{{#Wiki_filter:From: Neff, David B:(GenCo-Nuc)
{{#Wiki_filter:From:             Neff, David B:(GenCo-Nuc)
To: Ennis, Rick Cc: Helker, David P:(GenCo-Nuc)
To:               Ennis, Rick Cc:               Helker, David P:(GenCo-Nuc)


==Subject:==
==Subject:==
[External_Sender] PB MUR Draft Safety Evaluation Comments Date: Monday, November 13, 2017 2:48:58 PM Attachments:
[External_Sender] PB MUR Draft Safety Evaluation Comments Date:             Monday, November 13, 2017 2:48:58 PM Attachments:       PB MUR SER Draft Comments for NRC FINAL 111317.pdf As requested in your letter dated 10/30/17 (ML17289A324), attached are Exelons comments on the Draft Safety Evaluation for the PBAPS MUR Uprate Amendment. The is no proprietary information contained in this response. The vendors who submitted proprietary information contained in the original LAR have concluded that no additional information in the draft SE needs to be marked as proprietary. Comment 12 corrects the proprietary makers in Section 3.3.2 by reducing the text to be withheld. Comment 14 identifies a need to correct information contained within the proprietary markers in the table in Section 3.3.3 based on Attachment 10 of the original LAR. There were no significant errors identified which would require additional technical review.
PB MUR SER Draft Comments for NRC FINAL 111317.pdf As requested in your letter dated 10/30/17 (ML17289A324), attached are Exelon's comments on the Draft Safety Evaluation for the PBAPS MUR Uprate Amendment.
The is no proprietary information contained in this response.
The vendors who submitted proprietary information contained in the original LAR have concluded that no additional information in the draft SE needs to be marked as proprietary.
Comment 12 corrects the proprietary makers in Section 3.3.2 by reducing the text to be withheld. Comment 14 identifies a need to correct information contained within the proprietary markers in the table in Section 3.3.3 based on Attachment 10 of the original LAR.
There were no significant errors identified which would require additional technical review.
Please let me know if you have additional questions.
Please let me know if you have additional questions.
Thank you, Dave This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies. Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications.
Thank you, Dave This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies. Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -
-EXCIP PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document:  PB EPU Draft SE 1 0/3 0/2017  Page 1 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 1  1.1/p3  First sentence of last paragraph of this section should be revised to state: "-a differential pressure for a venturi is proportional to the square of the FW velocity in the pipe. Technical Clarification. 2  1.2/p3 Second sentence of first paragraph should be revised to state that the LEFM system was installed in U2 in 2002.
EXCIP
Factually Incorrect. See LAR Attachment 1 Section 1.0 p2 3  2.1.2/p13 Third paragraph, second sentence should be "burnable poison" vice "bundle poison" Editorial 4  3.1/p 10 Bullet for TSAR Section 11.0 incorrectly includes 'TSAR Section 12.0' Editorial. Delete "TSAR Section 12.0" from last bullet.
5  3.2.4/p17 5th paragraph: The paragraph should be clarified since the term "SLMCPR protection confirmation," is not used in the TSAR.
Technical Clarification
. See TSAR 2.4.1 Suggested wording:
  "The plant
-specific application demonstrates that the analyses and evaluations supporting DSS
-CD are applicable to the fuel loaded in the core and the new operating power domain.
TPO may also affect the SLMCPR protection confirmation slightly. The SLMCPR protection calculation is dependent upon the core and fuel design and The DSS-CD confirmation checklist based on the demonstrated applicability extension for TPO is used to demonstrate applicability performed for each reload. These features will be analyzed for the first reload analysis that incorporates the new rated power level
. 6  3.3.1/p20 1 st paragraph, 2nd sentence states:
  "As discussed in TSAR Section 3.1, the licensee stated that the steam flow associated with the TPO uprate can be regulated adequately by adjusting the turbine control valve (TCV) position;-"
This discussion is not explicitly discussed in Section 3.1 of the TSAR. A more appropriate reference is TSAR Section 5.2.1.
Editorial. Suggest revise sentence as follow:
"As discussed in TSAR Section 5.2.1, the licensee stated that the steam flow associated with the TPO uprate can be regulated adequately by adjusting the turbine control valve (TCV) position;-"


PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 2 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 7  3.3.1/, p.20 First sentence of 2 nd paragraph states: "Evaluations and analyses for PBAPS were performed (emphasis added) at 102 percent of CLTP to demonstrate that the reactor vessel conformed to ASME and plant TS requirements." Current ASME analysis, however, is performed at 100% CLTP with 2% power uncertainty consideration. TSAR therefore states that - the current ASME overpressure analysis . Suggest revise sentence as follows:
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
"Evaluations and analyses for PBAPS account for 102 percent of CLTP - and plant TS requirements."
Document: PB EPU Draft SE 10/30/2017 Item       SE                                     Comment                                           Suggested Comment Resolution
Technical Clarification. See TSAR 3.1 p3
  #    Section 1      1.1/p3  First sentence of last paragraph of this section should be revised to  Technical Clarification.
-1 4th bullet 8  3.3.2/p27 In the 2 nd paragraph on the page, the 1 st sentence states:  
state: a differential pressure for a venturi is proportional to the square of the FW velocity in the pipe.
  "The current licensing basis 32 EFPY and 54 EFPY P
2      1.2/p3  Second sentence of first paragraph should be revised to state that the Factually Incorrect. See LAR Attachment 1 Section 1.0 LEFM system was installed in U2 in 2002.                                p2 3    2.1.2/p13 Third paragraph, second sentence should be burnable poison vice      Editorial bundle poison 4      3.1/p10  Bullet for TSAR Section 11.0 incorrectly includes TSAR Section 12.0  Editorial. Delete TSAR Section 12.0 from last bullet.
-T limits for PBAPS, Units 2 and 3, were calculated based on the licensee's plant-specific application of the methodology documented in Topical Report NEDO
5    3.2.4/p17  5th paragraph: The paragraph should be clarified since the term        Technical Clarification. See TSAR 2.4.1 SLMCPR protection confirmation, is not used in the TSAR.
-33178-A."  The 32 EFPY is not current licensing basis. The data (from BWRVIP05) for 32 EFPY in TSAR Tables 3
Suggested wording:
-4a and 3-4b are provided as bounding value goals for the 54 EFPY plant
The plant-specific application demonstrates that the analyses and evaluations supporting DSS-CD are applicable to the fuel loaded in the core and the new operating power domain. TPO may also affect the SLMCPR protection confirmation slightly. The SLMCPR protection calculation is dependent upon the core and fuel design and The DSS-CD confirmation checklist based on the demonstrated applicability extension for TPO is used to demonstrate applicability performed for each reload. These features will be analyzed for the first reload analysis that incorporates the new rated power level.
-specific evaluation.
6    3.3.1/p20  1st paragraph, 2nd sentence states:                                    Editorial. Suggest revise sentence as follow:
Factually Incorrect. See TSAR 3.2.1 (c) and Tables 3
As discussed in TSAR Section 5.2.1, the As discussed in TSAR Section 3.1, the licensee stated that the      licensee stated that the steam flow associated steam flow associated with the TPO uprate can be regulated          with the TPO uprate can be regulated adequately adequately by adjusting the turbine control valve (TCV)              by adjusting the turbine control valve (TCV) position;                                                          position; This discussion is not explicitly discussed in Section 3.1 of the TSAR.
-4a and 3-4b Recommend re
A more appropriate reference is TSAR Section 5.2.1.
-writing the sentence as:
Page 1 of 7 11/13/2017
  "The current licensing basis 54 EFPY P
-T limits for PBAPS, Units 2 and 3 were calculated based on the licensee's plant
-specific application of the methodology documented in Topical Report NEDO-33178-A." 9  3.3.2/p28 Second to last line should be revised as follows:
"including locations where they intersect" Editorial 10  3.3.2/p30 In the subsection "RPV Structural Evaluation," the 1 st paragraph, last sentence states, in part:
  "-the shroud support attachment to the RPV component is within the allowable limits for acoustic loads and is, therefore, structurally qualified-"
Suggest this phrase be clarified as follows:
"-the shroud support attachment to the RPV component is within the allowable stress and fatigue limits, including acoustic loads, and is therefore structurally qualified-"
Technical Clarification. See TSAR Section 3.2.2.3 and Table 3
-5 11  3.3.2/p30 In the subsection "RPV Structural Evaluation," 2 nd paragraph, 3 rd line, change "1,02" to "1.02" (i.e., change comma to point).
Editorial.


PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 3 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 12  3.3.2/p30 In the subsection "RPV Structural Evaluation," 2 nd paragraph, 2 nd sentence: the phrase "-the proposed TPO power level of 4016 MWt
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
" is not marked as GEH proprietary information in the TSAR. TSAR Section 3.2.2 states outside of proprieary markings
Document: PB EPU Draft SE 10/30/2017 Item     SE                                     Comment                                           Suggested Comment Resolution
: "-the actual TPO operating power level of 4,016 MWt
  #    Section 7      3.3.1/, First sentence of 2nd paragraph states: Evaluations and analyses for  Technical Clarification. See TSAR 3.1 p3-1 4th bullet p.20    PBAPS were performed (emphasis added) at 102 percent of CLTP to demonstrate that the reactor vessel conformed to ASME and plant TS requirements. Current ASME analysis, however, is performed at 100% CLTP with 2% power uncertainty consideration. TSAR therefore states that  the current ASME overpressure analysis accounts for 102% of CLTP. Suggest revise sentence as follows:
." Note that this comment is written in such a way as to avoid stating proprietary information.
Evaluations and analyses for PBAPS account for 102 percent of CLTP and plant TS requirements.
Proprietary Marking Correction
8    3.3.2/p27  In the 2nd paragraph on the page, the 1st sentence states:              Factually Incorrect. See TSAR 3.2.1 (c) and Tables 3-4a and 3-4b The current licensing basis 32 EFPY and 54 EFPY P-T limits for PBAPS, Units 2 and 3, were calculated based on the licensees        Recommend re-writing the sentence as:
. The proprietary marking can end before "the proposed", such that the phrase "the proposed TPO power level of 4016 MWt" is public. 13  3.3.3/p31 The last sentence of the 1 st paragraph under Steam Separator and Dryer Performance states that a moisture content of 0.10 weight percent is the current licensing basis at TPO conditions. As discussed in the MELLLA+ Safety Evaluation Report (Reference 6 Attachment 1 of the MUR LAR), Section 3.2.8, 0.10 weight percent is actually the "design basis value
plant-specific application of the methodology documented in Topical Report NEDO-33178-A.                                          The current licensing basis 54 EFPY P-T limits for PBAPS, Units 2 and 3 were calculated based The 32 EFPY is not current licensing basis. The data (from                on the licensees plant-specific application of the BWRVIP05) for 32 EFPY in TSAR Tables 3-4a and 3-4b are                    methodology documented in Topical Report provided as bounding value goals for the 54 EFPY plant-specific            NEDO-33178-A.
" while 0.30 weight percent is the "licensing basis value" used for the bounding analysis for EPU which bounds MELLLA+ and MUR conditions. Suggest revising sentence as follows:  
evaluation.
  "The results of the evaluation demonstrated that the steam separator/dryer performance will be acceptable because the moisture content will remain less than or equal to the design basis value of 0.10 weight percent at TPO conditions."
9    3.3.2/p28  Second to last line should be revised as follows: including locations  Editorial where they intersect 10    3.3.2/p30  In the subsection RPV Structural Evaluation, the 1st paragraph, last  Technical Clarification. See TSAR Section 3.2.2.3 sentence states, in part:                                              and Table 3-5 the shroud support attachment to the RPV component is within the allowable limits for acoustic loads and is, therefore, structurally qualified Suggest this phrase be clarified as follows:
Technical Clarification. See MELLLA+ Safety Evaluation p51 1 st paragraph. 14  3.3.3./p 32 U3 Dryer component labels do not agree with label in LAR Attachment 10 Table 3-2 on page 19 Factually Incorrect. Proprietary Information Correction WEC Proprietary information 15  3.3.4./p32 2nd paragraph in section states:
the shroud support attachment to the RPV component is within the allowable stress and fatigue limits, including acoustic loads, and is therefore structurally qualified 11    3.3.2/p30  In the subsection RPV Structural Evaluation, 2nd paragraph, 3rd line, Editorial.
change 1,02 to 1.02 (i.e., change comma to point).
Page 2 of 7 11/13/2017


"The vibration levels for the TPO conditions were estimated from measured vibration data during startup tests on the prototype plant, Browns Ferry Nuclear Plant, Unit 1."
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
The GEH TSAR says: "-NRC designated prototype plant, Browns Ferry-.." Editorial. Add "NRC designated" to the sentence:
Document: PB EPU Draft SE 10/30/2017 Item      SE                                      Comment                                          Suggested Comment Resolution
  "The vibration levels for the TPO conditions were estimated from measured vibration data during startup tests on the NRC designated prototype plant, Browns Ferry Unit 1."
  #    Section 12    3.3.2/p30  In the subsection RPV Structural Evaluation, 2nd paragraph, 2nd      Proprietary Marking Correction. The proprietary sentence: the phrase the proposed TPO power level of 4016 MWt      marking can end before the proposed, such that the is not marked as GEH proprietary information in the TSAR. TSAR        phrase the proposed TPO power level of 4016 MWt is Section 3.2.2 states outside of proprieary markings: the actual TPO  public.
16 3.3.4/p33 In the 2 nd full paragraph on the page, 2 nd sentence, change "RPV top head nozzle" to "RPV top head nozzle s" (i.e., there is more than one nozzle). Editorial
operating power level of 4,016 MWt.
Note that this comment is written in such a way as to avoid stating proprietary information.
13    3.3.3/p31  The last sentence of the 1st paragraph under Steam Separator and      Technical Clarification. See MELLLA+ Safety Dryer Performance states that a moisture content of 0.10 weight        Evaluation p51 1st paragraph.
percent is the current licensing basis at TPO conditions. As discussed in the MELLLA+ Safety Evaluation Report (Reference 6 Attachment 1 of the MUR LAR), Section 3.2.8, 0.10 weight percent is actually the design basis value while 0.30 weight percent is the licensing basis value used for the bounding analysis for EPU which bounds MELLLA+ and MUR conditions. Suggest revising sentence as follows:
The results of the evaluation demonstrated that the steam separator/dryer performance will be acceptable because the moisture content will remain less than or equal to the design basis value of 0.10 weight percent at TPO conditions.
14    3.3.3./p32 U3 Dryer component labels do not agree with label in LAR Attachment    Factually Incorrect. Proprietary Information Correction 10 Table 3-2 on page 19                                                WEC Proprietary information 15    3.3.4./p32 2nd paragraph in section states:                                      Editorial. Add NRC designated to the sentence:
The vibration levels for the TPO conditions were estimated          The vibration levels for the TPO conditions were from measured vibration data during startup tests on the              estimated from measured vibration data during prototype plant, Browns Ferry Nuclear Plant, Unit 1.                startup tests on the NRC designated prototype plant, Browns Ferry Unit 1.
The GEH TSAR says: NRC designated prototype plant, Browns Ferry..
16   3.3.4/p33 In the 2nd full paragraph on the page, 2nd sentence, change RPV top   Editorial head nozzle to RPV top head nozzles (i.e., there is more than one nozzle).
Page 3 of 7 11/13/2017


PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 4 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 17 3.3.4/p33 In the 2 nd to last paragraph, last sentence, consider adding "based on ASME Appendix N criteria" after "analytical evaluations". Suggest revise as follows:
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
"The licensee stated that analytical evaluations based on ASME Appendix N criteria have shown that the safety
Document: PB EPU Draft SE 10/30/2017 Item     SE                                     Comment                                           Suggested Comment Resolution
-related piping components and thermowells in the MS, FW, and RRS piping are structurally adequate for TPO conditions."
  #    Section 17   3.3.4/p33 In the 2nd to last paragraph, last sentence, consider adding based on Editorial ASME Appendix N criteria after analytical evaluations. Suggest revise as follows:
Editorial 18 3.3.5/35 Erosion/Corrosion second paragraph states: The licensee stated that the CHECWORKS TM SFA 3.0 model is used to calculate potential wall thinning of components susceptible to FAC
The licensee stated that analytical evaluations based on ASME Appendix N criteria have shown that the safety-related piping components and thermowells in the MS, FW, and RRS piping are structurally adequate for TPO conditions.
. Suggest revise as follows as per TSAR 3.5.1 Erosion/Corrosion p3
18     3.3.5/35 Erosion/Corrosion second paragraph states:                             Editorial The licensee stated that the CHECWORKSTM SFA 3.0 model is used to calculate potential wall thinning of components susceptible to FAC.
-12:   "The licensee stated that the CHECWORKSTM SFA 3.0 predictive modeling program is used to calculate potential wall thinning of components susceptible to FAC
Suggest revise as follows as per TSAR 3.5.1 Erosion/Corrosion p3-12:
." Editorial . 19 3.3.5/p36 Third to last paragraph first sentence should be revised as follows:
The licensee stated that the CHECWORKSTM SFA 3.0 predictive modeling program is used to calculate potential wall thinning of components susceptible to FAC.
MELLA+ should be MELLLA+
19   3.3.5/p36 Third to last paragraph first sentence should be revised as follows:   Editorial MELLA+ should be MELLLA+
Editorial 20 3.4.2/p44 Last line of second paragraph in 3.4.2 should be revised as follows:
20   3.4.2/p44 Last line of second paragraph in 3.4.2 should be revised as follows:   Editorial Each of these systems is described below 21     3.4.2/ p SE Section 3.4.2 TSAR Section 4.2.5.1, top of p48, states that         Factually Incorrect. See TSAR 4.2.5.1 48    ECCS pumps suction strainer debris loading occurs during LOCAs and not during special events. However, the ATWS special events and the small steam line break also include ECCS suction strainer loading in NPSH calculations. Suggest revise first sentence as follows:
"Each of these systems is describe d below" Editorial 21 3.4.2/ p 48 SE Section 3.4.2 TSAR Section 4.2.5.1, top of p48, states that ECCS pumps suction strainer debris loading occu rs during LOCAs and not during special events
The ECCS pumps suction strainer debris loading occurs during LOCAs, the small steam line break, and during the ATWS special event.
. However, the ATWS special events and the small ste am line break also include ECCS suction strainer loading in NPSH calculations. Suggest revise first sentence as follows:  
Page 4 of 7 11/13/2017
"The ECCS pumps suction strainer debris loading occurs during LOCAs , the small steam line break
, and during the ATWS special event." Factually Incorrect. See TSAR 4.2.5.1


PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 5 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 22 3.4.3/ p. 48 SE states in second paragraph, 1 st sentence: "The PBAPS LOCA analyses resulted in a licensing basis peak cladding temperature (PCT) of less than 1925 °F for GNF2 fuel-".
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
This was the EPU PCT (see EPU LAR Table 2
Document: PB EPU Draft SE 10/30/2017 Item     SE                                     Comment                                             Suggested Comment Resolution
.8-6). The M+ PCT is 1920 °F. Suggest revise as follows
  #    Section 22     3.4.3/ p. SE states in second paragraph, 1st sentence: The PBAPS LOCA               Factually Incorrect. See MUR LAR Supplement 5 48    analyses resulted in a licensing basis peak cladding temperature           Reload 21 Revision 0 Table 16.1-1 (PCT) of less than 1925 °F for GNF2 fuel.
:  "The PBAPS LOCA analyses resulted in a licensing basis peak cladding temperature (PCT) of less than 1920 °F for GNF2 fuel-".
This was the EPU PCT (see EPU LAR Table 2.8-6). The M+ PCT is 1920 °F. Suggest revise as follows:
Factually Incorrect. See MUR LAR Supplement 5 Reload 21 Revision 0 Table 16.1
The PBAPS LOCA analyses resulted in a licensing basis peak cladding temperature (PCT) of less than 1920 °F for GNF2 fuel.
-1 23 3.4.6/p49 First line of section 3.4.6, should reference TSAR Section 4.6 not 3.4.6. Editorial 24 3.5.2/p52 Suggest clarifying the wording in second sentence of TSAR Section 5.2.1 - Pressure Control System regarding the use of the TBVs in pressure control.
23   3.4.6/p49 First line of section 3.4.6, should reference TSAR Section 4.6 not         Editorial 3.4.6.
Technical Clarification. Suggest using the information from the UFSAR 11.1 description of the TBVs and revise 2 nd sentence as follows:
24   3.5.2/p52 Suggest clarifying the wording in second sentence of TSAR Section         Technical Clarification. Suggest using the information 5.2.1 - Pressure Control System regarding the use of the TBVs in           from the UFSAR 11.1 description of the TBVs and pressure control.                                                          revise 2nd sentence as follows:: The PCS controls reactor pressure by modulating turbine control valve position and through use of the turbine bypass system when discharge of excess steam directly to the condenser is required.
: "The PCS controls reactor pressure by modulating turbine control valve position and through use of the turbine bypass system when discharge of excess steam directly to the condenser is required
25   3.5.4/p53 Sixth paragraph, last sentence, replace The Cameron LEFM system           Technical Clarification. The modes of Normal has... with The Cameron LEFM flow meters have two operating             (CheckPlus), Maintenance and Fail are applied to the modes (Normal and Maintenance) and a Fail mode as follows:               flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
." 25 3.5.4/p53 Sixth paragraph, last sentence, replace "The Cameron LEFM system has...with "The Cameron LEFM flow meters have two operating modes (Normal and Maintenance) and a Fail mode as follows:
26   3.5.4/p54 Suggest revising the last sentence of first bulleted item as follows: Per Technical Clarification. The modes of Normal the LAR, the plant will be able to operate at up to 4016 MWt when all     (CheckPlus), Maintenance and Fail are applied to the three LEFM flow meters are in CheckPlus mode.                            flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
" Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
27   3.5.4/p54 Suggest revising the last sentence of second bulleted item as follows:     Technical Clarification. The modes of Normal In the event of a failure of one path or plane in any, or all, of the    (CheckPlus), Maintenance and Fail are applied to the three LEFM flow meters that cannot be restored to full functionality       flow meters. See LAR Attachment 1 Section 3.3.4, p9, within 72 hours, power will be reduced to  4,010 MWt.                    2nd paragraph or Attachment 8 Section 2.0 28   3.5.4/p54 Suggest revising the last sentence of third bulleted item as follows: If Technical Clarification. The modes of Normal any of the three LEFM flow meters are in the Fail Mode, the power         (CheckPlus), Maintenance and Fail are applied to the level uncertainty reverts to the 2.0 percent associated with the venturi   flow meters. See LAR Attachment 1 Section 3.3.4, p9, flow meters and power will be reduced to  3,951 MWt within 72 hours      2nd paragraph or Attachment 8 Section 2.0.
26 3.5.4/p54 Suggest revising the last sentence of first bulleted item as follows:
if LEFM functionality cannot be restored.
"Per the LAR, the plant will be able to operate at up to 4016 MWt when all three LEFM flow meters are in CheckPlus mode."
Page 5 of 7 11/13/2017
Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
27 3.5.4/p54 Suggest revising the last sentence of second bulleted item as follows: "In the event of a failure of one path or plane in any, or all, of the three LEFM flow meters that cannot be restored to full functionality " Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0 28 3.5.4/p54 Suggest revising the last sentence of third bulleted item as follows:
  "If any of the three LEFM flow meters are in the Fail Mode, the power level uncertainty reverts to the 2.0 percent associated with the venturi if LEFM functionality cannot be restored."
Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.


PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 6 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 29 3.5.4/p54 Suggest revising the second sentence of the paragraph under bulleted items as follows: "These diagnostics can identify failure conditions that will cause the LEFM flow meters to switch from the CheckPlus mode to the Check (Maintenance) or Fail modes.
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
Document: PB EPU Draft SE 10/30/2017 Item     SE                                   Comment                                               Suggested Comment Resolution
30 3.5.4/p54 Suggest revising the fourth sentence of the paragraph under bulleted items as follows: The PMS provides a visual alarm upon change in the status of an LEFM flow meter on the operator overview visual display screen."
  #    Section 29   3.5.4/p54 Suggest revising the second sentence of the paragraph under bulleted     Technical Clarification. The modes of Normal items as follows: These diagnostics can identify failure conditions that (CheckPlus), Maintenance and Fail are applied to the will cause the LEFM flow meters to switch from the CheckPlus mode         flow meters. See LAR Attachment 1 Section 3.3.4, p9, to the Check (Maintenance) or Fail modes.                                2nd paragraph or Attachment 8 Section 2.0.
Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.
30   3.5.4/p54 Suggest revising the fourth sentence of the paragraph under bulleted     Technical Clarification. The modes of Normal items as follows: The PMS provides a visual alarm upon change in the      (CheckPlus), Maintenance and Fail are applied to the status of an LEFM flow meter on the operator overview visual             flow meters. See LAR Attachment 1 Section 3.3.4, p9, display screen.                                                          2nd paragraph or Attachment 8 Section 2.0.
31 3.5.4/p55 First paragraph under LEFM Inoperability (p55), last sentence, the "<" in front of 3951 MWt should be a "". Factually Incorrect. 3951 is the CLTP, see LAR Attachment 1 Section 1.0; also see SE p54 3 rd bullet (Fail Mode) 32 3.5.4/p55 In the table under LEFM Inoperability recommend changing the first heading by inserting "Flow Meter" between "LEFM" and "Operating" Technical Clarification. The modes of Normal (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0. Also see LAR Attachment 1 table on p12.
31               First paragraph under LEFM Inoperability (p55), last sentence, the <   Factually Incorrect. 3951 is the CLTP, see LAR 3.5.4/p55  in front of 3951 MWt should be a .                                    Attachment 1 Section 1.0; also see SE p54 3rd bullet (Fail Mode) 32   3.5.4/p55 In the table under LEFM Inoperability recommend changing the first       Technical Clarification. The modes of Normal heading by inserting Flow Meter between LEFM and Operating         (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0. Also see LAR Attachment 1 table on p12.
33 3.5.4/p55 In the table under LEFM Inoperability
33   3.5.4/p55 In the table under LEFM Inoperability, recommend replacing               Technical Clarification. See LAR Attachment 1 table on (Normal) with (All in Normal) under CheckPlus.                     p12 34   3.5.4/p55 In the table under LEFM Inoperability, recommend replacing               Technical Clarification. See LAR Attachment 1 table on Maintenance) with (One or More in Maintenance and None in             p12 Fail) 35   3.5.4/p55 In the table under LEFM Inoperability, recommend inserting [Any]       Technical Clarification. See LAR Attachment 1 Section under Fail                                                              3.3.4 LEFM Inoperability, last two sentences of third paragraph.
, recommend replacing "(Normal)" with "(All in Normal
36   3.5.4/p56 In sentence under Criterion 1 Conclusion, add concludes after NRC     Editorial staff 37   3.5.4/p.58 The explanation in the SE on p.58 for the remaining .02% difference       Technical Clarification. The SE should also state that between the 2002 LEFM uncertainty and the 2017 uncertainty is not         the largest contributor to the remaining 0.02%
)" under "CheckPlus".
complete.                                                                difference arises from a correction made to the application of a steam table enthalpy correlation uncertainty term as described in the response to EICB-RAI-1 in Supplement 2.
Technical Clarification. See LAR Attachment 1 table on p12 34 3.5.4/p55 In the table under LEFM Inoperability, recommend replacing "Maintenance)" with "(One or More in Maintenance and None in Fail)"  Technical Clarification. See LAR Attachment 1 table on p12 35 3.5.4/p55 In the table under LEFM Inoperability , recommend inserting "[Any]" under "Fail
38   3.6.1/p62 Second paragraph, third sentence. Suggest deleting only                 Editorial Page 6 of 7 11/13/2017
" Technical Clarification. See LAR Attachment 1 Section 3.3.4 LEFM Inoperability, last two sentences of third paragraph.
 
36 3.5.4/p56 In sentence under Criterion 1 Conclusion, add "concludes" after "NRC staff" Editorial 37 3.5.4/p.58 The explanation in the SE on p.58 for the remaining .02% difference between the 2002 LEFM uncertainty and the 2017 uncertainty is not complete.
PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.
Technical Clarification. The SE should also state that the largest contributor to the remaining 0.02%
Document: PB EPU Draft SE 10/30/2017 Item     SE                                     Comment                                           Suggested Comment Resolution
difference arises from a correction made to the application of a steam table enthalpy correlation uncertainty term as described in the response to EICB-RAI-1 in Supplement 2.
  #    Section 39     3.6.1/62 Third paragraph, fourth sentence, states: ...load values at maximum Factually Incorrect. See TSAR 6.1.1 p6-1, last bullet rated generator output are bounded by the projected load values at   and Supplement 2 Response to EEOB-RAI-2.
38 3.6.1/p62 Second paragraph, third sentence. Suggest deleting "only" Editorial PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENT S  A l l i n f o r m a t i o n c o n t a i n e d i n t h i s d o c u m e n t i s N o n-P r o p r i e t a r y. Document: PB EPU Draft SE 1 0/3 0/2017  Page 7 of 7 11/13/2017 Item # SE Section Comment Suggested Comment Resolution 39 3.6.1/62 Third paragraph, fourth sentence, states: "...load values at maximum rated generator output are bounded by the projected load values at TPO...The clauses are reversed. It should state: "...load values at maximum rated generator output bound the projected load values at TPO..." Factually Incorrect. See TSAR 6.1.1 p6
TPO... The clauses are reversed. It should state: ...load values at maximum rated generator output bound the projected load values at TPO...
-1, last bullet and Supplement 2 Response to EEOB
40     3.6.4/ p SE Section 3.6.4, 2nd paragraph states that PBAPS has a safety-       Technical Clarification. UFSAR Sections 1.6.3.3 and 65    related emergency heat sink facility. The Emergency Heat Sink,       10.24.3 however, is actually classified as a special safety system (UFSAR   Suggest revising sentence as follows: The normal heat 1.6.3.3) and seismic Class I structure (UFSAR 10.24.3).               sink for PBAPS is the Conowingo Pond. When the Conowingo Pond is not available, cooling water to the ESW and HPSW systems is provided from an emergency sink which is a special safety system and a seismic Class I structure.
-RAI-2. 40 3.6.4/ p 65 SE Section 3.6.4
41   3.9.2/p72 In fourth paragraph, UFSAR Table 14.9-7 should be UFSAR Table     Editorial 14.9.7 (i.e. dash should be a point) 42   3.9.3/ p77 SE 3.9.3 2nd paragraph on p77 states the licensee stated in         Editorial. TSAR Figure 1-1a supplement dated August 8, 2017, that limiting ATWS events for peak vessel bottom pressure, ATWS PCT, and ATWSI PCT, are all performed at the same statepoint corresponding to point J for MELLLA+ and point J for TPO on TSAR Figure 1-1a, Power/Flow Map for TPO.
, 2nd paragraph states that PBAPS has a safety
The MELLLA+ point is J (i.e. J prime). Suggest revising as follows:
-related emergency heat sink facility.
are all performed at the same statepoint corresponding to point J for MELLLA+ and point J for TPO on TSAR Figure 1-1a, Power/Flow Map for TPO.
The Emergency Heat Sink, however, is actually classified as a "special safety system" (UFSAR 1.6.3.3) and seismic Class I structure (UFSAR 10.24.3).
43   3.10.5/p8 First paragraph under Operator Actions, last sentence - that that   Editorial 6    should be than that.
Technical Clarification. UFSAR Sections 1.6.3.3 and 10.24.3  Suggest revising sentence as follows: "The normal heat sink for PBAPS is the Conowingo Pond. When the Conowingo Pond is not available, cooling water to the ESW and HPSW systems is provided from an emergency sink which is a special safety system and a seismic Class I structure.
44   END Page 7 of 7 11/13/2017}}
41 3.9.2/p72 In fourth paragraph, "UFSAR Table 14.9-7" should be "UFSAR Table 14.9.7" (i.e. dash should be a point)
Editorial  42 3.9.3/ p77 SE 3.9.3 2 nd paragraph on p77 states "-the licensee stated in supplement dated August 8, 2017, that limiting ATWS events for peak vessel bottom pressure, ATWS PCT, and ATWSI PCT, are all performed at the same statepoint corresponding to point J for MELLLA+ and point J for TPO on TSAR Figure 1
-1a, "Power/Flow Map for TPO.""
The MELLLA+ point is J' (i.e. J prime)
. Suggest revising as follows: "-are all performed at the same statepoint corresponding to point J' for MELLLA+ and point J for TPO on TSAR Figure 1
-1a, "Power/Flow Map for TPO."
Editorial. TSAR Figure 1
-1a 43 3.10.5/p8 6 First paragraph under Operator Actions, last sentence  
- "that that" should be "than that".
Editorial 44 END}}

Latest revision as of 02:56, 4 February 2020

Comments on Draft SE Regarding Mur Uprate Amendment
ML17319A683
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/13/2017
From: Deborah Neff
Exelon Nuclear
To: Richard Ennis
Plant Licensing Branch 1
Ennis R, NRR/DORL/LPL1, 415-1420
References
EPID L-2017-LLS-0001
Download: ML17319A683 (8)


Text

From: Neff, David B:(GenCo-Nuc)

To: Ennis, Rick Cc: Helker, David P:(GenCo-Nuc)

Subject:

[External_Sender] PB MUR Draft Safety Evaluation Comments Date: Monday, November 13, 2017 2:48:58 PM Attachments: PB MUR SER Draft Comments for NRC FINAL 111317.pdf As requested in your letter dated 10/30/17 (ML17289A324), attached are Exelons comments on the Draft Safety Evaluation for the PBAPS MUR Uprate Amendment. The is no proprietary information contained in this response. The vendors who submitted proprietary information contained in the original LAR have concluded that no additional information in the draft SE needs to be marked as proprietary. Comment 12 corrects the proprietary makers in Section 3.3.2 by reducing the text to be withheld. Comment 14 identifies a need to correct information contained within the proprietary markers in the table in Section 3.3.3 based on Attachment 10 of the original LAR. There were no significant errors identified which would require additional technical review.

Please let me know if you have additional questions.

Thank you, Dave This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies. Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -

EXCIP

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 1 1.1/p3 First sentence of last paragraph of this section should be revised to Technical Clarification.

state: a differential pressure for a venturi is proportional to the square of the FW velocity in the pipe.

2 1.2/p3 Second sentence of first paragraph should be revised to state that the Factually Incorrect. See LAR Attachment 1 Section 1.0 LEFM system was installed in U2 in 2002. p2 3 2.1.2/p13 Third paragraph, second sentence should be burnable poison vice Editorial bundle poison 4 3.1/p10 Bullet for TSAR Section 11.0 incorrectly includes TSAR Section 12.0 Editorial. Delete TSAR Section 12.0 from last bullet.

5 3.2.4/p17 5th paragraph: The paragraph should be clarified since the term Technical Clarification. See TSAR 2.4.1 SLMCPR protection confirmation, is not used in the TSAR.

Suggested wording:

The plant-specific application demonstrates that the analyses and evaluations supporting DSS-CD are applicable to the fuel loaded in the core and the new operating power domain. TPO may also affect the SLMCPR protection confirmation slightly. The SLMCPR protection calculation is dependent upon the core and fuel design and The DSS-CD confirmation checklist based on the demonstrated applicability extension for TPO is used to demonstrate applicability performed for each reload. These features will be analyzed for the first reload analysis that incorporates the new rated power level.

6 3.3.1/p20 1st paragraph, 2nd sentence states: Editorial. Suggest revise sentence as follow:

As discussed in TSAR Section 5.2.1, the As discussed in TSAR Section 3.1, the licensee stated that the licensee stated that the steam flow associated steam flow associated with the TPO uprate can be regulated with the TPO uprate can be regulated adequately adequately by adjusting the turbine control valve (TCV) by adjusting the turbine control valve (TCV) position; position; This discussion is not explicitly discussed in Section 3.1 of the TSAR.

A more appropriate reference is TSAR Section 5.2.1.

Page 1 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 7 3.3.1/, First sentence of 2nd paragraph states: Evaluations and analyses for Technical Clarification. See TSAR 3.1 p3-1 4th bullet p.20 PBAPS were performed (emphasis added) at 102 percent of CLTP to demonstrate that the reactor vessel conformed to ASME and plant TS requirements. Current ASME analysis, however, is performed at 100% CLTP with 2% power uncertainty consideration. TSAR therefore states that the current ASME overpressure analysis accounts for 102% of CLTP. Suggest revise sentence as follows:

Evaluations and analyses for PBAPS account for 102 percent of CLTP and plant TS requirements.

8 3.3.2/p27 In the 2nd paragraph on the page, the 1st sentence states: Factually Incorrect. See TSAR 3.2.1 (c) and Tables 3-4a and 3-4b The current licensing basis 32 EFPY and 54 EFPY P-T limits for PBAPS, Units 2 and 3, were calculated based on the licensees Recommend re-writing the sentence as:

plant-specific application of the methodology documented in Topical Report NEDO-33178-A. The current licensing basis 54 EFPY P-T limits for PBAPS, Units 2 and 3 were calculated based The 32 EFPY is not current licensing basis. The data (from on the licensees plant-specific application of the BWRVIP05) for 32 EFPY in TSAR Tables 3-4a and 3-4b are methodology documented in Topical Report provided as bounding value goals for the 54 EFPY plant-specific NEDO-33178-A.

evaluation.

9 3.3.2/p28 Second to last line should be revised as follows: including locations Editorial where they intersect 10 3.3.2/p30 In the subsection RPV Structural Evaluation, the 1st paragraph, last Technical Clarification. See TSAR Section 3.2.2.3 sentence states, in part: and Table 3-5 the shroud support attachment to the RPV component is within the allowable limits for acoustic loads and is, therefore, structurally qualified Suggest this phrase be clarified as follows:

the shroud support attachment to the RPV component is within the allowable stress and fatigue limits, including acoustic loads, and is therefore structurally qualified 11 3.3.2/p30 In the subsection RPV Structural Evaluation, 2nd paragraph, 3rd line, Editorial.

change 1,02 to 1.02 (i.e., change comma to point).

Page 2 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 12 3.3.2/p30 In the subsection RPV Structural Evaluation, 2nd paragraph, 2nd Proprietary Marking Correction. The proprietary sentence: the phrase the proposed TPO power level of 4016 MWt marking can end before the proposed, such that the is not marked as GEH proprietary information in the TSAR. TSAR phrase the proposed TPO power level of 4016 MWt is Section 3.2.2 states outside of proprieary markings: the actual TPO public.

operating power level of 4,016 MWt.

Note that this comment is written in such a way as to avoid stating proprietary information.

13 3.3.3/p31 The last sentence of the 1st paragraph under Steam Separator and Technical Clarification. See MELLLA+ Safety Dryer Performance states that a moisture content of 0.10 weight Evaluation p51 1st paragraph.

percent is the current licensing basis at TPO conditions. As discussed in the MELLLA+ Safety Evaluation Report (Reference 6 Attachment 1 of the MUR LAR), Section 3.2.8, 0.10 weight percent is actually the design basis value while 0.30 weight percent is the licensing basis value used for the bounding analysis for EPU which bounds MELLLA+ and MUR conditions. Suggest revising sentence as follows:

The results of the evaluation demonstrated that the steam separator/dryer performance will be acceptable because the moisture content will remain less than or equal to the design basis value of 0.10 weight percent at TPO conditions.

14 3.3.3./p32 U3 Dryer component labels do not agree with label in LAR Attachment Factually Incorrect. Proprietary Information Correction 10 Table 3-2 on page 19 WEC Proprietary information 15 3.3.4./p32 2nd paragraph in section states: Editorial. Add NRC designated to the sentence:

The vibration levels for the TPO conditions were estimated The vibration levels for the TPO conditions were from measured vibration data during startup tests on the estimated from measured vibration data during prototype plant, Browns Ferry Nuclear Plant, Unit 1. startup tests on the NRC designated prototype plant, Browns Ferry Unit 1.

The GEH TSAR says: NRC designated prototype plant, Browns Ferry..

16 3.3.4/p33 In the 2nd full paragraph on the page, 2nd sentence, change RPV top Editorial head nozzle to RPV top head nozzles (i.e., there is more than one nozzle).

Page 3 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 17 3.3.4/p33 In the 2nd to last paragraph, last sentence, consider adding based on Editorial ASME Appendix N criteria after analytical evaluations. Suggest revise as follows:

The licensee stated that analytical evaluations based on ASME Appendix N criteria have shown that the safety-related piping components and thermowells in the MS, FW, and RRS piping are structurally adequate for TPO conditions.

18 3.3.5/35 Erosion/Corrosion second paragraph states: Editorial The licensee stated that the CHECWORKSTM SFA 3.0 model is used to calculate potential wall thinning of components susceptible to FAC.

Suggest revise as follows as per TSAR 3.5.1 Erosion/Corrosion p3-12:

The licensee stated that the CHECWORKSTM SFA 3.0 predictive modeling program is used to calculate potential wall thinning of components susceptible to FAC.

19 3.3.5/p36 Third to last paragraph first sentence should be revised as follows: Editorial MELLA+ should be MELLLA+

20 3.4.2/p44 Last line of second paragraph in 3.4.2 should be revised as follows: Editorial Each of these systems is described below 21 3.4.2/ p SE Section 3.4.2 TSAR Section 4.2.5.1, top of p48, states that Factually Incorrect. See TSAR 4.2.5.1 48 ECCS pumps suction strainer debris loading occurs during LOCAs and not during special events. However, the ATWS special events and the small steam line break also include ECCS suction strainer loading in NPSH calculations. Suggest revise first sentence as follows:

The ECCS pumps suction strainer debris loading occurs during LOCAs, the small steam line break, and during the ATWS special event.

Page 4 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 22 3.4.3/ p. SE states in second paragraph, 1st sentence: The PBAPS LOCA Factually Incorrect. See MUR LAR Supplement 5 48 analyses resulted in a licensing basis peak cladding temperature Reload 21 Revision 0 Table 16.1-1 (PCT) of less than 1925 °F for GNF2 fuel.

This was the EPU PCT (see EPU LAR Table 2.8-6). The M+ PCT is 1920 °F. Suggest revise as follows:

The PBAPS LOCA analyses resulted in a licensing basis peak cladding temperature (PCT) of less than 1920 °F for GNF2 fuel.

23 3.4.6/p49 First line of section 3.4.6, should reference TSAR Section 4.6 not Editorial 3.4.6.

24 3.5.2/p52 Suggest clarifying the wording in second sentence of TSAR Section Technical Clarification. Suggest using the information 5.2.1 - Pressure Control System regarding the use of the TBVs in from the UFSAR 11.1 description of the TBVs and pressure control. revise 2nd sentence as follows:: The PCS controls reactor pressure by modulating turbine control valve position and through use of the turbine bypass system when discharge of excess steam directly to the condenser is required.

25 3.5.4/p53 Sixth paragraph, last sentence, replace The Cameron LEFM system Technical Clarification. The modes of Normal has... with The Cameron LEFM flow meters have two operating (CheckPlus), Maintenance and Fail are applied to the modes (Normal and Maintenance) and a Fail mode as follows: flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.

26 3.5.4/p54 Suggest revising the last sentence of first bulleted item as follows: Per Technical Clarification. The modes of Normal the LAR, the plant will be able to operate at up to 4016 MWt when all (CheckPlus), Maintenance and Fail are applied to the three LEFM flow meters are in CheckPlus mode. flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0.

27 3.5.4/p54 Suggest revising the last sentence of second bulleted item as follows: Technical Clarification. The modes of Normal In the event of a failure of one path or plane in any, or all, of the (CheckPlus), Maintenance and Fail are applied to the three LEFM flow meters that cannot be restored to full functionality flow meters. See LAR Attachment 1 Section 3.3.4, p9, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, power will be reduced to 4,010 MWt. 2nd paragraph or Attachment 8 Section 2.0 28 3.5.4/p54 Suggest revising the last sentence of third bulleted item as follows: If Technical Clarification. The modes of Normal any of the three LEFM flow meters are in the Fail Mode, the power (CheckPlus), Maintenance and Fail are applied to the level uncertainty reverts to the 2.0 percent associated with the venturi flow meters. See LAR Attachment 1 Section 3.3.4, p9, flow meters and power will be reduced to 3,951 MWt within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 2nd paragraph or Attachment 8 Section 2.0.

if LEFM functionality cannot be restored.

Page 5 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 29 3.5.4/p54 Suggest revising the second sentence of the paragraph under bulleted Technical Clarification. The modes of Normal items as follows: These diagnostics can identify failure conditions that (CheckPlus), Maintenance and Fail are applied to the will cause the LEFM flow meters to switch from the CheckPlus mode flow meters. See LAR Attachment 1 Section 3.3.4, p9, to the Check (Maintenance) or Fail modes. 2nd paragraph or Attachment 8 Section 2.0.

30 3.5.4/p54 Suggest revising the fourth sentence of the paragraph under bulleted Technical Clarification. The modes of Normal items as follows: The PMS provides a visual alarm upon change in the (CheckPlus), Maintenance and Fail are applied to the status of an LEFM flow meter on the operator overview visual flow meters. See LAR Attachment 1 Section 3.3.4, p9, display screen. 2nd paragraph or Attachment 8 Section 2.0.

31 First paragraph under LEFM Inoperability (p55), last sentence, the < Factually Incorrect. 3951 is the CLTP, see LAR 3.5.4/p55 in front of 3951 MWt should be a . Attachment 1 Section 1.0; also see SE p54 3rd bullet (Fail Mode) 32 3.5.4/p55 In the table under LEFM Inoperability recommend changing the first Technical Clarification. The modes of Normal heading by inserting Flow Meter between LEFM and Operating (CheckPlus), Maintenance and Fail are applied to the flow meters. See LAR Attachment 1 Section 3.3.4, p9, 2nd paragraph or Attachment 8 Section 2.0. Also see LAR Attachment 1 table on p12.

33 3.5.4/p55 In the table under LEFM Inoperability, recommend replacing Technical Clarification. See LAR Attachment 1 table on (Normal) with (All in Normal) under CheckPlus. p12 34 3.5.4/p55 In the table under LEFM Inoperability, recommend replacing Technical Clarification. See LAR Attachment 1 table on Maintenance) with (One or More in Maintenance and None in p12 Fail) 35 3.5.4/p55 In the table under LEFM Inoperability, recommend inserting [Any] Technical Clarification. See LAR Attachment 1 Section under Fail 3.3.4 LEFM Inoperability, last two sentences of third paragraph.

36 3.5.4/p56 In sentence under Criterion 1 Conclusion, add concludes after NRC Editorial staff 37 3.5.4/p.58 The explanation in the SE on p.58 for the remaining .02% difference Technical Clarification. The SE should also state that between the 2002 LEFM uncertainty and the 2017 uncertainty is not the largest contributor to the remaining 0.02%

complete. difference arises from a correction made to the application of a steam table enthalpy correlation uncertainty term as described in the response to EICB-RAI-1 in Supplement 2.

38 3.6.1/p62 Second paragraph, third sentence. Suggest deleting only Editorial Page 6 of 7 11/13/2017

PEACH BOTTOM MUR NRC DRAFT SAFETY EVALUTION COMMENTS All information contained in this document is Non-Proprietary.

Document: PB EPU Draft SE 10/30/2017 Item SE Comment Suggested Comment Resolution

  1. Section 39 3.6.1/62 Third paragraph, fourth sentence, states: ...load values at maximum Factually Incorrect. See TSAR 6.1.1 p6-1, last bullet rated generator output are bounded by the projected load values at and Supplement 2 Response to EEOB-RAI-2.

TPO... The clauses are reversed. It should state: ...load values at maximum rated generator output bound the projected load values at TPO...

40 3.6.4/ p SE Section 3.6.4, 2nd paragraph states that PBAPS has a safety- Technical Clarification. UFSAR Sections 1.6.3.3 and 65 related emergency heat sink facility. The Emergency Heat Sink, 10.24.3 however, is actually classified as a special safety system (UFSAR Suggest revising sentence as follows: The normal heat 1.6.3.3) and seismic Class I structure (UFSAR 10.24.3). sink for PBAPS is the Conowingo Pond. When the Conowingo Pond is not available, cooling water to the ESW and HPSW systems is provided from an emergency sink which is a special safety system and a seismic Class I structure.

41 3.9.2/p72 In fourth paragraph, UFSAR Table 14.9-7 should be UFSAR Table Editorial 14.9.7 (i.e. dash should be a point) 42 3.9.3/ p77 SE 3.9.3 2nd paragraph on p77 states the licensee stated in Editorial. TSAR Figure 1-1a supplement dated August 8, 2017, that limiting ATWS events for peak vessel bottom pressure, ATWS PCT, and ATWSI PCT, are all performed at the same statepoint corresponding to point J for MELLLA+ and point J for TPO on TSAR Figure 1-1a, Power/Flow Map for TPO.

The MELLLA+ point is J (i.e. J prime). Suggest revising as follows:

are all performed at the same statepoint corresponding to point J for MELLLA+ and point J for TPO on TSAR Figure 1-1a, Power/Flow Map for TPO.

43 3.10.5/p8 First paragraph under Operator Actions, last sentence - that that Editorial 6 should be than that.

44 END Page 7 of 7 11/13/2017