Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14
ML17354A285
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/03/1996
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354A286 List:
References
RTR-REGGD-01.014, RTR-REGGD-1.014 L-96-200, NUDOCS 9610100170
Download: ML17354A285 (19)


Text

A CATEGORY 1 I

REGULAT INFORMATION DISTRIBUTIONOISTEM (RIDE) l ACCESSION NBR:9610100170 DOC.DATE: 96/10/03 NOTARIZED: YES FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light DOCKET I C 05000250 50-25l Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power 6 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests that App A of licenses DPR-31 S DPR-41 be amended to modify plants Units 3 & 4 to revise TS allowing deferral for one cycle of reactor coolant pump flywheel ultrasonic TITLE:

NOTES:

OR exams required by reg guide 1.14.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR Submittal: General Distribution j ENCL

$ SIZE: ~D +Z E

'RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA 1 1 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL. ILE CEN 01 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11

~

e

~ j

OCT 03 f996 L-96-200 10 CFR 550.36 10 CFR 550.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Propose'd License Amendments In accordance with 10 CFR 550.90, Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to modify the Turkey Point Units 3 and 4 Technical Specifications. The purpose of the proposed license amendments is to revise the Technical Specifications to allow the deferral for one cycle of the reactor coolant pump flywheel ultrasonic examinations required by Regulatory Guide 1.14, Regulatory position C.4.b incorporated by reference in Technical Specification Surveillance Requirement 4.4.10, to coincide with the Units 3 and 4 refueling outages currently scheduled for September 1998 and March 1999 respectively. The next required flywheel inspections for Turkey Point Units 3 and 4 are currently scheduled for the Unit 3 March 1997 refueling outage'and the Unit 4 October 1997 refueling outage. Therefore, FPL requests review and approval of the proposed amendments by December 31, 1996.

FPL has determined that the proposed license amendments do not involve a significant hazards consideration pursuant to 10 CFR 550.92. A description of the amendments request is provided in Attachment 1. The no significant hazards determination in support of the proposed Technical Specifications change is provided in Attachment 2. Attachment 3 provides the proposed revised Technical Specifications page.

The proposed license amendments are similar to the request submitted by Florida Power Corporation for Crystal River Unit 3, submitted to the NRC on November 3, 1995, and approved by NRC letter dated February 15, 1996.

In accordance with 10 CFR 550.91(b)(1), a copy of these proposed license amendments is being forwarded to the State Designee for the State of Florida.

3O ,'DR9610100170 P

ADQCK 961008 05000250 PDR an FPL Group company

l L-g6-200 Page 2 The proposed license amendments have been reviewed by the Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.

Should there be any questions on this request, please contact us.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant OIH Attachments CC: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant W. A. Passetti, Florida Department of Health and Rehabilitative Services

~

~

L-96-200 Proposed License Amendments STATE OF FLORIDA )

) ss.

COUNTY OF DADE )

R. J. Hovey being first duly sworn, deposes and says:

That he is Vice President, Turkey Point Plant, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that. the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

R. J. Hove Subscribed and sworn to before me this rd day of 1996.

CHERVIL P g~yggpg 8 Lly COMMSSSN I CC6840jl Name of Notary Public (Type or Print) ~

ew il 8(Nd8(l gag

~ ~

EXPNES: y~ )g pgg NOTARY PUBLIC, in and for the County of Dade, State of Florida R. J. Hovey is personally known to me.

~

~

l, II ll g

I

'4

!( ~r,

I.-96-200 Page 1 ATTACHMENT 1 Description and Purpose Changes are proposed to revise Turkey Point Units 3 and 4 Technical Specifications (TS) to allow the deferral of the Reactor Coolant pump (RCP) flywheel ultrasonic examinations for one cycle. TS Surveillance Requirement 4.4.10 requires RCP flywheel inspections per the recommendations of Regulatory Position C.4.b of Regulatory Guide (RG) 1.14, Revision 1, August 1975. Regulatory positions C.4.b.l and C.4.b.2 of the RG require an in-place ultrasonic volumetric examination of the areas of higher stress concentration at the bore and keyway at approximately 3-year intervals, during the plant shutdown coinciding with the Inservice Inspection (ISI) Schedule as required by Section XI of the ASME Code.

The next required flywheel inspections for Turkey Point Units 3 and 4 are scheduled for the Unit 3 March 1997 refueling outage and the Unit 4 October 1997 refueling outage. FPL is requesting to defer the ultrasonic volumetric examinations for one cycle to allow for the completion of the Staff's review of WCAP 14535. Upon NRC approval of WCAP 14535, FPL may ask for the elimination of the TS requirement for all RCP motor flywheel examinations. The proposed change requests a one-time TS change to delay for one cycle performance of the in-place ultrasonic volumetric examination required by RG 1.14, Revision 1, and Regulatory Position C.4.b to coincide with Turkey Point Units 3 and 4 refueling outages currently scheduled for September 1998 and March 1999 respectively.

Specifically, FPL is requesting that TS 4.4 '0, page 3/4 4-38 be changed to read as follows:

"1n addition to the requirements of Specification 4.0.5, each reactor coolant pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975, except, the volumetric examination of the Turkey Point Units 3 and 4 flywheels may be delayed one cycle to coincide with the refueling outages currently scheduled for September 1998 and March 1999 respectively."

The proposed change will reduce personnel radiation exposure, and will minimize the possibility of damage to the RCP flywheel due to disassembly and reassembly necessary to perform the required examination. WCAP 14535, "Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination," developed by the Westinghouse Owners Group (WOG), in conjunction with other participants, presents the basis for complete elimination of the RCP flywheel inspections. WCAP 14535 was submitted for NRC review on January 24, 1996, by Duquesne Light Company for application to Beaver Valley Power Station Units 1 and 2.

The justification for the proposed change is based on FPL' operating experience at Turkey Point Units 3 and 4 and the technical justification presented in WCAP 14535. The proposed change is similar to the request submitted by Florida Power Corporation for Crystal River Unit 3,

L-96-200 Page 2 submitted to the NRC on November 3, 1995, and approved by NRC letter dated February 15, 1996.

Inspection Methodology and Summary Results RCP flywheel inspections are performed in accordance with the Turkey Point Units 3 and 4 Inservice Inspection (ISI) Program during refueling outages or motor refurbishment. The volumetric ultrasonic examinations are performed to the accessible surfaces of the flywheel after removal of the RCP flywheel shroud cover and/or gauge hole plugs. Scaffolding is required to access the surfaces to be examined. The volume of the flywheel is inspected for planar defects from the bore, keyways, and around the gauge holes.

The RCP motor design prohibits the performance of a complete volumetric examination of the RCP motor flywheel without disassembly of the upper motor area. The estimated exposure for this inspection is 1.5 Man Rem.

WCAP 14535 documents the results of flywheel inspections from approximately 57 nuclear stations covering approximately 217 flywheels and 729 examinations. The results show that there were no indications found that would affect the integrity of the flywheels. A number of recordable indications found were in the form of nicks and gashes in the keyway area created as a result of the disassembly and subsequent reassembly required to perform the flywheel inspections. Indications were found in the Northeast Utilities'addam Neck flywheels at the weld and heat affected zones used to join the two flywheel plates together.

All of the Westinghouse flywheels except Haddam Neck are made of A533 Grade B Class 1 steel. The Haddam Neck flywheels were made of boiler plate steel.

Turkey Point Units 3 and 4 flywheels are not welded, nor designed with this configuration, and therefore are not subject to the weld area cracking observed on the Haddam Neck RCP flywheels. Turkey Point has seven RCP flywheels in the ISI surveillance inspection program (i.e.,

six installed and one spare.) As presented in WCAP 14535, Turkey Point has performed 37 flywheel inspections with results showing two recordable indications. The first recordable indication observed in 1974, was determined to be laminations and was accepted as-is. The second recordable indication was observed in 1993 as a result of liquid penetrant testing. The indication was'in one keyway and was determined to be tom metal which was removed by buffing. As discussed in WCAP 14535, these indications are classified as knicks or gashes generally found at the keyway area, created by the act of removing or reassembling the flywheel. These indications are not expected to propagate throughout the service life of the flywheels and were dispositioned as not affecting flywheel integrity. Based on the results of flywheel inspections performed at Turkey Point Units 3 and 4 over the past 20 years, FPL has concluded that the integrity of the flywheels and the potential for flywheel failure has not been adversely affected.

L-96-200 Page 3 Stress and Fracture Evaluation In accordance with the regulatory re'quirements for flywheel design specified in RG 1.14, Revision 1, Section C, Subsection 2, WCAP 14535 document the results of the detailed stress and fracture evaluation of the RCP flywheels. The stress and fracture evaluation was performed for six,flywheel groups bounding the range of domestic flywheel dimensions.

Per RG 1.14, Section C, item 2f, the normal flywheel speed should be less than one-half of the lowest of the critical speeds calculated for ductile failure, nonductile failure and excessive deformation. The normal operating flywheel speed for the Turkey Point flywheels is 1200 rpm. A ductile failure analysis was performed for each flywheel group assuming a range of crack lengths. The minimum calculated limiting speed assuming no cracks are present is 3155 rpm. Therefore, the normal flywheel speed must be less than 1577 rpm . The normal operating flywheel speed of 1200 rpm is below 1577 rpm. The minimum calculated limiting speed assuming a crack length of 10" is present is 2698 rpm.

The normal operating speed of 1200 rpm is below the 1349 rpm requirement.

Per RG 1.14, Section C, item 2g, the predicted LOCA overspeed should be less than the lowest of the critical speeds calculated for ductile failure, nonductile failure and excessive deformation. The minimum calculated limiting speed for ductile failure assuming a crack length of 10" is present is 2698 rpm. WCAP 14535 documents 1500 rpm as the predicted LOCA overspeed for Westinghouse flywheels. The 1500 rpm LOCA overspeed is less than the minimum calculated limiting speed for ductile failure of 2698 rpm. Therefore, the requirements of item 2g for ductile failure are met.

A nonductile failure analysis was performed for flywheel integrity assuming flywheel overspeed of 1500 rpm and various critical crack lengths emanating radially from the keyway. The analysis considered a range of RTN T values of O'F and 60'F. The results of the analysis determined liat the critical crack lengths are quite large, even when considering higher values of RT <T and a lower than expected operating temperature. In addition, a fatigue crack growth analysis performed determined that crack growth is negligible over a 60 year life of the flywheel, even assuming a large initial crack length.

WCAP 14535 documents the results of excessive deformation analysis performed at the flywheel overspeed of 1500 rpm which shows that the maximum calculated flywheel deformation of only 0.010 inches is negligible.

The results of the analyses presented in WCAP 14535 and summarized above, show that 1) RCP flywheels have a very high tolerance for the presence of flaws, 2) there are no significant mechanisms for inservice degradation or deformation of the flywheels, and 3) fatigue crack growth over a 60 year life of the flywheel is negligible. Therefore, flywheel inspections performed prior to service are sufficient to ensure flywheel integrity during their service life.

L-P6-200 Page 4 Risk Assessment WCAP 14535 documents RCP flywheel structural reliability evaluations performed for each of the flywheel groups using conservative input values for preservice flaw existence, initial flaw length, inservice flaw detection capability, and RCP start/stop transients. The results of these evaluations determined that flywheel inspections beyond ten years of plant life have no significant benefit on the risk of flywheel failure. Most flaws that could lead to flywheel failure are detected during preservice examinations or early in plant life, and crack growth is negligible over plant life. Sensitivity studies documented in WCAP 14535 showed that improved flaw detection capability and increased number of inspections resulted in a very small relative change in the calculated failure probability.

The results of flywheel inspections presented in WCAP 14535 show that flywheel integrity and plant safety are actually increased by eliminating all flywheel inspections. Detailed stress and fracture analyses as well as risk analysis have been completed with the results indicating there would be no change in the probability of failure for RCP motor flywheels if all inspections were eliminated. Therefore, the additional personnel exposure and cost of the inspection is not warranted given no quantifiable safety benefit.

Evaluation of Request FPL believes that the proposed one-time change is justified based on the following:

1. Turkey Point has performed 37 flywheel inspections with no indications affecting flywheel integrity.
2. FPL and industry experience as documented in WCAP 14535 document there is a low probability of RCP'otor flywheel failure. A review of industry information through WOG revealed no critical flaws identified on RCP motor flywheels, and no RCP flywheel failures have been reported.
3. The WOG effort includes FPL Turkey Point Units 3 and 4 flywheels.

Detailed stress and fracture analyses as well as risk analysis have been completed with the results indicating that there would be no change in the probability of failure for RCP motor flywheels if all inspections were eliminated.

4. Flywheel inspections result in personnel exposure and additional costs related to outage time and replacement power.
5. Flywheel inspections have the potential for increased probability of failure resulting from flywheel damage incurred during disassembly or reassembly of the flywheel.

Therefore, the delay of the ultrasonic volumetric examination for one cycle does not affect the integrity of the flywheels or significantly increase the probability of failure.

L-96-200 Page 1 ATTACHMENT 2 NO SIGNIFICANT HAZ2QG)S CONSIDERATZON DETERMXNATXON Description of Proposed License Amendments Changes are proposed to revise Turkey Point Units 3 and 4 Technical Specifications (TS) to allow the deferral for one cycle of the Reactor Coolant pump (RCP) flywheel volumetric and surface examinations. TS Surveillance Requirement 4.4.10 requires RCP flywheel inspections per the recommendations of Regulatory Position C.4.b of Regulatory Guide (RG) 1.14, Revision 1, August 1975. Regulatory positions C.4.b.1 and C.4.b.2 of the RG require a volumetric examination of the areas of higher stress concentration at the bore and keyway at approximately 3-year intervals and a surface examination of all "exposed" surfaces of the flywheels and complete ultrasonic volumetric examination at approximately ten-year intervals during the plant shutdown coinciding with the Inservice Inspection (ISI) Schedule as required by Section XI of the ASME Code.

The proposed change requests a one-time TS change to delay performance of the volumetric examination required by RG 1.14, Revision 1, and Regulatory Position C.4.b to coincide with Turkey Point Units 3 and 4 refueling outage currently scheduled for September 1998 and March 1999 respectively.

Specifically, FPL is requesting that TS 4.4.10, page 3/4 4-38 be changed to read as follows:

"In addition to the requirements of Specification 4.0.5, each reactor coolant pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975, except, the volumetric examinations of the Turkey Point Units 3 and 4 flywheels may be delayed one cycle to coincide with the refueling outages currently scheduled for September 1998 and March 1999 respectively."

Introduction The Nuclear Regulatory Commission has provided standards for determining whether a significant hazards consideration exists (10 CFR 550.92 (c)).

A proposed amendment to an operating license for a facility involves no significant hazards consideration, if operation of the facility in accordance with the proposed amendments would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed below for the proposed amendments.

L-96-200 Page 2 Discussion Operation of the facility in accordance with the proposed amendments would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated because:

The safety function of the RCP flywheels is to provide a coastdown period during which the RCPs would continue to provide reactor coolant flow to the reactor after loss of power to the RCPs. The maximum loading on the RCP motor flywheel results from overspeed following a large LOCA. The estimated maximum obtainable speed in the event of a LOCA was established conservatively. The proposed one-time change does not affect that analysis. Reduced coastdown times due to a single failed flywheel is bounded by the locked rotor (instantaneous coastdown) analysis, therefore, it would not place the plant in an unanalyzed condition. Therefore, these changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

(2) Operation of the facility in accordance with the proposed amendments would not create the possibility of a new or different kind of accident from any accident previously evaluated.

The use of the modified specifications can not create the possibility of a new or different kind of accident from any previously evaluated since the proposed amendments will not change the physical plant or the modes of plant operation defined in the facility operating license. No new failure mode is introduced due to the deferral of the flywheel inspections for one cycle, since the proposed changes do not involve the addition or modification of equipment, nor do they alter the design or operation of affected plant systems, structures, or components.

Operation of the facility in accordance with the proposed amendments would not involve a significant reduction in a margin of safety.

The operating limits and functional capabilities of the affected systems, structures, and components are basically unchanged by the proposed amendments. The WOG effort includes FPL Turkey Point Units 3 and 4 flywheels. FPL has performed 37 flywheel inspections with no indications affecting flywheel integrity. The margins of safety defined in RG 1 14, Revision 1 used in the

~

analysis are not significantly changed. Detailed stress and fracture analyses as well as risk analysis have been completed with the results indicating that there would be no change in the probability of failure for RCP motor flywheels were eliminated.

if all inspections Therefore these changes do not involve a significant reduction in the margin of safety.

L-96-200 Page 3 Summary Based on the above, FPL has determined that the proposed amendments request does not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, (3) involve a significant reduction in a margin of safety; and therefore the proposed changes do not'nvolve a significant hazards consideration as defined in 10 CFR 550.92.