016                          07/23/2018 ALTERNATE DATE            07/28/2014        07/18/2016                          07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015                                                          CY 2017 PROPOSED NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH                    JUNE        SEPTEMBER DECEMBER ESTIMATED NUMBER OF          16                                                      16 CANDIDATES NRC FORM 536 (09-2011)
                                              --                --                                      -                                -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  1                                      0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2014            CY2016                                CY2018                            CY
                                              --                --                                      --                                -
NUMBER OF REACTOR OPERATORS 9                  10                                    10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                  4                6                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                  5                  5                                        5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                0                0                                        0 PROPOSED DATES PRIMARY DATE              07/21/2014        07/1112016                          07/23/2018 ALTERNATE DATE            07/28/2014        07/18/2016                          07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015                                                          CY 2017 PROPOSED NUMBER
                                            -                                                                --
MARCH        JUNE    SEPTEMBER DECEMBER            MARCH                    JUNE        SEPTEMBER DECEMBER ESTIMATED NUMBER OF          16                                                      16 CANDIDATES NRC FORM 536 (09-2011)


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 November 15, 2011 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 November 15, 2011 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
Line 164: Line 142:
OPERATOR LICENSING                        Nuclear Ref,ulatory Commission, Washington, DC 20555-000 , or b(c internet e-mail to in ocollects@nrc-sov, and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collect1on.
OPERATOR LICENSING                        Nuclear Ref,ulatory Commission, Washington, DC 20555-000 , or b(c internet e-mail to in ocollects@nrc-sov, and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collect1on.
FACIUTY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                    3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012            CY 2014                        CY 2016 PROPOSED NUMBER
FACIUTY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                    3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012            CY 2014                        CY 2016 PROPOSED NUMBER
                                               -                  -                                -                          CY
                                               -                  -                                -                          CY ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2012            CY 2014                        CY 2016                        CY NUMBER OF REACTOR                        8                    8                                8 OPERATORS NUMBER OF SENIOR REACTOR                                            4                                4 4
                                                                                                                                  -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2012            CY 2014                        CY 2016                        CY
                                              -                  -                                -                              -
NUMBER OF REACTOR                        8                    8                                8 OPERATORS NUMBER OF SENIOR REACTOR                                            4                                4 4
OPERATORS- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                          3                    3                                3 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                        0                    0                                0 PROPOSED DATES PRIMARY DATE                07/23/2012        07/2112014                    07/18/2016 ALTERNATE DATE                07/30/2012          07/28/2014                    07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013                                                    CY 2015 PROPOSED                                ---                                                          --
OPERATORS- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                          3                    3                                3 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED                        0                    0                                0 PROPOSED DATES PRIMARY DATE                07/23/2012        07/2112014                    07/18/2016 ALTERNATE DATE                07/30/2012          07/28/2014                    07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013                                                    CY 2015 PROPOSED                                ---                                                          --
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            12                                                    12 CANDIDATES NRC FORM 536 {10-2008)                                                                                              PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            12                                                    12 CANDIDATES NRC FORM 536 {10-2008)                                                                                              PRINTED ON RECYCLED PAPER
Line 185: Line 159:
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150*0131                          EXPIRES: 10131/2011 (10.:/00B)                                                      Estimated burden per res~onse to comply with this voluntary information collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments re~rdin~ burden OPERA TOR LICENSING                                                                                      j estimate to the Records and FDIA/Privacy Services Branch -5 F 3), U.S.
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150*0131                          EXPIRES: 10131/2011 (10.:/00B)                                                      Estimated burden per res~onse to comply with this voluntary information collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments re~rdin~ burden OPERA TOR LICENSING                                                                                      j estimate to the Records and FDIA/Privacy Services Branch -5 F 3), U.S.
Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or bfc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs. NE B-10202, (3150-0131), OffiCe of Management and Budget, Washmgton, DC 20503. II a means used to impose an information collection does not display a currently valrd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectron.
Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or bfc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs. NE B-10202, (3150-0131), OffiCe of Management and Budget, Washmgton, DC 20503. II a means used to impose an information collection does not display a currently valrd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectron.
FACILITY                                                                                                        NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                  3 Bridgman, MI 49.106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012            CY 2014                        CY 2016                        CY PROPOSED NUMBER
FACILITY                                                                                                        NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                  3 Bridgman, MI 49.106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012            CY 2014                        CY 2016                        CY PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS cvzot4                          CY 2016 PROPOSED NUMBER                    CY 2012 CY NUMBER OF REACTOR                      8                    8                                8 OPERATORS NUMBER OF SENIOR REACTOR                                          3                                3 4
                                              -                  --                              -                              -
ESTIMATED NUMBER OF LICENSEE-PREPARED                1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS cvzot4                          CY 2016 PROPOSED NUMBER                    CY 2012
                                              -                  -                                -                            .-
CY NUMBER OF REACTOR                      8                    8                                8 OPERATORS NUMBER OF SENIOR REACTOR                                          3                                3 4
OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 3                    4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0                    0                                0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE              07/23/2012        07/2112014                    07/18/2016 ALTERNATE DATE              07/30/2012        07/28/2014                    07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2011                                                  CY 2013 PROPOSED                                ---                                                          ---
OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 3                    4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0                    0                                0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE              07/23/2012        07/2112014                    07/18/2016 ALTERNATE DATE              07/30/2012        07/28/2014                    07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2011                                                  CY 2013 PROPOSED                                ---                                                          ---
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            12                                                  11 CANDIDATES NRC FORM 536 (10.2008)                                                                                            PRINTED ON RECYClED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            12                                                  11 CANDIDATES NRC FORM 536 (10.2008)                                                                                            PRINTED ON RECYClED PAPER
Line 208: Line 178:
Sincerely, IRA/
Sincerely, IRA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:    Distribution via ListServ
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:    Distribution via ListServ
* J.Jensen                                          In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
J.Jensen                                          In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,
                                                   /RAJ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:    Distribution via ListServ DISTRIBUTION:
                                                   /RAJ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:    Distribution via ListServ DISTRIBUTION:
Line 226: Line 197:
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION    APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 10/31/2011 (10-2008)                                                          Est1mated burden per response to comply with this voluntary information collection request: 1 hour. This Information collection is used to plan budgets and resources for operator examinations. Send comments re~1rding burden estimate to the Records and FOINPrivacy Services Branch \ -5 F53), U.S.
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION    APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 10/31/2011 (10-2008)                                                          Est1mated burden per response to comply with this voluntary information collection request: 1 hour. This Information collection is used to plan budgets and resources for operator examinations. Send comments re~1rding burden estimate to the Records and FOINPrivacy Services Branch \ -5 F53), U.S.
OPERATOR LICENSING                          Nuclear Regulatory Commission, Washington, DC 20555-000 , or by internet e-ma1l to tnfocollects@nrc.8ov. and to the Desk Officer. Off1ce of Information EXAMINATION DATA                          and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503.        If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.
OPERATOR LICENSING                          Nuclear Regulatory Commission, Washington, DC 20555-000 , or by internet e-ma1l to tnfocollects@nrc.8ov. and to the Desk Officer. Off1ce of Information EXAMINATION DATA                          and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503.        If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.
FACILITY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                    3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010            CY 2012                        CY 2014                          CY 2016 PROPOSED NUMBER
FACILITY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place                                                                                                    3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010            CY 2012                        CY 2014                          CY 2016 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                    1                          1                                1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                            0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2012                        CY 2014                          CY 2016 NUMBER OF REACTOR                          8                    8                                8                              8 OPERATORS NUMBER OF SENIOR REACTOR                        1                    3                                3                              3 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                                                              4 5                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS- LIMITED                        0 PROPOSED DATES PRIMARY DATE                  06/2112010        07/23/2012                      07/21/2014                      07/18/2016 ALTERNATE DATE                06/28/2010        07/30/2012                    07/28/2014                      07/25/2016
                                              --                --                              --                              --
ESTIMATED NUMBER OF LICENSEE-PREPARED                    1                          1                                1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                            0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2012                        CY 2014                          CY 2016
                                              --                --                                --                              --
NUMBER OF REACTOR                          8                    8                                8                              8 OPERATORS NUMBER OF SENIOR REACTOR                        1                    3                                3                              3 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                                                              4 5                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS- LIMITED                        0 PROPOSED DATES PRIMARY DATE                  06/2112010        07/23/2012                      07/21/2014                      07/18/2016 ALTERNATE DATE                06/28/2010        07/30/2012                    07/28/2014                      07/25/2016
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2011                                                CY 2013 PROPOSED                                ---                                                          ---
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2011                                                CY 2013 PROPOSED                                ---                                                          ---
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            11                                                    11 CANDIDATES NRC FORM 536 (10-2008)                                                                                              PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            11                                                    11 CANDIDATES NRC FORM 536 (10-2008)                                                                                              PRINTED ON RECYCLED PAPER
Line 246: Line 213:
OPERATOR LICENSING                        Nuclear Regulatory Commission, Washington, DC 20555-0001, or bh internet e-mail to infocollects@nrcgov. and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE B-10202. (3150-0131). Office of Management and Budget. Washmgton, DC 20503.          If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
OPERATOR LICENSING                        Nuclear Regulatory Commission, Washington, DC 20555-0001, or bh internet e-mail to infocollects@nrcgov. and to the Desk Officer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE B-10202. (3150-0131). Office of Management and Budget. Washmgton, DC 20503.          If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                        NRC REGION Donald C. Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 3
FACILITY                                                                                                        NRC REGION Donald C. Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 3
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2010            CY2012                          CY2014                          CY
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2010            CY2012                          CY2014                          CY ESTIMATED NUMBER OF LICENSEE-PREPARED                1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                            0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2012                        CY2014                          CY NUMBER OF REACTOR                                            8                                8 8
                                            --                --                              --                              --
ESTIMATED NUMBER OF LICENSEE-PREPARED                1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                            0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2012                        CY2014                          CY
                                            --                --                                --                              --
NUMBER OF REACTOR                                            8                                8 8
OPERATORS NUMBER OF SENIOR REACTOR                                          3                                3 2
OPERATORS NUMBER OF SENIOR REACTOR                                          3                                3 2
OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 5                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE              06/21/2010        07/23/2012                    07/21/2014 ALTERNATE DATE              06/28/2010        07/30/2012                    07/28/2014
OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 5                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE              06/21/2010        07/23/2012                    07/21/2014 ALTERNATE DATE              06/28/2010        07/30/2012                    07/28/2014
Line 286: Line 249:
Sincerely, Joel P. Gebbie Plant Manager JEN/rdw Enclosure AUG 2 9 2008
Sincerely, Joel P. Gebbie Plant Manager JEN/rdw Enclosure AUG 2 9 2008


..
U. S. Nuclear Regulatory Commission  AEP-NRC-2008-31 Page 2 c:    T. A. Beltz- NRC Washington DC J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill
U. S. Nuclear Regulatory Commission  AEP-NRC-2008-31 Page 2 c:    T. A. Beltz- NRC Washington DC J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill


,,
NRC FORM 536                  U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 08/31/2008 (8-2005)
NRC FORM 536                  U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments refrdin~ burden estimate to the Records and FOIA!Privacy Services Branch ( -5 F 3), U.S.
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments refrdin~ burden estimate to the Records and FOIA!Privacy Services Branch ( -5 F 3), U.S.
Line 295: Line 256:
FACILITY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place
FACILITY                                                                                                          NRC REGION Donald C. Cook Nuclear Plant One Cook Place
* Bridgman, Ml 49106 3
* Bridgman, Ml 49106 3
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2010              CY2012                          CY2014                          CY
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2010              CY2012                          CY2014                          CY ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY2012                          CY2014                          CY NUMBER OF REACTOR                                              8                                8 8
                                                  --                  --                              --                              --
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY2012                          CY2014                          CY
                                                  --                  --                              --                              --
NUMBER OF REACTOR                                              8                                8 8
OPERATORS NUMBER OF SENIOR REACTOR                                            3                                3 3
OPERATORS NUMBER OF SENIOR REACTOR                                            3                                3 3
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                  06/07/2010        07/23/2012                    07/21/2014 ALTERNATE DATE                06/14/2010          07/30/2012                    07/28/2014
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4                  4                                4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                  06/07/2010        07/23/2012                    07/21/2014 ALTERNATE DATE                06/14/2010          07/30/2012                    07/28/2014
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2009                                                  CY 2011 PROPOSED                                ---                                                            ---
: c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY    2009                                                  CY 2011 PROPOSED                                ---                                                            ---
NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            11                                                    11 CANDIDATES NRC FORM 536 .(8-2005)                                                                                              PRINTED ON RECYCLED PAPER}}
NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            11                                                    11 CANDIDATES NRC FORM 536 .(8-2005)                                                                                              PRINTED ON RECYCLED PAPER}}

Latest revision as of 16:50, 5 February 2020

2014 D.C. Cook Nuclear Plant Initial License Examination Miscellaneous Correspondence
ML14309A130
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/21/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML13093a429 List:
References
Download: ML14309A130 (36)


Text

2014 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 15, 2014 Mr. Larry Weber Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Weber:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Donald C. Cook Nuclear Power Plant, Units 1 and 2.

The U.S. Nuclear Regulatory Commission (NRC) has completed its r~view of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Daniel Emery, Training Manager. Note that any examination waivers have been addressed in separate correspondence.

The NRC will administer the written examinations and operating tests in accordance with Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of July 21 and 28, 2014.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at you~ facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at (630) 829-9707.

Please contact Mr. D. McNeil, Chief Examiner, at (630) 829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents

L. Weber Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-7 4 cc: Distribution via LISTSER~

L. Weber Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via LISTSER~

DISTRIBUTION:

Cindy Resales-Cooper RidsNrrDorllpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Carmen Olteanu John McHale DOCUMENT NAME: +Ltr 07xx14 DCC Exam Approval (DRM).docx IS] Publicly Available D Non-Publicly AvailableO Sensitive ISl Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE Rill I ri Rill IC. Rill I Rill I NAME DMcNeil:bl iMM. JKweiser~i-" HPete~on ..:uv/

DATE 07/ \'\ /14 07/ 1 I /14!1 07/ ~~ /14 "(-./.

OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 January 27, 2014 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Weber:

We have received your letters AEP-NRC-2012-52, dated July 23, 2012, and AEP-NRC-2013-62, dated August 5, 2013. In these letters, you requested that initial operator licensing examinations be scheduled at the Donald C. Cook Nuclear Power Plant in July 2016 and July 2018.

In response, you have been scheduled an initial license exam for the weeks of July 11 and 18, 2016, with an onsite validation scheduled for June 13, 2016. Additionally, we have scheduled an initial license exam for the weeks of July 23 and 30, 2018, with an onsite validation date of June 25, 2018.

We note that you were previously scheduled for an initial operator licensing exam the week of July 21 and 28, 2014, with an onsite validation date of June 23, 2014. This exam date has not changed. This examination will be written by the Nuclear Regulatory Commission Operator Licensing Branch in Region Ill.

The NRC will write the initial operator licensing exam scheduled in July 2014 in accordance with NUREG 1021, Revision 9, Supplement 1. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions, and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination scheduled in 2016 and 2018 unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates decline below ten for any examination, as this will impact the examination schedule.

Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

L. Weber A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2. 390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or froni the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ'

L. Weber A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The Jetter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ' DISTRIBUTION:

Brett Rini RidsNrrDorllpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: DCCook 2014.docx C8l Publicly Available D Non-Publicly Available D Sensitive C8l Non-Sensitive

=

To receive a copy of this document, indicate in the concurrence box "C" Copy without attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE Rill l Rill L.. Rill J Rill l NAME RKWalton:bl R_}L\,V HPeterson f)

DATE 01/ 1.'1-/14 01~t{l14 ~,

OFFICIAL RECORD COPY

s INDIANA MICHIGAN Indiana Michigan Power POWER.- One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com July 23, 2012 AEP-NRC-2012-52 10 CFR 50.4 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO REGULATORY ISSUE

SUMMARY

2012-07 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Nuclear Regulatory Commission (NRC}, Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Examinations," dated June 8, 2012, requests licensees to update examination schedules and applicant estimates for calendar years 2014 through 2017.

Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing, as an enclosure to this letter, NRC Form 536, "Operator Licensing Examination Data," which contains the details of CNPs examination schedule as requested. The class size and composition has significantly changed, since the previous update to the NRC, for the July 2014 and July 2016 classes.

There are no commitments included in this submittal. Should you have any questions, please contact Ron Sieber, Training Manager at (269) 466-3439.

Sincerely, Joel P. Gebbie Site Vice President KMH/jmr

Enclosure:

NRC Form 536, Operator Licensing Examination Data JUL 3 0 2012

U.S. Nuclear Regulatory Commission AEP-NRC-2012-52 Page 2 c: J. R. Kweiser- NRC Region Ill

.NRC Resident Inspector H. Peterson- NRC Region Ill P. S. Tam- NRC Washington DC

ENCLOSURE TO AEP NRC 2012-52 NRC FORM 536 OPERATOR LICENSING EXAMINATION DATA

JUL 3 0 2012 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/3012014 (9-2011)

Estimated burden per response to comply with this \/Oiuntaty lnfonnation coDection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection is used to plan budgets and resoun:es for operator examinations. Send coovnents regarding burden esumate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocollects.Resoun:e@nrc.gov, and to the Desk Officer, Office of lnfonnatlon and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washlngton, DC 20503. If a means used to Impose an Information collection does not display a cunently va&d OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the infonnatlon collection.

FACIUTY Nt<CRt:GION Donald C. Cook Nuclear Plant 3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2014 CY2016 CY2018 CY PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY PROPOSED NUMBER CY2014 CY2016 CY2018 NUMBER OF REACTOR OPERATORS 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 07/2112014 07/1112016 07/23/2018 ALTERNATE DATE 07/28/2014 07/18/2016 07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2013 SEPTEMBER DECEMBER MARCH CY 2015 JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (9-2011)

\= INDIANA MICHIGAN POWER*

Indiana Michigan Power Cook Nuclear Plant One Cook Place A unit ofAmerican Electric Power Bridgman, Ml 49106 lndianaMichiganPower.com August 5, 2013 AEP'"NRC-2013-62 10 CFR 50.4 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO REGULATORY ISSUE

SUMMARY

2013-06 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013, requests licensees to update examination schedules and applicant estimates for calendar years 2015 through 2018.

Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing, as an enclosure to this letter, NRC Form 536, "Operator Licensing Examination Data," which contains the details of GNP's examination schedule as requested. CNP has fewer applicants than originally planned for the July 2014 class; this is the only change since our previous submittal, AEP-NRC-2012-52, "Response to Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations," dated July 23, 2012.

There are no commitments included in this submittal. Should you have any questions, please contact Ron Sieber, Training Manager at (269) 466-3439.

Sincerely,

~r.Jilltt Joel P. Gebbie Site Vice President KMH/db

Enclosure:

NRC Form 536, Operator Licensing Examination Data

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-4131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnalion collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, OffiCe of lnfonnation and EXAMINATION DATA Regulatory Affairs, NEOB-10202. (315Q.0131), Office of Management and Budge~ Washington, oc 20503. na means used to impose an infonnafion coUection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation coUection.

FACIUTY NRCRt:l:iiUN Donald C. Cook Nuclear Plant 3 One Cook Place Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2016 CY2018 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 1 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2016 CY2018 CY NUMBER OF REACTOR OPERATORS 9 10 10 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 4 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 07/21/2014 07/1112016 07/23/2018 ALTERNATE DATE 07/28/2014 07/18/2016 07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (09-2011)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 November 15, 2011 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Weber:

We have received your Jetter AEP-NRC-2011-60. In that letter, you did not request any additional initial operator licensing exam dates.

We have verified the previously requested exam dates of July 21 and July 28, 2014, with an onsite validation date of June 30, 2014, have not changed. However, the July 2016 exam date has been moved up one week to allow more flexibility with the U.S. Nuclear Regulatory Commission (NRC) Operator Licensing schedule. We have scheduled an initial operator licensing exam for the weeks of July 11 and 18, 2016, with an onsite validation date of June 20, 2016.

The NRC will write the initial operator licensing exam scheduled for July 2016 in accordance with NUREG 1021, Revision 9, Supplement 1. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions, and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination scheduled for 2012 and 2014 unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates decline below ten for any examination, as this will impact the examination schedule.

Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, Jist the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

L. Weber In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ'

L. Weber In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ' DISTRIBUTION:

Amy Snyder RidsNrrDorllpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Aria no Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 110411 DCCook Units 1 and 2 Exam 2011.docx D Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" =Copy with attach/encl "N" = No copy OFFICE Rill Rill NAME RKWalton:ls HPeterson DATE 10/31/11 11//f" /11 OFFICIAL RECORD COPY

Indiana Michigan Power INDIANA Cook Nuclear Plant MICHIGAN One Cook Place PC7tlnR~ Bridgman, Ml 49106 AEP.com A unit ofAmerican Electric Power August 24, 2011 AEP-NRC-2011-60 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission AITN: Licensing Branch Chief, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 UPDATED INFORMATION FOR INITIAL LICENSE EXAMINATION SUPPORT This letter provides updated information for Reactor Operator Initial License Examinations planned to be administered at Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details for those planned examinations.

Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on July 23, 2012, July 21, 2014, and July 18, 2016.

However, the number of Instant/Direct Senior Reactor Operator candidates for the examinations beginning on July 21, 2014, and on July 18, 2016, has increased by one for each of those examination dates and the number of Upgrade Senior Reactor Operator candidates has decreased by one for each of those examination dates. The original numbers were submitted in letter AEP-NRC-201 0-66, dated August 12, 2010. We have included the revised numbers on the enclosed NRC Form 536.

There are no new commitments identified in this submittal.

Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.

Sincerely, P.

7~.~ a. S\l\a111e.. L-es Jo#: Gebbia .e.,. . J:P. ~etJ..ie Site Vice President JEN/jmr Enclosure c: J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill P. S. Tam- NRC Washington DC AUG 2 6 Z011

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011

{10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments i'1tardin~ burden estimate to the Records and FOIA/Privacy Services Branch~ -5 F 3), U.S.

OPERATOR LICENSING Nuclear Ref,ulatory Commission, Washington, DC 20555-000 , or b(c internet e-mail to in ocollects@nrc-sov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collect1on.

FACIUTY NRC REGION Donald C. Cook Nuclear Plant One Cook Place 3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2014 CY 2016 PROPOSED NUMBER

- - - CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2014 CY 2016 CY NUMBER OF REACTOR 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 4 4

OPERATORS- INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 07/23/2012 07/2112014 07/18/2016 ALTERNATE DATE 07/30/2012 07/28/2014 07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2015 PROPOSED --- --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 {10-2008) PRINTED ON RECYCLED PAPER

s UNDIIANA

/MI(H!IGIAWJ lndiar1a Michigan Power IJ!IOWlfR One Cook Place Bridgill~n. Ml 49106 A unit of American Electric Power lndianaMichiganPower corn August12,2010 AEP-NRC-2010-66 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 UPDATED INFORMATION FOR INITIAL LICENSE EXAMINATION SUPPORT This letter provides updated information for Reactor Operator Initial License Examinations planned to be administered at Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details for those planned examinations.

Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on July 23, 2012, July 21, 2014, and July 18, 2016.

However, the number of Instant/Direct Senior Reactor Operator candidates for the examination beginning on July 23, 2012, has increased by one and the number of Upgrade Senior Reactor Operator candidates has decreased by one from the number submitted in letter AEP-NRC-2009-67, dated September 11, 2009. We have included the revised numbers on the enclosed NRC Form 536.

There are no new commitments identified in this submittal.

Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.

Sincerely,

~~-J{Ju; Joel P. Gebbia Site Vice President JEN/jmr Enclosure c: J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill P. S. Tam- NRC Washington DC k ~ 1-ia vtNM-i A.UG i 3 2010

U.S. Nuclear Regulatory Commission AEP-NRC-2010~66 Page 2 be: S. L. Freeman

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 10131/2011 (10.:/00B) Estimated burden per res~onse to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments re~rdin~ burden OPERA TOR LICENSING j estimate to the Records and FDIA/Privacy Services Branch -5 F 3), U.S.

Nuclear Re~ulatory Commission, Washington, DC 20555-000 , or bfc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE B-10202, (3150-0131), OffiCe of Management and Budget, Washmgton, DC 20503. II a means used to impose an information collection does not display a currently valrd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectron.

FACILITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place 3 Bridgman, MI 49.106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2014 CY 2016 CY PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS cvzot4 CY 2016 PROPOSED NUMBER CY 2012 CY NUMBER OF REACTOR 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 3 3 4

OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 3 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 07/23/2012 07/2112014 07/18/2016 ALTERNATE DATE 07/30/2012 07/28/2014 07/25/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 2013 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 11 CANDIDATES NRC FORM 536 (10.2008) PRINTED ON RECYClED PAPER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Joseph Jensen Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:

DONALD C. COOK NUCLEAR PLANTS UNITS 1 AND 2

Dear Mr. Jensen:

In response to your Jetter dated September 11, 2009, (AEP-NRC-2009-67}, the initial license operator examination requested to be conducted in July 2016 has been scheduled to start during the week of July 18, 2016. The other examinations you have requested in June 2010, July 2012, and July 2014 are scheduled to start per your letter dated August 28, 2008, (Voluntary Response to NRC RJS 2008-16). The on-site validation of the examinations will occur approximately 3 weeks prior to the examination start week. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine the NRC needs to develop an examination. Because each of these examinations has greater than nine candidates anticipated for the examinations, the examinations have been scheduled for two weeks. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date or the number of candidates declines below ten candidates as this will impact the examination schedule.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, Jist the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

J.Jensen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ

J.Jensen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RAJ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorllpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariana Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak HPeterson 02/19/10 OFFICIAL RECORD COPY

Indiana Michigan Power Company r\JIJCie,:r *Joner,t!.*)!) CrlltJP INDIANA U1:e Cvt.k Plac8 MICHIGAN 8r!il911\ilr:, Mi 4~11Cl6 POWER c)l::!jl ((!Ill September 11, 2009 AEP-NRC-2009-67 10 CFR 55.31(a)(3)

Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR INITIAL LICENSE EXAMINATION SUPPORT This letter requests Reactor Operator Initial License Examination support by Nuclear Regulatory Commission (NRC) Region Ill personnel in July 2016, for Donald C. Cook Nuclear Plant (CNP).

Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details of our request.

Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on June 21, 2010, July 23, 2012, and July 21, 2014.

However, the number of Instant/Direct Senior Reactor Operator candidates for the examination beginning on June 21, 2010, has decreased by one from the number submitted in letter AEP-NRC-2008-45, dated October 16, 2008. We have included the revised number on the enclosed NRC Form 536.

There are no new commitments identified in this submittal.

Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.

Sincerely, Lawrence J. Weber Site Vice President JEN/rdw Enclosure SEP 1 5 2009

U.S. Nuclear Regulatory Commission AEP-NRC-2009-67 Page 2 c: T. A. Beltz- NRC Washington DC J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Est1mated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments re~1rding burden estimate to the Records and FOINPrivacy Services Branch \ -5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-000 , or by internet e-ma1l to tnfocollects@nrc.8ov. and to the Desk Officer. Off1ce of Information EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.

FACILITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place 3 Bridgman, Ml 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2012 CY 2014 CY 2016 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2012 CY 2014 CY 2016 NUMBER OF REACTOR 8 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 1 3 3 3 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 5 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0 PROPOSED DATES PRIMARY DATE 06/2112010 07/23/2012 07/21/2014 07/18/2016 ALTERNATE DATE 06/28/2010 07/30/2012 07/28/2014 07/25/2016

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 2013 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Indiana Michigan Power Company Nnclrar Generatron Gro11p INDIANA One Conk Place MICHIGAN BrH1gman, Mt 49106 POWIR aep.com October 16, 2008 AEP-NRC-2008-45 Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 REVISED DATES FOR 2010 REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Units 1 and 2, is submitting a request for revised dates for the June 2010 reactor operator initial license examinations. Based upon our class size, class composition, and start date, we are requesting examination dates for the weeks of June 21st and June 28th of 2010. These revised dates have tentatively been agreed to in a telephone conversation between Mr. D. R. McNeil, Nuclear Regulatory Commission (NRC), and Mr. I. D. Fleetwood, I&M. Upon NRC review and approval of these revised dates, I&M will no longer need the 2010 examination dates discussed in letter AEP-NRC-2008-31, dated August 28, 2008. I&M still intends to administer the reactor operator initial license examinations in 2012 and 2014 as proposed in the August 28, 2008, letter.

Although the total number of candidates remains the same for the 2010 examinations, the number of Senior Reactor Operator (SRO) - Instant candidates has changed from 3 to 2, the number of SRO - Upgrade candidates has changed from 4 to 5, and the number of candidates for the Generic Fundamentals Examination has changed from 11 to 10. This revised information is included on the enclosed NRC Form 536.

Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.

Sincerely,

(~::-

Plant Manager JEN/rdw enclosure OCT 1 7 2008

U. S. Nuclear Regulatory Commission AEP-NRC-2008-45 Page 2 c: T. A. Beltz- NRC Washington DC J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES: 08/31/2008 i8-2005i Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments refrding burden estimate to the Records and FOIAIPrivacy Services Branch ( -5 F53). U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or bh internet e-mail to infocollects@nrcgov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202. (3150-0131). Office of Management and Budget. Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2012 CY2014 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2012 CY2014 CY NUMBER OF REACTOR 8 8 8

OPERATORS NUMBER OF SENIOR REACTOR 3 3 2

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 5 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 06/21/2010 07/23/2012 07/21/2014 ALTERNATE DATE 06/28/2010 07/30/2012 07/28/2014

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2011 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 11 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER

October 7, 2008 Mr. Michael W. Rencheck Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

CONFIRMATION OF INITIAUREQUALIFICATION OPERATOR LICENSE EXAMINATIONS: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Rencheck:

In response to your letter dated August 28, 2008, {Voluntary Response to NRC RIS 2008-16),

initial license operator examinations were scheduled to start during the weeks of June 7, 2010, July 23,2012, and July 21,2014. On-site validation of the examinations will occur approximately three weeks prior to the examination start week. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine the NRC needs to develop an examination. Because each examination has greater than nine candidates anticipated for the examination, each examination has been scheduled for two weeks. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date or the number of candidates declines below ten candidates as this will impact the examination schedule.

A supplementary letter will be sent to the training department approximately 120 days prior to each examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program.

We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of March 8, 2010. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

M. Rencheck In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Planning Manager, Emergency Management and Homeland Security Division, Michigan State Police Department T. Strong, State Liaison Officer

M. Rencheck In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Planning Manager, Emergency Management and Homeland Security Division, Michigan State Police Department T. Strong, State Liaison Officer DISTRIBUTION:

RidsNrrDorllpl3-1 RidsNrrPMDCCook Resource Tamara Bloomer RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSill Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\DCC 100708 DRS OL.DOC X Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a cop' of this document, indicate in the box "C" =Copy w/o attach/encl "E" = :=!:!==:===i====#=======::!::::==r====;J OFFICE RIII:DRS I RIII:DRS I RIII:D

~----~--+-----------~_,1 NAME JKweiser:cco DMcNeil HPeterson

~--------+-------------_,1 DATE 09/30/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR INITIAL LICENSE EXAMINATION SUPPORT This letter requests Reactor Operator Initial License Examination support by Nuclear Regulatory Commission (NRC) Region Ill personnel in July 2012 and July 2014 for Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details of our request.

Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on June 7, 2010. However, the number of candidates for this examination is different than originally submitted in letter AEP:NRC:2574-121, dated December 15, 2005. We have also included the revised numbers on the enclosed NRC Form 536.

There are no new commitments identified in this submittal.

Should you have any questions, please contact Mr. Ronald E. Harrah, Operations Training Manager, at (269) 466-3407.

Sincerely, Joel P. Gebbie Plant Manager JEN/rdw Enclosure AUG 2 9 2008

U. S. Nuclear Regulatory Commission AEP-NRC-2008-31 Page 2 c: T. A. Beltz- NRC Washington DC J. R. Kweiser- NRC Region Ill NRC Resident Inspector H. Peterson- NRC Region Ill

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments refrdin~ burden estimate to the Records and FOIA!Privacy Services Branch ( -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-0001, or bfc internet e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washrngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place

  • Bridgman, Ml 49106 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2012 CY2014 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2012 CY2014 CY NUMBER OF REACTOR 8 8 8

OPERATORS NUMBER OF SENIOR REACTOR 3 3 3

OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/07/2010 07/23/2012 07/21/2014 ALTERNATE DATE 06/14/2010 07/30/2012 07/28/2014

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2011 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 .(8-2005) PRINTED ON RECYCLED PAPER