| title = Audit 298-008, WNP-2 Emergency Preparedness Program.
| title = Audit 298-008, WNP-2 Emergency Preparedness Program.
| author name = ATKINSON D K, BARBER A S, MASSEY J W
| author name = Atkinson D, Barber A, Massey J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:QualityDepartment AuditReportWNP-2EMERGENCY PREPAREDNESS PROGRAMAudit298-008April10,1998AuditDates:February23throughMarch5,1998EntranceMeeting:February23,1998ExitMeeting:March18,199898oso7oss6 eso4aaPDRADQCK05000397FPDRWASHINGTON PUBLICPOWER1NSUPPLYSYSTEM QUALITYDEPARTMENT AUDIT298408TABLEOFCONTENTSExecutive Summary.PurposeandScope.ReportDetailsSection1.0Emergency PlanImplementing Procedures Section2.0Emergency ResponseOrganization Training.
{{#Wiki_filter:Quality Department Audit Report WNP-2 EMERGENCY PREPAREDNESS PROGRAM Audit 298-008 April 10, 1998 Audit Dates: February 23 through March 5, 1998 Entrance Meeting: February 23, 1998 Exit Meeting: March 18, 1998 WASHINGTON P UB LIC POWER 1N SUPPLY SYSTEM 98oso7oss6 eso4aa PDR  ADQCK 05000397 F              PDR
Section3.0Readiness Testing..
 
Section4.0Equipment andFacilities.
QUALITYDEPARTMENT AUDIT298408 TABLE OF CONTENTS Executive Summary.
Section5.0Interfaces withStateandLocalGovernments Section6.0ProblemIdentification andResolution Section7.0DoseAssessment Capabilities.
Purpose and Scope.
Section8.0Personnel Qualifications Section9.0Emergency ResponseOrganization StaKngLevels...
Report Details Section 1.0    Emergency Plan Implementing Procedures Section 2.0    Emergency Response Organization Training.
FSARReviewandResponseto10CFR50.54(f)RequestforInformation.
Section 3.0    Readiness Testing..
AppendixAPersonnel Contacted.
Section 4.0    Equipment and Facilities.
AppendixBReferences
Section 5.0    Interfaces with State and Local Governments Section 6.0    Problem Identification and Resolution Section 7.0    Dose Assessment Capabilities.
.AppendixCQualityRecommendations,
Section 8.0    Personnel Qualifications Section 9.0    Emergency Response Organization StaKng    Levels...
: Findings, andStrengths.
FSAR Review and Response to 10 CFR 50.54(f) Request for Information.
Ig\~I QUALITYDEPARTMENT AUDIT298%EXECUTIVE SUMMARYAn'ndependent auditoftheWNP-2Emergency Preparedness Programisperformed atleastonceeverytwelvemonthsasrequiredbyTitle10oftheCodeofFederalRegulations, Part50.54(t)andOperational QualityAssurance ProgramDescription (OQAPD)AppendixIII,Additional QualityProgramRequirements.
Appendix  A    Personnel Contacted.
TheauditteamassessedspecificareasasrequiredbyNUREG0654,CriteriaforPreparation andEvaluation ofRadiological Emergency ResponsePlansandPreparedness inSupportofNuclearPowerPlants.Theresultsoftheauditindicatethatactivities whichmakeuptheWNP-2Emergency Preparedness Programareimplemented andconducted inaccordance withgoverning regulations andarecapableofprotecting thehealthandsafetyofthepublicintheeventofanemergency.
Appendix B    References  .
TheEmergency Preparedness (EP)organization hascontinued todemonstrate astrongdesireforself-improvement.
Appendix C    Quality Recommendations, Findings, and Strengths.
Thiswasillustrated.
 
bytheirprogramownership, pro-active identification andresolution ofproblems, andcommunication withoffsiteagencypersonnel.
Ig
However,thesuccessoftheEmergency Preparedness Programisdependent onthesupportandparticipation ofallSupplySystemorganizations.
\
Theprimaryissuesidentified duringthisauditrelatedtoalackofownership ofthelineorganizations fortheirportionsoftheprogram.Asaresultofthisaudit,threeProblemEvaluation Requests(PERs)wereissuedinthefollowing areas:Lineorganizations arenotassuringthatpersonnel arequalified andassignedtotheappropriate qualification group;withthereduction inshiftcompliment andchangesinshiftschedule, management hasnotassuredthatminimumEmergency ResponseOrganization (ERO)shiftstaffinghasbeenmaintained; andprocesses thateffectemergency preparedness havebeenchangedwithoutnotifying theEmergency Preparedness Department orupdatingtheEmergency Plan.TwelveQualityRecommendations wereissuedtocorrectminorerrorsintheEmergency Planandimplementing procedures orforsuggested programimprovements.
  ~ I
Inaddition, three"properuse"goldcardswereissuedduringthecourseoftheauditforcommendable individual performance.
 
8.~~9/jo/ffD.K.Atkinson, Manager,QualityDepartment A.S.Barber,Supervisor, QualityServicesio.Massey,itTeamLeader(ATL)AUDITTEAMKMGunterQualityJCLattaQualityMKLaudisioQualityJGDockterAdminstration ServicesTARogersFranklinCountyEmergency Management QUALITYDEPARTMENT AUDIT298408PURPOSEANDSCOPE~~IAnindependent auditoftheWNP-2Emergency Preparedness Programisrequiredeverytwelvemonthsby10CFR50.54(t)andtheOQAPDAppendixIII,Section2.2.8(f).
QUALITYDEPARTMENT AUDIT298%
Specificareasassessedaredescribed in10CFR50,AppendixEandNUEEG0654,SectionII.P.9andinclude:~Emergency PlanandImplementing Procedures
EXECUTIVE  
~Emergency ResponseOrganization (ERO)Training~Readiness Testing-(DrillObservation)
 
~Equipment andFacilities
==SUMMARY==
~Interfaces withStateandLocalGovernments Inaddition, thefollowing additional areaswereincludedinthescopeofthisaudit:~ProblemIdentification andResolution
 
~DoseAssessment
An'ndependent audit of the WNP-2 Emergency Preparedness Program is performed at least once every twelve months as required by Title 10 of the Code of Federal Regulations, Part 50.54(t) and Operational Quality Assurance Program Description (OQAPD) Appendix III, Additional Quality Program Requirements. The audit team assessed specific areas as required by NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
~Personnel Qualifications
The results    of  the audit indicate that activities which make up the WNP-2 Emergency Preparedness Program are implemented and conducted in accordance with governing regulations and are capable of protecting the health and safety of the public in the event of an emergency.
~StaffingLevels(Emergency ResponseOrganization)
The Emergency Preparedness (EP) organization has continued to demonstrate a strong desire for self-improvement. This was illustrated. by their program ownership, pro-active identification and resolution of problems, and communication with offsite agency personnel. However, the success of the Emergency Preparedness Program is dependent on the support and participation of all Supply System organizations. The primary issues identified during this audit related to a lack of ownership of the line organizations for their portions of the program.
REPORTDETAILSSection1.0-Emergency PlanandImplementing Procedures Areviewwasconducted todetermine iftheEmergency PlanImplementing Procedures (Volume13ofthePlantProcedure Manual(PPM))satisfytherequirements oftheWNP-2Emergency Plan.Additionally, thereviewverifiedthattherequirements of10CFR50,AppendixEandNUEEG-0654 werecontained intheEmergency Plan.Thereviewconcluded thattheWNP-2Emergency Preparedness Programsatisfies theregulatory requirements.
As a result of this audit, three Problem Evaluation Requests (PERs) were issued in the following areas:   Line organizations are not assuring that personnel are qualified and assigned to the appropriate qualification group; with the reduction in shift compliment and changes in shift schedule, management has not assured that minimum Emergency Response Organization (ERO) shift staffing has been maintained; and processes that effect emergency preparedness have been changed without notifying the Emergency Preparedness Department or updating the Emergency Plan. Twelve Quality Recommendations were issued to correct minor errors in the Emergency Plan and implementing procedures or for suggested program improvements.
However,somedeficiencies wereidentified intheEmergency Planandprocedures thatneedtobecorrected.
In addition, three "proper use" gold cards were issued during the course of the audit for commendable individual performance.
Thedeficiencies thatcouldpotentially resultinadecreaseineffectiveness oftheprogramhavebeensubmitted onPERsforfurtherreview.Thedetailsofthenoteddeficiencies andthestrengths oftheprogramarerecordedundertheappropriate sectionsofthisreport.TheEmergency Planrequiresaninternalreviewoftheplanandanindependent auditoftheemergency planandimplementing procedures everytwelvemonths.TheEmergency Planhasbeenrevisedfivetimeswithinthelastthreeyears.
8.~     ~                       9/jo/ff D.K. Atkinson, Manager, Quality Department KM Gunter AUDITTEAM Quality JC Latta        Quality MKLaudisio      Quality JG Dockter      Adminstration Services A.S. Barber, Supervisor, Quality Services TA Rogers        Franklin County Emergency Management io
SinceithasbeenlessthanayearsinceRevision19wasissued(4/3/97),
    . Massey,     it Team Leader (ATL)
andRevision20isinareviewstage,itcanbeconcluded thatthePlanhasbeenreviewedatleastannuallyduringthelastfewyears.Areviewofpreviousauditreportsconcluded thatappropriate areaswereassessed, theauditswereindependent ofEPpersonnel, andtheauditswereperformed withintwelvemonths.10CFR50,AppendixEstates:"Licensees whoareauthorized tooperateanuclearpowerfacilityshallsubmitanychangestotheEmergency Planorprocedures totheCommission, within30daysofsuchchanges."
 
TheauditteamverifiedthatRevision19totheWNP-2Emergency Plan,datedMarch27,1997,wassenttotheNRCwithin30daysoftherevisiondate.2 r~QUALITYDEPARTMENT AUDIT298-008Section1.0-Emergency PlanandIinplementing Procedures
QUALITYDEPARTMENT AUDIT298408 PURPOSE AND SCOPE
-continued
  ~
~~~Revision19wassubmitted totheNRConApril3,1997,asdocumented bySupplySystemlettertotheNRC,GO297-062.
    ~ I An independent audit of the WNP-2 Emergency Preparedness Program is required every twelve months by 10 CFR 50.54(t) and the OQAPD Appendix III, Section 2.2.8(f).
Abriefreviewofthesynopsisofchangeswasperformed todetermine whetheranyofthechangesreducedtheeffectiveness oftheplan.Inparticular, EROstaffingchangesmadewerereviewed.
Specific areas assessed  are described in 10 CFR 50, Appendix E and NUEEG 0654, Section II.P.9 and include:
Ineachcase,thestaffingchangewasjustified basedonthepositionbeingassumedbyanothermemberorthepositioneliminated duetoincreased efficiency.
~   Emergency Plan and Implementing Procedures
Thesechangesareinaccordance withtheguidanceinPPM1.3.43,Licensing BasisImpactDetermination, regarding changestotheEmergency Plan.AreviewoftheEmergency Plan(Rev.19)andthePPMdatabasefoundthatthe30-dayrequirement forsubmitting changestotheemergency procedures wasnotcontained inthePlanorWNP-2PlantProcedures.
~   Emergency Response Organization (ERO) Training
TheSupplySystemhasmetthisrequirement byincluding theNuclearRegulatory Commission (NRC)onthedistribution listforchangestotheVolume13Emergency Procedures.
~   Readiness Testing - (Drill Observation)
RecordsControlpersonnel havebeensubmitting Volume13changestotheNRCwithintherequiredtimelimitusingaDesktopInstruction, butwerenotawarethatthiswasaregulatory requirement.
~   Equipment and Facilities
Therefore, Qualityissuedthefollowing recommendation:
~   Interfaces with State and Local Governments In addition, the following additional areas were included in the scope of this audit:
QUALITYRECOMMENDATION AU298-008-A Assignedto:TimMessersmith DueDate:June9,1998Incorporate the10CI"R50,AppendixErequirement tosubmitanychangestotheEmergency Planorprocedures totheNRCwithin30daysofsuchchangesintoanappropriate KVP-2procedure.
~   Problem Identification and Resolution
SitewideProcedure SWP-PRO-03, Section3.2.3.1.2 states:"Whenever arequirement orcommitment issatisfied byastatement inthebodyofaprocedure, thestatement shouldbeidentified byplacingtherequirement orcommitment numberinbraces,rightjustified, immediately following thestatement."
~   Dose Assessment
Thisstatement isamanagement expectation toassurethatwhenaprocedure isrevisedallrequirements andcommitments areidentified andconsidered.
~   Personnel Qualifications
Noneoftheemergency procedures reviewedcontained bracestoidentifytrackedrequirements andcommitments.
~   Staffing Levels (Emergency Response Organization)
Asaresult,Qualityissuedthefollowing recommendation:
REPORT DETAILS Section 1.0 - Emergency Plan and Implementing Procedures A review was conducted to determine ifthe Emergency        Plan Implementing Procedures (Volume 13 of the Plant Procedure Manual (PPM)) satisfy the        requirements of the WNP-2 Emergency Plan. Additionally, the review verified that the requirements of 10 CFR 50, Appendix E and NUEEG-0654 were contained in the Emergency Plan. The review concluded that the WNP-2 Emergency Preparedness Program satisfies the regulatory requirements.               However, some deficiencies were identified in the Emergency Plan and procedures that need to be corrected. The deficiencies that could potentially result in a decrease in effectiveness of the program have been submitted on PERs for further review. The details of the noted deficiencies and the strengths of the program are recorded under the appropriate sections of this report.
QUALITYRECOMMENDATION AU298-008-8 Assignedto:TimMessersmith DueDate:June9,1998AnnotateRegulatory Requirements andCommitments intheemergency procedures inaccordance withSPY-PRO-03.
The Emergency Plan requires an internal review of the plan and an independent audit of the emergency plan and implementing procedures every twelve months. The Emergency Plan has been revised five times within the last threeyears.     Since it has been less than a year since Revision 19 was issued (4/3/97), and Revision 20 is in a review stage, it can be concluded that the Plan has been reviewed at least annually during the last few years. A review of previous audit reports concluded that appropriate areas were assessed, the audits were independent of EP personnel, and the audits were performed within twelve months.
DuringthereviewoftheEmergency Plan,itwasdiscovered thatacanceledprocedure (PPM13.10.15) wasstilllistedinAppendix2ofthePlanasanImplementing Procedure.
10 CFR 50, Appendix    E states: "Licensees who are authorized to operate a nuclear power facility shall submit any changes to the Emergency Plan or procedures to the Commission, within 30 days of such changes." The audit team verified that Revision 19 to the WNP-2 Emergency Plan, dated March 27, 1997, was sent to the NRC within 30 days of the revision date.
Also,inSection5.2.1theEmergency Planstates,"thatothermeteorological information isavailable fromBattelle."
2
Thereferenced procedures formeteorological datastates,"PNNLasthebackupsourceforthistypeofinformation."
 
Asaresult,thefollowing Qualityrecommendation wasissued:
r QUALITYDEPARTMENT AUDIT298-008
QUALITYDEPARTMENT AUDIT298408Section1.0-Emergency PlanandImplementing Procedures
                                                                  ~
-continued QUALITYRECOMMENDATION AU298-008-C Assignedto:TimMessersmith DueDate:June9,1998UpdatethelistofEmergency Planimplementing procedures inthe8XP-2Emergency Plan,Appendix2,andreplacethereference toBattellewithPALinSection5.2.1.Section2.0-Emergency ResponseOrganization TrainingTheWNP-2Emergency Plan,theQualification Directory Manual,theEmergency Preparedness trainingcoursecatalog,andtheSitewideProcedure (SWP)onEROtrainingwasreviewed.
Section 1.0 - Emergency Plan and Iinplementing Procedures - continued
Thereviewfoundthatappropriate trainingisofferedforeachidentified EROposition.
~     ~
Thetrainingincludesspecifictrainingforcertainpositions aswellasgeneraltrainingrequirements forallEROpositions.
    ~
Therearealsoprovisions forannualrefresher training.
Revision 19 was submitted to the NRC on April 3, 1997, as documented by Supply System letter to the NRC, GO297-062. A brief review of the synopsis of changes was performed to determine whether any of the changes reduced the effectiveness of the plan. In particular, ERO staffing changes made were reviewed. In each case, the staffing change was justified based on the position being assumed by another member or the position eliminated due to increased efficiency.
TheWNP-2Emergency Planstatesthattrainingforstateandcountyagencieswillbemadeavailable byWNP-2.WNP-2alsoprovidesMedicalServicesSupportTrainingtolocalhospitals andfiredepartments.
These changes are in accordance with the guidance in PPM 1.3.43, Licensing Basis Impact Determination, regarding changes to the Emergency Plan.
Aletterissenttoappropriate oFsiteorganizations eachyear.Thelettergivesindividuals responding toanemergency theopportunity toattendWNP-2GeneralEmployeeTraining(GET)orspecificEPtraining.
A review of the Emergency        Plan (Rev. 19) and the PPM database found that the 30-day requirement for submitting changes to the emergency procedures was not contained in the Plan or WNP-2 Plant Procedures. The Supply System has met this requirement by including the Nuclear Regulatory Commission (NRC) on the distribution list for changes to the Volume 13 Emergency Procedures. Records Control personnel have been submitting Volume 13 changes to the NRC within the required time limit using a Desktop Instruction, but were not aware that this was a regulatory requirement. Therefore, Quality issued the following recommendation:
Annualrefresher trainingisprovidedforallEROpersonnel.
QUALITYRECOMMENDATIONAU298-008-A Assigned to: Tim Messersmith                                              DueDate: June9, 1998 Incorporate the 10  CI"R 50, Appendix E requirement to submit any changes to the Emergency Plan or procedures to the NRC within 30 days of such changes into an appropriate KVP-2 procedure.
Thistrainingisprovidedinseveralwaysincluding drills,classroom
Sitewide Procedure SWP-PRO-03, Section 3.2.3.1.2 states: "Whenever a requirement or commitment is satisfied by a statement in the body of a procedure, the statement should be identified by placing the requirement or commitment number in braces, right justified, immediately following the statement." This statement is a management expectation to assure that when a procedure is revised all requirements and commitments are identified and considered. None of the emergency procedures reviewed contained braces to identify tracked requirements and commitments. As a result, Quality issued the following recommendation:
: training, andmailoutmaterial.
QUALITYRECOMMENDATIONAU298-008-8 Assigned to: Tim Messersmith                                              Due Date: June 9, 1998 Annotate Regulatory Requirements and Commitments          in the  emergency procedures in accordance with SPY-PRO-03.
EPmonitorsallEROpersonnel toverifythattrainingrequirements arebeingmet.EPnotifiesindividuals, andtheirmanagement, viae-mailwhentheirtrainingiscomingdue.EPremovestheindividual
During the review of the Emergency Plan, it was discovered that a canceled procedure (PPM 13.10.15) was still listed in Appendix 2 of the Plan as an Implementing Procedure. Also, in Section 5.2.1 the Emergency Plan states, "that other meteorological information is available from Battelle." The referenced procedures for meteorological data states, "PNNL as the backup source for this type of information." As a result, the following Quality recommendation was issued:
&omtheautomatic dialersystem(ADS)immediately whenre&esherrequirements becomedelinquent, andnotifiestheindividual andtheirmanagement.
 
Aprogramhasbeeninitiated whereEPisnotifiedbySecurityimmediately uponreceiving a16440formfortermination ofanemployee.
QUALITYDEPARTMENT AUDIT298408 Section 1.0 - Emergency Plan and Implementing Procedures - continued QUALITYRECOMMENDATIONAU298-008-C Assigned to: Tim Messersmith                                                      DueDate: June9, 1998 Update  the  list of Emergency    Plan  implementing  procedures   in  the 8XP-2 Emergency Plan, Appendix 2, and replace the reference to Battelle with PAL in Section 5.2.1.
EPthenremovestheterminated employeefromtheADS.Forthoseindividuals whoreceiveallrequiredtrainingbutareunabletoparticipate inanannualemergency drill,EPprovidesamailouttestasare&esher.
Section 2.0 - Emergency Response Organization Training The WNP-2 Emergency Plan, the Qualification Directory Manual, the Emergency Preparedness training course catalog, and the Sitewide Procedure (SWP) on ERO training was reviewed. The review found that appropriate training is offered for each identified ERO position. The training includes specific training for certain positions as well as general training requirements for all ERO positions. There are also provisions for annual refresher training.
Whenthemail-outiscompleted andreturnedtoEP,thePersonnel Qualification Database(PQD)isupdated.Theauditteamconcluded thatnecessary mechanisms areinplacetotrackEROqualifications andpersonnel areproperlynotifiedwhenre-qualification isdue.STRENGTHEmergency Preparedness personnel arediligentattrackingqualifications forthoseindividuals listedasEROmembers.Appropriate management isnotifiedpriortoindividiialslosingtheirqualifications andalsowhenqualifications expire.DespiteEP'seffortstotrackandnotifyEROpersonnel whenrequiredtrainingisneeded,linemanagement andsupervision havenotassuredthatallindividuals assignedtotheEROsatisfyqualification requirements priortobecomingdelinquent.
The WNP-2 Emergency Plan states that training for state and county agencies will be made available by WNP-2. WNP-2 also provides Medical Services Support Training to local hospitals and fire departments. A letter is sent to appropriate oFsite organizations each year. The letter gives individuals responding to an emergency the opportunity to attend WNP-2 General Employee Training (GET) or specific EP training.
Thelineorganizations haverecognized theproblemwithre-qualifying shiftworkerswhohavelimitedtimetomeetalltheirtrainingneeds.Theadministrative assistants foreachshophavetakenresponsibility tore-schedule thetaskssuchasmask QUALITYDEPARTMENT AUDIT298408Section2.0-Emergency ResponseOrganization Training-continued
Annual refresher training is provided for all ERO personnel. This training is provided in several ways including drills, classroom training, and mail out material. EP monitors all ERO personnel to verify that training requirements are being met. EP notifies individuals, and their management, via e-mail when their training is coming due. EP removes the individual &om the automatic dialer system (ADS) immediately when re&esher requirements become delinquent, and notifies the individual and their management.     A program has been initiated where EP is notified by Security immediately upon receiving a 16440 form for termination of an employee. EP then removes the terminated employee from the ADS. For those individuals who receive all required training but are unable to participate in an annual emergency drill, EP provides a mail out test as a re&esher. When the mail-out is completed and returned to EP, the Personnel Qualification Database (PQD) is updated. The audit team concluded that necessary mechanisms are in place to track ERO qualifications and personnel are properly notified when re-qualification is due.
~I~fitsandmedicalexaminations inblocks.ThiswillallowmeetingtheEROrequirements foreachcrewatonetime.TheshopshavealsoworkedwithHealthPhysics(HP)toarrangefortherequiredfacilities tobeprovidedonthedaywherethemostnumberofshiftpersonnel areavailable.
STRENGTH Emergency Preparedness personnel are diligent at tracking qualifications for those individuals listed as ERO members. Appropriate management is notified prior to indi vidiials losing their qualifications and also when qualifications expire.
EPisworkingwiththelineorganizations toassurethatafullytrainedEROorganization ismaintained.
Despite EP's efforts to track and notify ERO personnel when required training is needed, line management and supervision have not assured that all individuals assigned to the ERO satisfy qualification requirements prior to becoming delinquent. The line organizations have recognized the problem with re-qualifying shift workers who have limited time to meet all their training needs. The administrative assistants for each shop have taken responsibility to re-schedule the tasks such as mask
SitewideProcedure SWP-EPP-01, "Emergency ResponseOrganization Training,"
 
undertheinitialtrainingsection,states:"Uponcompletion oftraining, thestudentsarenormallyrequiredtopassawrittenexam,ortodemonstrate performance-based actions,e.g.,duringadrillorexercise."
QUALITYDEPARTMENT AUDIT298408 Section 2.0 - Emergency Response Organization Training - continued
Performance-based scenarios areconducted withtheCenterDirectors toensuretheirproficiency.
        ~
However,formanyEROpositions, performance-based actionsarenotperformed untiladrillorexercise.
~
Interviews withEROparticipants andobservations ofthedrillconducted inNovember1997foundthatmanyofthenewpersonnel didnotfullyunderstand theirdutiesasEROmembers.Onseveraloccasions, duringthedrill,coachingoftheseindividuals wasrequiredbytheEPrepresentative orotherpersonnel inthecenter.Thoseinterviewed alsonotedthataftertheirfirstdrilltheyfeltmoreproficient inperforming theirduties.TheEPorganization hasrecognized, fromobservation andafteractionreports,thatfirsttimeparticipants areuncomfortable intheiremergency centerroles.EPisinitiating apracticeofassigning anexperienced coachwithnewpersonnel fillingemergency centerpositions.
I fits and medical examinations in blocks. This will allow meeting the ERO requirements for each crew at one time. The shops have also worked with Health Physics (HP) to arrange for the required facilities to be provided on the day where the most number of shift personnel are available. EP is working with the line organizations to assure that a fully trained ERO organization is maintained.
ThispracticeshouldincreasetheeKciencyofthedrillandalleviate theapprehensions ofthefirsttimeresponders.
Sitewide Procedure SWP-EPP-01, "Emergency Response Organization Training," under the initial training section, states: "Upon completion of training, the students are normally required to pass a written exam, or to demonstrate performance-based actions, e.g., during a drill or exercise." Performance-based scenarios are conducted with the Center Directors to ensure their proficiency. However, for many ERO positions, performance-based actions are not performed until a drill or exercise. Interviews with ERO participants and observations of the drill conducted in November 1997 found that many of the new personnel did not fully understand their duties as ERO members. On several occasions, during the drill, coaching of these individuals was required by the EP representative or other personnel in the center. Those interviewed also noted that after their first drill they felt more proficient in performing their duties. The EP organization has recognized, from observation and after action reports, that first time participants are uncomfortable in their emergency center roles.
However,immediately uponnotification thatanindividual hascompleted therequiredclassroom
EP is initiating a practice of assigning an experienced coach with new personnel filling emergency center positions. This practice should increase the eKciency of the drill and alleviate the apprehensions of the first time responders.           However, immediately upon notification that an individual has completed the required classroom training, EP updates the automatic dialer and notifies the individual that they have been activated in the system. Since drills are conducted annually, the potential exists for personnel to be required to respond to an actual emergency prior to participating in performance-based actions. Since initial training is performed year round, quality recommends the following:
: training, EPupdatestheautomatic dialerandnotifiestheindividual thattheyhavebeenactivated inthesystem.Sincedrillsareconducted
QUALITYRECOMMENDATIONAU298-008-D Assigned to: Tim Messersmith                                                      DueDate: June9, 1998 Expand the initial training for emergency center personnel involved with communications, log keeping, and team tracking to include performance-based actions.
: annually, thepotential existsforpersonnel toberequiredtorespondtoanactualemergency priortoparticipating inperformance-based actions.Sinceinitialtrainingisperformed yearround,qualityrecommends thefollowing:
Section 3.0 - Readiness Testing (Drill Observations)
QUALITYRECOMMENDATION AU298-008-D Assignedto:TimMessersmith DueDate:June9,1998Expandtheinitialtrainingforemergency centerpersonnel involvedwithcommunications, logkeeping,andteamtrackingtoincludeperformance-based actions.Section3.0-Readiness Testing(DrillObservations)
Since there were no drill activities scheduled during the performance of this audit, the audit team used observations gathered during the Team B drill performed November 18, 1997, to determine ifidentified concerns had been adequately resolved by the EP organization. During the November drill, Quality personnel were- stationed in the Emergency Offsite Facility (EOF), Technical Support Center (TSC), Operations Support Center (OSC), and Joint Information Center (JIC).
Sincetherewerenodrillactivities scheduled duringtheperformance ofthisaudit,theauditteamusedobservations gatheredduringtheTeamBdrillperformed November18,1997,todetermine ifidentified concernshadbeenadequately resolvedbytheEPorganization.
Additionally, a Quality individual accompanied one of the field teams performing radiological, monitoring. In general, Quality concluded that drill performance was adequate in the centers assessed.       Strengths were cited in the teamwork observed in the field teams, EOF, and JIC.
DuringtheNovemberdrill,Qualitypersonnel were-stationed intheEmergency OffsiteFacility(EOF),Technical SupportCenter(TSC),Operations SupportCenter(OSC),andJointInformation Center(JIC).Additionally, aQualityindividual accompanied oneofthefieldteamsperforming radiological, monitoring.
Quality's assessment of the drill performance was supported by Emergency Preparedness Drill Report 97-4.
Ingeneral,Qualityconcluded thatdrillperformance wasadequateinthecentersassessed.
 
Strengths werecitedintheteamworkobservedinthefieldteams,EOF,andJIC.Quality's assessment ofthedrillperformance wassupported byEmergency Preparedness DrillReport97-4.
e QUALITYDEPARTMENT AUDIT298408 Section 3.0 - Readiness Testing (Drill Observations) - continued
e QUALITYDEPARTMENT AUDIT298408Section3.0-Readiness Testing(DrillObservations)
'uality    observed issues concerning the staffing of the OSC in that initially no Equipment Operators (EO's) were available to support the drill. Also, there were no Chemistry Technicians available. In addition, the scheduled OSC Communicator was not present. As a result, an individual who was present to observe the position (and was qualified in the position) was called on to participate.
-continued
Problems with staffing the OSC has been a repeat drill concern. Specific actions taken by EP personnel to resolve these actions have resulted in improved performance.             For the EOs, arrangements have been made with Operations Training to schedule the training week EOs for drill participation rather than trying to use on-shift EOs who also have concurrent plant duties.
'ualityobservedissuesconcerning thestaffingoftheOSCinthatinitially noEquipment Operators (EO's)wereavailable tosupportthedrill.Also,therewerenoChemistry Technicians available.
Agreements were made with Chemistry Technicians to clarify their participation during drills.
Inaddition, thescheduled OSCCommunicator wasnotpresent.Asaresult,anindividual whowaspresenttoobservetheposition(andwasqualified intheposition) wascalledontoparticipate.
Chemistry Technicians are directed to report to the OSC and sign in, after which they return to the laboratory. The individual performance issue associated with the OSC Communicator was addressed with the individual's supervisor who took appropriate actions. For the subsequent drills performed since November 1997, participation has been well supported with a full complement of EOs, Chemistry Technicians, HPs, and craft personnel.
ProblemswithstaffingtheOSChasbeenarepeatdrillconcern.SpecificactionstakenbyEPpersonnel toresolvetheseactionshaveresultedinimprovedperformance.
Quality personnel attended the training provided to the Controller/Evaluators prior to the drill and also the training given to players the day of the drill. During the Controller/Evaluator training, it was noted that the Controllers were reminded to use the drill as an opportunity to provide training. The use of drills as a training method and the role of Controllers in providing that training was a concern from the previous Emergency Preparedness audit. During the player training, it was noted that there was not a mechanism employed to capture player comments/suggestions or to provide feedback to the player making the suggestion.             Several suggestions and much discussion was not captured by the EP organization. Therefore, the following recommendation is issued:
FortheEOs,arrangements havebeenmadewithOperations TrainingtoschedulethetrainingweekEOsfordrillparticipation ratherthantryingtouseon-shiftEOswhoalsohaveconcurrent plantduties.Agreements weremadewithChemistry Technicians toclarifytheirparticipation duringdrills.Chemistry Technicians aredirectedtoreporttotheOSCandsignin,afterwhichtheyreturntothelaboratory.
QUALITYRECOMMENDATIONAU-298-008-E Assigned to: Tim Messersmith                                                Due Date: June 9, 1998 Provide a mechanism to capture information, comments, and suggestions provided during pre-drill training sessions. This mechanism should have a feedback loop to the individual providing the information.
Theindividual performance issueassociated withtheOSCCommunicator wasaddressed withtheindividual's supervisor whotookappropriate actions.Forthesubsequent drillsperformed sinceNovember1997,participation hasbeenwellsupported withafullcomplement ofEOs,Chemistry Technicians, HPs,andcraftpersonnel.
The drill report dated December 18, 1997, was evaluated for identified strengths and weaknesses.
Qualitypersonnel attendedthetrainingprovidedtotheController/Evaluators priortothedrillandalsothetraininggiventoplayersthedayofthedrill.DuringtheController/Evaluator
The report is formatted such that it provides an overall summary of the drill as well as individual center summaries. Individual drill objectives are identified for each center and are categorized as follows: Demonstrated, Not Demonstrated, Demonstrated with Issue, Not Observed, or Not Applicable. Two of the nineteen drill objectives were not demonstrated. One was the ability to recognize Emergency Action Levels and classify the incident (Control Room). The other was the activation and staffing of emergency facilities (OSC). In discussions with Emergency Planners, it was determined that corrective actions were being taken to address these issues. However, there was no apparent tracking mechanism used to identify those corrective actions. This does not agree with the Section 4.10 of the Drill and Exercise Manual which states the drill report shall "ensure items requiring corrective action are placed into an appropriate activity tracking system."
: training, itwasnotedthattheControllers wereremindedtousethedrillasanopportunity toprovidetraining.
 
TheuseofdrillsasatrainingmethodandtheroleofControllers inproviding thattrainingwasaconcernfromthepreviousEmergency Preparedness audit.Duringtheplayertraining, itwasnotedthattherewasnotamechanism employedtocaptureplayercomments/suggestions ortoprovidefeedbacktotheplayermakingthesuggestion.
QUALITYDEPARTMENT AUDIT 898408 Section 3.0- Readiness Testing (Drill Observations) - continued
Severalsuggestions andmuchdiscussion wasnotcapturedbytheEPorganization.
~
Therefore, thefollowing recommendation isissued:QUALITYRECOMMENDATION AU-298-008-E Assignedto:TimMessersmith DueDate:June9,1998Provideamechanism tocaptureinformation,
    ~
: comments, andsuggestions providedduringpre-drill trainingsessions.
Player comments are solicited after each drill. These are reviewed by EP staff and those that require follow-up actions are entered into a Regulatory Affairs database within the PTL system.
Thismechanism shouldhaveafeedbacklooptotheindividual providing theinformation.
Priorities, due dates, and responsible individuals are identified in the database, as well as the name of the player submitting the comment. All comments entered into the database for the 1997 drills were reviewed for appropriate priorities, reasonable due dates, and repeat issues. Approximately 113 player comments were reviewed. Of these, 67 were entered into the database.           Ifa comment is not entered into the database and the player requests a reply, there is no mechanism to ensure a reply is provided. A review was conducted of the latest Final After Action Report (FAAR) which documented an event where WNP-2 entered Technical Specification Action Statement 3.0.3. The report identified eight areas for improvement. These were not tracked in the Regulatory Affairs Action database. From the noted examples, there is no consistency as to what is tracked in the database. As a result of the issues raised above, the following recommendation was issued:
ThedrillreportdatedDecember18,1997,wasevaluated foridentified strengths andweaknesses.
QUALITYRECOMMENDATIONAU298-008-F Assigned to: Tim Messersmith                                                      Due Date: June 9, 1998 Identify items that should be tracked in the Regulatory Affairs database. Items to consider include: Replies to player comments, controller/evaluator concerns, drillobjectives not demonstrated, and I:AAR areas for improvement.
Thereportisformatted suchthatitprovidesanoverallsummaryofthedrillaswellasindividual centersummaries.
Items were selected from the drill player comments to determine if follow-up action had been performed. Four player comment forms noted where telephone numbers were not correct in the Emergency Phone Directory. These are reviewed and verified on a quarterly basis, but since some moves had been made (JIC, County EOC) in the interval they had not been updated. A check of the latest directory, dated December 1997, indicated that the telephone number changes had been incorporated except for one number. In this case, the Authorized Nuclear Insurer (ANI) number had a typographical error. The correct number was also located in a separate section of the directory. When notified of this discrepancy, EP personnel immediately corrected the database.
Individual drillobjectives areidentified foreachcenterandarecategorized asfollows:Demonstrated, NotDemonstrated, Demonstrated withIssue,NotObserved, orNotApplicable.
Section 4.0- Equipment and Facilities The WNP-2 Emergency Plan and PPM 13.14.4, Emergency Equipment, were reviewed and walkdowns were conducted of all emergency centers.
Twoofthenineteendrillobjectives werenotdemonstrated.
A sample of emergency kits and cabinets were inspected to verify contents listed in PPM 13.14.4. The contents of the kits and cabinets and the calibration of radiation instruments are verified periodically through Model Work Orders or through Plant Tracking System (PTL) action items. The materials in the emergency centers are restocked after each drill. The review determined that the emergency facilities are adequately stocked and that periodic verifications are being conducted.
Onewastheabilitytorecognize Emergency ActionLevelsandclassifytheincident(ControlRoom).Theotherwastheactivation andstaffingofemergency facilities (OSC).Indiscussions withEmergency
One area of the Emergency Plan that Quality reviewed involved the three local hospitals. These hospitals serve as the primaiy or backup stations for the decontamination of injured personnel. The Supply System provides emergency radiological kits for each hospital to treat personnel if such a scenario occurs. Quality reviewed the list of contents of the hospital emergency kits in PPM 13.14.4, .3 and questioned whether a dose rate meter was included. This question was based on a
: Planners, itwasdetermined thatcorrective actionswerebeingtakentoaddresstheseissues.However,therewasnoapparenttrackingmechanism usedtoidentifythosecorrective actions.ThisdoesnotagreewiththeSection4.10oftheDrillandExerciseManualwhichstatesthedrillreportshall"ensureitemsrequiring corrective actionareplacedintoanappropriate activitytrackingsystem."
 
QUALITYDEPARTMENT AUDIT898408Section3.0-Readiness Testing(DrillObservations)
QUALITYDEPARTMENT AUDIT298408 Section 4.0 - Equipment and Facilities -'continued
-continued
~     ~
~~Playercommentsaresolicited aftereachdrill.ThesearereviewedbyEPstaffandthosethatrequirefollow-up actionsareenteredintoaRegulatory AffairsdatabasewithinthePTLsystem.Priorities, duedates,andresponsible individuals areidentified inthedatabase, aswellasthenameoftheplayersubmitting thecomment.Allcommentsenteredintothedatabaseforthe1997drillswerereviewedforappropriate priorities, reasonable duedates,andrepeatissues.Approximately 113playercommentswerereviewed.
possible scenario where a highly contaminated person may have emanating radiation from the contamination. Emergency Preparedness personnel pointed out that although a dose rate meter is not listed, it is part of all the kits. The Kadlec Medical Center Radiological Kit contents were verified and a dose rate meter was included. Based on this, the following recommendation was issued:
Ofthese,67wereenteredintothedatabase.
QUALITYRECOMMENDATIONAU-298-008G Assigned To: Tim Messersmith                                                        DueDate: June9, 1998 Include a Dose Rate Meter as part of the contents listed on Attachment 5.3 ofPPM 13.14.4, Hospital RadiologicalEmergency Kit.
Ifacommentisnotenteredintothedatabaseandtheplayerrequestsareply,thereisnomechanism toensureareplyisprovided.
The hospital kits are tracked on Model Work Orders (MWO) both by EP and Radiation Protection (RP). Radiation Protection tracks the Thermoluminescent Dosimeters (TLD), count rate meters, and dose rate meters to ensure that they are in calibration and ready for use. EP performs quarterly checks to verify and change-out the instruments. For the MWO's to perform the quarterly checks, two of the work orders generated were incorrectly assigned to RP, while one was assigned to EP. To align the work order process with the appropriate discipline the following recommendation is issued:
Areviewwasconducted ofthelatestFinalAfterActionReport(FAAR)whichdocumented aneventwhereWNP-2enteredTechnical Specification ActionStatement 3.0.3.Thereportidentified eightareasforimprovement.
QUALITYRECOMMENDATIONAU298-0088 Assign To:     Tim  Messersmith                                                  Due Date: June 9, 1998 Ensure work orders generated to inventory hospital radiological kits are assigned to the Emergency Preparedness group.
ThesewerenottrackedintheRegulatory AffairsActiondatabase.
The audit team assessed whether emergency facilities and equipment identified by NUEEG-0696 and described in the FSAR as supporting emergency response has been adequately provided and maintained. This assessment determined that sufficient equipment and facilities are in place to support emergency response.
Fromthenotedexamples, thereisnoconsistency astowhatistrackedinthedatabase.
Section 5.0- Interfaces With State and Local Governments
Asaresultoftheissuesraisedabove,thefollowing recommendation wasissued:QUALITYRECOMMENDATION AU298-008-F Assignedto:TimMessersmith DueDate:June9,1998IdentifyitemsthatshouldbetrackedintheRegulatory Affairsdatabase.
'The WNP-2 Emergency Plan, Section 4.3 and Plant Procedure Manual 13.1.1, Classifying The Emergency, require that agreements with offsite agencies be reviewed annually, with the latest revision reviewed by state and local government representatives.             Interviews were conducted and the Memorandums of Understandings (MOUs), agreement letters, and contracts were reviewed. These documents are in place to ensure that the Supply System and offsite agencies communicate and review any changes in their agreements.
Itemstoconsiderinclude:Repliestoplayercomments, controller/evaluator
Various offsite personnel were interviewed to ensure that agreements and contracts between the Supply System and their facility have been reviewed and also to determine the relationship between offsite agencies and WNP-2. Some of the agreements and all of the MOUs were verified as having received the required annual review. The personnel interviewed indicated that they are informed of all revisions to the emergency plan and their communication with WNP-2 EP personnel continues to be strong. Both on and offsite personnel expressed a professional and amicable relationship with their counterparts. All personnel interviewed stated that there is an adequate level of support for each others programs and an improved response to emergency topics among their groups. Quality has determined that the EP group adequately interfaces with the offsite agencies.
: concerns, drillobjectives notdemonstrated, andI:AARareasforimprovement.
 
Itemswereselectedfromthedrillplayercommentstodetermine iffollow-up actionhadbeenperformed.
QUALITYDEPARTMENT AUDIT298-008 Section 5.0 - Interfaces   %ith State and Local Governments - continued
Fourplayercommentformsnotedwheretelephone numberswerenotcorrectintheEmergency PhoneDirectory.
~
Thesearereviewedandverifiedonaquarterly basis,butsincesomemoveshadbeenmade(JIC,CountyEOC)intheintervaltheyhadnotbeenupdated.Acheckofthelatestdirectory, datedDecember1997,indicated thatthetelephone numberchangeshadbeenincorporated exceptforonenumber.Inthiscase,theAuthorized NuclearInsurer(ANI)numberhadatypographical error.Thecorrectnumberwasalsolocatedinaseparatesectionofthedirectory.
    ~
Whennotifiedofthisdiscrepancy, EPpersonnel immediately corrected thedatabase.
STRENGTH The Emergency Preparedness group mainiains an open line        ofcommunication  with offsite personnel regarding emergency preparedness issues.
Section4.0-Equipment andFacilities TheWNP-2Emergency PlanandPPM13.14.4,Emergency Equipment, werereviewedandwalkdowns wereconducted ofallemergency centers.Asampleofemergency kitsandcabinetswereinspected toverifycontentslistedinPPM13.14.4.Thecontentsofthekitsandcabinetsandthecalibration ofradiation instruments areverifiedperiodically throughModelWorkOrdersorthroughPlantTrackingSystem(PTL)actionitems.Thematerials intheemergency centersarerestocked aftereachdrill.Thereviewdetermined thattheemergency facilities areadequately stockedandthatperiodicverifications arebeingconducted.
A concern    was raised by the Director of Morrow County Emergency Management (Oregon). The issue regarded a disparity of map scale between WNP-2 and Department of Energy (DOE)-RL maps used to chart dose projection. It was stated that DOE and not the Supply System was unwilling to cooperate in correcting the maps. As a result, Quality recommends:
OneareaoftheEmergency PlanthatQualityreviewedinvolvedthethreelocalhospitals.
QUALITYRECOMMENDATIONAU298-008-I Assigned To: Tim Messersmith                                                      DueDate: June9, 1998 Investigate the disparitt'es in scales dealing with exposurelingestion county maps to if determine these differences affect the counties'bility to respond to an emergency event at WAF-2.
Thesehospitals serveastheprimaiyorbackupstationsforthedecontamination ofinjuredpersonnel.
Section 6.0 - Problem IdentiTication and Resolution The PERs and Recommendations resulting from the 1997 Emergency Preparedness Program Audit were reviewed for effectiveness. Three PERs resulted from the 1997 audit. Two of the PERs have been completed and closed (297-0183 and 297-0198). The audit team reviewed the corrective actions associated with these PERs to determine ifthey were implemented effectively.
TheSupplySystemprovidesemergency radiological kitsforeachhospitaltotreatpersonnel ifsuchascenariooccurs.Qualityreviewedthelistofcontentsofthehospitalemergency kitsinPPM13.14.4,Attachment 5.3andquestioned whetheradoseratemeterwasincluded.
The closure documentation for these PERs satisfied the instructions on the corrective action plans. There were no concerns with these PERs.
Thisquestionwasbasedona QUALITYDEPARTMENT AUDIT298408Section4.0-Equipment andFacilities
One PER remains open from last year's audit.                       PER 297-0205 documented that "Instructions/Procedures do not exist which maintain the license basis requirements for non power block facilities." This PER has five corrective actions, all of which are still open. These actions have been extended, and at the last time of request for extension Quality required a plan for completion as well as a justification for extension. Potential effects of the extended due dates are mitigated by Corrective Action Plan (CAP) 5 which is an interim action for the Manager of Facilities and Support Services (or designee) to review all Facility Service Requests issued until CAPs 1 through 4 are completed. As such, this action will be in place and ongoing until the other actions have been completed. Quality will continue to follow this issue and review documentation upon completion of PER 298-0205.
-'continued
There were ten Quality Recommendations issued with the previous Emergency Preparedness Program Audit. Only one is open at this time. Recommendation AU297-005-B was issued to revise PPM13.8.1, Emergency Dose Projection System Operations, to incorporate dose assessment enhancements.       This action will be completed at the time of biennial review of the procedure, currently scheduled for April 1998. This was acceptable to Quality.
~~possiblescenariowhereahighlycontaminated personmayhaveemanating radiation fromthecontamination.
Another recommendation, that was closed based on pending actions, was evaluated to determine ifthe action had been completed. Recommendation AU297-005-J was issued to establish criteria to maintain the backup Post Accident Sampling System (PASS) laboratory in a state of readiness.
Emergency Preparedness personnel pointedoutthatalthoughadoseratemeterisnotlisted,itispartofallthekits.TheKadlecMedicalCenterRadiological Kitcontentswereverifiedandadoseratemeterwasincluded.
The response to this recommendation indicated that Chemistry would revise PPM 12.1.1,
Basedonthis,thefollowing recommendation wasissued:QUALITYRECOMMENDATION AU-298-008G AssignedTo:TimMessersmith DueDate:June9,1998IncludeaDoseRateMeteraspartofthecontentslistedonAttachment 5.3ofPPM13.14.4,HospitalRadiologicalEmergency Kit.ThehospitalkitsaretrackedonModelWorkOrders(MWO)bothbyEPandRadiation Protection (RP).Radiation Protection trackstheThermoluminescent Dosimeters (TLD),countratemeters,anddoseratemeterstoensurethattheyareincalibration andreadyforuse.EPperformsquarterly checkstoverifyandchange-out theinstruments.
 
FortheMWO'stoperformthequarterly checks,twooftheworkordersgenerated wereincorrectly assignedtoRP,whileonewasassignedtoEP.Toaligntheworkorderprocesswiththeappropriate discipline thefollowing recommendation isissued:QUALITYRECOMMENDATION AU298-0088 AssignTo:TimMessersmith DueDate:June9,1998Ensureworkordersgenerated toinventory hospitalradiological kitsareassignedtotheEmergency Preparedness group.Theauditteamassessedwhetheremergency facilities andequipment identified byNUEEG-0696 anddescribed intheFSARassupporting emergency responsehasbeenadequately providedandmaintained.
1 ~ A I
Thisassessment determined thatsufficient equipment andfacilities areinplacetosupportemergency response.
 
Section5.0-Interfaces WithStateandLocalGovernments
QUALITYDEPARTMENT AUDIT298408 Section 6.0 - Problem Identification and Resolution - continued Laboratory Quality Assurance, to provide schedule frequencies for backup PASS laboratory instrumentation. A review of PPM 12.1.1, Rev. 9, dated December 17, 1997, indicated that these actions had not been incorporated into the procedure. Since the time this recommendation was issued, Quality has established a practice of tracking actions in response to recommendations.
'TheWNP-2Emergency Plan,Section4.3andPlantProcedure Manual13.1.1,Classifying TheEmergency, requirethatagreements withoffsiteagenciesbereviewedannually, withthelatestrevisionreviewedbystateandlocalgovernment representatives.
This practice will aid the responsible individual, as well as Quality, in assuring completion of audit recommendation responses. Quality toured the PASS Laboratory and determined that it was in a state of readiness. However, Quality still believes this issue warrants action and therefore, is re-issuing the following recommendation:
Interviews wereconducted andtheMemorandums ofUnderstandings (MOUs),agreement letters,andcontracts werereviewed.
QUALITYRECOMMENDATIONAU298-008- J Assigned to: John C. Hanson                                                      DueDate: June 9, 1998 Establish criteria to maintain the baciasp PASS Laboratory in a state of readiness.
Thesedocuments areinplacetoensurethattheSupplySystemandoffsiteagenciescommunicate andreviewanychangesintheiragreements.
The remaining recommendations that had been closed were verified to have been implemented or referred to another document (PERA) that was tracking the item.
Variousoffsitepersonnel wereinterviewed toensurethatagreements andcontracts betweentheSupplySystemandtheirfacilityhavebeenreviewedandalsotodetermine therelationship betweenoffsiteagenciesandWNP-2.Someoftheagreements andalloftheMOUswereverifiedashavingreceivedtherequiredannualreview.Thepersonnel interviewed indicated thattheyareinformedofallrevisions totheemergency planandtheircommunication withWNP-2EPpersonnel continues tobestrong.Bothonandoffsitepersonnel expressed aprofessional andamicablerelationship withtheircounterparts.
The PTL database for the Emergency Preparedness group was searched for PERs assigned to EP since January 1, 1997. The PER summaries were reviewed and considered for indications of repeat occurrences or trends. Two PERs related to the Automated Notification System (ANS) were selected for additional review. PER 297-0230 documented where the ANS transmitted an incorrect message, indicating a drill was in progress instead of the actual Unusual Event.
Allpersonnel interviewed statedthatthereisanadequatelevelofsupportforeachothersprogramsandanimprovedresponsetoemergency topicsamongtheirgroups.Qualityhasdetermined thattheEPgroupadequately interfaces withtheoffsiteagencies.
PER297-0740 documented where the ANS stopped processing outgoing telephone and pager messages. In the first instance, it was determined that the problem was due to the vendor failing to link the correct scenario to the correct message.             Corrective actions associated with PER 297-0230 included a procurement of a device that would allow testing the system without activating ERO pagers and to check all scenarios for similar occurrences. The second PER was inconclusive in identifying a cause. Through discussions with the vendor, it was believed that an excessive amount of data stored in 'temporary data logs within the system caused the problem.
QUALITYDEPARTMENT AUDIT298-008Section5.0-Interfaces
Corrective actions included monitoring and purging of the temporary files and testing the system each 12 hours to verify operability. Quality's review of these two PERs determined that they did not represent an adverse trend or failure to prevent recurrence since the two failures were not directly related.
%ithStateandLocalGovernments
The most recent self-assessment performed by EP was performed February 21, 1997. This self-
-continued
. assessment utilized EP individuals from offsite utilities as well as personnel from the state and county emergency organizations. Three PERs and 29 recommendations resulted from the self-assessment. All recommendations have been closed except one which is dependent on the next self-assessment performance to close. Currently, EP is scheduling the next self-assessment for the first week of May 1998. The 1997 EP self-assessment was determined to be self-critical and effectively used outside resources to identify and resolve problem areas.
~~STRENGTHTheEmergency Preparedness groupmainiains anopenlineofcommunication withoffsitepersonnel regarding emergency preparedness issues.AconcernwasraisedbytheDirectorofMorrowCountyEmergency Management (Oregon).
STRENGTH The Emergency Preparedness organization is proacti ve in identifying problems and implementing appropriate corrective actions.
Theissueregardedadisparity ofmapscalebetweenWNP-2andDepartment ofEnergy(DOE)-RLmapsusedtochartdoseprojection.
10
ItwasstatedthatDOEandnottheSupplySystemwasunwilling tocooperate incorrecting themaps.Asaresult,Qualityrecommends:
 
QUALITYRECOMMENDATION AU298-008-I AssignedTo:TimMessersmith DueDate:June9,1998Investigate thedisparitt'es inscalesdealingwithexposurelingestion countymapstodetermine ifthesedifferences affectthecounties'bility torespondtoanemergency eventatWAF-2.Section6.0-ProblemIdentiTication andResolution ThePERsandRecommendations resulting fromthe1997Emergency Preparedness ProgramAuditwerereviewedforeffectiveness.
QUALITYDEPARTMENT AUDIT298408 Section 7.0- Dose Assessment Capabilities The WNP-2 Emergency Plan and applicable plant procedures were reviewed to determine if required systems are available and accessible for personnel to acquire results for dose assessments in a timely manner. Also, interviews were conducted and training reviewed to assure that capable personnel were available to perform the dose assessments.
ThreePERsresultedfromthe1997audit.TwoofthePERshavebeencompleted andclosed(297-0183 and297-0198).
The available WNP-2 systems include the Emergency Dose Projection System (EDPS), Backup Emergency Dose Projection System (BEDPS) and the Quick Emergency Dose Projection Systems (QEDPS). These programs are stand-alone systems which have alternate power supplies allowing for data acquisition in the event of loss of power during an emergency. These programs are also used by the offsite agencies and are comparable with the dose assessment program utilized by the Nuclear Regulatory Commission. Quality concludes that adequate systems are available to provide data for personnel to perform dose assessments in a timely manner.
Theauditteamreviewedthecorrective actionsassociated withthesePERstodetermine iftheywereimplemented effectively.
There is a manual backup model for dose assessment in place for system failures noted in PPM 13.1.1, Classifying the Emergency, Attachment 5.1, Tables 3 and 4. All dose assessment personnel interviewed were aware of this backup model and stated it was presented in training but not utilized during drills. When using the QEDPS, dose assessment personnel are required to draw a dose projection map for distribution to offsite agencies. All personnel interviewed stated that they have drawn dose projection maps in drills and are comfortable in doing so. Personnel tasked with performing dose assessments were determined to be trained and qualified.
Theclosuredocumentation forthesePERssatisfied theinstructions onthecorrective actionplans.TherewerenoconcernswiththesePERs.OnePERremainsopenfromlastyear'saudit.PER297-0205documented that"Instructions/Procedures donotexistwhichmaintainthelicensebasisrequirements fornonpowerblockfacilities."
PPM 13.8.1, Emergency Dose Projection System, defines BEDPS as the backup system to EDPS and refers to the pre-planned alternate monitoring method as per Technical Specification 3.3.7.5.
ThisPERhasfivecorrective actions,allofwhicharestillopen.Theseactionshavebeenextended, andatthelasttimeofrequestforextension Qualityrequiredaplanforcompletion aswellasajustification forextension.
It was noted that Technical Specification 3.3.7.5 was not a valid document and had been removed with the implementation of Improved Technical Specifications (ITS). Therefore, Quality recommends:
Potential effectsoftheextendedduedatesaremitigated byCorrective ActionPlan(CAP)5whichisaninterimactionfortheManagerofFacilities andSupportServices(ordesignee) toreviewallFacilityServiceRequestsissueduntilCAPs1through4arecompleted.
QUALITYRECOMMENDATIONAV298-008-K Assigned to: Tim Messersmith                                                Due Date: June 9, 1998 Revise  dose  projection  PPMs    13.8.1  and  13.8.2 to  delete references  to superseded Technical Specification 3.3.7.5 and reflect current requirements.
Assuch,thisactionwillbeinplaceandongoinguntiltheotheractionshavebeencompleted.
Emergency Preparedness proposed to eliminate BEDPS through Rev. 20 of the Emergency Plan.
Qualitywillcontinuetofollowthisissueandreviewdocumentation uponcompletion ofPER298-0205.
It was believed that this monitoring method had been deleted with the implementation of the ITS.
ThereweretenQualityRecommendations issuedwiththepreviousEmergency Preparedness ProgramAudit.Onlyoneisopenatthistime.Recommendation AU297-005-B wasissuedtorevisePPM13.8.1, Emergency DoseProjection SystemOperations, toincorporate doseassessment enhancements.
Revision states: "EDPS software will be upgraded by combining so&ware features of the BEDPS and will provide an easy to use operating platform, thus allowing the removal of the BEDPS program." However, a Supply System letter to the Nuclear Regulatory Commission dated December 23, 1996, states the BEDPS is "the pre-planned alternate monitoring method as per Technical Specifications 3.3.7.5." Based on this information, EP decided to keep BEDPS in the Emergency Plan.
Thisactionwillbecompleted atthetimeofbiennialreviewoftheprocedure, currently scheduled forApril1998.Thiswasacceptable toQuality.Anotherrecommendation, thatwasclosedbasedonpendingactions,wasevaluated todetermine iftheactionhadbeencompleted.
Emergency Plan, Section 5.1.4, Personnel Dose Assessment, refers to routine and emergency personnel exposure monitoring and dose assessments              being accomplished by issuing thermoluminescent dosimeters (TLDs), electronic, or direct reading dosimeters and monitoring for airborne radioactivity. The plan also denotes that there is a 24-hour-per-day capability to 11
Recommendation AU297-005-J wasissuedtoestablish criteriatomaintainthebackupPostAccidentSamplingSystem(PASS)laboratory inastateofreadiness.
 
Theresponsetothisrecommendation indicated thatChemistry wouldrevisePPM12.1.1, 1~AI QUALITYDEPARTMENT AUDIT298408Section6.0-ProblemIdentification andResolution
t    QUALITYDEPARTMENT AUDIT298408 t
-continued
Section 7.0 - Dose Assessment Capabilities - continued analyze Supply System issued dosimetry. It further states that the Supply System maintains a personnel monitoring program through the use of TLD readers and whole body counters. The requirement to provide 24-hour-per-day capability comes from NUIKG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants. Presently, the Supply System has no onsite equipment for the analyzing of TLDs. Section 6.2.8 of the Emergency Plan, Health Physics Center, states the Supply System contracts with a local vendor to process TLDs and provide results to the Supply System in a timely manner. The Supply System's local contract vendor, ThermoNuTech, has relocated from West Richland, Washington, to Albuquerque, New Mexico. Although the contract vender is not local, EP believes that the Supply System can demonstrate the capability to analyze TLDs 24-hours-per-day and provide the results in a timely manner. Since the Emergency Plan does not reflect actual practice, the following PER was issued.
'Laboratory QualityAssurance, toprovideschedulefrequencies forbackupPASSlaboratory instrumentation.
QUALITYHOUNDING PER 298-0194 Section 6.2.8 of the emergency Plan states that the Supply System contracts wi th a local vendor to process TLDs. The vendor relocated to Albuquerque, New Mexico.
AreviewofPPM12.1.1,Rev.9,datedDecember17,1997,indicated thattheseactionshadnotbeenincorporated intotheprocedure.
Regulatory Guide 1.23, Onsite Meteorology Programs, Rev. 0, states:                 "meteorological instruments should be inspected and serviced at a frequency which will assure at least a ninety percent data recovery and which will minimize extended periods of instrument outage." Quality utilized the 1996 and 1997 Annual Radioactive Eftluent Report to verify that the meteorological joint recovery data submitted to the NRC annually was at least within the ninety percent acceptance criteria. The joint recovery data for these two years was found acceptable.
Sincethetimethisrecommendation wasissued,Qualityhasestablished apracticeoftrackingactionsinresponsetorecommendations.
Section 8.0 - Personnel QualiTications The Qualification Directory Manual, the November 1997 drill observations, drill after action reports, and previous drill reports were reviewed to determine ifERO members were qualified to perform their emergency center functions.            Also, interviews were conducted with ERO responders. All personnel listed as ERO responders have met the qualifications required of their positions. All personnel interviewed expressed that as a first time responder they were unsure of what was required. However, each person interviewed said that after participating in a drill they were confident in their ability to perform their duties. The issue with first time responder qualifications is addressed in the training section of this report (Recommendation AU298-008-D).
Thispracticewillaidtheresponsible individual, aswellasQuality,inassuringcompletion ofauditrecommendation responses.
PQD was reviewed against Operations, Maintenance, and Health Physics crew schedules.
QualitytouredthePASSLaboratory anddetermined thatitwasinastateofreadiness.
Individual qualification requirements were evaluated by name and by Qualification Group.
However,Qualitystillbelievesthisissuewarrantsactionandtherefore, isre-issuingthefollowing recommendation:
Maintenance and Health Physics personnel were found to have adequate qualifications. However, two Operations'rews did not appear to have the required compliments of two ERO trained individuals. A review of training records by Operations found that required training had been conducted but some equipment operators were not entered in the appropriate Qualification Group in PQD. One shift manager stated that the requirements of PPM 1.3.1 were used to verify required shift compliment. It was also indicated that when filling vacant crew positions, ERO 12
QUALITYRECOMMENDATION AU298-008-JAssignedto:JohnC.HansonDueDate:June9,1998Establish criteriatomaintainthebaciaspPASSLaboratory inastateofreadiness.
 
Theremaining recommendations thathadbeenclosedwereverifiedtohavebeenimplemented orreferredtoanotherdocument(PERA)thatwastrackingtheitem.ThePTLdatabasefortheEmergency Preparedness groupwassearchedforPERsassignedtoEPsinceJanuary1,1997.ThePERsummaries werereviewedandconsidered forindications ofrepeatoccurrences ortrends.TwoPERsrelatedtotheAutomated Notification System(ANS)wereselectedforadditional review.PER297-0230documented wheretheANStransmitted anincorrect message,indicating adrillwasinprogressinsteadoftheactualUnusualEvent.PER297-0740 documented wheretheANSstoppedprocessing outgoingtelephone andpagermessages.
r-I E
Inthefirstinstance, itwasdetermined thattheproblemwasduetothevendorfailingtolinkthecorrectscenariotothecorrectmessage.Corrective actionsassociated withPER297-0230includedaprocurement ofadevicethatwouldallowtestingthesystemwithoutactivating EROpagersandtocheckallscenarios forsimilaroccurrences.
 
ThesecondPERwasinconclusive inidentifying acause.Throughdiscussions withthevendor,itwasbelievedthatanexcessive amountofdatastoredin'temporary datalogswithinthesystemcausedtheproblem.Corrective actionsincludedmonitoring andpurgingofthetemporary filesandtestingthesystemeach12hourstoverifyoperability.
QUALITYDEPARTMENT AUDIT298-008 Section 8.0 - Personnel QualiTications - continued qualifications were not always reviewed. It was assumed that fire brigade training met the qualification requirements for the ERO. As a result of the above issues, the following PER was issued:
Quality's reviewofthesetwoPERsdetermined thattheydidnotrepresent anadversetrendorfailuretopreventrecurrence sincethetwofailureswerenotdirectlyrelated.Themostrecentself-assessment performed byEPwasperformed February21,1997.Thisself-.assessment utilizedEPindividuals fromoffsiteutilities aswellaspersonnel fromthestateandcountyemergency organizations.
QUALITYFINDING PER 298-0169 The process is inadequate for assigning new equipment operators to Emergency Response Qualification Groups.
ThreePERsand29recommendations resultedfromtheself-assessment.
Section 9.0 - StaAing Levels Emergency Response Organization The WNP-2 ERO Personnel List, the PQD, and PPM 1.3.1 (WNP-2 Operating Policies, Programs, and Practices) were reviewed to determine ifERO staffing was adequate to respond to an emergency.
Allrecommendations havebeenclosedexceptonewhichisdependent onthenextself-assessment performance toclose.Currently, EPisscheduling thenextself-assessment forthefirstweekofMay1998.The1997EPself-assessment wasdetermined tobeself-critical andeffectively usedoutsideresources toidentifyandresolveproblemareas.STRENGTHTheEmergency Preparedness organization isproactiveinidentifying problemsandimplementing appropriate corrective actions.10 QUALITYDEPARTMENT AUDIT298408Section7.0-DoseAssessment Capabilities TheWNP-2Emergency Planandapplicable plantprocedures werereviewedtodetermine ifrequiredsystemsareavailable andaccessible forpersonnel toacquireresultsfordoseassessments inatimelymanner.Also,interviews wereconducted andtrainingreviewedtoassurethatcapablepersonnel wereavailable toperformthedoseassessments.
The audit team concluded that there are adequate personnel available to staff the WNP-2 ERO within the required 60-minute limit. Those personnel tracked via the PQD are assigned to one of four ERO teams who rotate through a two week period of being on-call. The Duty team is issued pagers. In the event of an emergency or during the conduct of a Notification Drill, the EP staff initiate the alert using the Dialogics Automated Notification System (DANS). ERO team members respond using a telephonic code to indicate whether they are able to report for emergencyduties. Shortages areidentified and replacements are called in. A staffing check" of the oncoming ERO team is conducted the Thursday prior to shift rotation by EP staff This check identifies any gaps in the ERO team and allows EP staff time to find personnel to fillthe roster.
Theavailable WNP-2systemsincludetheEmergency DoseProjection System(EDPS),BackupEmergency DoseProjection System(BEDPS)andtheQuickEmergency DoseProjection Systems(QEDPS).Theseprogramsarestand-alone systemswhichhavealternate powersuppliesallowingfordataacquisition intheeventoflossofpowerduringanemergency.
NUREG 0654, Rev. 1, Section II.A.4 states in part, "Each principal organization shall be capable of continuous (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative, and material) shall be specified by title." In general, the current method of staffing the ERO should provide for continuous operations. However, the WNP-2 Emergency Plan (Rev. 19), does not specify the person responsible for ensuring 24-hour continuous operations.
Theseprogramsarealsousedbytheoffsiteagenciesandarecomparable withthedoseassessment programutilizedbytheNuclearRegulatory Commission.
This topic is discussed in several ERO duty position procedures and specifically in the Manpower Scheduler duty description. There are no guidelines in the emergency procedures for how long ERO personnel will man their stations after reporting.             Although this requirement from NUREG 0654 is met by the word and intent of the        WNP-2    Emergency Plan, it is unclear in the Volume 13 procedures that a 24-hour staffing schedule may be required. Also, there are no clear provisions in the procedures to establish a 24-hour staffing schedule for a protracted period.
Qualityconcludes thatadequatesystemsareavailable toprovidedataforpersonnel toperformdoseassessments inatimelymanner.Thereisamanualbackupmodelfordoseassessment inplaceforsystemfailuresnotedinPPM13.1.1,Classifying theEmergency, Attachment 5.1,Tables3and4.Alldoseassessment personnel interviewed wereawareofthisbackupmodelandstateditwaspresented intrainingbutnotutilizedduringdrills.WhenusingtheQEDPS,doseassessment personnel arerequiredtodrawadoseprojection mapfordistribution tooffsiteagencies.
Therefore Quality recommends:
Allpersonnel interviewed statedthattheyhavedrawndoseprojection mapsindrillsandarecomfortable indoingso.Personnel taskedwithperforming doseassessments weredetermined tobetrainedandqualified.
                        'QUALITYRECOMMENDATIONAU298-008-L Assigned to: Tim Messersmith                                                    Due Date: Iune 9, 1998 Revise the Emergency    Plan Implementing    Procediires to provide  guidance for establishing and maintaining continrious 24-hour staffing of the Emergency Response organization for a protracted period.
PPM13.8.1,Emergency DoseProjection System,definesBEDPSasthebackupsystemtoEDPSandreferstothepre-planned alternate monitoring methodasperTechnical Specification 3.3.7.5.ItwasnotedthatTechnical Specification 3.3.7.5wasnotavaliddocumentandhadbeenremovedwiththeimplementation ofImprovedTechnical Specifications (ITS).Therefore, Qualityrecommends:
13
QUALITYRECOMMENDATION AV298-008-K Assignedto:TimMessersmith DueDate:June9,1998Revisedoseprojection PPMs13.8.1and13.8.2todeletereferences tosuperseded Technical Specification 3.3.7.5andreflectcurrentrequirements.
 
Emergency Preparedness proposedtoeliminate BEDPSthroughRev.20oftheEmergency Plan.Itwasbelievedthatthismonitoring methodhadbeendeletedwiththeimplementation oftheITS.Revisionstates:"EDPSsoftwarewillbeupgradedbycombining so&warefeaturesoftheBEDPSandwillprovideaneasytouseoperating
QUALITYDEPARTMENT AUDIT298408-Section 9.0 - Staffing Levels Emergency Response Organization - continued The administrative mechanisms to ensure minimum shift staffing and augmentation requirements are in place and, if used consistently by all organizations, will meet the goals of the Emergency Plan. However, some line supervisors are not aware of the ERO staffing requirements nor use the tools provided.
: platform, thusallowingtheremovaloftheBEDPSprogram."
The WNP-2 Emergency Plan, Table 2-1 and NUREG-0654, Table B-1, specify the minimum staffing for the Supply System Emergency Response organization. These tables require two equipment operators and two maintenance personnel on-shift (around the clock) to perform emergency functions. The position of the maintenance personnel may be provided by shift personnel assigned other functions. On April 3, 1997, Rev. 19 to the WNP-2 Emergency Plan was submitted to the NRC. Attachment A of the 10 CFR 50.54(q) evaluation supporting the changes was an assessment of minimum on-shift ERO staffing. This assessment concluded that four equipment operators were needed on-shift to meet ERO requirements. The two additional equipment operators are assigned to cover the emergency maintenance function between 2:00 and 6:40 a.m. when maintenance personnel are not available on-shift. The Minimum Shift ERO Staffing Table developed by this assessment was included in PPM 1.3.1, WNP-2 Operating Policies, Programs, and Practices.
However,aSupplySystemlettertotheNuclearRegulatory Commission datedDecember23,1996,statestheBEDPSis"thepre-planned alternate monitoring methodasperTechnical Specifications 3.3.7.5."
A review of qualifications for operating  crews found that Operations Crews C and E have been staffed, during the hours between 2:00 a.m. to 6:40 a.m., with less than four ERO qualified equipment operators. This problem on ERO staffing resulted in:
Basedonthisinformation, EPdecidedtokeepBEDPSintheEmergency Plan.Emergency Plan,Section5.1.4,Personnel DoseAssessment, referstoroutineandemergency personnel exposuremonitoring anddoseassessments beingaccomplished byissuingthermoluminescent dosimeters (TLDs),electronic, ordirectreadingdosimeters andmonitoring forairborneradioactivity.
QUALITYFINDING PER 298-0191 PPM 1.3.1 requirements  for minimum shift ERO staffing are    not being met between 2: 00 a.m. and 6:40 a.m. with qualified personnel.
Theplanalsodenotesthatthereisa24-hour-per-day capability to11 ttQUALITYDEPARTMENT AUDIT298408Section7.0-DoseAssessment Capabilities
FSAR REVIEW AND RESPONSE TO 10 CFR 50.54(f) REQUEST FOR INFORMATION The FSAR, Section 13.3, identifies the required support centers and emphasizes communications between those centers and the Control Room. The details of the program description are contained in the Emergency Plan. The Emergency Plan is an attachment to the FSAR and was reviewed extensively throughout this audit. There are no FSAR issues other than those delineated in the report in connection with the Emergency Plan.
-continued analyzeSupplySystemissueddosimetry.
There is no discussion of Emergency Preparedness or the Emergency Response organization in the 50.54(f) letter. However, under the Requirements Tracking Database discussion, the 50.54(f) letter states, "Development of the database also includes verification of where the commitment is met in the current operating programs and procedures."           This statement supports Quality Recommendation AU298-008-B which pertains to identifying commitments in emergency procedures.
ItfurtherstatesthattheSupplySystemmaintains apersonnel monitoring programthroughtheuseofTLDreadersandwholebodycounters.
14
Therequirement toprovide24-hour-per-day capability comesfromNUIKG-0654, CriteriaforPreparation andEvaluation ofRadiological Emergency ResponsePlansandPreparedness inSupportofNuclearPowerPlants.Presently, theSupplySystemhasnoonsiteequipment fortheanalyzing ofTLDs.Section6.2.8oftheEmergency Plan,HealthPhysicsCenter,statestheSupplySystemcontracts withalocalvendortoprocessTLDsandprovideresultstotheSupplySysteminatimelymanner.TheSupplySystem'slocalcontractvendor,ThermoNuTech, hasrelocated fromWestRichland, Washington, toAlbuquerque, NewMexico.Althoughthecontractvenderisnotlocal,EPbelievesthattheSupplySystemcandemonstrate thecapability toanalyzeTLDs24-hours-per-day andprovidetheresultsinatimelymanner.SincetheEmergency Plandoesnotreflectactualpractice, thefollowing PERwasissued.QUALITYHOUNDINGPER298-0194Section6.2.8oftheemergency PlanstatesthattheSupplySystemcontracts withalocalvendortoprocessTLDs.Thevendorrelocated toAlbuquerque, NewMexico.Regulatory Guide1.23,OnsiteMeteorology
 
: Programs, Rev.0,states:"meteorological instruments shouldbeinspected andservicedatafrequency whichwillassureatleastaninetypercentdatarecoveryandwhichwillminimizeextendedperiodsofinstrument outage."Qualityutilizedthe1996and1997AnnualRadioactive EftluentReporttoverifythatthemeteorological jointrecoverydatasubmitted totheNRCannuallywasatleastwithintheninetypercentacceptance criteria.
APPENDIX A Personnel Contacted During the Audit HM Adams      Supervisor, Maintenance Craft AL Alexander  Technical Specialist, Chemistry TE Alton      Quality Technical Specialist AJ Anderson    Technical Support Specialist/Administrative Services DK Atkinson    Manager, Quality ~
Thejointrecoverydataforthesetwoyearswasfoundacceptable.
LW Ball        Emergency Planner+ ~
Section8.0-Personnel QualiTications TheQualification Directory Manual,theNovember1997drillobservations, drillafteractionreports,andpreviousdrillreportswerereviewedtodetermine ifEROmemberswerequalified toperformtheiremergency centerfunctions.
AS Barber      Supervisor, Quality Services RE Barnes      Mechanic KC Beard      Director, Morrow County Emergency Management DABennett      OSC Communicator T Brown        Emergency Planner, Cooper Nuclear Station SM Bruce      Supervisor, Control Room DW Coleman    Acting Manager, Regulatory Affairs+
Also,interviews wereconducted withEROresponders.
LL Collins    Technical Support Specialist/Administrative Services MS Collins    Quality Services JG Dockter    Technical Support Specialist/Administrative Services+
Allpersonnel listedasEROresponders havemetthequalifications requiredoftheirpositions.
RL Ehr        Supervisor, Engineering JS Flood      Shift Technical Advisor JA Gloyn      Supervisor, FFD / Training SR Goodwin    Quality Services+
Allpersonnel interviewed expressed thatasafirsttimeresponder theywereunsureofwhatwasrequired.
KM Gunter      Quality Services+
However,eachpersoninterviewed saidthatafterparticipating inadrilltheywereconfident intheirabilitytoperformtheirduties.Theissuewithfirsttimeresponder qualifications isaddressed inthetrainingsectionofthisreport(Recommendation AU298-008-D).
JC Hanson      Manager, WNP-2 Chemistry M Henry        Manager, Department of Health DW Hillyer    Manager, WNP-2 Radiation Protection+
PQDwasreviewedagainstOperations, Maintenance, andHealthPhysicscrewschedules.
DB Holmes      Emergency Planner+0 JP Ittner      Emergency Planner+0 RE Jorgenson  Lead Emergency Planner+
Individual qualification requirements wereevaluated bynameandbyQualification Group.Maintenance andHealthPhysicspersonnel werefoundtohaveadequatequalifications.
JP Kane        Engineering General Manager+
However,twoOperations'rews didnotappeartohavetherequiredcompliments oftwoEROtrainedindividuals.
AF Klauss      Emergency Planner ~
AreviewoftrainingrecordsbyOperations foundthatrequiredtraininghadbeenconducted butsomeequipment operators werenotenteredintheappropriate Qualification GroupinPQD.Oneshiftmanagerstatedthattherequirements ofPPM1.3.1wereusedtoverifyrequiredshiftcompliment.
JALakey        Chemistry Technician AALangdon      Assistant to the WNP-2 Plant General Manager+
Itwasalsoindicated thatwhenfillingvacantcrewpositions, ERO12 r-IE QUALITYDEPARTMENT AUDIT298-008Section8.0-Personnel QualiTications
JC Latta      Quality Services+o MKLaudisio    Quahty Services +0 CR Madden      Health Physics ~
-continued qualifications werenotalwaysreviewed.
RD Madden      Quality Services+
Itwasassumedthatfirebrigadetrainingmetthequalification requirements fortheERO.Asaresultoftheaboveissues,thefollowing PERwasissued:QUALITYFINDINGPER298-0169Theprocessisinadequate forassigning newequipment operators toEmergency ResponseQualification Groups.Section9.0-StaAingLevelsEmergency ResponseOrganization TheWNP-2EROPersonnel List,thePQD,andPPM1.3.1(WNP-2Operating
JW Massey      Quality Services+0 LL Mayne      Chemistry Specialist JE McDonald    Science Environmental RP KP Meehan      Emergency Planner ~
: Policies, Programs, andPractices) werereviewedtodetermine ifEROstaffingwasadequatetorespondtoanemergency.
TC Messersmith Corporate Emergency Preparedness, Health and Safety Ofncer+
Theauditteamconcluded thatthereareadequatepersonnel available tostafftheWNP-2EROwithintherequired60-minute limit.Thosepersonnel trackedviathePQDareassignedtooneoffourEROteamswhorotatethroughatwoweekperiodofbeingon-call.TheDutyteamisissuedpagers.Intheeventofanemergency orduringtheconductofaNotification Drill,theEPstaffinitiatethealertusingtheDialogics Automated Notification System(DANS).EROteammembersrespondusingatelephonic codetoindicatewhethertheyareabletoreportforemergencyduties.
M Messman      Program Manager, DOE GAMoyer        Craft Supervisor RR Nelson      Operations Specialist 15
Shortages areidentified andreplacements arecalledin.Astaffingcheck"oftheoncomingEROteamisconducted theThursdaypriortoshiftrotationbyEPstaffThischeckidentifies anygapsintheEROteamandallowsEPstafftimetofindpersonnel tofilltheroster.NUREG0654,Rev.1,SectionII.A.4statesinpart,"Eachprincipal organization shallbecapableofcontinuous (24-hour) operations foraprotracted period.Theindividual intheprincipal organization whowillberesponsible forassuringcontinuity ofresources (technical, administrative, andmaterial) shallbespecified bytitle."Ingeneral,thecurrentmethodofstaffingtheEROshouldprovideforcontinuous operations.
 
However,theWNP-2Emergency Plan(Rev.19),doesnotspecifythepersonresponsible forensuring24-hourcontinuous operations.
QUALITYDEPARTMENT AUDIT298408 APPENDIX A - continued
Thistopicisdiscussed inseveralEROdutypositionprocedures andspecifically intheManpowerScheduler dutydescription.
~   ~   ~
Therearenoguidelines intheemergency procedures forhowlongEROpersonnel willmantheirstationsafterreporting.
HL Nielson        Supervisor, Chemistry DL Overman        Technical Specialist WAPQtzer          Licensing+
Althoughthisrequirement fromNUREG0654ismetbythewordandintentoftheWNP-2Emergency Plan,itisunclearintheVolume13procedures thata24-hourstaffingschedulemayberequired.
RM Pfluger        Senior Auditor GD Phillips      Health Physics Technician LARathbun        Health Physics JE Rhoads        Engineering KD Saenz          Records Team Lead DL Seever        Emergency Planner, Southern California Edison DM Smith          Technical Support Specialist/Administrative Services RL Webring        Vice President, Operations Support/Public Information Officer ~
Also,therearenoclearprovisions intheprocedures toestablish a24-hourstaffingscheduleforaprotracted period.Therefore Qualityrecommends:
JE Wyrick        Supervisor, Quality Services +
'QUALITYRECOMMENDATION AU298-008-L Assignedto:TimMessersmith DueDate:Iune9,1998RevisetheEmergency PlanImplementing Procediires toprovideguidanceforestablishing andmaintaining continrious 24-hourstaffingoftheEmergency Responseorganization foraprotracted period.13 QUALITYDEPARTMENT AUDIT298408-Section9.0-StaffingLevelsEmergency ResponseOrganization
+ Attended Entrance Meeting
-continued Theadministrative mechanisms toensureminimumshiftstaffingandaugmentation requirements areinplaceand,ifusedconsistently byallorganizations, willmeetthegoalsoftheEmergency Plan.However,somelinesupervisors arenotawareoftheEROstaffingrequirements norusethetoolsprovided.
~ Attended Exit Meeting 16
TheWNP-2Emergency Plan,Table2-1andNUREG-0654, TableB-1,specifytheminimumstaffingfortheSupplySystemEmergency Responseorganization.
 
Thesetablesrequiretwoequipment operators andtwomaintenance personnel on-shift(aroundtheclock)toperformemergency functions.
QUALITYDEPARTMENT AUDIT298%08 APPENDIX B References Emergency Plans Conditions of Licenses Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities NUREG 0654, FEMA REP-1, Rev. 1; Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants; Section II.B WNP-2 Emergency Preparedness Plan, Rev. 19 WNP-2 Emergency Plan, Rev. 20 Proposal Emergency Dose Assessment System Users Manual Volume 13 Series of Emergency Plan Implementing Procedures PASSPORT Predefined Database PPM 1.3.43 Rev. 12 "Licensing Basis Impact Determination" Emergency Preparedness Training Course Catalog SWP-TQS-01           Training, Qualification, and Simulators SWP-EPP-01           Emergency Response Qualifications and Training Emergency Phone Directory Emergency Response Organization List Emergency Response Organization Training Player Training Handout IOM dated September 12, 1996, to Offsite Emergency Management Organizations,  
Thepositionofthemaintenance personnel maybeprovidedbyshiftpersonnel assignedotherfunctions.
OnApril3,1997,Rev.19totheWNP-2Emergency Planwassubmitted totheNRC.Attachment Aofthe10CFR50.54(q)evaluation supporting thechangeswasanassessment ofminimumon-shiftEROstaffing.
Thisassessment concluded thatfourequipment operators wereneededon-shifttomeetEROrequirements.
Thetwoadditional equipment operators areassignedtocovertheemergency maintenance functionbetween2:00and6:40a.m.whenmaintenance personnel arenotavailable on-shift.
TheMinimumShiftEROStaffingTabledeveloped bythisassessment wasincludedinPPM1.3.1,WNP-2Operating
: Policies, Programs, andPractices.
Areviewofqualifications foroperating crewsfoundthatOperations CrewsCandEhavebeenstaffed,duringthehoursbetween2:00a.m.to6:40a.m.,withlessthanfourEROqualified equipment operators.
ThisproblemonEROstaffingresultedin:QUALITYFINDINGPER298-0191PPM1.3.1requirements forminimumshiftEROstaffingarenotbeingmetbetween2:00a.m.and6:40a.m.withqualified personnel.
FSARREVIEWANDRESPONSETO10CFR50.54(f)REQUESTFORINFORMATION TheFSAR,Section13.3,identifies therequiredsupportcentersandemphasizes communications betweenthosecentersandtheControlRoom.Thedetailsoftheprogramdescription arecontained intheEmergency Plan.TheEmergency Planisanattachment totheFSARandwasreviewedextensively throughout thisaudit.TherearenoFSARissuesotherthanthosedelineated inthereportinconnection withtheEmergency Plan.Thereisnodiscussion ofEmergency Preparedness ortheEmergency Responseorganization inthe50.54(f)letter.However,undertheRequirements TrackingDatabasediscussion, the50.54(f)letterstates,"Development ofthedatabasealsoincludesverification ofwherethecommitment ismetinthecurrentoperating programsandprocedures."
Thisstatement supportsQualityRecommendation AU298-008-B whichpertainstoidentifying commitments inemergency procedures.
14 APPENDIXAPersonnel Contacted DuringtheAuditHMAdamsALAlexander TEAltonAJAndersonDKAtkinsonLWBallASBarberREBarnesKCBeardDABennettTBrownSMBruceDWColemanLLCollinsMSCollinsJGDockterRLEhrJSFloodJAGloynSRGoodwinKMGunterJCHansonMHenryDWHillyerDBHolmesJPIttnerREJorgenson JPKaneAFKlaussJALakeyAALangdonJCLattaMKLaudisioCRMaddenRDMaddenJWMasseyLLMayneJEMcDonaldKPMeehanTCMessersmith MMessmanGAMoyerRRNelsonSupervisor, Maintenance CraftTechnical Specialist, Chemistry QualityTechnical Specialist Technical SupportSpecialist/Administrative ServicesManager,Quality~Emergency Planner+~Supervisor, QualityServicesMechanicDirector, MorrowCountyEmergency Management OSCCommunicator Emergency Planner,CooperNuclearStationSupervisor, ControlRoomActingManager,Regulatory Affairs+Technical SupportSpecialist/Administrative ServicesQualityServicesTechnical SupportSpecialist/Administrative Services+
Supervisor, Engineering ShiftTechnical AdvisorSupervisor, FFD/TrainingQualityServices+
QualityServices+
Manager,WNP-2Chemistry Manager,Department ofHealthManager,WNP-2Radiation Protection+
Emergency Planner+0 Emergency Planner+0 LeadEmergency Planner+Engineering GeneralManager+Emergency Planner~Chemistry Technician Assistant totheWNP-2PlantGeneralManager+QualityServices+o QuahtyServices+0HealthPhysics~QualityServices+
QualityServices+0 Chemistry Specialist ScienceEnvironmental RPEmergency Planner~Corporate Emergency Preparedness, HealthandSafetyOfncer+ProgramManager,DOECraftSupervisor Operations Specialist 15 QUALITYDEPARTMENT AUDIT298408~~~APPENDIXA-continued HLNielsonDLOvermanWAPQtzerRMPflugerGDPhillipsLARathbunJERhoadsKDSaenzDLSeeverDMSmithRLWebringJEWyrickSupervisor, Chemistry Technical Specialist Licensing+
SeniorAuditorHealthPhysicsTechnician HealthPhysicsEngineering RecordsTeamLeadEmergency Planner,SouthernCalifornia EdisonTechnical SupportSpecialist/Administrative ServicesVicePresident, Operations Support/Public Information Officer~Supervisor, QualityServices++AttendedEntranceMeeting~AttendedExitMeeting16 QUALITYDEPARTMENT AUDIT298%08APPENDIXBReferences Emergency PlansConditions ofLicensesAppendixE,Emergency PlanningandPreparedness forProduction andUtilization Facilities NUREG0654,FEMAREP-1,Rev.1;CriteriaforPreparation andEvaluation ofRadiological Emergency ResponsePlansandPreparedness inSupportofNuclearPowerPlants;SectionII.BWNP-2Emergency Preparedness Plan,Rev.19WNP-2Emergency Plan,Rev.20ProposalEmergency DoseAssessment SystemUsersManualVolume13SeriesofEmergency PlanImplementing Procedures PASSPORTPredefined DatabasePPM1.3.43Rev.12"Licensing BasisImpactDetermination" Emergency Preparedness TrainingCourseCatalogSWP-TQS-01
: Training, Qualification, andSimulators SWP-EPP-01 Emergency ResponseQualifications andTrainingEmergency PhoneDirectory Emergency ResponseOrganization ListEmergency ResponseOrganization TrainingPlayerTrainingHandoutIOMdatedSeptember 12,1996,toOffsiteEmergency Management Organizations,


==Subject:==
==Subject:==
AnnualTrainingforOffsiteAgenciesIOMfromL.W.Balldated01/30/98,
 
Annual Training for Offsite Agencies IOM from L.W. Ball dated 01/30/98,  


==Subject:==
==Subject:==
February1998ERPPastDueTrainingReportIOMfromL.W.Balldated02/13/98,
February 1998 ERP Past Due Training Report IOM from L.W. Ball dated 02/13/98,  


==Subject:==
==Subject:==
EROTrainingLookAheadReportPQDEROLateReportgenerated byL.W.Ball,dated02/13/98QualityDepartment AuditReportAU297-055, WNP-2Training, Performance, andQualification QualityDepartment AuditReportAU297-005, WNP-2Emergency Preparedness ProgramPER297-0816, EROPersonnel NotinCompliance WithMinimumTrainingRequirements IOMfromC.L.Blissdated08/26/97
ERO Training Look Ahead Report PQD ERO Late Report generated by L. W. Ball, dated 02/13/98 Quality Department Audit Report AU297-055, WNP-2 Training, Performance, and Qualification Quality Department Audit Report AU297-005, WNP-2 Emergency Preparedness Program PER 297-0816, ERO Personnel Not in Compliance With Minimum Training Requirements IOM from C.L. Bliss dated 08/26/97  


==Subject:==
==Subject:==
CraftMembersoftheEROPQDScheduled MonthlyReportdated02/25/98DrillandExerciseManualforWNP-2,Rev.6Quarterly TrainingDrill97-4DrillReport,datedDecember18,1997PTLDatabaseRegulatory AffairsAction,InternalActionSummaryReportfor1997DrillsLetterNo.G02-89-227, Supply.SystemtoNRC,datedDecember2,1989,"Response toNoticeofViolation" FinalAfterActionReportNo.31datedMarch20,1997Sample,ModelWorkOrdersforEmergency Equipment TrackingRegGuide1.101Rev.3,Emergency PlaningandPreparedness forNuclearPowerPlantsLetterNo.GO2-94-263, SupplySystemtoFEMA,"MOUContractNo.C-30061"LetterNo.GO2-95-225, SupplySystemtoFEMA,"WNP-2Emergency PlanAnnualReviewofSupporting Agreements ContractNo.C-30046"LetterNo.G02-95-230, SupplySystemtoDOE,"WNP-2Emergency PlanAnnualReviewofSupporting Agreements ContractNo.C-00676"LetterNo.GO2-95-236, SupplySystemtoDOE,"WNP-2Emergency PlanAnnualreviewofSupporting Agreements ContractNo.C-30042"17  
Craft Members of the ERO PQD Scheduled Monthly Report dated 02/25/98 Drill and Exercise Manual for WNP-2, Rev. 6 Quarterly Training Drill 97-4 DrillReport, dated December 18, 1997 PTL Database          Regulatory Affairs Action, Internal Action Summary Report for 1997 Drills Letter No. G02-89-227, Supply. System to NRC, dated December 2, 1989, "Response to Notice of Violation" Final After Action Report No. 31 dated March 20, 1997 Sample, Model Work Orders for Emergency Equipment Tracking Reg Guide 1.101      Rev. 3, Emergency Planing and Preparedness for Nuclear Power Plants Letter No. GO2-94-263, Supply System to FEMA, "MOU Contract No. C-30061" Letter No. GO2-95-225, Supply System to FEMA, "WNP-2 Emergency Plan Annual Review of Supporting Agreements Contract No. C-30046" Letter No. G02-95-230, Supply System to DOE, "WNP-2 Emergency Plan Annual Review of Supporting Agreements Contract No. C-00676" Letter No. GO2-95-236, Supply System to DOE, "WNP-2 Emergency Plan Annual review of Supporting Agreements Contract No. C-30042" 17
 
QUALITYDEPARTMENT AUDIT 208408 APPENDIX B - continued PTL Database PERs 297-0183, 297-0198, 297-0205, 297-0230, 297-0740 1997 Emergency Preparedness Program Audit 297-005 1997 Emergency Preparedness Self-Assessment NRC Inspection Manual Chapter 2515/134, Licensee On-Shift Dose Assessment Capabilities Reg. Guide 1.23, Rev. 0, Onsite Meteorology Programs Reg. Guide 1.101, Rev. 3, Emergency Planning and Preparedness for Nuclear Power Plants NRC Inspection Manual Chapter 2515/134, Licensee On-Shift Dose Assessment Capabilities Letter No GO2-96-251, Supply System to the NRC, dated December 23, 1996, "WNP-2 Operating License NPF-21 Special Report Reactor Building Effluent Monitoring System" NRC Inspection Manual "Dose Calculation and Assessment" No. 82207 ANSUAN 2.5 "Standard for Determining Meteorological Information at Nuclear Power Plants EPA-520/1-95-001-A "Manual of Protective Action Guides and Protective Actions for Nuclear Power Incidents," 1990 NRC Inspection Procedure No. 82701 "Operational Status of the Emergency Preparedness Program" Quality Department Audit Report AU297-005, WNP-2 Emergency Preparedness Program Quality Department Audit Report AU297-055, WNP-2 Training, Performance, and Qualification Qualification Directory Manual, Section 2.8, Emergency Response Qualification Directory Manual, Section 4.2, Equipment Operators Emergency Preparedness Training Course Catalog Emergency Phone Directory, Emergency Response Organization List Emergency Response Organization Training Player Training Handout Operations Logs dated 09/27/97 to 10/01/97 Operations Logs dated 02/01/98 to 02/25/98 Operations Crew Roosters dated 09/21/97 and 03/2/98 Health Physics Shift Assignments for September to October 1997 and dated January 27,1998 PQD Reports for QUAL Groups EPAL, EPAN, EPAQEPCN, EPAJ, EPCP, EPAC, EPAI PPM 1.3.1, WNP-2 Operations, Policies, Programs, and Practices PER$ 297-0816, 297, 0108 EP Response to PSA Synopsis of Changes to WNP-2 Emergency Plan; proposed Rev. 20, dated February 23, 1998 SWP-EPP-01: Emergency Response Organization and Training; Rev. 0; dated August 5, 1997 18
 
APPENDIX C Summary of Quality Recommendations, Findings, and Strengths AU298-008-A    Incorporate the 10 CFR 50 Appendix E requirement to submit any changes to the Emergency Plan or procedures to the Commission within 30 days of such changes into a appropriate WNP-2 procedure.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-B    Annotate Regulatory Requirements and Commitments in the Emergency Procedures in accordance with SWP-PRO-03.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-C    Update the list of Emergency Plan implementing procedures in the WNP-2 Emergency Plan Appendix 2, and replace the reference to Battelle with PNNL in Section 5.2.1.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-D    Expand the initial training for emergency center personnel involved with communications, log keeping, and team tracking to include performance-based actions.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-E    Provide a mechanism to capture information, comments, and suggestions provided during pre-drill training sessions. This mechanism should have a feedback loop to the individual providing the information.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-F    Identify items that should be'tracked in the Regulatory Affairs database.
Items to consider include: replies to player comments, controller/evaluator concerns, drill objectives not demonstrated,        and FAAR areas for improvement.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-G    Include a Dose Rate Meter as part of the contents listed on Attachment 5.3 of PPM 13.14.4., Hospital Radiological Emergency Kit.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-H    Ensure work orders generated to inventory hospital radiological kits are assigned to the Emergency Preparedness group.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-I    Investigate the disparities in scales dealing with exposure/ingestion county maps to determine ifthese differences effect the counties'bility to respond to an emergency event at WNP-2.
(Assigned to T.M. Messersmith - Response due date June 9, 1998) 19
 
QUALITYDEPARTMENT AUDIT298408 APPENDIX C - continued AU298-008- J Establish criteria to maintain the backup PASS Laboratory in a state                of readiness.
(Assigned to J.C. Hanson - Response due June 9, 1998)
AU298-008-K  Revise dose projection PPMs 13.8.1 and 13.8.2 to delete references to superseded      Technical Specification 3.3.7.5 and to reflect current requirements.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
AU298-008-L  Revise the Emergency Plan Implementing Procedures to provide guidance for establishing and maintaining continuous 24-hour staffing of the Emergency Response organization for a protracted period.
(Assigned to T.M. Messersmith - Response due date June 9, 1998)
PER 298-0194 Section 6.2.8  of the Emergency Plan states that the Supply System contracts with a local vendor to process              TLD's. The vendor relocated to Albuquerque, New Mexico.
PER 298-0169 The process is inadequate for assigning new equipment operators                    to Emergency Response Qualification Groups.
PER 298-0191 PPM 1.3.1 requirements for minimum shift ERO staffing are not being met between 2:00 a.m. and 6:40 a.m. with qualified personnel.
Strength:    Emergency preparedness personnel are diligent at tracking qualifications for those individuals listed as ERO members. Appropriate management is notified prior to individuals losing their qualifications and also when qualifications expire.
Strength:    The Emergency Preparedness group maintains an open line of communication with oF-site personnel regarding emergency preparedness issues.
Strength:    The Emergency Preparedness organization is proactive in identifying problems and implementing appropriate corrective actions.
20


QUALITYDEPARTMENT AUDIT208408APPENDIXB-continued PTLDatabasePERs297-0183, 297-0198, 297-0205, 297-0230, 297-07401997Emergency Preparedness ProgramAudit297-0051997Emergency Preparedness Self-Assessment NRCInspection ManualChapter2515/134, LicenseeOn-ShiftDoseAssessment Capabilities Reg.Guide1.23,Rev.0,OnsiteMeteorology ProgramsReg.Guide1.101,Rev.3,Emergency PlanningandPreparedness forNuclearPowerPlantsNRCInspection ManualChapter2515/134, LicenseeOn-ShiftDoseAssessment Capabilities LetterNoGO2-96-251, SupplySystemtotheNRC,datedDecember23,1996,"WNP-2Operating LicenseNPF-21SpecialReportReactorBuildingEffluentMonitoring System"NRCInspection Manual"DoseCalculation andAssessment" No.82207ANSUAN2.5"Standard forDetermining Meteorological Information atNuclearPowerPlantsEPA-520/1-95-001-A "ManualofProtective ActionGuidesandProtective ActionsforNuclearPowerIncidents,"
0 (f
1990NRCInspection Procedure No.82701"Operational StatusoftheEmergency Preparedness Program"QualityDepartment AuditReportAU297-005, WNP-2Emergency Preparedness ProgramQualityDepartment AuditReportAU297-055, WNP-2Training, Performance, andQualification Qualification Directory Manual,Section2.8,Emergency ResponseQualification Directory Manual,Section4.2,Equipment Operators Emergency Preparedness TrainingCourseCatalogEmergency PhoneDirectory, Emergency ResponseOrganization ListEmergency ResponseOrganization TrainingPlayerTrainingHandoutOperations Logsdated09/27/97to10/01/97Operations Logsdated02/01/98to02/25/98Operations CrewRoostersdated09/21/97and03/2/98HealthPhysicsShiftAssignments forSeptember toOctober1997anddatedJanuary27,1998PQDReportsforQUALGroupsEPAL,EPAN,EPAQEPCN, EPAJ,EPCP,EPAC,EPAIPPM1.3.1,WNP-2Operations,
t    v}}
: Policies, Programs, andPractices PER$297-0816, 297,0108EPResponsetoPSASynopsisofChangestoWNP-2Emergency Plan;proposedRev.20,datedFebruary23,1998SWP-EPP-01:
Emergency ResponseOrganization andTraining; Rev.0;datedAugust5,199718 APPENDIXCSummaryofQualityRecommendations,
: Findings, andStrengths AU298-008-A Incorporate the10CFR50AppendixErequirement tosubmitanychangestotheEmergency Planorprocedures totheCommission within30daysofsuchchangesintoaappropriate WNP-2procedure.
(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-B AnnotateRegulatory Requirements andCommitments intheEmergency Procedures inaccordance withSWP-PRO-03.
(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-C UpdatethelistofEmergency Planimplementing procedures intheWNP-2Emergency PlanAppendix2,andreplacethereference toBattellewithPNNLinSection5.2.1.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-D Expandtheinitialtrainingforemergency centerpersonnel involvedwithcommunications, logkeeping,andteamtrackingtoincludeperformance-basedactions.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-E Provideamechanism tocaptureinformation,
: comments, andsuggestions providedduringpre-drill trainingsessions.
Thismechanism shouldhaveafeedbacklooptotheindividual providing theinformation.
(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-F Identifyitemsthatshouldbe'tracked intheRegulatory Affairsdatabase.
Itemstoconsiderinclude:repliestoplayercomments, controller/evaluator
: concerns, drillobjectives notdemonstrated, andFAARareasforimprovement.
(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-G IncludeaDoseRateMeteraspartofthecontentslistedonAttachment 5.3ofPPM13.14.4.,
HospitalRadiological Emergency Kit.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-H Ensureworkordersgenerated toinventory hospitalradiological kitsareassignedtotheEmergency Preparedness group.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-I Investigate thedisparities inscalesdealingwithexposure/ingestion countymapstodetermine ifthesedifferences effectthecounties'bility torespondtoanemergency eventatWNP-2.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)19 QUALITYDEPARTMENT AUDIT298408APPENDIXC-continued AU298-008-JEstablish criteriatomaintainthebackupPASSLaboratory inastateofreadiness.
(Assigned toJ.C.Hanson-ResponsedueJune9,1998)AU298-008-K Revisedoseprojection PPMs13.8.1and13.8.2todeletereferences tosuperseded Technical Specification 3.3.7.5andtoreflectcurrentrequirements.
(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)AU298-008-L RevisetheEmergency PlanImplementing Procedures toprovideguidanceforestablishing andmaintaining continuous 24-hourstaffingoftheEmergency Responseorganization foraprotracted period.(Assigned toT.M.Messersmith
-ResponseduedateJune9,1998)PER298-0194Section6.2.8oftheEmergency PlanstatesthattheSupplySystemcontracts withalocalvendortoprocessTLD's.Thevendorrelocated toAlbuquerque, NewMexico.PER298-0169Theprocessisinadequate forassigning newequipment operators toEmergency ResponseQualification Groups.PER298-0191PPM1.3.1requirements forminimumshiftEROstaffingarenotbeingmetbetween2:00a.m.and6:40a.m.withqualified personnel.
Strength:
Emergency preparedness personnel arediligentattrackingqualifications forthoseindividuals listedasEROmembers.Appropriate management isnotifiedpriortoindividuals losingtheirqualifications andalsowhenqualifications expire.Strength:
TheEmergency Preparedness groupmaintains anopenlineofcommunication withoF-sitepersonnel regarding emergency preparedness issues.Strength:
TheEmergency Preparedness organization isproactive inidentifying problemsandimplementing appropriate corrective actions.20 0t(fv}}

Latest revision as of 06:54, 4 February 2020

Audit 298-008, WNP-2 Emergency Preparedness Program.
ML17292B368
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/10/1998
From: Atkinson D, Barber A, Massey J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17292B367 List:
References
298-008, 298-8, NUDOCS 9805070336
Download: ML17292B368 (28)


Text

Quality Department Audit Report WNP-2 EMERGENCY PREPAREDNESS PROGRAM Audit 298-008 April 10, 1998 Audit Dates: February 23 through March 5, 1998 Entrance Meeting: February 23, 1998 Exit Meeting: March 18, 1998 WASHINGTON P UB LIC POWER 1N SUPPLY SYSTEM 98oso7oss6 eso4aa PDR ADQCK 05000397 F PDR

QUALITYDEPARTMENT AUDIT298408 TABLE OF CONTENTS Executive Summary.

Purpose and Scope.

Report Details Section 1.0 Emergency Plan Implementing Procedures Section 2.0 Emergency Response Organization Training.

Section 3.0 Readiness Testing..

Section 4.0 Equipment and Facilities.

Section 5.0 Interfaces with State and Local Governments Section 6.0 Problem Identification and Resolution Section 7.0 Dose Assessment Capabilities.

Section 8.0 Personnel Qualifications Section 9.0 Emergency Response Organization StaKng Levels...

FSAR Review and Response to 10 CFR 50.54(f) Request for Information.

Appendix A Personnel Contacted.

Appendix B References .

Appendix C Quality Recommendations, Findings, and Strengths.

Ig

\

~ I

QUALITYDEPARTMENT AUDIT298%

EXECUTIVE

SUMMARY

An'ndependent audit of the WNP-2 Emergency Preparedness Program is performed at least once every twelve months as required by Title 10 of the Code of Federal Regulations, Part 50.54(t) and Operational Quality Assurance Program Description (OQAPD) Appendix III, Additional Quality Program Requirements. The audit team assessed specific areas as required by NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

The results of the audit indicate that activities which make up the WNP-2 Emergency Preparedness Program are implemented and conducted in accordance with governing regulations and are capable of protecting the health and safety of the public in the event of an emergency.

The Emergency Preparedness (EP) organization has continued to demonstrate a strong desire for self-improvement. This was illustrated. by their program ownership, pro-active identification and resolution of problems, and communication with offsite agency personnel. However, the success of the Emergency Preparedness Program is dependent on the support and participation of all Supply System organizations. The primary issues identified during this audit related to a lack of ownership of the line organizations for their portions of the program.

As a result of this audit, three Problem Evaluation Requests (PERs) were issued in the following areas: Line organizations are not assuring that personnel are qualified and assigned to the appropriate qualification group; with the reduction in shift compliment and changes in shift schedule, management has not assured that minimum Emergency Response Organization (ERO) shift staffing has been maintained; and processes that effect emergency preparedness have been changed without notifying the Emergency Preparedness Department or updating the Emergency Plan. Twelve Quality Recommendations were issued to correct minor errors in the Emergency Plan and implementing procedures or for suggested program improvements.

In addition, three "proper use" gold cards were issued during the course of the audit for commendable individual performance.

8.~ ~ 9/jo/ff D.K. Atkinson, Manager, Quality Department KM Gunter AUDITTEAM Quality JC Latta Quality MKLaudisio Quality JG Dockter Adminstration Services A.S. Barber, Supervisor, Quality Services TA Rogers Franklin County Emergency Management io

. Massey, it Team Leader (ATL)

QUALITYDEPARTMENT AUDIT298408 PURPOSE AND SCOPE

~

~ I An independent audit of the WNP-2 Emergency Preparedness Program is required every twelve months by 10 CFR 50.54(t) and the OQAPD Appendix III, Section 2.2.8(f).

Specific areas assessed are described in 10 CFR 50, Appendix E and NUEEG 0654,Section II.P.9 and include:

~ Emergency Plan and Implementing Procedures

~ Emergency Response Organization (ERO) Training

~ Readiness Testing - (Drill Observation)

~ Equipment and Facilities

~ Interfaces with State and Local Governments In addition, the following additional areas were included in the scope of this audit:

~ Problem Identification and Resolution

~ Dose Assessment

~ Personnel Qualifications

~ Staffing Levels (Emergency Response Organization)

REPORT DETAILS Section 1.0 - Emergency Plan and Implementing Procedures A review was conducted to determine ifthe Emergency Plan Implementing Procedures (Volume 13 of the Plant Procedure Manual (PPM)) satisfy the requirements of the WNP-2 Emergency Plan. Additionally, the review verified that the requirements of 10 CFR 50, Appendix E and NUEEG-0654 were contained in the Emergency Plan. The review concluded that the WNP-2 Emergency Preparedness Program satisfies the regulatory requirements. However, some deficiencies were identified in the Emergency Plan and procedures that need to be corrected. The deficiencies that could potentially result in a decrease in effectiveness of the program have been submitted on PERs for further review. The details of the noted deficiencies and the strengths of the program are recorded under the appropriate sections of this report.

The Emergency Plan requires an internal review of the plan and an independent audit of the emergency plan and implementing procedures every twelve months. The Emergency Plan has been revised five times within the last threeyears. Since it has been less than a year since Revision 19 was issued (4/3/97), and Revision 20 is in a review stage, it can be concluded that the Plan has been reviewed at least annually during the last few years. A review of previous audit reports concluded that appropriate areas were assessed, the audits were independent of EP personnel, and the audits were performed within twelve months.

10 CFR 50, Appendix E states: "Licensees who are authorized to operate a nuclear power facility shall submit any changes to the Emergency Plan or procedures to the Commission, within 30 days of such changes." The audit team verified that Revision 19 to the WNP-2 Emergency Plan, dated March 27, 1997, was sent to the NRC within 30 days of the revision date.

2

r QUALITYDEPARTMENT AUDIT298-008

~

Section 1.0 - Emergency Plan and Iinplementing Procedures - continued

~ ~

~

Revision 19 was submitted to the NRC on April 3, 1997, as documented by Supply System letter to the NRC, GO297-062. A brief review of the synopsis of changes was performed to determine whether any of the changes reduced the effectiveness of the plan. In particular, ERO staffing changes made were reviewed. In each case, the staffing change was justified based on the position being assumed by another member or the position eliminated due to increased efficiency.

These changes are in accordance with the guidance in PPM 1.3.43, Licensing Basis Impact Determination, regarding changes to the Emergency Plan.

A review of the Emergency Plan (Rev. 19) and the PPM database found that the 30-day requirement for submitting changes to the emergency procedures was not contained in the Plan or WNP-2 Plant Procedures. The Supply System has met this requirement by including the Nuclear Regulatory Commission (NRC) on the distribution list for changes to the Volume 13 Emergency Procedures. Records Control personnel have been submitting Volume 13 changes to the NRC within the required time limit using a Desktop Instruction, but were not aware that this was a regulatory requirement. Therefore, Quality issued the following recommendation:

QUALITYRECOMMENDATIONAU298-008-A Assigned to: Tim Messersmith DueDate: June9, 1998 Incorporate the 10 CI"R 50, Appendix E requirement to submit any changes to the Emergency Plan or procedures to the NRC within 30 days of such changes into an appropriate KVP-2 procedure.

Sitewide Procedure SWP-PRO-03, Section 3.2.3.1.2 states: "Whenever a requirement or commitment is satisfied by a statement in the body of a procedure, the statement should be identified by placing the requirement or commitment number in braces, right justified, immediately following the statement." This statement is a management expectation to assure that when a procedure is revised all requirements and commitments are identified and considered. None of the emergency procedures reviewed contained braces to identify tracked requirements and commitments. As a result, Quality issued the following recommendation:

QUALITYRECOMMENDATIONAU298-008-8 Assigned to: Tim Messersmith Due Date: June 9, 1998 Annotate Regulatory Requirements and Commitments in the emergency procedures in accordance with SPY-PRO-03.

During the review of the Emergency Plan, it was discovered that a canceled procedure (PPM 13.10.15) was still listed in Appendix 2 of the Plan as an Implementing Procedure. Also, in Section 5.2.1 the Emergency Plan states, "that other meteorological information is available from Battelle." The referenced procedures for meteorological data states, "PNNL as the backup source for this type of information." As a result, the following Quality recommendation was issued:

QUALITYDEPARTMENT AUDIT298408 Section 1.0 - Emergency Plan and Implementing Procedures - continued QUALITYRECOMMENDATIONAU298-008-C Assigned to: Tim Messersmith DueDate: June9, 1998 Update the list of Emergency Plan implementing procedures in the 8XP-2 Emergency Plan, Appendix 2, and replace the reference to Battelle with PAL in Section 5.2.1.

Section 2.0 - Emergency Response Organization Training The WNP-2 Emergency Plan, the Qualification Directory Manual, the Emergency Preparedness training course catalog, and the Sitewide Procedure (SWP) on ERO training was reviewed. The review found that appropriate training is offered for each identified ERO position. The training includes specific training for certain positions as well as general training requirements for all ERO positions. There are also provisions for annual refresher training.

The WNP-2 Emergency Plan states that training for state and county agencies will be made available by WNP-2. WNP-2 also provides Medical Services Support Training to local hospitals and fire departments. A letter is sent to appropriate oFsite organizations each year. The letter gives individuals responding to an emergency the opportunity to attend WNP-2 General Employee Training (GET) or specific EP training.

Annual refresher training is provided for all ERO personnel. This training is provided in several ways including drills, classroom training, and mail out material. EP monitors all ERO personnel to verify that training requirements are being met. EP notifies individuals, and their management, via e-mail when their training is coming due. EP removes the individual &om the automatic dialer system (ADS) immediately when re&esher requirements become delinquent, and notifies the individual and their management. A program has been initiated where EP is notified by Security immediately upon receiving a 16440 form for termination of an employee. EP then removes the terminated employee from the ADS. For those individuals who receive all required training but are unable to participate in an annual emergency drill, EP provides a mail out test as a re&esher. When the mail-out is completed and returned to EP, the Personnel Qualification Database (PQD) is updated. The audit team concluded that necessary mechanisms are in place to track ERO qualifications and personnel are properly notified when re-qualification is due.

STRENGTH Emergency Preparedness personnel are diligent at tracking qualifications for those individuals listed as ERO members. Appropriate management is notified prior to indi vidiials losing their qualifications and also when qualifications expire.

Despite EP's efforts to track and notify ERO personnel when required training is needed, line management and supervision have not assured that all individuals assigned to the ERO satisfy qualification requirements prior to becoming delinquent. The line organizations have recognized the problem with re-qualifying shift workers who have limited time to meet all their training needs. The administrative assistants for each shop have taken responsibility to re-schedule the tasks such as mask

QUALITYDEPARTMENT AUDIT298408 Section 2.0 - Emergency Response Organization Training - continued

~

~

I fits and medical examinations in blocks. This will allow meeting the ERO requirements for each crew at one time. The shops have also worked with Health Physics (HP) to arrange for the required facilities to be provided on the day where the most number of shift personnel are available. EP is working with the line organizations to assure that a fully trained ERO organization is maintained.

Sitewide Procedure SWP-EPP-01, "Emergency Response Organization Training," under the initial training section, states: "Upon completion of training, the students are normally required to pass a written exam, or to demonstrate performance-based actions, e.g., during a drill or exercise." Performance-based scenarios are conducted with the Center Directors to ensure their proficiency. However, for many ERO positions, performance-based actions are not performed until a drill or exercise. Interviews with ERO participants and observations of the drill conducted in November 1997 found that many of the new personnel did not fully understand their duties as ERO members. On several occasions, during the drill, coaching of these individuals was required by the EP representative or other personnel in the center. Those interviewed also noted that after their first drill they felt more proficient in performing their duties. The EP organization has recognized, from observation and after action reports, that first time participants are uncomfortable in their emergency center roles.

EP is initiating a practice of assigning an experienced coach with new personnel filling emergency center positions. This practice should increase the eKciency of the drill and alleviate the apprehensions of the first time responders. However, immediately upon notification that an individual has completed the required classroom training, EP updates the automatic dialer and notifies the individual that they have been activated in the system. Since drills are conducted annually, the potential exists for personnel to be required to respond to an actual emergency prior to participating in performance-based actions. Since initial training is performed year round, quality recommends the following:

QUALITYRECOMMENDATIONAU298-008-D Assigned to: Tim Messersmith DueDate: June9, 1998 Expand the initial training for emergency center personnel involved with communications, log keeping, and team tracking to include performance-based actions.

Section 3.0 - Readiness Testing (Drill Observations)

Since there were no drill activities scheduled during the performance of this audit, the audit team used observations gathered during the Team B drill performed November 18, 1997, to determine ifidentified concerns had been adequately resolved by the EP organization. During the November drill, Quality personnel were- stationed in the Emergency Offsite Facility (EOF), Technical Support Center (TSC), Operations Support Center (OSC), and Joint Information Center (JIC).

Additionally, a Quality individual accompanied one of the field teams performing radiological, monitoring. In general, Quality concluded that drill performance was adequate in the centers assessed. Strengths were cited in the teamwork observed in the field teams, EOF, and JIC.

Quality's assessment of the drill performance was supported by Emergency Preparedness Drill Report 97-4.

e QUALITYDEPARTMENT AUDIT298408 Section 3.0 - Readiness Testing (Drill Observations) - continued

'uality observed issues concerning the staffing of the OSC in that initially no Equipment Operators (EO's) were available to support the drill. Also, there were no Chemistry Technicians available. In addition, the scheduled OSC Communicator was not present. As a result, an individual who was present to observe the position (and was qualified in the position) was called on to participate.

Problems with staffing the OSC has been a repeat drill concern. Specific actions taken by EP personnel to resolve these actions have resulted in improved performance. For the EOs, arrangements have been made with Operations Training to schedule the training week EOs for drill participation rather than trying to use on-shift EOs who also have concurrent plant duties.

Agreements were made with Chemistry Technicians to clarify their participation during drills.

Chemistry Technicians are directed to report to the OSC and sign in, after which they return to the laboratory. The individual performance issue associated with the OSC Communicator was addressed with the individual's supervisor who took appropriate actions. For the subsequent drills performed since November 1997, participation has been well supported with a full complement of EOs, Chemistry Technicians, HPs, and craft personnel.

Quality personnel attended the training provided to the Controller/Evaluators prior to the drill and also the training given to players the day of the drill. During the Controller/Evaluator training, it was noted that the Controllers were reminded to use the drill as an opportunity to provide training. The use of drills as a training method and the role of Controllers in providing that training was a concern from the previous Emergency Preparedness audit. During the player training, it was noted that there was not a mechanism employed to capture player comments/suggestions or to provide feedback to the player making the suggestion. Several suggestions and much discussion was not captured by the EP organization. Therefore, the following recommendation is issued:

QUALITYRECOMMENDATIONAU-298-008-E Assigned to: Tim Messersmith Due Date: June 9, 1998 Provide a mechanism to capture information, comments, and suggestions provided during pre-drill training sessions. This mechanism should have a feedback loop to the individual providing the information.

The drill report dated December 18, 1997, was evaluated for identified strengths and weaknesses.

The report is formatted such that it provides an overall summary of the drill as well as individual center summaries. Individual drill objectives are identified for each center and are categorized as follows: Demonstrated, Not Demonstrated, Demonstrated with Issue, Not Observed, or Not Applicable. Two of the nineteen drill objectives were not demonstrated. One was the ability to recognize Emergency Action Levels and classify the incident (Control Room). The other was the activation and staffing of emergency facilities (OSC). In discussions with Emergency Planners, it was determined that corrective actions were being taken to address these issues. However, there was no apparent tracking mechanism used to identify those corrective actions. This does not agree with the Section 4.10 of the Drill and Exercise Manual which states the drill report shall "ensure items requiring corrective action are placed into an appropriate activity tracking system."

QUALITYDEPARTMENT AUDIT 898408 Section 3.0- Readiness Testing (Drill Observations) - continued

~

~

Player comments are solicited after each drill. These are reviewed by EP staff and those that require follow-up actions are entered into a Regulatory Affairs database within the PTL system.

Priorities, due dates, and responsible individuals are identified in the database, as well as the name of the player submitting the comment. All comments entered into the database for the 1997 drills were reviewed for appropriate priorities, reasonable due dates, and repeat issues. Approximately 113 player comments were reviewed. Of these, 67 were entered into the database. Ifa comment is not entered into the database and the player requests a reply, there is no mechanism to ensure a reply is provided. A review was conducted of the latest Final After Action Report (FAAR) which documented an event where WNP-2 entered Technical Specification Action Statement 3.0.3. The report identified eight areas for improvement. These were not tracked in the Regulatory Affairs Action database. From the noted examples, there is no consistency as to what is tracked in the database. As a result of the issues raised above, the following recommendation was issued:

QUALITYRECOMMENDATIONAU298-008-F Assigned to: Tim Messersmith Due Date: June 9, 1998 Identify items that should be tracked in the Regulatory Affairs database. Items to consider include: Replies to player comments, controller/evaluator concerns, drillobjectives not demonstrated, and I:AAR areas for improvement.

Items were selected from the drill player comments to determine if follow-up action had been performed. Four player comment forms noted where telephone numbers were not correct in the Emergency Phone Directory. These are reviewed and verified on a quarterly basis, but since some moves had been made (JIC, County EOC) in the interval they had not been updated. A check of the latest directory, dated December 1997, indicated that the telephone number changes had been incorporated except for one number. In this case, the Authorized Nuclear Insurer (ANI) number had a typographical error. The correct number was also located in a separate section of the directory. When notified of this discrepancy, EP personnel immediately corrected the database.

Section 4.0- Equipment and Facilities The WNP-2 Emergency Plan and PPM 13.14.4, Emergency Equipment, were reviewed and walkdowns were conducted of all emergency centers.

A sample of emergency kits and cabinets were inspected to verify contents listed in PPM 13.14.4. The contents of the kits and cabinets and the calibration of radiation instruments are verified periodically through Model Work Orders or through Plant Tracking System (PTL) action items. The materials in the emergency centers are restocked after each drill. The review determined that the emergency facilities are adequately stocked and that periodic verifications are being conducted.

One area of the Emergency Plan that Quality reviewed involved the three local hospitals. These hospitals serve as the primaiy or backup stations for the decontamination of injured personnel. The Supply System provides emergency radiological kits for each hospital to treat personnel if such a scenario occurs. Quality reviewed the list of contents of the hospital emergency kits in PPM 13.14.4, .3 and questioned whether a dose rate meter was included. This question was based on a

QUALITYDEPARTMENT AUDIT298408 Section 4.0 - Equipment and Facilities -'continued

~ ~

possible scenario where a highly contaminated person may have emanating radiation from the contamination. Emergency Preparedness personnel pointed out that although a dose rate meter is not listed, it is part of all the kits. The Kadlec Medical Center Radiological Kit contents were verified and a dose rate meter was included. Based on this, the following recommendation was issued:

QUALITYRECOMMENDATIONAU-298-008G Assigned To: Tim Messersmith DueDate: June9, 1998 Include a Dose Rate Meter as part of the contents listed on Attachment 5.3 ofPPM 13.14.4, Hospital RadiologicalEmergency Kit.

The hospital kits are tracked on Model Work Orders (MWO) both by EP and Radiation Protection (RP). Radiation Protection tracks the Thermoluminescent Dosimeters (TLD), count rate meters, and dose rate meters to ensure that they are in calibration and ready for use. EP performs quarterly checks to verify and change-out the instruments. For the MWO's to perform the quarterly checks, two of the work orders generated were incorrectly assigned to RP, while one was assigned to EP. To align the work order process with the appropriate discipline the following recommendation is issued:

QUALITYRECOMMENDATIONAU298-0088 Assign To: Tim Messersmith Due Date: June 9, 1998 Ensure work orders generated to inventory hospital radiological kits are assigned to the Emergency Preparedness group.

The audit team assessed whether emergency facilities and equipment identified by NUEEG-0696 and described in the FSAR as supporting emergency response has been adequately provided and maintained. This assessment determined that sufficient equipment and facilities are in place to support emergency response.

Section 5.0- Interfaces With State and Local Governments

'The WNP-2 Emergency Plan, Section 4.3 and Plant Procedure Manual 13.1.1, Classifying The Emergency, require that agreements with offsite agencies be reviewed annually, with the latest revision reviewed by state and local government representatives. Interviews were conducted and the Memorandums of Understandings (MOUs), agreement letters, and contracts were reviewed. These documents are in place to ensure that the Supply System and offsite agencies communicate and review any changes in their agreements.

Various offsite personnel were interviewed to ensure that agreements and contracts between the Supply System and their facility have been reviewed and also to determine the relationship between offsite agencies and WNP-2. Some of the agreements and all of the MOUs were verified as having received the required annual review. The personnel interviewed indicated that they are informed of all revisions to the emergency plan and their communication with WNP-2 EP personnel continues to be strong. Both on and offsite personnel expressed a professional and amicable relationship with their counterparts. All personnel interviewed stated that there is an adequate level of support for each others programs and an improved response to emergency topics among their groups. Quality has determined that the EP group adequately interfaces with the offsite agencies.

QUALITYDEPARTMENT AUDIT298-008 Section 5.0 - Interfaces %ith State and Local Governments - continued

~

~

STRENGTH The Emergency Preparedness group mainiains an open line ofcommunication with offsite personnel regarding emergency preparedness issues.

A concern was raised by the Director of Morrow County Emergency Management (Oregon). The issue regarded a disparity of map scale between WNP-2 and Department of Energy (DOE)-RL maps used to chart dose projection. It was stated that DOE and not the Supply System was unwilling to cooperate in correcting the maps. As a result, Quality recommends:

QUALITYRECOMMENDATIONAU298-008-I Assigned To: Tim Messersmith DueDate: June9, 1998 Investigate the disparitt'es in scales dealing with exposurelingestion county maps to if determine these differences affect the counties'bility to respond to an emergency event at WAF-2.

Section 6.0 - Problem IdentiTication and Resolution The PERs and Recommendations resulting from the 1997 Emergency Preparedness Program Audit were reviewed for effectiveness. Three PERs resulted from the 1997 audit. Two of the PERs have been completed and closed (297-0183 and 297-0198). The audit team reviewed the corrective actions associated with these PERs to determine ifthey were implemented effectively.

The closure documentation for these PERs satisfied the instructions on the corrective action plans. There were no concerns with these PERs.

One PER remains open from last year's audit. PER 297-0205 documented that "Instructions/Procedures do not exist which maintain the license basis requirements for non power block facilities." This PER has five corrective actions, all of which are still open. These actions have been extended, and at the last time of request for extension Quality required a plan for completion as well as a justification for extension. Potential effects of the extended due dates are mitigated by Corrective Action Plan (CAP) 5 which is an interim action for the Manager of Facilities and Support Services (or designee) to review all Facility Service Requests issued until CAPs 1 through 4 are completed. As such, this action will be in place and ongoing until the other actions have been completed. Quality will continue to follow this issue and review documentation upon completion of PER 298-0205.

There were ten Quality Recommendations issued with the previous Emergency Preparedness Program Audit. Only one is open at this time. Recommendation AU297-005-B was issued to revise PPM13.8.1, Emergency Dose Projection System Operations, to incorporate dose assessment enhancements. This action will be completed at the time of biennial review of the procedure, currently scheduled for April 1998. This was acceptable to Quality.

Another recommendation, that was closed based on pending actions, was evaluated to determine ifthe action had been completed. Recommendation AU297-005-J was issued to establish criteria to maintain the backup Post Accident Sampling System (PASS) laboratory in a state of readiness.

The response to this recommendation indicated that Chemistry would revise PPM 12.1.1,

1 ~ A I

QUALITYDEPARTMENT AUDIT298408 Section 6.0 - Problem Identification and Resolution - continued Laboratory Quality Assurance, to provide schedule frequencies for backup PASS laboratory instrumentation. A review of PPM 12.1.1, Rev. 9, dated December 17, 1997, indicated that these actions had not been incorporated into the procedure. Since the time this recommendation was issued, Quality has established a practice of tracking actions in response to recommendations.

This practice will aid the responsible individual, as well as Quality, in assuring completion of audit recommendation responses. Quality toured the PASS Laboratory and determined that it was in a state of readiness. However, Quality still believes this issue warrants action and therefore, is re-issuing the following recommendation:

QUALITYRECOMMENDATIONAU298-008- J Assigned to: John C. Hanson DueDate: June 9, 1998 Establish criteria to maintain the baciasp PASS Laboratory in a state of readiness.

The remaining recommendations that had been closed were verified to have been implemented or referred to another document (PERA) that was tracking the item.

The PTL database for the Emergency Preparedness group was searched for PERs assigned to EP since January 1, 1997. The PER summaries were reviewed and considered for indications of repeat occurrences or trends. Two PERs related to the Automated Notification System (ANS) were selected for additional review. PER 297-0230 documented where the ANS transmitted an incorrect message, indicating a drill was in progress instead of the actual Unusual Event.

PER297-0740 documented where the ANS stopped processing outgoing telephone and pager messages. In the first instance, it was determined that the problem was due to the vendor failing to link the correct scenario to the correct message. Corrective actions associated with PER 297-0230 included a procurement of a device that would allow testing the system without activating ERO pagers and to check all scenarios for similar occurrences. The second PER was inconclusive in identifying a cause. Through discussions with the vendor, it was believed that an excessive amount of data stored in 'temporary data logs within the system caused the problem.

Corrective actions included monitoring and purging of the temporary files and testing the system each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to verify operability. Quality's review of these two PERs determined that they did not represent an adverse trend or failure to prevent recurrence since the two failures were not directly related.

The most recent self-assessment performed by EP was performed February 21, 1997. This self-

. assessment utilized EP individuals from offsite utilities as well as personnel from the state and county emergency organizations. Three PERs and 29 recommendations resulted from the self-assessment. All recommendations have been closed except one which is dependent on the next self-assessment performance to close. Currently, EP is scheduling the next self-assessment for the first week of May 1998. The 1997 EP self-assessment was determined to be self-critical and effectively used outside resources to identify and resolve problem areas.

STRENGTH The Emergency Preparedness organization is proacti ve in identifying problems and implementing appropriate corrective actions.

10

QUALITYDEPARTMENT AUDIT298408 Section 7.0- Dose Assessment Capabilities The WNP-2 Emergency Plan and applicable plant procedures were reviewed to determine if required systems are available and accessible for personnel to acquire results for dose assessments in a timely manner. Also, interviews were conducted and training reviewed to assure that capable personnel were available to perform the dose assessments.

The available WNP-2 systems include the Emergency Dose Projection System (EDPS), Backup Emergency Dose Projection System (BEDPS) and the Quick Emergency Dose Projection Systems (QEDPS). These programs are stand-alone systems which have alternate power supplies allowing for data acquisition in the event of loss of power during an emergency. These programs are also used by the offsite agencies and are comparable with the dose assessment program utilized by the Nuclear Regulatory Commission. Quality concludes that adequate systems are available to provide data for personnel to perform dose assessments in a timely manner.

There is a manual backup model for dose assessment in place for system failures noted in PPM 13.1.1, Classifying the Emergency, Attachment 5.1, Tables 3 and 4. All dose assessment personnel interviewed were aware of this backup model and stated it was presented in training but not utilized during drills. When using the QEDPS, dose assessment personnel are required to draw a dose projection map for distribution to offsite agencies. All personnel interviewed stated that they have drawn dose projection maps in drills and are comfortable in doing so. Personnel tasked with performing dose assessments were determined to be trained and qualified.

PPM 13.8.1, Emergency Dose Projection System, defines BEDPS as the backup system to EDPS and refers to the pre-planned alternate monitoring method as per Technical Specification 3.3.7.5.

It was noted that Technical Specification 3.3.7.5 was not a valid document and had been removed with the implementation of Improved Technical Specifications (ITS). Therefore, Quality recommends:

QUALITYRECOMMENDATIONAV298-008-K Assigned to: Tim Messersmith Due Date: June 9, 1998 Revise dose projection PPMs 13.8.1 and 13.8.2 to delete references to superseded Technical Specification 3.3.7.5 and reflect current requirements.

Emergency Preparedness proposed to eliminate BEDPS through Rev. 20 of the Emergency Plan.

It was believed that this monitoring method had been deleted with the implementation of the ITS.

Revision states: "EDPS software will be upgraded by combining so&ware features of the BEDPS and will provide an easy to use operating platform, thus allowing the removal of the BEDPS program." However, a Supply System letter to the Nuclear Regulatory Commission dated December 23, 1996, states the BEDPS is "the pre-planned alternate monitoring method as per Technical Specifications 3.3.7.5." Based on this information, EP decided to keep BEDPS in the Emergency Plan.

Emergency Plan, Section 5.1.4, Personnel Dose Assessment, refers to routine and emergency personnel exposure monitoring and dose assessments being accomplished by issuing thermoluminescent dosimeters (TLDs), electronic, or direct reading dosimeters and monitoring for airborne radioactivity. The plan also denotes that there is a 24-hour-per-day capability to 11

t QUALITYDEPARTMENT AUDIT298408 t

Section 7.0 - Dose Assessment Capabilities - continued analyze Supply System issued dosimetry. It further states that the Supply System maintains a personnel monitoring program through the use of TLD readers and whole body counters. The requirement to provide 24-hour-per-day capability comes from NUIKG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants. Presently, the Supply System has no onsite equipment for the analyzing of TLDs. Section 6.2.8 of the Emergency Plan, Health Physics Center, states the Supply System contracts with a local vendor to process TLDs and provide results to the Supply System in a timely manner. The Supply System's local contract vendor, ThermoNuTech, has relocated from West Richland, Washington, to Albuquerque, New Mexico. Although the contract vender is not local, EP believes that the Supply System can demonstrate the capability to analyze TLDs 24-hours-per-day and provide the results in a timely manner. Since the Emergency Plan does not reflect actual practice, the following PER was issued.

QUALITYHOUNDING PER 298-0194 Section 6.2.8 of the emergency Plan states that the Supply System contracts wi th a local vendor to process TLDs. The vendor relocated to Albuquerque, New Mexico.

Regulatory Guide 1.23, Onsite Meteorology Programs, Rev. 0, states: "meteorological instruments should be inspected and serviced at a frequency which will assure at least a ninety percent data recovery and which will minimize extended periods of instrument outage." Quality utilized the 1996 and 1997 Annual Radioactive Eftluent Report to verify that the meteorological joint recovery data submitted to the NRC annually was at least within the ninety percent acceptance criteria. The joint recovery data for these two years was found acceptable.

Section 8.0 - Personnel QualiTications The Qualification Directory Manual, the November 1997 drill observations, drill after action reports, and previous drill reports were reviewed to determine ifERO members were qualified to perform their emergency center functions. Also, interviews were conducted with ERO responders. All personnel listed as ERO responders have met the qualifications required of their positions. All personnel interviewed expressed that as a first time responder they were unsure of what was required. However, each person interviewed said that after participating in a drill they were confident in their ability to perform their duties. The issue with first time responder qualifications is addressed in the training section of this report (Recommendation AU298-008-D).

PQD was reviewed against Operations, Maintenance, and Health Physics crew schedules.

Individual qualification requirements were evaluated by name and by Qualification Group.

Maintenance and Health Physics personnel were found to have adequate qualifications. However, two Operations'rews did not appear to have the required compliments of two ERO trained individuals. A review of training records by Operations found that required training had been conducted but some equipment operators were not entered in the appropriate Qualification Group in PQD. One shift manager stated that the requirements of PPM 1.3.1 were used to verify required shift compliment. It was also indicated that when filling vacant crew positions, ERO 12

r-I E

QUALITYDEPARTMENT AUDIT298-008 Section 8.0 - Personnel QualiTications - continued qualifications were not always reviewed. It was assumed that fire brigade training met the qualification requirements for the ERO. As a result of the above issues, the following PER was issued:

QUALITYFINDING PER 298-0169 The process is inadequate for assigning new equipment operators to Emergency Response Qualification Groups.

Section 9.0 - StaAing Levels Emergency Response Organization The WNP-2 ERO Personnel List, the PQD, and PPM 1.3.1 (WNP-2 Operating Policies, Programs, and Practices) were reviewed to determine ifERO staffing was adequate to respond to an emergency.

The audit team concluded that there are adequate personnel available to staff the WNP-2 ERO within the required 60-minute limit. Those personnel tracked via the PQD are assigned to one of four ERO teams who rotate through a two week period of being on-call. The Duty team is issued pagers. In the event of an emergency or during the conduct of a Notification Drill, the EP staff initiate the alert using the Dialogics Automated Notification System (DANS). ERO team members respond using a telephonic code to indicate whether they are able to report for emergencyduties. Shortages areidentified and replacements are called in. A staffing check" of the oncoming ERO team is conducted the Thursday prior to shift rotation by EP staff This check identifies any gaps in the ERO team and allows EP staff time to find personnel to fillthe roster.

NUREG 0654, Rev. 1,Section II.A.4 states in part, "Each principal organization shall be capable of continuous (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative, and material) shall be specified by title." In general, the current method of staffing the ERO should provide for continuous operations. However, the WNP-2 Emergency Plan (Rev. 19), does not specify the person responsible for ensuring 24-hour continuous operations.

This topic is discussed in several ERO duty position procedures and specifically in the Manpower Scheduler duty description. There are no guidelines in the emergency procedures for how long ERO personnel will man their stations after reporting. Although this requirement from NUREG 0654 is met by the word and intent of the WNP-2 Emergency Plan, it is unclear in the Volume 13 procedures that a 24-hour staffing schedule may be required. Also, there are no clear provisions in the procedures to establish a 24-hour staffing schedule for a protracted period.

Therefore Quality recommends:

'QUALITYRECOMMENDATIONAU298-008-L Assigned to: Tim Messersmith Due Date: Iune 9, 1998 Revise the Emergency Plan Implementing Procediires to provide guidance for establishing and maintaining continrious 24-hour staffing of the Emergency Response organization for a protracted period.

13

QUALITYDEPARTMENT AUDIT298408-Section 9.0 - Staffing Levels Emergency Response Organization - continued The administrative mechanisms to ensure minimum shift staffing and augmentation requirements are in place and, if used consistently by all organizations, will meet the goals of the Emergency Plan. However, some line supervisors are not aware of the ERO staffing requirements nor use the tools provided.

The WNP-2 Emergency Plan, Table 2-1 and NUREG-0654, Table B-1, specify the minimum staffing for the Supply System Emergency Response organization. These tables require two equipment operators and two maintenance personnel on-shift (around the clock) to perform emergency functions. The position of the maintenance personnel may be provided by shift personnel assigned other functions. On April 3, 1997, Rev. 19 to the WNP-2 Emergency Plan was submitted to the NRC. Attachment A of the 10 CFR 50.54(q) evaluation supporting the changes was an assessment of minimum on-shift ERO staffing. This assessment concluded that four equipment operators were needed on-shift to meet ERO requirements. The two additional equipment operators are assigned to cover the emergency maintenance function between 2:00 and 6:40 a.m. when maintenance personnel are not available on-shift. The Minimum Shift ERO Staffing Table developed by this assessment was included in PPM 1.3.1, WNP-2 Operating Policies, Programs, and Practices.

A review of qualifications for operating crews found that Operations Crews C and E have been staffed, during the hours between 2:00 a.m. to 6:40 a.m., with less than four ERO qualified equipment operators. This problem on ERO staffing resulted in:

QUALITYFINDING PER 298-0191 PPM 1.3.1 requirements for minimum shift ERO staffing are not being met between 2: 00 a.m. and 6:40 a.m. with qualified personnel.

FSAR REVIEW AND RESPONSE TO 10 CFR 50.54(f) REQUEST FOR INFORMATION The FSAR, Section 13.3, identifies the required support centers and emphasizes communications between those centers and the Control Room. The details of the program description are contained in the Emergency Plan. The Emergency Plan is an attachment to the FSAR and was reviewed extensively throughout this audit. There are no FSAR issues other than those delineated in the report in connection with the Emergency Plan.

There is no discussion of Emergency Preparedness or the Emergency Response organization in the 50.54(f) letter. However, under the Requirements Tracking Database discussion, the 50.54(f) letter states, "Development of the database also includes verification of where the commitment is met in the current operating programs and procedures." This statement supports Quality Recommendation AU298-008-B which pertains to identifying commitments in emergency procedures.

14

APPENDIX A Personnel Contacted During the Audit HM Adams Supervisor, Maintenance Craft AL Alexander Technical Specialist, Chemistry TE Alton Quality Technical Specialist AJ Anderson Technical Support Specialist/Administrative Services DK Atkinson Manager, Quality ~

LW Ball Emergency Planner+ ~

AS Barber Supervisor, Quality Services RE Barnes Mechanic KC Beard Director, Morrow County Emergency Management DABennett OSC Communicator T Brown Emergency Planner, Cooper Nuclear Station SM Bruce Supervisor, Control Room DW Coleman Acting Manager, Regulatory Affairs+

LL Collins Technical Support Specialist/Administrative Services MS Collins Quality Services JG Dockter Technical Support Specialist/Administrative Services+

RL Ehr Supervisor, Engineering JS Flood Shift Technical Advisor JA Gloyn Supervisor, FFD / Training SR Goodwin Quality Services+

KM Gunter Quality Services+

JC Hanson Manager, WNP-2 Chemistry M Henry Manager, Department of Health DW Hillyer Manager, WNP-2 Radiation Protection+

DB Holmes Emergency Planner+0 JP Ittner Emergency Planner+0 RE Jorgenson Lead Emergency Planner+

JP Kane Engineering General Manager+

AF Klauss Emergency Planner ~

JALakey Chemistry Technician AALangdon Assistant to the WNP-2 Plant General Manager+

JC Latta Quality Services+o MKLaudisio Quahty Services +0 CR Madden Health Physics ~

RD Madden Quality Services+

JW Massey Quality Services+0 LL Mayne Chemistry Specialist JE McDonald Science Environmental RP KP Meehan Emergency Planner ~

TC Messersmith Corporate Emergency Preparedness, Health and Safety Ofncer+

M Messman Program Manager, DOE GAMoyer Craft Supervisor RR Nelson Operations Specialist 15

QUALITYDEPARTMENT AUDIT298408 APPENDIX A - continued

~ ~ ~

HL Nielson Supervisor, Chemistry DL Overman Technical Specialist WAPQtzer Licensing+

RM Pfluger Senior Auditor GD Phillips Health Physics Technician LARathbun Health Physics JE Rhoads Engineering KD Saenz Records Team Lead DL Seever Emergency Planner, Southern California Edison DM Smith Technical Support Specialist/Administrative Services RL Webring Vice President, Operations Support/Public Information Officer ~

JE Wyrick Supervisor, Quality Services +

+ Attended Entrance Meeting

~ Attended Exit Meeting 16

QUALITYDEPARTMENT AUDIT298%08 APPENDIX B References Emergency Plans Conditions of Licenses Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities NUREG 0654, FEMA REP-1, Rev. 1; Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants;Section II.B WNP-2 Emergency Preparedness Plan, Rev. 19 WNP-2 Emergency Plan, Rev. 20 Proposal Emergency Dose Assessment System Users Manual Volume 13 Series of Emergency Plan Implementing Procedures PASSPORT Predefined Database PPM 1.3.43 Rev. 12 "Licensing Basis Impact Determination" Emergency Preparedness Training Course Catalog SWP-TQS-01 Training, Qualification, and Simulators SWP-EPP-01 Emergency Response Qualifications and Training Emergency Phone Directory Emergency Response Organization List Emergency Response Organization Training Player Training Handout IOM dated September 12, 1996, to Offsite Emergency Management Organizations,

Subject:

Annual Training for Offsite Agencies IOM from L.W. Ball dated 01/30/98,

Subject:

February 1998 ERP Past Due Training Report IOM from L.W. Ball dated 02/13/98,

Subject:

ERO Training Look Ahead Report PQD ERO Late Report generated by L. W. Ball, dated 02/13/98 Quality Department Audit Report AU297-055, WNP-2 Training, Performance, and Qualification Quality Department Audit Report AU297-005, WNP-2 Emergency Preparedness Program PER 297-0816, ERO Personnel Not in Compliance With Minimum Training Requirements IOM from C.L. Bliss dated 08/26/97

Subject:

Craft Members of the ERO PQD Scheduled Monthly Report dated 02/25/98 Drill and Exercise Manual for WNP-2, Rev. 6 Quarterly Training Drill 97-4 DrillReport, dated December 18, 1997 PTL Database Regulatory Affairs Action, Internal Action Summary Report for 1997 Drills Letter No. G02-89-227, Supply. System to NRC, dated December 2, 1989, "Response to Notice of Violation" Final After Action Report No. 31 dated March 20, 1997 Sample, Model Work Orders for Emergency Equipment Tracking Reg Guide 1.101 Rev. 3, Emergency Planing and Preparedness for Nuclear Power Plants Letter No. GO2-94-263, Supply System to FEMA, "MOU Contract No. C-30061" Letter No. GO2-95-225, Supply System to FEMA, "WNP-2 Emergency Plan Annual Review of Supporting Agreements Contract No. C-30046" Letter No. G02-95-230, Supply System to DOE, "WNP-2 Emergency Plan Annual Review of Supporting Agreements Contract No. C-00676" Letter No. GO2-95-236, Supply System to DOE, "WNP-2 Emergency Plan Annual review of Supporting Agreements Contract No. C-30042" 17

QUALITYDEPARTMENT AUDIT 208408 APPENDIX B - continued PTL Database PERs 297-0183, 297-0198, 297-0205, 297-0230, 297-0740 1997 Emergency Preparedness Program Audit 297-005 1997 Emergency Preparedness Self-Assessment NRC Inspection Manual Chapter 2515/134, Licensee On-Shift Dose Assessment Capabilities Reg. Guide 1.23, Rev. 0, Onsite Meteorology Programs Reg. Guide 1.101, Rev. 3, Emergency Planning and Preparedness for Nuclear Power Plants NRC Inspection Manual Chapter 2515/134, Licensee On-Shift Dose Assessment Capabilities Letter No GO2-96-251, Supply System to the NRC, dated December 23, 1996, "WNP-2 Operating License NPF-21 Special Report Reactor Building Effluent Monitoring System" NRC Inspection Manual "Dose Calculation and Assessment" No. 82207 ANSUAN 2.5 "Standard for Determining Meteorological Information at Nuclear Power Plants EPA-520/1-95-001-A "Manual of Protective Action Guides and Protective Actions for Nuclear Power Incidents," 1990 NRC Inspection Procedure No. 82701 "Operational Status of the Emergency Preparedness Program" Quality Department Audit Report AU297-005, WNP-2 Emergency Preparedness Program Quality Department Audit Report AU297-055, WNP-2 Training, Performance, and Qualification Qualification Directory Manual, Section 2.8, Emergency Response Qualification Directory Manual, Section 4.2, Equipment Operators Emergency Preparedness Training Course Catalog Emergency Phone Directory, Emergency Response Organization List Emergency Response Organization Training Player Training Handout Operations Logs dated 09/27/97 to 10/01/97 Operations Logs dated 02/01/98 to 02/25/98 Operations Crew Roosters dated 09/21/97 and 03/2/98 Health Physics Shift Assignments for September to October 1997 and dated January 27,1998 PQD Reports for QUAL Groups EPAL, EPAN, EPAQEPCN, EPAJ, EPCP, EPAC, EPAI PPM 1.3.1, WNP-2 Operations, Policies, Programs, and Practices PER$ 297-0816, 297, 0108 EP Response to PSA Synopsis of Changes to WNP-2 Emergency Plan; proposed Rev. 20, dated February 23, 1998 SWP-EPP-01: Emergency Response Organization and Training; Rev. 0; dated August 5, 1997 18

APPENDIX C Summary of Quality Recommendations, Findings, and Strengths AU298-008-A Incorporate the 10 CFR 50 Appendix E requirement to submit any changes to the Emergency Plan or procedures to the Commission within 30 days of such changes into a appropriate WNP-2 procedure.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-B Annotate Regulatory Requirements and Commitments in the Emergency Procedures in accordance with SWP-PRO-03.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-C Update the list of Emergency Plan implementing procedures in the WNP-2 Emergency Plan Appendix 2, and replace the reference to Battelle with PNNL in Section 5.2.1.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-D Expand the initial training for emergency center personnel involved with communications, log keeping, and team tracking to include performance-based actions.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-E Provide a mechanism to capture information, comments, and suggestions provided during pre-drill training sessions. This mechanism should have a feedback loop to the individual providing the information.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-F Identify items that should be'tracked in the Regulatory Affairs database.

Items to consider include: replies to player comments, controller/evaluator concerns, drill objectives not demonstrated, and FAAR areas for improvement.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-G Include a Dose Rate Meter as part of the contents listed on Attachment 5.3 of PPM 13.14.4., Hospital Radiological Emergency Kit.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-H Ensure work orders generated to inventory hospital radiological kits are assigned to the Emergency Preparedness group.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-I Investigate the disparities in scales dealing with exposure/ingestion county maps to determine ifthese differences effect the counties'bility to respond to an emergency event at WNP-2.

(Assigned to T.M. Messersmith - Response due date June 9, 1998) 19

QUALITYDEPARTMENT AUDIT298408 APPENDIX C - continued AU298-008- J Establish criteria to maintain the backup PASS Laboratory in a state of readiness.

(Assigned to J.C. Hanson - Response due June 9, 1998)

AU298-008-K Revise dose projection PPMs 13.8.1 and 13.8.2 to delete references to superseded Technical Specification 3.3.7.5 and to reflect current requirements.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

AU298-008-L Revise the Emergency Plan Implementing Procedures to provide guidance for establishing and maintaining continuous 24-hour staffing of the Emergency Response organization for a protracted period.

(Assigned to T.M. Messersmith - Response due date June 9, 1998)

PER 298-0194 Section 6.2.8 of the Emergency Plan states that the Supply System contracts with a local vendor to process TLD's. The vendor relocated to Albuquerque, New Mexico.

PER 298-0169 The process is inadequate for assigning new equipment operators to Emergency Response Qualification Groups.

PER 298-0191 PPM 1.3.1 requirements for minimum shift ERO staffing are not being met between 2:00 a.m. and 6:40 a.m. with qualified personnel.

Strength: Emergency preparedness personnel are diligent at tracking qualifications for those individuals listed as ERO members. Appropriate management is notified prior to individuals losing their qualifications and also when qualifications expire.

Strength: The Emergency Preparedness group maintains an open line of communication with oF-site personnel regarding emergency preparedness issues.

Strength: The Emergency Preparedness organization is proactive in identifying problems and implementing appropriate corrective actions.