CATEGORY j.
REGULATORY INFORMATION DISTRIBUTIOPSYSTEM (RIDE)
ACCESSION NBR:9604290197 DOC.DATE: 96/04/19 NOTARIZED: YES FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HOVEY,R.J.
Florida Power
& Light,Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amends to licenses DPR-31
& DPR-4l,revising TS to achieve consistency throughout document by removing outdated matl
& incorporating administrative clarifications
& corrections.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED: LTR i
ENCL I
SIZE:
TITLE: OR Submittal: General Distribution DOCKET 05000250 05000251 NOTES:
RECIPIENT ID CODE/NAME PD2-1 LA CROTEAU,R COPIES LTTR ENCL 1
1 1
1, RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 INTERNAL R
NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC 1
1 1
1 1
1 1
0 1
1 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR 1
1 1
1 1
1 1
~ 1 D
E N
NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12, ENCL 11
r,
P.O. Box 029100, Miami, FL, 33102-9100 APR18 19'"
L-96-019 10 CFR 550.36 10 CFR 550.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Proposed License Amendments In accordance with 10 CFR 550.90, Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to modify the Turkey Point Units 3 and 4 Technical Specifications.
The purpose of this amendment is to revise the Technical Specifications to achieve consistency throughout this document by (a) removing outdated material, and (b) incorporating administrative clarifications and corrections.
Comparisons have been made with NUREG-1431g "Standard Technical Specifications Westinghouse Plants",
and changes are requested to ensure consistency with that NUREG.
FPL has determined that the proposed license amendments do not involve a significant hazards consideration pursuant to 10 CFR 550.92.
A description of the amendments request is provided in Attachment 1.
The no significant hazards determination in support of the proposed Technical Specifications changes is provided in Attachment 2.
Attachment 3 provides the proposed revised Technical Specifications.
In accordance with 10 CFR 550.91(b)(1),
a copy of these proposed license amendments are being forwarded to the State Designee for the State of Florida.
The proposed license amendments have been reviewed by Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.
Should there be any questions on this request, please contact us.
Very truly yours, R. J.
Hovey Vice President Turkey Point Plant CDV Attachments CC1 S.
D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant W. A. Passetti, Florida Department of Health and Rehabilitative Services 9604290197 96041'r PDR ADGCK 05000250 P
~
~
n P~
~1 I
I
STATE OF FLORIDA COUNTY OF DADE
)
) ss.
)
R. J.
Hovey being first duly sworn, deposes and says:
That he is Vice President, Turkey Point Plant, of Florida Power and Light Company, the Licensee herein; That, he has executed the foregoing document; that the statements made in this document are true and correct to the best of,his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
Subscribed and sworn to before me this R. J.
Hovey day of 1996.
Name of Notary Public (Type or Print)
NOTARY PUBLIC, in and for the County of Dade, State of Florida My Commission expires Commission No.
R. J.
Hovey is personally known to me.
g
'S't k
L-96-019 Attachment 1
Page 1
ATTACHMENT 1 Description and Purpose The proposed amendments revise the Turkey Point Units 3 and 4 Technical Specifications (TS) to achieve consistency throughout the TS by (a) removing outdated material, and (b) incorporating administrative clarifications and corrections.
These changes represent an administrative update to the Turkey Point Units 3 and 4 TS.
Each of the proposed changes is discussed in detail below.
Background
Through periodic examinations of Turkey Point Units 3 and 4 TS, several administrative inconsistencies were noted throughout the TS.
These inconsistencies were then cross-checked and verified to actually be in
- error, based on a review of NUREG-1431 and the present TS.
FPL proposes to amend the following TS to correct these administrative errors, add clarification, and maintain consistency throughout Turkey Point Units 3
and 4 TS.
Discussion and Description of Proposed Changes The following changes in plant Technical Specifications, shown in Attachment 3, are proposed:
Recommendation:
Add the following clarification as shown below:
"If an ACTION item requires periodic performance on a "once per
..." basis, the above frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications."
Justification:
This proposed change will further clarify the requirements for meeting the specified frequency for a required ACTION statement with a completion time that requires the periodic performance of the required ACTION on a "once pez..." interval.
The applicability of this concept is stated in NUREG-1431, Rev 1, TS Surveillance Requirement 3.0.2.
This extension facilitates scheduling and considers plant operating conditions that may not be suitable for conducting the required ACTION (e.g., transient conditions or other ongoing surveillance or maintenance activities).
The 25% extension does not significantly degrade the reliability that results from performing the required ACTION item at its specified frequency.
L-96-019 Attachment 1
Page 2
2.
A statement is also added to provide for possible exceptions to this extension as specified in individual Specifications.
Recommendation:
Delete the requirement to notify the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of declaring a startup transformer inoperable from ACTION statement a.
Justification:
This reporting requirement would be deleted from the plant TS since 10 CFR 50.72 and 50.73 address the regulatory requirement for licenses to notify the NRC and report failures.
This proposed change is in accordance with the guidance of NUREG-1431.
3.
Recommendation:
Change the footnote at the bottom of the page to read as follows:
The required RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Reactor Coolant System boron concentration.
Justification:
The current TS only allows the temporary securing of RHR for CORE ALTERATIONS only.
The proposed change will allow temporary suspension of RHR for activities such as core verification inspections also.
This requirement was initially foreseen to only affect CORE ALTERATIONS near the reactor vessel hot leg nozzles that required the securing of RHR.
Since the analysis for temporary securing of RHR is independent of whether or not CORE ALTERATIONS are being performed, this revision will only further clarify that activities other than CORE ALTERATIONS can be performed while RHR is secured, therefore not affecting the analytical justification for temporary RHR suspension.
The proposed revisions to Turkey Point Units 3 and 4 Technical Specifications are administrative in nature.
These requested changes do not have an adverse effect on plant safety, security or operation, do not constitute an unreviewed safety question, and do not require changes to the Technical Specifications other than administrative changes.
These proposed changes do not constitute changes to the plant or to procedures as described in the UFSAR, nor do they change any test or experiment as described in the UFSAR.
FPL proposes to revise the Turkey Point Units 3 and 4 TS to achieve consistency throughout the TS by (a) removing outdated material, and (b) incorporating administrative clarifications by changing the selected Technical Specifications mentioned above.
L-96-019 Attachment 2
Page 1
ATTACHMENT 2 NO SXGNXFXCANT HAZARDS CONSZDERATZON DETERMXNATZON Description of Proposed License Amendments The proposed license amendments involve administrative changes to existing requirements of Turkey Point Units 3 and 4 Technical Specifications (TS).
These changes do not affect plant design or the modes of plant operation.
The following proposed changes are requested:
2
~
Recommendation:
Add the following clarification as shown below:
I ~
"If an ACTION item requires periodic performance on a "once per
..." basis, the above frequency extension applies to each performance after the 'initial performance.
Exceptions to this Specification are stated in the individual Specifications."
A statement is also added to provide for possible exceptions to this extension as specified in individual Specifications.
Recommendation:
Delete the requirement to notify the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of declaring a startup transformer inoperable from ACTION statement a.
3.
Recommendation:
Change the footnote at the bottom of the page to read as follows:
The required RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Reactor Coolant System boron concentration.
Xntroduction The Nuclear Regulatory Commission has provided standards for determining whether a significant hazards consideration exists (10 CFR 550.92 (c)).
A proposed amendment to an operating license for a facility involves no significant hazards consideration, if operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident
F
L-96-019 Attachment 2
Page 2
previously evaluated; or (2) create different kind of accident from any (3) involve a significant reduction standard is discussed below for the the possibility of a new or accident previously evaluated; or in a margin of safety.
Each proposed amendments.
Discussion (1)
Operation of the facility in accordance with the proposed amendments would not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated because the proposed amendments are purely administrative in nature.
These amendments will not involve a significant increase in the probability or consequences of an accident previously evaluated because they do not affect assumptions contained in plant safety analyses, the physical design and/or operation of the plant, nor do they affect Technical Specifications that preserve safety analysis assumptions.
Therefore, the proposed changes do not affect the probability or consequences of accidents previously analyzed.
(2)
Operation of the facility in accordance with the proposed amendments would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The use of the modified specifications can not create the possibility of a new or different kind of accident from any previously evaluated since the proposed amendments will not change the physical plant or the modes of plant operation defined in the facility operating license.
No new failure mode is introduced due to the administrative changes and clarifications, since the proposed changes do not involve the addition or modification of equipment nor do they alter the design or operation of affected plant systems, structures, or components.
(3)
Operation of the facility in accordance with the proposed amendments would not involve a significant reduction in a margin of safety.
The operating limits and functional capabilities of the affected
- systems, structures, and components are unchanged by the proposed amendments.
The modified specifications which correct administrative errors and clarify existing Technical Specification requirements do not significantly reduce any of the margins of safety.
Based on the above, FPL has determined that the proposed amendment request does not (1) involve a significant increase in the probability
L-96-019 Attachment 2
Page 3
or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, (3) involve a significant reduction in a margin of safety; and therefore the proposed changes do not involve a significant hazards consideration as defined in 10 CFR 550.92.