Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17355A3901999-07-27027 July 1999 Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3021999-04-26026 April 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2471999-03-0808 March 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Certain Requirements from TS Section 6.0 That Are Adequately Controlled by Existing Regulations Other than 10CFR50.36 & TS ML17355A2391999-02-24024 February 1999 Application for Amends to Licenses DPR-31 & DPR-41,removing Restrictions on Location at Which Temp of UHS May Be Monitored in TS 3/4.7.4 ML17354B1621998-10-27027 October 1998 Application for Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi- Discipline Supervisor Position Into TS ML17354A8321998-03-12012 March 1998 Application for Amends to Licenses DPR-31 & DPR-41,deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7601998-01-0909 January 1998 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 5.3.1 & 6.9.1.7 to Allow Implementation of Zirlo Fuel Rod Cladding ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17354A6141997-08-27027 August 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4201997-02-24024 February 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs 6.9.1.7, COLR & Adding Best Estimate Large Break Loss of Coolant Accident Analysis to COLR ML17354A3721996-12-17017 December 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3501996-11-22022 November 1996 Application for Amends to Licenses DPR-31 & DPR-41, Requesting Rev to Allow Unit 3 Diesel Fuel Oil Storage Tank to Be Drained,Inspected & Cleaned While Maintaining at Least One Unit 3 Diesel Operable ML17354A2851996-10-0303 October 1996 Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7971996-07-17017 July 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7091996-05-28028 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Section 6.0, Administrative Controls, IAW 10CFR50.90 to Address Licensed Qualifications of Operations Manager ML17353A6881996-05-10010 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6501996-04-23023 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 7.4 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation. ML17353A6561996-04-19019 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6151996-03-21021 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6061996-03-20020 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.5.1 to Remove SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels from Ts,Per Line-Item 7.4 from GL 93-05 ML17353A5981996-03-0505 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 4.4.3.3 & 4.5.2 to Reduce Frequency of Surveillances & Insps in Accordance W/Gl 93-05 Items,6.6 & 7.5 ML17353A5011995-12-18018 December 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising Definition of RTP from 2,200 Mwt to 2,300 Mwt.Proprietary TR WCAP-13719,Rev 2 & Nonproprietary TRs WCAP-13718,Rev 2 & WCAP-14276,Rev 1 Encl.Proprietary TR WCAP-13719 Withheld ML17353A4521995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Index to Delete Bases Re Administrative Controls & Reviews ML17353A4491995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs w/Line-Item 10.1 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation, Per GL 94-01 ML17353A3951995-10-0404 October 1995 Application for Amend to License DPR-31 & DPR-41,modifying Plant TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/ Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3811995-09-28028 September 1995 Application for Amends to Licenses DPR-31 & DPR-41, Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3511995-09-11011 September 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 ML17353A2811995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation. ML17353A2771995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 ML17353A2741995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2711995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2681995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.1.3.1, Movable Control Assemblies - Group Height & 3/4.1.3.2, Position Indication Sys - Operating & Asociated Bases ML17353A2651995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Table 4.3-1 Re Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17352B1821995-05-23023 May 1995 Application for Amends to Licenses DPR-31 & DPR-41.Amends Would Use Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation Setpoints ML17352B0851995-03-30030 March 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot- Start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17352A8361994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3.9.4 & 1.9,allowing Containment Personnel Airlock Doors to Be Opened During Core Operations & Movement of Irradiated Fuel in Containment ML17352A8291994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.4.9.1 to Remove Schedule for Withdrawal of Rv Matl Surveillance Specimens,Gl 91-01 ML17352A7221994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3.1.3.6, Reactivity Control Sys CR Insertion Limits, 3/4.2.2, Heat Flux Hot Channel Factor - Fq(Z) & 6.9.1.7, COLR & Associated Bases,Per GL 88-16.COLRs Encl ML17352A7301994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.7.1 & Associated Bases Which Address Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML17352A7271994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.8.1.1.2e & 4.8.1.1.2f Re EDG Fuel Oil Testing Program ML17352A5451994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.0.5a, Applicability - Srs, to Reflect Intent of Revised STS (NUREG-1431) for ISI & Testing Programs,In Accordance W/Recommendations in Draft NUREG-1482 ML17352A5421994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.6.2.1.d, CSS Surveillance Interval for Air or Smoke Flow Test Through CS Header from at Least Once Per 5 Yrs to at Least Once Per 10 Yrs,Per GL 93-05 & NUREG-1366 ML17352A4611994-02-18018 February 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.5.2.8, Audits by Deleting Frequencies Performed Under Cognizance of Nuclear Review Board,Per GL 93-07 ML17352A4351993-12-28028 December 1993 Application for Amends to Licenses DPR-31 & DPR-41,proposing Addition of SG Water Level - high-high Protection to TS Tables 3.3-2,3.3-3,4.3-2 & Associated Bases,In Accordance W/ Commitment to GL 89-19 for Resolution of USI A-47 ML17352A2621993-10-0404 October 1993 Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0 ML17352A2201993-09-0303 September 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3/4.7.1.6, Standby FW Sys & Associated Bases to Eliminate Cranking DGs ML17352A2011993-08-17017 August 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising License Conditions 3.G & 3.F Respectively,To Conform to Std Fire Protection License Proposed as Stated in GL 86-10 ML17352A1061993-07-20020 July 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Definitions to Ensure Consistency W/New 10CFR20 Requirements & Changing Radiological Effluent Release Rept Frequency ML17349A8771993-05-21021 May 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 5.2.2, Design Pressure & Temp & Associated Bases to Correct Ref to Max Containment Design Internal Pressure from 59 Psig to 55 Psig 1999-07-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17355A3901999-07-27027 July 1999 Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3021999-04-26026 April 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2471999-03-0808 March 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Certain Requirements from TS Section 6.0 That Are Adequately Controlled by Existing Regulations Other than 10CFR50.36 & TS ML17355A2391999-02-24024 February 1999 Application for Amends to Licenses DPR-31 & DPR-41,removing Restrictions on Location at Which Temp of UHS May Be Monitored in TS 3/4.7.4 ML17354B1621998-10-27027 October 1998 Application for Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi- Discipline Supervisor Position Into TS ML17354A8321998-03-12012 March 1998 Application for Amends to Licenses DPR-31 & DPR-41,deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7601998-01-0909 January 1998 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 5.3.1 & 6.9.1.7 to Allow Implementation of Zirlo Fuel Rod Cladding ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17354A6141997-08-27027 August 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4201997-02-24024 February 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs 6.9.1.7, COLR & Adding Best Estimate Large Break Loss of Coolant Accident Analysis to COLR ML17354A3721996-12-17017 December 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3501996-11-22022 November 1996 Application for Amends to Licenses DPR-31 & DPR-41, Requesting Rev to Allow Unit 3 Diesel Fuel Oil Storage Tank to Be Drained,Inspected & Cleaned While Maintaining at Least One Unit 3 Diesel Operable ML17354A2851996-10-0303 October 1996 Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7971996-07-17017 July 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7091996-05-28028 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Section 6.0, Administrative Controls, IAW 10CFR50.90 to Address Licensed Qualifications of Operations Manager ML17353A6881996-05-10010 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6501996-04-23023 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 7.4 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation. ML17353A6561996-04-19019 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6151996-03-21021 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6061996-03-20020 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.5.1 to Remove SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels from Ts,Per Line-Item 7.4 from GL 93-05 ML17353A5981996-03-0505 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 4.4.3.3 & 4.5.2 to Reduce Frequency of Surveillances & Insps in Accordance W/Gl 93-05 Items,6.6 & 7.5 ML17353A5011995-12-18018 December 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising Definition of RTP from 2,200 Mwt to 2,300 Mwt.Proprietary TR WCAP-13719,Rev 2 & Nonproprietary TRs WCAP-13718,Rev 2 & WCAP-14276,Rev 1 Encl.Proprietary TR WCAP-13719 Withheld ML17353A4521995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Index to Delete Bases Re Administrative Controls & Reviews ML17353A4491995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs w/Line-Item 10.1 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation, Per GL 94-01 ML17353A3951995-10-0404 October 1995 Application for Amend to License DPR-31 & DPR-41,modifying Plant TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/ Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3811995-09-28028 September 1995 Application for Amends to Licenses DPR-31 & DPR-41, Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3511995-09-11011 September 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 ML17353A2811995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation. ML17353A2771995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 ML17353A2741995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2711995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2681995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.1.3.1, Movable Control Assemblies - Group Height & 3/4.1.3.2, Position Indication Sys - Operating & Asociated Bases ML17353A2651995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Table 4.3-1 Re Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17352B1821995-05-23023 May 1995 Application for Amends to Licenses DPR-31 & DPR-41.Amends Would Use Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation Setpoints ML17352B0851995-03-30030 March 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot- Start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17352A8361994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3.9.4 & 1.9,allowing Containment Personnel Airlock Doors to Be Opened During Core Operations & Movement of Irradiated Fuel in Containment ML17352A8291994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.4.9.1 to Remove Schedule for Withdrawal of Rv Matl Surveillance Specimens,Gl 91-01 ML17352A7221994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3.1.3.6, Reactivity Control Sys CR Insertion Limits, 3/4.2.2, Heat Flux Hot Channel Factor - Fq(Z) & 6.9.1.7, COLR & Associated Bases,Per GL 88-16.COLRs Encl ML17352A7301994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.7.1 & Associated Bases Which Address Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML17352A7271994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.8.1.1.2e & 4.8.1.1.2f Re EDG Fuel Oil Testing Program ML17352A5451994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.0.5a, Applicability - Srs, to Reflect Intent of Revised STS (NUREG-1431) for ISI & Testing Programs,In Accordance W/Recommendations in Draft NUREG-1482 ML17352A5421994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.6.2.1.d, CSS Surveillance Interval for Air or Smoke Flow Test Through CS Header from at Least Once Per 5 Yrs to at Least Once Per 10 Yrs,Per GL 93-05 & NUREG-1366 ML17352A4611994-02-18018 February 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.5.2.8, Audits by Deleting Frequencies Performed Under Cognizance of Nuclear Review Board,Per GL 93-07 ML17352A4351993-12-28028 December 1993 Application for Amends to Licenses DPR-31 & DPR-41,proposing Addition of SG Water Level - high-high Protection to TS Tables 3.3-2,3.3-3,4.3-2 & Associated Bases,In Accordance W/ Commitment to GL 89-19 for Resolution of USI A-47 ML17352A2621993-10-0404 October 1993 Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0 ML17352A2201993-09-0303 September 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3/4.7.1.6, Standby FW Sys & Associated Bases to Eliminate Cranking DGs ML17352A2011993-08-17017 August 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising License Conditions 3.G & 3.F Respectively,To Conform to Std Fire Protection License Proposed as Stated in GL 86-10 ML17352A1061993-07-20020 July 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Definitions to Ensure Consistency W/New 10CFR20 Requirements & Changing Radiological Effluent Release Rept Frequency ML17349A8771993-05-21021 May 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 5.2.2, Design Pressure & Temp & Associated Bases to Correct Ref to Max Containment Design Internal Pressure from 59 Psig to 55 Psig 1999-07-27
[Table view] |
Text
t PRTORXTY 1 (ACCELERATED RIDS PROCESSING)
REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:9507310219 DOC.DATE: 95/07/26 NOTARIZED: YES'OCKET g FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFXLIATION PLUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) I
SUBJECT:
Application for amends to licenses DPR-31 & DPR-41,revising TS to achieve consistency throughout document by removing outdated matl,incorporatlng administrative clarzfications &
corrections & correcting typos.
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR ENCL / SIZE: i0 TITLE: OR Submittal: General Distribution I NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 CROTEAU,R 1 1 INTERN ~TL'E CHERE~ .
1 1 NRR/DE/EMCB 1 1
~DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0
'D EXTERNAL: NOAC 1 1 NRC PDR 1 ~ 1 C
N'OTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11
~ g ~
~ ~
a JUL 86 1995 L-95-192
%PI 10 CFR 550.36 10 CFR 550.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Proposed License Amendments Administrative U date 1995 In accordance with 10 CFR 550.90, Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to modify the Turkey Point Units 3 & 4 Technical Specifications. The purpose of this amendment is to revise the Technical Specifications to achieve consistency throughout this document by (a) removing outdated material, (b) incorporating administrative clarifications and corrections, and (c) correcting typographical errors.
Comparisons have been made with NUREG-1431, "Standard Technical Specifications Westinghouse Plants", and changes are requested to ensure consistency with that NUREG.
FPL has determined that the proposed license amendments do not involve a significant hazards consideration pursuant to 10 CFR 550.92. A description of the amendments request is provided in Attachment 1. The no significant hazards determination in support of the proposed Technical Specifications changes is provided in Attachment 2. Attachment 3 provides the proposed revised Technical Specifications.
In accordance with 10 CFR 550.91(b) (1), a copy of these proposed license amendments are being forwarded to the State Designee for the State of Florida.
The proposed license amendments have been reviewed by Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.
Should there be any questions on this request, please contact us.
Very truly yours, j~~~
T. F. Plunkett Vice President Turkey Point Plant CDV Attachments CC: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant W. A. Passetti, Florida Department of Health and Rehabilitative Services I i Pl lelA r 9507310219 950726 PDR ADOCK 05000250 P PDR an FPL Group company
Y '~
/
rl A
STATE OF FLORIDA )
) ss.
COUNTY OF DADE )
T. F. Plunkett being first duly sworn, deposes and says:
That he is Vice President, Turkey Point Plant, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his -knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
T. . Plunkett Subscribed and sworn to before me this cRQ day of 1995.
Name of N ary Public (Ty e or int)
NOTARY PUBLIC, in and for ~ III RHEA i0, St te of Florida MY CNMSSOH 4 CC 223781 My Commission expires t'ai .g BSRES: Scptcrnber 27, 1996 tkesy Pub@ Ondeneltso Commission No.
T. F. Plunkett is personally known to me.
~
p 1
E'I yy ~
e ll N II
L-'95-192 Page 1 ATTACHMENT 1 DESCRXPTXON OP AMENDMENTS RE VEST Description and Purpose The pzoposed amendments revi.se the Turkey Point Units 3 and 4 Technical Specifications (TS) to achieve consistency throughout the TS by (a) removing outdated materi.al, (b) i.ncozporating administrative clarifications and corrections, and (c) correcting typographical errors. These changes represent an administrative update to the Turkey Point Units 3 and 4 TS. Each of the proposed changes is discussed in detail below.
Background
Through periodic examinations of Turkey Point Units 3 and 4 TS, several administrative inconsistencies were noted throughout the TS.
These inconsistencies were then cross-checked and verified to actually be in error, based on a review of NUREG-1431 and the present TS.
Also, the BASES for the Ultimate Heat Sink (UHS) are given further clarification on its limitations, based on a safety evaluation completed on the Component Cooling Water (CCW) heat exchanger performance monitoring program. FPL proposes to amend the followi.ng TS to correct these administrative errors, add clarification, and maintain consistency throughout Turkey Point Units 3 and 4 TS.
Discussion and Descripti.on of Proposed Changes The following changes in plant Technical Specifications, shown in , are proposed:
TS BASES 3 4.1.3 Movable Control Assemblies Recommendation: Change the maximum step count reached from 231 to 230 on the step counter.
Justificati.on: Newer Westinghouse plants can reach the 231 limit, but Turkey Point Units 3 and 4 can only be withdrawn to 230 steps. FPL proposes to change the indicated requirement to between 200 and 230 vice 231.
2 ~ TS 4.2.2.2.c.1 MIDS Recommendation: Correct symbol foz standard deviation from "
to 11 (y II Justification: "0>" is the correct symbol for standard deviation, however the " a " was inadveztantly omitted.
L-'95-192 Page 2
- 3. TS 4.3.1.1 Reactor Tri S stem Instrumentation Recommendation: Capitalize 'Reactor'here it is stated "Each reactor Trip System..."
Justification: To maintain consistency throughout the TS, Reactor Trip System should be capitalized.
4 ~ TS Table 3.3-1 Reactor Tri S stem Instrumentation Recommendation: Convert Item 18.B to Item 18.b. Delete one of the 'per'ords in ACTION 2.b.
Justification: To maintain consistency throughout the TS numbering system, the letters following Item 18 should be lowercase. Only one 'per's required in ACTION 2.b.
- 5. TS 3.9.4 Containment Buildin Penetrations Recommendation: Change 3.9.4.b.2) from "at least 23 feet of water above the fuel..." to "at least 23 feet of water above the reactor vessel flan e Justification: To maintain consistency throughout the TS and with current operating procedures, 'fuel'hould be changed to
'flange'i.e., TS 3.9.8.1, 3.9.8.2, 3.9.10). This change would be a more conservative requirement than the existing requirement of 23 feet of water above the fuel, and is requested to eliminate confusion when compared with other specifications governing refueling operations.
- 6. TS 3.12.l.c Monitorin Pro zam Recommendation: Change reference to 'Semiannual Radioactive Effluent Release Report'o 'Annual Radioactive Effluent Release Report' Justification: The required Radioactive Effluent Release Report is generated on an annual basis now vice the previous semiannual interval. This change will remove outdated references from the existing TS.
- 7. TS 3.12.2.b Land Use Census Recommendation: Change reference to 'Semiannual Radioactive Effluent Release Report'o 'Annual Radioactive Effluent Release Report' Justification: The required Radioactive Effluent Release Report is generated on an annual basis now vice the previous semiannual interval. This change will remove outdated references from the existing TS.
L-'95-192 Page 3
- 8. TS BASES 3 4.2.4 uadzant Power Tilt Ratio Recommendation: Delete one of the words, 'action', in the third paragraph.
Justification: Only one 'action'ord is required.
- 9. TS BASES 3 4.7.4 Ultimate Heat Sink Recommendation: Change the BASES for the Ultimate Heat Sink (UHS) to read as follows:
The limit on ultimate heat sink temperature in conjunction with the SURVEILLANCE REQUIREMENTS of Technical Specification 3/4.7.2 will ensure that sufficient cooling capacity is available either: (1) to provide normal cooldown of the facility, or (2) to mitigate the effects of accident conditions within acceptable limits.
With the implementation of the CCW heat exchanger performance monitozing program, the limiting UHS temperature can be treated as a variable with an absolute upper limit of 100'F without compromising any margin of safety.
Demonstration of actual heat exchanger performance capability supports system operation with postulated canal temperatures greater than 100'F. Therefore, an upper Technical Specification limit of 100'F is conservative.
Justification: This BASES change will provide further clarification on the limitations of the UHS. Pursuant to the requirement of 10 CFR 550.59, the requested change does not have an adverse effect on plant safety, security or operation, does not constitute an unreviewed safety question, and does not require changes to the Technical Specifications other than an administrative change to the BASES Section. Therefore, in accordance with the requirements of 10 CFR 550.59, prior NRC approval for implementation is not required.
- 10. TS 6.8.2 Procedures and Pro zams Recommendation: Delete the reference to "Specification 6.8.1 +a ualit Control Pro ram for environmental monitorin Justification: To maintain present and future consistency with 6.8.1 as changes to it aze made, restructuring the wording will eliminate the need for further revisions.
- 11. TS 6.8.3 Procedures and Pro rams Recommendation: Delete the reference to "Specification 6.8.1 ~a "Specification 6.8.1 above".
'e L-'95-192 Page 4 Justification: To maintain present and future consistency with 6.8.1 as changes to it aze made, restructuring the wording will eliminate the need for further revisions.
The proposed revisions to Turkey Point Units 3 and 4 Technical Specifications are administrative in nature. These zequested changes do not have an adverse effect on plant safety, security or operation, do not constitute an unzeviewed safety question, and do not require changes to the Technical Specifications other than administrative changes. These proposed changes do not constitute changes to the plant oz to procedures as described in the FSAR, noz do they change any test or experiment as described in the FSAR. FPL proposes to revise the Turkey Point Units 3 and 4 TS to achieve consistency throughout the TS by (a) removing outdated material, (b) incorporating administrative clazifications, and (c) correcting typographical errors by changing the selected Technical Specifications mentioned above.
L-'95-192 Page 1 ATTACHMENT 2 NO SZGNXFZCANT HAZARDS CONSZDERATZON DETERMINATION Description of Proposed License Amendments The proposed license amendments involve administrative changes to existing requirements of Turkey Point Units 3 and 4 Technical Specifications (TS) . These changes do not affect plant design or the modes of plant operation. The following pzoposed changes are requested:
TS BASES 3/4.1.3 Movable Control Assemblies Recommendation: Change the maximum step count reached from 231 to 230 on the step counter.
- 2. TS 4.2.2.2.c.l MIDS Recommendation: Correct symbol for standard deviation from " j" to If (z fl TS 4.3.1.1 Reactor Trip System Instrumentation Recommendation: Capitalize 'Reactor'here it is stated "Each reactor Trip System..."
- 4. TS Table 3.3-1 Reactor Trip System Instrumentation Recommendation: Convert Item 18.B to Item 18.b. Delete one of the 'pez'ords in ACTION 2.b.
- 5. TS 3.9.4 Containment Building Penetrations Recommendation: Change 3.9.4.b.2) from "at least 23 feet of water above the fuel..." to "at least 23 feet of water above the reactor vessel flan e
- 6. TS 3.12.1.c Monitoring Program Recommendation: Change reference to 'Semiannual Radioactive Effluent Release Report'o 'Annual Radioactive Effluent Release Report'
- 7. TS 3.12.2.b Land Use Census Recommendation: Change reference to 'Semiannual Radioactive Effluent Release Report'o 'Annual Radioactive Effluent Release Report'
L-'95-192 Page 2
- 8. TS BASES 3/4.2.4 Quadrant Power Tilt Ratio Recommendation: Delete one of the words, 'action', in the third paragraph.
- 9. TS BASES 3/4.7.4 Ultimate Heat Sink Recommendation: Change the BASES for the Ultimate Heat Sink (UHS) to read as follows:
The limit on ultimate heat sink temperature in conjunction with the SURVEILLANCE REQUIREMENTS of Technical Specification 3/4.7.2 will ensure that sufficient cooling capacity is available either: (1) to provide normal cooldown of the facility, or (2) to mitigate the effects of accident conditions within acceptable limits.
With the implementation of the CCW heat exchanger performance monitoring program, the limiting UHS temperature can be treated as a variable with an absolute upper limit of 100'F without compromising any margin of safety.
Demonstration of actual heat exchanger performance capability supports system operation with postulated canal temperatures greater than 100'F. Therefore, an upper Technical Specification limit of 100'F is conservative.
- 10. TS 6.8.2 Procedures and Programs Recommendation: Delete the reference to "Specification 6.8.1 ~a ualit Control Pro ram for environmental monitorin 11 'S 6.8.3 Procedures and Programs Recommendation: Delete the reference to "Specification 6.8.1 ~a "Specification 6.8.1 above".
Introduction The Nuclear Regulatory Commission has provided standards for determining whether a significant hazards consideration exists (10 CFR 550.92 (c)) . A proposed amendment to an operating license for a facility involves no significant hazards consideration, if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; oz (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed below for the proposed amendments.
L-95-192 Page 3 Discussion (1) Operation of the facility in accordance with the proposed amendments would not involve a signi.ficant increase in the probability or consequences of an accident previously evaluated.
The proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated because the proposed amendments are purely administrative in nature. These amendments will not involve a significant increase in the probability or consequences of an accident previously evaluated because they do not affect assumptions contained in plant safety analyses, the physical design and/oz operation of the plant, nor do they affect Technical Specifications that preserve safety analysis assumptions. Therefore, the proposed changes do not affect the probability or consequences of accidents previously analyzed.
(2) Operation of the facility in accordance with the proposed amendments would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The use of the modified specifications can not create the possibility of a new or different kind of accident from any previously evaluated since the proposed amendments will not change the physical plant or the modes of plant operation defined in the facility operating license. No new failure mode is introduced due to the administrative changes and clarifications, since the proposed changes do not involve the addition or modification of equipment nor do they alter the design or operation of affected plant systems, structures, or components.
(3) Operation of the facility in accordance with the proposed amendments would not involve a significant reduction in a margin of safety.
The operating limits and functional capabilities of the affected systems, stzuctures, and components are unchanged by the proposed amendments. The modified specifications which correct administra-tive errors and clarify existing Technical Specification requirements do not significantly reduce any of the margins of safety.
Based on the above, FPL has determined that the proposed amendment request does not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, (3) involve a significant reduction in a margin of safety; and therefore the proposed changes do not involve a significant hazards consideration as defined in 10 CFR 550.92.
L-95-192 ATTACHMENT 3 PROPOSED LICENSE AMENDMENT FOR ADMZNISTRATZVE UPDATE 1995 PROPOSED TECHNICAL SPECIFICATIONS PAGES B 3/4 1-4 3/4 2-7 3/4 3-1 3/4 3-4 3/4 3-5 3/4 9-4 3/4 12-2 3/4 12-11 B 3/4 2-8 B 3/4 7-5 6-13