ML17341A390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:REGULATOR.
{{#Wiki_filter:REGULATOR. lNFORMATION DISTRIBUTION       S   I'EH (RIDS)
lNFORMATION DISTRIBUTION S I'EH (RIDS)ACCESSION NBR:8107310148 DOC~DATE: 81/07/23 NOTARIZED:
ACCESSION NBR:8107310148               DOC ~ DATE: 81/07/23     NOTARIZED: YES         'OCKET       ¹ FACIL:50-250 Turkey Point Planti Unit 3i Florida Power and Light                         C 05000250 50 251 Turkey Point Planti Unit 4i Florida Power and Lignt BYNAME                                                                            C 0 AUTH                     AUTHOR   AFFILIATION UHRI Gi R ~ E,           Florida Power 8 Light Co, REC IP ~ ''IlAME         REC IPIEN i'FFILIATION EISENHUT'PD.G,           Division of l.icensing
YES'OCKET¹FACIL:50-250 Turkey Point Planti Unit 3i Florida Power and Light C 05000250 50 251 Turkey Point Planti Unit 4i Florida Power and Lignt C 0 AUTH BYNAME AUTHOR AFFILIATION UHRI Gi R~E, Florida Power 8 Light Co, REC IP~''IlAME REC IPIEN i'FFILIATION EISENHUT'PD.G, Division of l.icensing


==SUBJECT:==
==SUBJECT:==
Apolication for amend to Apo A of Licenses DPR 31 8 DPR 40i allowing up to 36 assemolies of Unit.3 Region 10 fuel to oe removed from Unit 3 spent fuel oit after decay period of 95 aaysiinstead of required 120 days.Fee encl.DISTRIS'JTIOR CODE: JIOO IS COPIES RECEIVED:LTR g ENCL J SIZE: g2 TITLE: General Distribution for after Issuance of Operating License NOTES: g 6fgCg$1900 RECIPIENT ID CODE/NAHE ACTION: ORB&#xb9;1 BC 04 INTERNAL: D/DIRiHUH FAC08 IaE 06 OELD 11 RAD ASHT BR COPIES LTTR ENCL 13 13 1 2 2 1 0 1 1 RECIPIENT ID CODE/NAME DIRI DIV OF LIC NRC PDR 02 0 BR 10 REG F 01 COPIES LTTR ENCL 1 1 1 1 0 EXTERNAL: ACRS NSIC 09 05 16 16 1 1 I PDR NTIS 03 1 1 1 TOTAL NUHBE<OF COPIES REQUlRE,D:
Apolication for amend to Apo A of Licenses DPR 31 8 DPR 40i allowing up to 36 assemolies of Unit. 3 Region 10 fuel to oe removed from Unit 3 spent fuel oit after decay period of 95 aaysiinstead of required 120 days.Fee encl.
LTTR (41 ENCL 39 4
DISTRIS'JTIOR CODE:       JIOO IS   COPIES RECEIVED:LTR       g ENCL     J     SIZE: g2 TITLE: General       Distribution for after Issuance of Operating License NOTES:     g 6fgCg           $ 1900 RECIPIENT           COPIES            RECIPIENT              COPIES ID CODE/NAHE         LTTR ENCL        ID CODE/NAME            LTTR ENCL ACTION:         ORB &#xb9;1 BC     04     13    13 INTERNAL: D/DIRiHUH FAC08                       1     DIRI DIV   OF LIC                 1 IaE            06        2    2    NRC PDR           02       1    1 OELD            11      1    0     0            BR   10       1    0 RAD ASHT BR              1    1    REG   F           01 EXTERNAL: ACRS                   09       16   16     I PDR             03       1     1 NSIC            05        1    1    NTIS                              1 TOTAL NUHBE< OF COPIES           REQUlRE,D: LTTR (   41   ENCL     39
'.BOX 529100 i%1IAiVI, F L 33 I 52 i Office of Nuclear Reactor Regulation Attention:
Mr.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555


==Dear Mr.Ei senhut:==
4 i  BOX 529100 i%1IAiVI,F L 33 I 52 FLORIOA POWER  Ei LIGHT COMPANY July 23,    1981 L-81-313 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Re: Turkey Point Units 3 8 4 Docket No.50-250 5 50-251 Proposed License Amendment Fuel Assembl Decay Period FLORIOA POWER Ei LIGHT COMPANY July 23, 1981 L-81-313~~<5.<h'UL 3O 8@QW~gspH In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.This amendment is submitted to allow up to 36 assemblies of the Unit 3 Region 10 fuel to be removed from the Unit 3 spent fuel pit after a decay period of 95 days instead of the presently required period of 120 days.These assemblies were in a critical reactor at very low power for only approximately 6?1/2 hours between April 19, 1981 and April 24, 1981 and are to be transferred to the Unit 4 spent fuel pit.The proposed amendment is described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.3.2-A footnote changing the decay period for Unit 3 from 120 days to 95 days is added.We have determined that this is a Class I and Class III request in accordance with 10 CFR 170.A check for$4,400 is enclosed.The proposed amendment has been reviewed by the Turkey Point P'lant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review 8oard.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8, Technology REU/PLP/ras cc: Mr.J.P.O'Reilly, Region II Harold F.Rei s, Esquire 8107310148 810723 PDR ADOCK 05000250 P PDR STATE OF FLORIDA))COUNTY OF DADE)ss Robert E.Uhrig, being first duly sworn, deposes and says: That he is a Vice President of Florida Power 6 Light Company, the Licensee herein.That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.Robert E.Unr1g Subscribed and sworn to before me this day of 19 J/NOTARY PUBLXC in and for the county of Dade, State of Florida Not ry Pc'bric.State of F~dda at Large fb,"y Cor,.m'."ion Ev'is~Octet:er 30, 1983 Np COmmiSSiOn Qxpi reS: Bond~tftra Shayn rd Bor.d:rg rtgcr'cy}}
                                                                      ~~<5.<h
 
==Dear Mr. Ei senhut:==
 
3O 8@
                                                                                                'UL Re:   Turkey Point Units 3 8 4                                       QW  ~gspH Docket No. 50-250 5 50-251 Proposed License Amendment Fuel Assembl     Decay Period In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.
This amendment is submitted to allow up to 36 assemblies of the Unit 3 Region 10 fuel to be removed from the Unit 3 spent fuel pit after a decay period of 95 days instead of the presently required period of 120 days. These assemblies were in a critical reactor at very low power for only approximately 6? 1/2 hours between April 19, 1981 and April 24, 1981 and are to be transferred to the Unit 4 spent fuel pit.
The proposed   amendment is described below and shown on   the accompanying Technical Specification     pages bearing the date of this letter in the lower right hand corner.
: 3. 2-A footnote changing the decay period for Unit     3 from 120 days to 95 days       is   added.
We have determined     that this is a Class I and Class III request   in accordance with 10 CFR 170. A   check for $ 4,400 is enclosed.
The proposed amendment has been reviewed by the Turkey Point P'lant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review 8oard.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems     8, Technology REU/PLP/ras cc:   Mr. J. P. O'Reilly, Region II Harold F. Rei s, Esquire 8107310148 810723 PDR ADOCK   05000250 P                   PDR
 
STATE OF FLORIDA     )
                      )           ss COUNTY OF DADE       )
Robert E. Uhrig, being first duly sworn, deposes and says:
That he is a Vice President of Florida Power 6 Light Company, the Licensee herein.
That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
Robert E. Unr1g Subscribed and sworn to before               me   this day of                                                   19 J/
NOTARY PUBLXC   in and for the county of                     Dade, State of Florida Not ry Pc'bric. State of F~dda at Large fb,"y Cor,.m'. "ion Ev'is~ Octet:er 30, 1983 Np COmmiSSiOn Qxpi reS:   Bond~ tftra Shayn rd Bor.d:rg rtgcr'cy}}

Latest revision as of 23:57, 3 February 2020

Application for Amend to App a of Licenses DPR-31 & DPR-40, Allowing Up to 36 Assemblies of Unit 3 Region 10 Fuel to Be Removed from Unit 3 Spent Fuel Pit After Decay Period of 95 Days,Instead of Required 120 Days.Fee Encl
ML17341A390
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/23/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17341A391 List:
References
L-81-313, NUDOCS 8107310148
Download: ML17341A390 (4)


Text

REGULATOR. lNFORMATION DISTRIBUTION S I'EH (RIDS)

ACCESSION NBR:8107310148 DOC ~ DATE: 81/07/23 NOTARIZED: YES 'OCKET ¹ FACIL:50-250 Turkey Point Planti Unit 3i Florida Power and Light C 05000250 50 251 Turkey Point Planti Unit 4i Florida Power and Lignt BYNAME C 0 AUTH AUTHOR AFFILIATION UHRI Gi R ~ E, Florida Power 8 Light Co, REC IP ~ IlAME REC IPIEN i'FFILIATION EISENHUT'PD.G, Division of l.icensing

SUBJECT:

Apolication for amend to Apo A of Licenses DPR 31 8 DPR 40i allowing up to 36 assemolies of Unit. 3 Region 10 fuel to oe removed from Unit 3 spent fuel oit after decay period of 95 aaysiinstead of required 120 days.Fee encl.

DISTRIS'JTIOR CODE: JIOO IS COPIES RECEIVED:LTR g ENCL J SIZE: g2 TITLE: General Distribution for after Issuance of Operating License NOTES: g 6fgCg $ 1900 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAHE LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: ORB ¹1 BC 04 13 13 INTERNAL: D/DIRiHUH FAC08 1 DIRI DIV OF LIC 1 IaE 06 2 2 NRC PDR 02 1 1 OELD 11 1 0 0 BR 10 1 0 RAD ASHT BR 1 1 REG F 01 EXTERNAL: ACRS 09 16 16 I PDR 03 1 1 NSIC 05 1 1 NTIS 1 TOTAL NUHBE< OF COPIES REQUlRE,D: LTTR ( 41 ENCL 39

4 i BOX 529100 i%1IAiVI,F L 33 I 52 FLORIOA POWER Ei LIGHT COMPANY July 23, 1981 L-81-313 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

~~<5.<h

Dear Mr. Ei senhut:

3O 8@

'UL Re: Turkey Point Units 3 8 4 QW ~gspH Docket No. 50-250 5 50-251 Proposed License Amendment Fuel Assembl Decay Period In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.

This amendment is submitted to allow up to 36 assemblies of the Unit 3 Region 10 fuel to be removed from the Unit 3 spent fuel pit after a decay period of 95 days instead of the presently required period of 120 days. These assemblies were in a critical reactor at very low power for only approximately 6? 1/2 hours between April 19, 1981 and April 24, 1981 and are to be transferred to the Unit 4 spent fuel pit.

The proposed amendment is described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.

3. 2-A footnote changing the decay period for Unit 3 from 120 days to 95 days is added.

We have determined that this is a Class I and Class III request in accordance with 10 CFR 170. A check for $ 4,400 is enclosed.

The proposed amendment has been reviewed by the Turkey Point P'lant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review 8oard.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8, Technology REU/PLP/ras cc: Mr. J. P. O'Reilly, Region II Harold F. Rei s, Esquire 8107310148 810723 PDR ADOCK 05000250 P PDR

STATE OF FLORIDA )

) ss COUNTY OF DADE )

Robert E. Uhrig, being first duly sworn, deposes and says:

That he is a Vice President of Florida Power 6 Light Company, the Licensee herein.

That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Unr1g Subscribed and sworn to before me this day of 19 J/

NOTARY PUBLXC in and for the county of Dade, State of Florida Not ry Pc'bric. State of F~dda at Large fb,"y Cor,.m'. "ion Ev'is~ Octet:er 30, 1983 Np COmmiSSiOn Qxpi reS: Bond~ tftra Shayn rd Bor.d:rg rtgcr'cy