{{#Wiki_filter:M
{{#Wiki_filter:M MICHIGAN STATE UNIVERSITY COI LFGF OF INGINitR1NG DIVI 510N OF FNGINEl MING HE5F ARCH                EAST LANir. MICillGAN 43824 Director of Inspection and Enforcement U. 3      Nuclear Regulatory Commission Washington, D. C.                              20555
,.
MICHIGAN STATE UNIVERSITY COI LFGF OF INGINitR1NG DIVI 510N OF FNGINEl MING HE5F ARCH                EAST LANir. MICillGAN 43824 Director of Inspection and Enforcement U. 3      Nuclear Regulatory Commission Washington, D. C.                              20555


==Subject:==
==Subject:==
Line 36: Line 34:
5-2-78          Period                  Movement of recorder chassis 6-8-78          % Power                  Instrument not properly calibrated 7-3-78          Period                  Transients in log recorder circuit 9-28-78        Recorder                Operator Error - Failure to upscale recorder range switch 12-22-78 Recorder                      Transients in linear end Icg recorder circuits 5    The final components of the pressurized Ar41 monitoring were purchased Tio3c M 59
5-2-78          Period                  Movement of recorder chassis 6-8-78          % Power                  Instrument not properly calibrated 7-3-78          Period                  Transients in log recorder circuit 9-28-78        Recorder                Operator Error - Failure to upscale recorder range switch 12-22-78 Recorder                      Transients in linear end Icg recorder circuits 5    The final components of the pressurized Ar41 monitoring were purchased Tio3c M 59


s
s during 1978. The system is currently being tested.
.
during 1978. The system is currently being tested.
: 6. The renewal process for License R-114 was continued with the pre-paration of an Environmental Impact Appraisal, a Financial Statement and modification of the Technical Specifications.
: 6. The renewal process for License R-114 was continued with the pre-paration of an Environmental Impact Appraisal, a Financial Statement and modification of the Technical Specifications.
7  The control rods were inspected during December. Their condition was satisfactory, no blistering or cracking war apparent.
7  The control rods were inspected during December. Their condition was satisfactory, no blistering or cracking war apparent.

Latest revision as of 21:54, 1 February 2020

Annual Operating Rept for 1978
ML19261B990
Person / Time
Site: 05000294
Issue date: 03/09/1979
From: Carrick J
MICHIGAN STATE UNIV., EAST LANSING, MI
To:
References
NUDOCS 7903090259
Download: ML19261B990 (2)


Text

M MICHIGAN STATE UNIVERSITY COI LFGF OF INGINitR1NG DIVI 510N OF FNGINEl MING HE5F ARCH EAST LANir. MICillGAN 43824 Director of Inspection and Enforcement U. 3 Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Michigan State University Triga Rentor License R-114 Annual Report (Docket 50-294)

Dear Sir:

Pursiant to 10CFR50-59 the f4 Ilowing report is submitted:

1. During the operating period of January 1, to December 31, 1978 the following experiments were performed:
a. 53 central thimble irradiations
b. 724 rotary specimen rack Irradiations
c. total operation of 1.12 megawatt-days
2. Records indicate Ar41 releases totalling 1422.7 pCi or en average release rate of 1.2 X 10 10 pCi/ml. In addi tion, appi o. ,cely 500 pCI of Br 82 were released.

3 Tank bottom deflection has been monitored regularly with no apparent change.

4. There were seven unscheduled scrams during the reporting period:

DATE SCRAM CAUSE l-18-78 Recorder Operator Error-Failure to upscale recorder range swltch 5-1-78 Power Failure Condenser in Iinear channel ampiifler failed, causing a fuse in control console power supply to burn.

5-2-78 Period Movement of recorder chassis 6-8-78  % Power Instrument not properly calibrated 7-3-78 Period Transients in log recorder circuit 9-28-78 Recorder Operator Error - Failure to upscale recorder range switch 12-22-78 Recorder Transients in linear end Icg recorder circuits 5 The final components of the pressurized Ar41 monitoring were purchased Tio3c M 59

s during 1978. The system is currently being tested.

6. The renewal process for License R-114 was continued with the pre-paration of an Environmental Impact Appraisal, a Financial Statement and modification of the Technical Specifications.

7 The control rods were inspected during December. Their condition was satisfactory, no blistering or cracking war apparent.

8. A pneumatic transfer system was constructed which will allow the transfer of samples from the core to the spectroscopy room 9 An NSF grant was received for the purpose of obtaining computer based gamma spectroscopy equipment.

Sincerely, James Carrick -

Reactor Supervisor