| issue date = 07/25/1994
| issue date = 07/25/1994
| title = Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants
| title = Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 15: Line 15:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 15
| page count = 15
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:PR.IC)R.I EV 1 CCELERATED RIDS PROCESSING)
{{#Wiki_filter:PR.IC)R.I CCELERATED EV     1 RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM.(RIDS)
REGULATORY INFORMATION DISTRIBUTION SYSTEM.(RIDS)
ACCESSION NBR:9408030024 DOC.DATE: 94/07/25 NOTARIZED:
ACCESSION NBR:9408030024                 DOC.DATE: 94/07/25       NOTARIZED: YES         DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power It'ight Co.                         05000389 AUTH. NAME             AUTHOR     AFFILIATION SAGER,D.A.             Florida       Power 6 Light Co.
YES FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power It'ight Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
  'RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document             Control Desk)
Florida Power 6 Light Co.'RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000389


==SUBJECT:==
==SUBJECT:==
Application for amend to license NPF-16,proposing TS upgrading TS 3/4.7.1.6 for main feedwater line isolation valves to be consistent w/NUREG-1432,standard TS for C-E plants.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL J SIZE: (2-~TITLE: OR Submittal:
Application for amend to license NPF-16,proposing TS upgrading TS 3/4.7.1.6 for main feedwater line isolation valves to be consistent w/NUREG-1432,standard TS for C-E plants.
General Distribution NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB OC/LFDCB~EG~E 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 2 2 6 6 1 1 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 NOTE TO ALL'RIDS" RECIPIENTS:
DISTRIBUTION CODE: AOOID TITLE:  OR COPIES RECEIVED:LTR Submittal: General Distribution                    J ENCL J     SIZE: (2-~
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'EED!
NOTES:
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20 Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 July 25, 1994 L-94-139 10 CFR 50.90 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Pursuant to 10 CFR 50.90, Florida Power&Light Company (FPL)requests to amend Facility Operating License NPF-16 for St.Lucie Unit 2.The amendment will upgrade Technical Specification (TS)3/4.7.1.6 for the Main Feedwater Line Isolation Valves to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.The changes include all related requirements of NUREG-1432, Revision 0, specification 3.7.3.Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).FPL requests that the proposed amendment, if approved, be issued by February 1, 1995.Attachment 1 is an evaluation of the proposed TS changes.Attachment 2 is the"Determination of No Significant Hazards Consideration." Attachment 3 contains a copy of the appropriate TS pages marked-up to show the proposed changes.The proposed amendment has been reviewed by the St.Lucie Facility Review Group and the Florida Power R Light Company Nuclear Review Board.In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.Please contact us if there are any questions about this submittal.
RECIPIENT                COPIES              RECIPIENT         COPIES ID  CODE/NAME              LTTR ENCL        ID CODE/NAME       LTTR ENCL PD2-2 LA                         1    1    PD2-2 PD                1    1 NORRIS,J                       2      2 INTERNAL: ACRS                             6      6    NRR/DE/EELB            1    1 NRR/DORS/ONDD                   1    1    NRR/DRCH/HICB          1    1 NRR/DRPW                       1      1    NRR/DSSA/SPLB          1    1 NRR/DSSA/SRXB                   1    1    NUDOCS-ABSTRACT        1    1 OC/LFDCB                         1    0    OGC/HDS3                1    0
Very truly yours, D.A.S ger Vice Pr sident St.L ie Plant DAS/RLD/kw DAS/PSL N1167-94 Attachments cc: See next page 9408030020 9'40725'PDR" ADOCK 05000389 an FPL Group company'': "'DR g0 4 h St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment L-94-139 Page 2 cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC.Senior Resident Inspector, USNRC, St.Lucie Plant.Mr.W.A.Passetti, Florida Department of Health and Rehabilitative Services.
          ~EG~     E         01            1    1 EXTERNAL: NRC PDR                           1     1     NSIC                    1   1 NOTE TO ALL'RIDS" RECIPIENTS:
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment L-94-139 Page 3 STATE OF FLORIDA))COUNTY OF ST.LUCIE)ss.D.A.Sager being first duly sworn, deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power 8 Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.D.A.ager STATE OF FLORIDA COUNTY OF ST.3C/The foregoing instrument was acknowledged before me this 25 day of CJ by D.A.Sager, who is person ly known to me and who did take an oath.4-i-')c-M Ln/-T Name of Notary Public My Commission expires 0/t Commission No.~M'~~Z Q ee>ee>g>>>O" fpj, KAREN Mg 810N~CC8M82~~RRE APf8 18, 1888'~4'e1>Ne OOOO THOO pe p~OIOMOO~  
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'EED!
~1>f>/11 at St.Lucie Unit 2 Docket No.50-389 Proposed'License Amendment EVALUATION OF PROPOSED TS CHANGES St.Lucie-Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 1 Page 1 of 4 EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL)proposes to change the St.Lucie Unit 2 Technical Specifications (TS)for the Main Feedwater Line Isolation Valves (MFIVs).The revision will upgrade the action completion times imposed for inoperable MFIVs to account for the redundancy afforded by the existing feedwater system design.The proposed applicability of TS 3/4.7.1.6 will be in agreement with related TS established for the automatic closure signals which are provided to the MFIVs to perform their design safety function.The proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).Descri tion of Chan es TS 3/4.7.1.6 will be revised in its entirety to be consistent with the corresponding specification of NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.Bases section 3/4.7.1.6 (Page B 3/4 7-3)will be updated to reflect the bases for the proposed action completion times.Attachment 3 contains the marked-up pages of the existing TS and the proposed replacement text.Back round The St.Lucie Unit 2 (PSL2)Main Feedwater (MFW)System includes four electro-hydraulic MFIVs which serve to isolate the safety related portion from the non-safety related portion of the system.Two of the safety-grade MFIVs are arranged in series in each feedwater line.These valves are located outside of the reactor containment and upstream of the Auxiliary Feedwater (AFW)System injection points.Inside containment, a check valve is installed in each feedwater line near the feedwater nozzle to preclude backflow from the associated steam generator (SG).The MFIVs will automatically close when actuated by the Engineered Safety Features Actuation System (ESFAS)Main Steam Isolation Signal (MSIS), or the Auxiliary Feedwater Actuation System (AFAS).All four MFIVs will close upon receipt of an MSIS generated by low SG pressure (in either SG)or high containment pressure.In response to a low liquid level in a non-faulted SG, an AFAS signal will close the MFIVs associated with that SG and initiate AFW flow.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   22  ENCL   20
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 1 Page 2 of 4 Automatic closure of the MFIVs is assumed in the success paths identified for mitigation of various accidents and transients, including certain steam line breaks (SLB), feedwater line breaks, loss of coolant accidents, and steam generator tube ruptures.The redundancy of two MFIVs per feedwater line provides a capability for accomplishing this feedwater isolation safety function considering single-failure criteria.In addition, analyses have been performed to show that the containment design pressure would not be exceeded in the event an MFIV failed to close (single-active failure)following a large SLB inside containment.
 
Bases for TS Chan e The MFIVs are considered OPERABLE when they can be closed with an isolation actuation signal and they are capable of full-closure within the time assumed in the plant safety analyses.The proposed Limiting Condition for Operation (LCO)requires all four MFIVs to be OPERABLE except when an MFIV is closed and deactivated.
Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 July 25,       1994                      L-94-139 10 CFR 50.90 U. S.     Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C.               20555 Re:     St. Lucie Unit         2 Docket No. 50-389 Proposed License Amendment Pursuant to           10 CFR 50.90,     Florida         Power     &   Light       Company             (FPL) requests to           amend Facility     Operating License NPF-16 for St. Lucie Unit 2.         The amendment       will upgrade Technical Specification (TS) 3/4.7.1.6 for the Main Feedwater Line Isolation Valves to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.                     The changes include all related requirements of NUREG-1432, Revision 0, specification 3.7.3.
Since the feedwater isolation safety function is satisfied when at least one MFIV is closed in each feedwater line, the LCO provides assurance that the MFIV safety function can be performed considering single-failure criteria.The proposed LCO implements NUREG-1432 specification 3.7.3.The proposed APPLICABILITY during MODES 1, 2, and 3 is in agreement with existing St.Lucie Unit 2 TS 3.3.2 for the MSIS and AFAS functions, which initiate the automatic closure signals to the MFIVs.In MODES 4, 5, and 6, automatic actuation of the ESFAS and AFAS functions is not required since SG and feedwater energy is low.In addition, the MFIVs are normally closed for these lower modes since MFW is not required, e.g., startup and shutdown are performed using the AFW system.The proposed APPLICABILITY is consistent with NUREG-1432 and the plant safety analyses.With one inoperable MFIV in one or more main feedwater lines, ACTION-a requires the inoperable MFIVs to be returned to OPERABLE status, closed, or isolated within 72 hours.The 72 hour action completion time takes into account the redundancy afforded by the remaining OPERABLE valves such that the isolation function is still available, and the low probability that an event will occur during this period that would require isolation of the MFW flowpaths.
Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132)     .
The 72 hour action completion time is reasonable, based upon operating experience, and is consistent with NUREG-1432.
FPL   requests that the proposed amendment, February 1, 1995.
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 1 Page 3 of 4 With more than one inoperable MFIV in the same flowpath, then there is no redundant system to automatically isolate main feedwater.
if approved,           be issued by     is an evaluation of the proposed TS                                     changes. is the "Determination of No Significant                                   Hazards Consideration."             Attachment 3 contains a copy of the appropriate                                   TS pages marked-up             to show the proposed changes.
Therefore, the double failure is treated the same as a loss of the isolation capability for this flowpath.Under these conditions, ACTION-b requires at least one of the affected MFIVs to be returned to OPERABLE status or closed within 4 hours.This action will return the feedwater system to the condition where at least one valve in each flowpath is capable of performing, or is performing, the required safety function.The proposed action interval is more conservative than that contained in NUREG-1432, and is in agreement with the St.Lucie TS for Main Steam Isolation Valves (MSIV).Four hours to complete the required actions is based on operating experience and the low probability of an event requiring feedwater isolation during the time period.If the MFIVs cannot be restored to OPERABLE status, closed, or isolated as required by ACTIONS a or b, the unit must be placed in a MODE for which the LCO does not apply.To achieve this status, the proposed LCO requires the unit to be placed in at least MODE 3 within 6 hours, and in MODE 4 within the following 6 hours.Based on operating experience, the allowed completion times are reasonable to reach the required unit status from full power conditions in an orderly manner, and without challenging plant systems.The time to complete each action is consistent with NUREG-1432 and is in agreement with the existing PSL2 shutdown ACTION requirements which must be implemented when an LCO is not met pursuant to TS 3.0.3.Proposed surveillance requirement (SR)4.7.1.6.a specifies that operability of each MFIV be demonstrated by verifying full closure within 5.15 seconds.This closure criterion considers instrument response time and maximum allowable valve stroke time, and is consistent with the PSL2 safety analyses.The MFIVs are tested pursuant to an NRC approved Inservice Testing (IST)Program.The closure criterion has not been changed from the existing LCO and operating experience shows that the MFIVs normally pass this SR when performed at the frequency required by the IST Program.In accordance with existing plant procedures, the full-closure test required by SR 4.7.1.6.a is normally performed in MODE 3, when returning the unit to operation, following a cold shutdown as described in the IST program.Until the test, the MFIVs are maintained closed and feedwater is added to the SG, as appropriate, by the AFW system.For these reasons, FPL considers the proposed exception to the provisions of TS 4.0.4 for entry into MODE 3, which would otherwise prevent entry into MODE 3 prior to performing the test, to be acceptable.
The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power R Light Company Nuclear Review Board.         In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 1 Page 4 of 4 Proposed SR 4.7.1.6.b is consistent with the actions required by NUREG-1432.
Please contact us             if there are any questions about                   this submittal.
The SR ensures that MFIVs which cannot be restored to OPERABLE status within the required action completion time, but are closed or isolated, are verified on a periodic basis to be closed or isolated.This ensures that assumptions in the safety analyses remain valid.In view of the valve status indications available in the control room and existing plant administrative controls, the 7 day completion time is reasonable to verify that the applicable valves remain closed or isolated.Conclusion The changes proposed for St.Lucie Unit 2 TS 3/4.7.1.6 are consistent with the plant safety analyses, and the existing technical specifications for the automatic MSIS and AFAS functions.
Very     truly yours, D. A. S ger Vice Pr sident St. L ie Plant DAS/RLD/kw DAS/PSL N1167-94 Attachments                                                                                                         g0 cc: See next page an FPL Group company
The proposed amendment includes the related requirements of NUREG-1432, Revision 0, Specification 3.7.3, and is consistent with the Commission's Final Policy Statement on Technical Specification Improvements (58 FR 39132).Therefore, FPL considers the proposed amendment to be acceptable.
                              'PDR"
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 2 Page 1 of 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination may be made that a proposed license amendment involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1)involve a significant increase in the probability or consequences of an accident previously evaluated; or (2)create the possibility of a new or different kind of accident from any accident previously evaluated; or (3)involve a significant reduction in a margin of safety.Each standard is discussed as follows: (1)Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.
                                    'DR 9408030020 9'40725
The proposed amendment will upgrade the existing Limiting Condition for Operation (LCO)associated with the Main Feedwater Line Isolation Valves (MFIVs)to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants.The MFIVs are not initiators of accidents previously evaluated, but are included as part of the success paths associated with mitigating various accidents and transients.
                              '':    ADOCK 05000389
The redundancy afforded by two MFIVs per feedwater line in conjunction with the requirements of the proposed LCO assure that the feedwater isolation safety function of these valves can be accomplished considering single failure criteria.Neither the feedwater system design nor the safety function of the MFIVs have been altered from those previously evaluated, and the proposed amendment does not change the applicable plant safety analyses.Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
 
(2)Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
4 h
The proposed amendment will not change the physical plant or the modes of operation defined in the facility license.The changes are administrative in nature in that they do not involve the addition of new equipment or the modification of existing equipment, nor do they otherwise alter the design of St.Lucie Unit St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Main Feedwater Isolation Valves L-94-139 Attachment 2 Page 2 of 2 2 systems.Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
 
(3)Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.The safety function of the MFIVs is to terminate main feedwater flow and isolate the safety related portion from the non-safety related portion of the feedwater system.The proposed amendment, in conjunction with the redundancy afforded by the feedwater system design, assures that this safety function can be accomplished considering single-failure criteria.The bases for required actions and the action completion times specified for inoperable MFIVs is consistent with the corresponding specifications in NUREG-1432, which are equally applicable to St.Lucie Unit 2.The safety analyses for applicable accidents and transients remain unchanged from those previously evaluated and reported in the Updated Final Safety Analysis Report.Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.Based on the discussion presented above and on the supporting Evaluation of Proposed TS Changes, FPL has concluded that this proposed license amendment involves no significant hazards consideration.
St. Lucie Unit 2                                     L-94-139 Docket No. 50-389                                     Page  2 Proposed License Amendment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC.
St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment ST.LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 3/4 7-10 Insert-A Page B 3/4 7-3 Insert-B}}
Senior Resident Inspector, USNRC, St. Lucie Plant.
Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.
 
St. Lucie Unit           2                                               L-94-139 Docket No. 50-389                                                         Page 3 Proposed License Amendment STATE OF FLORIDA                           )
                                          )     ss.
COUNTY OF ST.           LUCIE             )
D. A. Sager         being     first       duly sworn, deposes and says:
That he is Vice President, St. Lucie Plant for the Nuclear Division of Florida Power 8 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
D. A. ager STATE OF FLORIDA COUNTY OF         ST.           3C /
The foregoing instrument was acknowledged before me this       25 day of CJ by D.A. Sager, who is person ly known to me and who did take an oath.
4-i-')     c-M       Ln/   - T Name     of Notary Public 0 /t My Commission Commission No.             ~
expires M'~~ Z Q ee>ee>
g>>>O" fpj,         KAREN   Mg 810N ~ CC8M82~~RRE APf8 18, 1888
        '~4'e1>Ne   OOOO THOO pe p~OIOMOO   ~
 
  ~1
>f>/11 at
 
St. Lucie Unit   2 Docket No. 50-389 Proposed 'License Amendment EVALUATION OF PROPOSED TS CHANGES
 
St. Lucie-Unit 2                                       L-94-139 Docket No. 50-389                                       Attachment  1 Proposed License Amendment                             Page 1 of  4 Main Feedwater   Isolation Valves EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL) proposes to change the St.
Lucie Unit 2 Technical Specifications (TS) for the Main Feedwater Line Isolation Valves (MFIVs). The revision will upgrade the action completion times imposed for inoperable MFIVs to account for the redundancy afforded by the existing feedwater system design.
The proposed applicability of TS 3/4.7.1.6 will be in agreement with related TS established for the automatic closure signals which are provided to the MFIVs to perform their design safety function.
The proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).
Descri tion of   Chan es TS 3/4.7.1.6 will be revised in its entirety to be consistent with the corresponding specification of NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants. Bases section 3/4.7.1.6 (Page B 3/4 7-3) will be updated to reflect the bases for the proposed action completion times. Attachment 3 contains the marked-up pages of the existing TS and the proposed replacement text.
Back round The St. Lucie Unit 2 (PSL2) Main Feedwater (MFW) System includes four electro-hydraulic MFIVs which serve to isolate the safety related portion from the non-safety related portion of the system.
Two of the safety-grade MFIVs are arranged in series in each feedwater line. These valves are located outside of the reactor containment and upstream of the Auxiliary Feedwater (AFW) System injection points. Inside containment, a check valve is installed in each feedwater line near the feedwater nozzle to preclude backflow from the associated   steam generator (SG).
The MFIVs will automatically close when actuated by the Engineered Safety Features Actuation System (ESFAS) Main Steam Isolation Signal (MSIS), or the Auxiliary Feedwater Actuation System (AFAS).
All four MFIVs will close upon receipt of an MSIS generated by low SG pressure   (in either SG) or high containment pressure.       In response to a low liquid level in a non-faulted SG, an AFAS signal will close the MFIVs associated with that SG and initiate AFW flow.
 
St. Lucie Unit 2                                     L-94-139 Docket No. 50-389                                     Attachment  1 Proposed License Amendment                             Page 2 of  4 Main Feedwater Isolation Valves Automatic closure of the MFIVs   is assumed in the success paths identified for mitigation of various accidents and transients, including certain steam line breaks (SLB), feedwater line breaks, loss of coolant accidents, and steam generator tube ruptures. The redundancy of two MFIVs per feedwater line provides a capability for accomplishing this feedwater isolation safety function considering single-failure criteria. In addition, analyses have been performed to show that the containment design pressure would not be exceeded in the event an MFIV failed to close (single-active failure) following a large SLB inside containment.
Bases for TS Chan e The MFIVs are considered OPERABLE when they can be closed with an isolation actuation signal and they are capable of full-closure within the time assumed in the plant safety analyses. The proposed Limiting Condition for Operation (LCO) requires all four MFIVs to be OPERABLE except when an MFIV is closed and deactivated. Since the feedwater isolation safety function is satisfied when at least one MFIV is closed in each feedwater line, the LCO provides assurance   that the MFIV safety function can be performed considering single-failure criteria. The proposed LCO implements NUREG-1432 specification 3.7.3.
The proposed APPLICABILITYduring MODES 1, 2, and 3 is in agreement with existing St. Lucie Unit 2 TS 3.3.2 for the MSIS and AFAS functions, which initiate the automatic closure signals to the MFIVs. In MODES 4, 5, and 6, automatic actuation of the ESFAS and AFAS functions is not required since SG and feedwater energy is low. In addition, the MFIVs are normally closed for these lower modes since MFW is not required, e.g., startup and shutdown are performed using the AFW system. The proposed APPLICABILITY is consistent with NUREG-1432 and the plant safety analyses.
With one inoperable MFIV in one or more main feedwater lines, ACTION-a requires the inoperable MFIVs to be returned to OPERABLE status, closed, or isolated within 72 hours. The 72 hour action completion time takes into account the redundancy afforded by the remaining OPERABLE valves such that the isolation function is still available, and the low probability that an event will occur during this period that would require isolation of the MFW flowpaths. The 72 hour action completion time is reasonable, based upon operating experience, and is consistent with NUREG-1432.
 
St. Lucie Unit 2                                         L-94-139 Docket No. 50-389                                       Attachment  1 Proposed License Amendment                               Page 3  of 4 Main Feedwater Isolation Valves With more than one inoperable MFIV in the same flowpath, then there is no redundant system to automatically isolate main feedwater.
Therefore, the double failure is treated the same as a loss of the isolation capability for this flowpath. Under these conditions, ACTION-b requires at least one of the affected MFIVs to be returned to OPERABLE status or closed within 4 hours. This action will return the feedwater system to the condition where at least one valve in each flowpath is capable of performing, or is performing, the required safety function. The proposed action interval is more conservative than that contained in NUREG-1432, and is in agreement with the St. Lucie TS for Main Steam Isolation Valves (MSIV). Four hours to complete the required actions is based on operating experience and the low probability of an event requiring feedwater isolation during the time period.
If the MFIVs cannot   be restored to OPERABLE status,   closed, or isolated as required by ACTIONS a or b, the unit must be placed in a MODE for which the LCO does not apply. To achieve this status, the proposed LCO requires the unit to be placed in at least MODE 3 within 6 hours, and in MODE 4 within the following 6 hours. Based on operating   experience,   the allowed completion times are reasonable to reach the required unit status from         full power conditions in an orderly manner, and without challenging plant systems. The time to complete each action is consistent with NUREG-1432 and is in agreement with the existing PSL2 shutdown ACTION requirements which must be implemented when an LCO is not met pursuant to TS 3.0.3.
Proposed surveillance requirement (SR) 4.7.1.6.a specifies that operability of each MFIV be demonstrated by verifying full closure within 5.15 seconds. This closure criterion considers instrument response time and maximum allowable valve stroke time, and is consistent with the PSL2 safety analyses. The MFIVs are tested pursuant to an NRC approved Inservice Testing (IST) Program. The closure criterion has not been changed from the existing LCO and operating experience shows that the MFIVs normally pass this SR when performed at the frequency required by the IST Program.
In accordance with existing plant procedures, the full-closure test required by SR 4.7.1.6.a is normally performed in MODE 3, when returning the unit to operation, following a cold shutdown as described in the IST program.       Until the test, the MFIVs are maintained closed and feedwater is added to the SG, as appropriate, by the AFW system. For these reasons, FPL considers the proposed exception to the provisions of TS 4.0.4 for entry into MODE 3, which would otherwise prevent entry into MODE 3 prior to performing the test, to be acceptable.
 
St. Lucie Unit   2                                     L-94-139 Docket No. 50-389                                     Attachment  1 Proposed License Amendment                             Page 4  of 4 Main Feedwater Isolation Valves Proposed SR 4.7.1.6.b is consistent with the actions required by NUREG-1432. The SR ensures that MFIVs which cannot be restored to OPERABLE status within the required action completion time, but are closed or isolated, are verified on a periodic basis to be closed or isolated. This ensures that assumptions in the safety analyses remain valid. In view of the valve status indications available in the control room and existing plant administrative controls, the 7 day completion time is reasonable to verify that the applicable valves remain closed or isolated.
Conclusion The changes proposed for St. Lucie Unit 2 TS 3/4.7.1.6 are consistent with the plant safety analyses, and the existing technical specifications for the automatic MSIS and AFAS functions.
The proposed amendment includes the related requirements of NUREG-1432, Revision 0, Specification 3.7.3, and is consistent with the Commission's Final Policy Statement on Technical Specification Improvements (58 FR 39132). Therefore, FPL considers the proposed amendment to be acceptable.
 
St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION
 
St. Lucie Unit   2                                       L-94-139 Docket No. 50-389                                       Attachment    2 Proposed License Amendment                               Page 1  of  2 Main Feedwater Isolation Valves DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination   may be made that a proposed license amendment involves no significant hazards consideration operation of the facility in accordance with the proposed amendment if would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed as follows:
(1) Operation of the facility in accordance with the proposed amendment   would not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment will upgrade the existing Limiting Condition for Operation (LCO) associated with the Main Feedwater Line Isolation Valves (MFIVs) to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants. The MFIVs are not initiators of accidents previously evaluated, but are included as part of the success paths associated with mitigating various accidents and transients. The redundancy afforded by two MFIVs per feedwater line in conjunction with the requirements of the proposed LCO assure that the feedwater isolation safety function of these valves can be accomplished considering single failure criteria. Neither the feedwater system design nor the safety function of the MFIVs have been altered from those previously evaluated, and the proposed amendment does not change the applicable plant safety analyses. Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences       of an accident previously evaluated.
(2) Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment   will not change the physical plant or the modes of operation defined   in the facility license. The changes are administrative in nature in that they do not involve the addition of new equipment or the modification of existing equipment, nor do they otherwise   alter the design of St. Lucie Unit
 
St. Lucie Unit   2                                       L-94-139 Docket No. 50-389                                       Attachment  2 Proposed License Amendment                               Page 2 of  2 Main Feedwater Isolation Valves 2 systems. Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
(3)   Operation of the facility in accordance with the proposed amendment would   not involve a significant reduction in a margin of safety.
The safety function of the MFIVs is to terminate main feedwater flow and isolate the safety related portion from the non-safety related portion of the feedwater system. The proposed amendment, in conjunction with the redundancy afforded by the feedwater system design, assures that this safety function can be accomplished considering single-failure criteria.         The bases for required actions and the action completion times specified for inoperable MFIVs is consistent with the corresponding specifications in NUREG-1432, which are equally applicable to St. Lucie Unit 2. The safety analyses for applicable accidents and transients remain unchanged from those previously evaluated and reported in the Updated Final Safety Analysis Report. Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.
Based   on the discussion presented above and on the supporting Evaluation of Proposed TS Changes, FPL has concluded that this proposed   license amendment involves no significant hazards consideration.
 
St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment ST. LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page   3/4 7-10 Insert   - A Page   B   3/4 7-3 Insert   - B}}

Latest revision as of 13:34, 4 February 2020

Application for Amend to License NPF-16,proposing TS Upgrading TS 3/4.7.1.6 for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants
ML17228A654
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/25/1994
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228A655 List:
References
RTR-NUREG-1432 L-94-139, NUDOCS 9408030024
Download: ML17228A654 (15)


Text

PR.IC)R.I CCELERATED EV 1 RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM.(RIDS)

ACCESSION NBR:9408030024 DOC.DATE: 94/07/25 NOTARIZED: YES DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power It'ight Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co.

'RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to license NPF-16,proposing TS upgrading TS 3/4.7.1.6 for main feedwater line isolation valves to be consistent w/NUREG-1432,standard TS for C-E plants.

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution J ENCL J SIZE: (2-~

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 NORRIS,J 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 NRR/DORS/ONDD 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 0 OGC/HDS3 1 0

~EG~ E 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20

Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 July 25, 1994 L-94-139 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Pursuant to 10 CFR 50.90, Florida Power & Light Company (FPL) requests to amend Facility Operating License NPF-16 for St. Lucie Unit 2. The amendment will upgrade Technical Specification (TS) 3/4.7.1.6 for the Main Feedwater Line Isolation Valves to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants. The changes include all related requirements of NUREG-1432, Revision 0, specification 3.7.3.

Accordingly, the proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132) .

FPL requests that the proposed amendment, February 1, 1995.

if approved, be issued by is an evaluation of the proposed TS changes. is the "Determination of No Significant Hazards Consideration." Attachment 3 contains a copy of the appropriate TS pages marked-up to show the proposed changes.

The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power R Light Company Nuclear Review Board. In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.

Please contact us if there are any questions about this submittal.

Very truly yours, D. A. S ger Vice Pr sident St. L ie Plant DAS/RLD/kw DAS/PSL N1167-94 Attachments g0 cc: See next page an FPL Group company

'PDR"

'DR 9408030020 9'40725

: ADOCK 05000389

4 h

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Page 2 Proposed License Amendment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC.

Senior Resident Inspector, USNRC, St. Lucie Plant.

Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Page 3 Proposed License Amendment STATE OF FLORIDA )

) ss.

COUNTY OF ST. LUCIE )

D. A. Sager being first duly sworn, deposes and says:

That he is Vice President, St. Lucie Plant for the Nuclear Division of Florida Power 8 Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

D. A. ager STATE OF FLORIDA COUNTY OF ST. 3C /

The foregoing instrument was acknowledged before me this 25 day of CJ by D.A. Sager, who is person ly known to me and who did take an oath.

4-i-') c-M Ln/ - T Name of Notary Public 0 /t My Commission Commission No. ~

expires M'~~ Z Q ee>ee>

g>>>O" fpj, KAREN Mg 810N ~ CC8M82~~RRE APf8 18, 1888

'~4'e1>Ne OOOO THOO pe p~OIOMOO ~

~1

>f>/11 at

St. Lucie Unit 2 Docket No. 50-389 Proposed 'License Amendment EVALUATION OF PROPOSED TS CHANGES

St. Lucie-Unit 2 L-94-139 Docket No. 50-389 Attachment 1 Proposed License Amendment Page 1 of 4 Main Feedwater Isolation Valves EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL) proposes to change the St.

Lucie Unit 2 Technical Specifications (TS) for the Main Feedwater Line Isolation Valves (MFIVs). The revision will upgrade the action completion times imposed for inoperable MFIVs to account for the redundancy afforded by the existing feedwater system design.

The proposed applicability of TS 3/4.7.1.6 will be in agreement with related TS established for the automatic closure signals which are provided to the MFIVs to perform their design safety function.

The proposal is consistent with the Commission's Final Policy Statement on Technical Specifications Improvements (58 FR 39132).

Descri tion of Chan es TS 3/4.7.1.6 will be revised in its entirety to be consistent with the corresponding specification of NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants. Bases section 3/4.7.1.6 (Page B 3/4 7-3) will be updated to reflect the bases for the proposed action completion times. Attachment 3 contains the marked-up pages of the existing TS and the proposed replacement text.

Back round The St. Lucie Unit 2 (PSL2) Main Feedwater (MFW) System includes four electro-hydraulic MFIVs which serve to isolate the safety related portion from the non-safety related portion of the system.

Two of the safety-grade MFIVs are arranged in series in each feedwater line. These valves are located outside of the reactor containment and upstream of the Auxiliary Feedwater (AFW) System injection points. Inside containment, a check valve is installed in each feedwater line near the feedwater nozzle to preclude backflow from the associated steam generator (SG).

The MFIVs will automatically close when actuated by the Engineered Safety Features Actuation System (ESFAS) Main Steam Isolation Signal (MSIS), or the Auxiliary Feedwater Actuation System (AFAS).

All four MFIVs will close upon receipt of an MSIS generated by low SG pressure (in either SG) or high containment pressure. In response to a low liquid level in a non-faulted SG, an AFAS signal will close the MFIVs associated with that SG and initiate AFW flow.

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Attachment 1 Proposed License Amendment Page 2 of 4 Main Feedwater Isolation Valves Automatic closure of the MFIVs is assumed in the success paths identified for mitigation of various accidents and transients, including certain steam line breaks (SLB), feedwater line breaks, loss of coolant accidents, and steam generator tube ruptures. The redundancy of two MFIVs per feedwater line provides a capability for accomplishing this feedwater isolation safety function considering single-failure criteria. In addition, analyses have been performed to show that the containment design pressure would not be exceeded in the event an MFIV failed to close (single-active failure) following a large SLB inside containment.

Bases for TS Chan e The MFIVs are considered OPERABLE when they can be closed with an isolation actuation signal and they are capable of full-closure within the time assumed in the plant safety analyses. The proposed Limiting Condition for Operation (LCO) requires all four MFIVs to be OPERABLE except when an MFIV is closed and deactivated. Since the feedwater isolation safety function is satisfied when at least one MFIV is closed in each feedwater line, the LCO provides assurance that the MFIV safety function can be performed considering single-failure criteria. The proposed LCO implements NUREG-1432 specification 3.7.3.

The proposed APPLICABILITYduring MODES 1, 2, and 3 is in agreement with existing St. Lucie Unit 2 TS 3.3.2 for the MSIS and AFAS functions, which initiate the automatic closure signals to the MFIVs. In MODES 4, 5, and 6, automatic actuation of the ESFAS and AFAS functions is not required since SG and feedwater energy is low. In addition, the MFIVs are normally closed for these lower modes since MFW is not required, e.g., startup and shutdown are performed using the AFW system. The proposed APPLICABILITY is consistent with NUREG-1432 and the plant safety analyses.

With one inoperable MFIV in one or more main feedwater lines, ACTION-a requires the inoperable MFIVs to be returned to OPERABLE status, closed, or isolated within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action completion time takes into account the redundancy afforded by the remaining OPERABLE valves such that the isolation function is still available, and the low probability that an event will occur during this period that would require isolation of the MFW flowpaths. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action completion time is reasonable, based upon operating experience, and is consistent with NUREG-1432.

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Attachment 1 Proposed License Amendment Page 3 of 4 Main Feedwater Isolation Valves With more than one inoperable MFIV in the same flowpath, then there is no redundant system to automatically isolate main feedwater.

Therefore, the double failure is treated the same as a loss of the isolation capability for this flowpath. Under these conditions, ACTION-b requires at least one of the affected MFIVs to be returned to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. This action will return the feedwater system to the condition where at least one valve in each flowpath is capable of performing, or is performing, the required safety function. The proposed action interval is more conservative than that contained in NUREG-1432, and is in agreement with the St. Lucie TS for Main Steam Isolation Valves (MSIV). Four hours to complete the required actions is based on operating experience and the low probability of an event requiring feedwater isolation during the time period.

If the MFIVs cannot be restored to OPERABLE status, closed, or isolated as required by ACTIONS a or b, the unit must be placed in a MODE for which the LCO does not apply. To achieve this status, the proposed LCO requires the unit to be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Based on operating experience, the allowed completion times are reasonable to reach the required unit status from full power conditions in an orderly manner, and without challenging plant systems. The time to complete each action is consistent with NUREG-1432 and is in agreement with the existing PSL2 shutdown ACTION requirements which must be implemented when an LCO is not met pursuant to TS 3.0.3.

Proposed surveillance requirement (SR) 4.7.1.6.a specifies that operability of each MFIV be demonstrated by verifying full closure within 5.15 seconds. This closure criterion considers instrument response time and maximum allowable valve stroke time, and is consistent with the PSL2 safety analyses. The MFIVs are tested pursuant to an NRC approved Inservice Testing (IST) Program. The closure criterion has not been changed from the existing LCO and operating experience shows that the MFIVs normally pass this SR when performed at the frequency required by the IST Program.

In accordance with existing plant procedures, the full-closure test required by SR 4.7.1.6.a is normally performed in MODE 3, when returning the unit to operation, following a cold shutdown as described in the IST program. Until the test, the MFIVs are maintained closed and feedwater is added to the SG, as appropriate, by the AFW system. For these reasons, FPL considers the proposed exception to the provisions of TS 4.0.4 for entry into MODE 3, which would otherwise prevent entry into MODE 3 prior to performing the test, to be acceptable.

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Attachment 1 Proposed License Amendment Page 4 of 4 Main Feedwater Isolation Valves Proposed SR 4.7.1.6.b is consistent with the actions required by NUREG-1432. The SR ensures that MFIVs which cannot be restored to OPERABLE status within the required action completion time, but are closed or isolated, are verified on a periodic basis to be closed or isolated. This ensures that assumptions in the safety analyses remain valid. In view of the valve status indications available in the control room and existing plant administrative controls, the 7 day completion time is reasonable to verify that the applicable valves remain closed or isolated.

Conclusion The changes proposed for St. Lucie Unit 2 TS 3/4.7.1.6 are consistent with the plant safety analyses, and the existing technical specifications for the automatic MSIS and AFAS functions.

The proposed amendment includes the related requirements of NUREG-1432, Revision 0, Specification 3.7.3, and is consistent with the Commission's Final Policy Statement on Technical Specification Improvements (58 FR 39132). Therefore, FPL considers the proposed amendment to be acceptable.

St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Attachment 2 Proposed License Amendment Page 1 of 2 Main Feedwater Isolation Valves DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination may be made that a proposed license amendment involves no significant hazards consideration operation of the facility in accordance with the proposed amendment if would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed as follows:

(1) Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed amendment will upgrade the existing Limiting Condition for Operation (LCO) associated with the Main Feedwater Line Isolation Valves (MFIVs) to be consistent with NUREG-1432, Standard Technical Specifications for Combustion Engineering Plants. The MFIVs are not initiators of accidents previously evaluated, but are included as part of the success paths associated with mitigating various accidents and transients. The redundancy afforded by two MFIVs per feedwater line in conjunction with the requirements of the proposed LCO assure that the feedwater isolation safety function of these valves can be accomplished considering single failure criteria. Neither the feedwater system design nor the safety function of the MFIVs have been altered from those previously evaluated, and the proposed amendment does not change the applicable plant safety analyses. Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.

(2) Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed amendment will not change the physical plant or the modes of operation defined in the facility license. The changes are administrative in nature in that they do not involve the addition of new equipment or the modification of existing equipment, nor do they otherwise alter the design of St. Lucie Unit

St. Lucie Unit 2 L-94-139 Docket No. 50-389 Attachment 2 Proposed License Amendment Page 2 of 2 Main Feedwater Isolation Valves 2 systems. Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.

(3) Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.

The safety function of the MFIVs is to terminate main feedwater flow and isolate the safety related portion from the non-safety related portion of the feedwater system. The proposed amendment, in conjunction with the redundancy afforded by the feedwater system design, assures that this safety function can be accomplished considering single-failure criteria. The bases for required actions and the action completion times specified for inoperable MFIVs is consistent with the corresponding specifications in NUREG-1432, which are equally applicable to St. Lucie Unit 2. The safety analyses for applicable accidents and transients remain unchanged from those previously evaluated and reported in the Updated Final Safety Analysis Report. Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.

Based on the discussion presented above and on the supporting Evaluation of Proposed TS Changes, FPL has concluded that this proposed license amendment involves no significant hazards consideration.

St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment ST. LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES Page 3/4 7-10 Insert - A Page B 3/4 7-3 Insert - B