ATTACHMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS The croposed change to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
ATTACHMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS The croposed change to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
Remove Page                    Insert Pace 3.5-12                        3.5-12
Remove Page                    Insert Pace 3.5-12                        3.5-12 8011070            t 993                                    .            - ...
_
8011070            t 993                                    .            - ...


  '
1.lMITING CONDITIONS FOR OPERATION                                  SURVEILLUCE REQUIREw NTS 3.5.J Plant Service Water Svseca 4.5.J Plant Stevice Vzter Svste-
1.lMITING CONDITIONS FOR OPERATION                                  SURVEILLUCE REQUIREw NTS 3.5.J Plant Service Water Svseca
                                                      -
4.5.J Plant Stevice Vzter Svste-
: 1. Normal Availability                                1. The automatic pump start func-(
: 1. Normal Availability                                1. The automatic pump start func-(
  .-
tions 'nd    a automatic isolation The reactor shall not be                                functions shall be tested once made critical from the                                  per operating cycle.
tions 'nd    a automatic isolation The reactor shall not be                                functions shall be tested once made critical from the                                  per operating cycle.
cold shutdown condition unless the Plant Service Water System (including 4 plant service water pumps and the standby service water pumo) is operable."
cold shutdown condition unless the Plant Service Water System (including 4 plant service water pumps and the standby service water pumo) is operable."
: 2. Inocerable Co=cenents
: 2. Inocerable Co=cenents
                                                          '
: 2. Inocerable Components
: 2. Inocerable Components
: a. The standby service water                            a. When the standby serv te pump may be inoperable for                                  water pu=p is made e- feun' a period not to exceed 60                                    to be inoperable, the feur days provided that an alter-                                remaining PSV pu=ps, both nate Unit 1 plant service                                    PSW divisions, and all three water cooling source to the                                  diesel generators, shall be 1B diesel generator is                                      demonstrated to be operable OPERABLE.                                                    immediately.
: a. The standby service water                            a. When the standby serv te pump may be inoperable for                                  water pu=p is made e- feun' a period not to exceed 60                                    to be inoperable, the feur days provided that an alter-                                remaining PSV pu=ps, both nate Unit 1 plant service                                    PSW divisions, and all three water cooling source to the                                  diesel generators, shall be 1B diesel generator is                                      demonstrated to be operable OPERABLE.                                                    immediately.
Line 49: Line 41:
b            J'        ,
b            J'        ,
daily thereafter.
daily thereafter.
3.5-12
3.5-12 b}}
      . . . . ..                .  .                      .          . , . - . _ . . . .  . . -  .
                                                                                                          -
                                                                                                                  - , -
b}}

Latest revision as of 11:20, 31 January 2020

Proposed Changes to App a Tech Specs,Revising Section 3.5.J.2a Re Limiting Conditions for Operation of Plant Svc Water Sys
ML19339B579
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/29/1980
From:
GEORGIA POWER CO.
To:
Shared Package
ML19339B576 List:
References
NUDOCS 8011070282
Download: ML19339B579 (2)


Text

'

()

ATTACHMENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS The croposed change to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Pace 3.5-12 3.5-12 8011070 t 993 . - ...

1.lMITING CONDITIONS FOR OPERATION SURVEILLUCE REQUIREw NTS 3.5.J Plant Service Water Svseca 4.5.J Plant Stevice Vzter Svste-

1. Normal Availability 1. The automatic pump start func-(

tions 'nd a automatic isolation The reactor shall not be functions shall be tested once made critical from the per operating cycle.

cold shutdown condition unless the Plant Service Water System (including 4 plant service water pumps and the standby service water pumo) is operable."

2. Inocerable Co=cenents
2. Inocerable Components
a. The standby service water a. When the standby serv te pump may be inoperable for water pu=p is made e- feun' a period not to exceed 60 to be inoperable, the feur days provided that an alter- remaining PSV pu=ps, both nate Unit 1 plant service PSW divisions, and all three water cooling source to the diesel generators, shall be 1B diesel generator is demonstrated to be operable OPERABLE. immediately.
b. One PS"' pu=p r.sy be in- b. When one PS*** pump is made

~

operable for a period not or found to be inoperable, to exceed 30 days provided the standby service water 3

all diesel generators are pu=p, the three remaining operable. PSW pumps, both PSW divisior

( and all three diesel senera-tors, shall be demonstrated to be operable immediately and weekly thereafter.

c. One PSW pu=p and the stand- c. When one PSW pump and the by service water pu=p =ay standby service water pump be inoperable for a period are made or found to be not to exceed 30 days pro- inoperable, the three re-vided all diesel generators maining PSV pu=ps, both PSW are operable. divisions, and all three diesel generators, shall be demonstrated to be operable immediately and Geekly there-after.
d. Tvo PSV pumps or one PSW d. When two PSW pumps or one division may be inoperable for PSW division are made or a period not to exceed 7 found to be inoperable, tSe days provided the diesel standby service water puer generators associated with the 'and all active compe ents operable PS** components are of the operable divisfor e-operable. divisions and the diesel generators associated with the operable PSW components,

@ shall be demonstrated to be m ~,W 3' operable immediately 2nd

,D<@

Amendment No. 5@

b J' ,

daily thereafter.

3.5-12 b