| PLANT NAME: Cook 8 1 | | PLANT NAME: Cook 8 1 FOR ACTION/INFORMATION B~2-75 BUTLER (L) SCHWQNCER (L) ZIEMANN (L) REGAN (E) |
| '
| |
| FOR ACTION/INFORMATION B~2-75 BUTLER (L) SCHWQNCER (L) ZIEMANN (L) REGAN (E) | |
| W/ Copies W/ Copies YI// Copies W/ Copies'- '"M CLARK (L) STOLZ (L) DICKER (E) LEAR (L) | | W/ Copies W/ Copies YI// Copies W/ Copies'- '"M CLARK (L) STOLZ (L) DICKER (E) LEAR (L) |
| W/ Copies W/ Copies W/ Copies YI/ Copies PARR (L) | | W/ Copies W/ Copies W/ Copies YI/ Copies PARR (L) |
Line 33: |
Line 31: |
| Wd Copies PURPLE (L) | | Wd Copies PURPLE (L) |
| 'VI/ Copies YOUNGBLOOD (E) | | 'VI/ Copies YOUNGBLOOD (E) |
| -
| |
| W/ Copies RBTj) | | W/ Copies RBTj) |
| W/ Copies QCKNQ~EDBED INTERNAL DISTRIBUTION a>> w -> | | W/ Copies QCKNQ~EDBED INTERNAL DISTRIBUTION a>> w -> |
Line 49: |
Line 46: |
| BENARQYA | | BENARQYA |
| <<VOL LME R HARLESS EXTERNAL DISTRIBUTION | | <<VOL LME R HARLESS EXTERNAL DISTRIBUTION |
| .
| |
| : v. wi~sO~ (L) | | : v. wi~sO~ (L) |
| R. INGRAM (L) hf DUNCAN~@'' 'U | | R. INGRAM (L) hf DUNCAN~@'' 'U |
Line 56: |
Line 52: |
| ~1 LOCAL I'DR St Joseph, Michigan | | ~1 LOCAL I'DR St Joseph, Michigan |
| ~1 TIC (ABERNA I HY) (1)(2)(10) NATIONAL LABS 1 PDR SAN/LA/NY | | ~1 TIC (ABERNA I HY) (1)(2)(10) NATIONAL LABS 1 PDR SAN/LA/NY |
| ~1 NSIC (BUCHANAN) 1 W. PENNINC>TON, Rni E-201 GT B ROOK I I AV L N N AT LA8 | | ~1 NSIC (BUCHANAN) 1 W. PENNINC>TON, Rni E-201 GT B ROOK I I AV L N N AT LA8 ASLf3 1 CONSULTANTS G. ULRIKSON, OANL 1 Newton Anderson NEWMARK/GLUME/AGBABIAN ,AGMED(RUTH GUSSMAN) |
| '
| |
| ASLf3 1 CONSULTANTS G. ULRIKSON, OANL 1 Newton Anderson NEWMARK/GLUME/AGBABIAN ,AGMED(RUTH GUSSMAN) | |
| <<>- ACRS SEi"I'. iO LIC;SST M. Service Rrn 8-127 GT J. D. RUNKLES, Rrn E-201 SEND OTILY TEN DAY REPORTS 1 GT | | <<>- ACRS SEi"I'. iO LIC;SST M. Service Rrn 8-127 GT J. D. RUNKLES, Rrn E-201 SEND OTILY TEN DAY REPORTS 1 GT |
|
| |
|
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip 05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 05000315/LER-1999-027, LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination1999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L ML18219B5641978-08-10010 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-051/03L-0) ML18219B5651978-08-0909 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-1) ML18219B5661978-08-0808 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-050/03L-0) ML18219B5671978-08-0404 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-0) ML18219B5681978-08-0202 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-029/03L-1 and RO 78-048/03L-0) ML18219B5691978-07-21021 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-019/03L-1 and RO 78-023/03L-1) ML18219B5701978-07-18018 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-047/03L-0) ML18219B5711978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-043/03L-0), Submitted Late Due to a Paper Defect ML18219B5721978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-034/03L-1, RO 78-044/03L-0, RO 78-045/03L-0, RO 78-046/03L-0) ML18219B5731978-07-0505 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-042/03L-0) ML18219B5751978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken IR 05000316/19780371978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken ML18219B5771978-06-22022 June 1978 D.C. Cook - Submit Licensee Event Report RO 78-036/03L-0 for Unit 2 ML18219B5761978-06-21021 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-035/03L-0), a Resubmittal of LER 78-034/03L-0 Dated 6/19/1978 ML18219B5781978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 IR 05000316/19780341978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 ML18219B5221978-06-0606 June 1978 06/06/1978 Letter Licensee Event Report 2024-09-12
[Table view] |
Text
NRC Dl lIBUTION FOR PART 50 DOCKE ARTERIAL (TEMPORARY FORM)
CONTROL NO. 12889 FILE INCIDENI'EPORT I'ILP n sana >c >gna ower DATE OF DOC DATE EC'D R LTR TWX RPT OTHER Bridgman, MIchigaa R.II. Jur ensen 10-31-75 11-11-75 XXX TO: ORIG CC OTHER SENT AEC PDR XXX XXX e ~Leep d -SENT LOCAL PDR CLASS UNC LASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
1 . 50-.
DESCR IPTION: ENC LOSU R ES:
Abnormal. Occur rence' 75-68, on 10-1-75, Eoncerning Failure to close of the motor operator valve IMO-316 durning .the cycling.
test.......
(1 Copy Received)
PLANT NAME: Cook 8 1 FOR ACTION/INFORMATION B~2-75 BUTLER (L) SCHWQNCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies YI// Copies W/ Copies'- '"M CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies YI/ Copies PARR (L)
W/ Copies VASSALLO (L)
W/ Copies KNIGHTON (E)
W/ Copies SPELS W/ Copies QQ NQT REMORSE yKNIEL (L)
Wd Copies PURPLE (L)
'VI/ Copies YOUNGBLOOD (E)
W/ Copies RBTj)
W/ Copies QCKNQ~EDBED INTERNAL DISTRIBUTION a>> w ->
t., FiLE TECH RCViEW DENTON LIC ASST A/T IND .
<<SCHROFDE R +~~a R I itti ES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A rMIACCARY ILL SALTZMAN I'NIGHT H. GEARIN (L)
~
GAMM GOSSI CK/STAF KASTNER E. GOULBQURNE (L) ME LTZ
~CASE . PAWLICKI BALLARD P. KREUTZER (E)
GIAMBUSSO SHAQ SPANGLER J. LEE (L) P L AN( s BOYD "~<<STE LLO M. RUSffar,om: (L} MCDONALD MOOR E (L) >'<"-<<HOUSTON ENVIRQ S. RFED (F) CHAPMAN DEYOUNG (L) ""'QVAK MULLER ~'SERViCE (L) DOBE (Ltr)
SKOVHQLT (L) <<ROSS DICK E R S. SHEPPAR D (L) E. COUPP GOI LER (L) (Ltr) <<IPPOLITO I:NIGHTON M. SLATER (E) PETERSON P. COLLINS OTEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)
DENISE J. COLLINS RFGAN S. TEFTS (L) <<KLECKF.R Rf=G QPR LAINAS PROJECT LDR G. WILLIAMS(E) EfSENHUT Wl-li f= 5 ITEGION (2)
~,. >'PC//'
Sl EELE
(~)
BENARQYA
<<VOL LME R HARLESS EXTERNAL DISTRIBUTION
- v. wi~sO~ (L)
R. INGRAM (L) hf DUNCAN~@ 'U
'WIGGINTON m F. HXLLIA~IS
~'~lA
~1 LOCAL I'DR St Joseph, Michigan
~1 TIC (ABERNA I HY) (1)(2)(10) NATIONAL LABS 1 PDR SAN/LA/NY
~1 NSIC (BUCHANAN) 1 W. PENNINC>TON, Rni E-201 GT B ROOK I I AV L N N AT LA8 ASLf3 1 CONSULTANTS G. ULRIKSON, OANL 1 Newton Anderson NEWMARK/GLUME/AGBABIAN ,AGMED(RUTH GUSSMAN)
<<>- ACRS SEi"I'. iO LIC;SST M. Service Rrn 8-127 GT J. D. RUNKLES, Rrn E-201 SEND OTILY TEN DAY REPORTS 1 GT
t 1
s h'
ghmorloen ~ReEu atory '+Pi ~
y $ IIVDIAIVA & MICHIGAIV PD SE8 COIÃPAIVY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 October 31, 1975 II09cypj, a l.'p I~@@!y Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory Guide 1.16, Revision 3, Section 2.b, the following Abnormal Occurrence Report is submitted:
AO 50-315/75-68 Sincerely, y bocxrrra
.W. J ge n Plant ana er <0@X >875~ =
+4(
/bab Seers'~~>
Cork cc: R.S. Hunter J.E. Dolan '~7t I" ~
G.E. Lien R.J. Vollen BPI R. Kilburn R.C. Callen MPSC K.R. Baker RO: III P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G. Olson PNSRC R.S. Keith Director, IE (30 copies)
Director, MIPC (3 copies)
~
~
ICENSEE EVENT REPORT
<<CONTROL BLOCK: (PLEA8E PRINT ALL REQUIRED INFORMATION) 1 UCENSEE LCENSE EVENT NAME UCENSE NUMBER TYPE TYPE Jog M I 0 C C 0 0 0 0 00 0 0 0 A 1 1 1 1 ~01 7 89 14 15 25 26 30 31 32 I'0 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE
[001]coNT ~PO L L 0 5 0 0 3 1 5 1 0 0 1 7 5 1 0 0 6 7 5 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION
[oa~7 While erformin routine surveillance per Plant procedure.OHP 4030.STP.008, the motor 7 8 9 80 Qo 3 o erator would not close valve IMO 316 (East Residual Heat Removal Pump to loops 1 7 89 80
~04 and 4 cold le s durin the cycling test. Tor ue switch setting in motor operator 7 8 9 80
[oOs) reset from factory setting of 2.0 up to 3.0 and valve then operated properly during 7 8 9 80 Jog c clin . Appendix A Technical Specifications Section 4.5.2.a.5.
PRME AO-050-315/75-68 80 COMPONENT COMPONENT CODE SUPPUER MANUFACTURER VIOLATION
~CF 5 V A L V 0 P N L 2 0 0 Y 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION 7
gg8 9 al a one of four new motor 0 erators recentl installed. Others are on IMO 315 80 Qg IMO 325 IMO 326. Ex erience shows factor settin s too low for this a lication.
7 8 9 n motor 0 erators have been increased to 3.5 to 7 89 80 FACILITY METHOD OF 7 8 STATUS
~B 9
~00 10 POWER 12 13 NA OTHER STATUS 44 DISCOVERY 45 B
46 DISCOVERY DESCRIPTION Surveillance Test 80 FORM OF ACTIVITY CONTENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Jig z z NA 7 8 9 .10 11 44 45 80 PERSONNEL EXPOSURES NUMBER" TYPE DESCRIPTION
~00 0 Z NA 7 89 11 12 13 80
~<4 7 8
~~
PERSONNEL INJURIES 9'1 NUMBER OFFSITE CONSEQUENCES 12 DESCRIPTION NA 80 Qi 5 None 7 8 9 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION Z None 7 89 10 80 PUBLICITY No a 7 89 80 ADDITIONAL FACTORS Q~
7 I89 Cause Descri tion - cont. - assure ositive o eration.
80 I
7 89 80 NAME. Walter Cornell PHQNE.
465-5901 (Ext. 352)
GPO 88'I ~ 887 I
~, %~(
V~
3 ~