ML080990454: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080990454
| number = ML080990454
| issue date = 04/07/2008
| issue date = 04/07/2008
| title = 2008/04/07 - Pilgrim - Email from Susan Uttal to the Board and Parties, Attaching NRC Staff'S Exhibit List
| title = Pilgrim - Email from Susan Uttal to the Board and Parties, Attaching NRC Staff'S Exhibit List
| author name = Uttal S L
| author name = Uttal S
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Abramson P B, Cole R F, Thibault J, Young A M
| addressee name = Abramson P, Cole R, Thibault J, Young A
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000293
| docket = 05000293
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From: Susan Uttal Sent: Monday, April 07, 2008 3:02 PM To: Ann Young; Paul Abramson; Richard Cole; Johanna Thibault Cc: Kimberly Sexton; James Adler; David Lewis; Fire Chief, Duxbury; Hearing Docket; Terence Burke; Mark Silvia; Mary Lampert; OCAAMAIL Resource; Sheila Hollis; Paul Gaukler; Richard MacDonald  
{{#Wiki_filter:From:                     Susan Uttal Sent:                     Monday, April 07, 2008 3:02 PM To:                       Ann Young; Paul Abramson; Richard Cole; Johanna Thibault Cc:                       Kimberly Sexton; James Adler; David Lewis; Fire Chief, Duxbury; Hearing Docket; Terence Burke; Mark Silvia; Mary Lampert; OCAAMAIL Resource; Sheila Hollis; Paul Gaukler; Richard MacDonald


==Subject:==
==Subject:==
NRC Staff Exhibit List Attachments: Final Exhibit List.pdf April 7, 2008 Administrative Judge                                                 Administrative Judge Ann Marshall Young, Chair                                         Paul B. Abramson Atomic Safety and Licensing Board                           Atomic Safety and Licensing Board
NRC Staff Exhibit List Attachments:             Final Exhibit List.pdf April 7, 2008 Administrative Judge                                     Administrative Judge Ann Marshall Young, Chair                                 Paul B. Abramson Atomic Safety and Licensing Board                         Atomic Safety and Licensing Board Administrative Judge Richard F. Cole Atomic Safety and Licensing Board In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
 
(Pilgrim Nuclear Power Station)
Administrative Judge Richard F. Cole Atomic Safety and Licensing Board
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
 
In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Pilgrim Nuclear Power Station) Docket No. 50-293-LR; ASLBP No. 06-848-02-LR


==Dear Administrative Judges:==
==Dear Administrative Judges:==


Pursuant to the Licensing Board's March 24, 2008 Order, the NRC staff
Pursuant to the Licensing Boards March 24, 2008 Order, the NRC staff hereby serves an electronic copy of the NRC staffs Exhibit List. A copy of this e-mail with attachment is being served on the service list.
 
Sincerely, Susan L. Uttal Counsel for the NRC Staff cc w/ attachment: Service List E-mail Properties Mail Envelope Properties (BAA05516ED14F646811ABACA61C7AD103732D57667)
hereby serves an electronic copy of the NRC staff's Exhibit List. A copy of this e-  
 
mail with attachment is being served on the service list.  
 
Sincerely,
 
Susan L. Uttal                                                                                                             Counsel for the NRC Staff cc w/ attachment: Service List  
 
E-mail Properties Mail Envelope Propert ies (BAA05516ED14F646811A BACA61C7AD103732D57667)  


==Subject:==
==Subject:==
NRC Staff Exhibit List Sent Date:
NRC Staff Exhibit List Sent Date:     4/7/2008 3:02:16 PM Received Date:       4/7/2008 3:02:16 PM From:           Susan Uttal Created By:       Susan.Uttal@nrc.gov Recipients:
4/7/2008 3:02:16 PM Received Date:       4/7/2008 3:02:16 PM From:               Susan Uttal  
Ann.Young@nrc.gov (Ann Young)
 
Tracking Status: None Paul.Abramson@nrc.gov (Paul Abramson)
Created By:         Susan.Uttal@nrc.gov  
Tracking Status: None Richard.Cole@nrc.gov (Richard Cole)
 
Tracking Status: None Johanna.Thibault@nrc.gov (Johanna Thibault)
Recipients:  
Tracking Status: None Kimberly.Sexton@nrc.gov (Kimberly Sexton)
 
Tracking Status: None James.Adler@nrc.gov (James Adler)
Ann.Young@nrc.gov (Ann Young)  
Tracking Status: None david.lewis@pillsburylaw.com (David Lewis)
 
Tracking Status: None nord@town.duxbury.ma.us (Fire Chief, Duxbury)
Tracking Status: None Paul.Abramson@nrc.gov (Paul Abramson)  
Tracking Status: None Hearing.Docket@nrc.gov (Hearing Docket)
 
Tracking Status: None  
 
Richard.Cole@nrc.gov (Richard Cole)  
 
Tracking Status: None  
 
Johanna.Thibault@nrc.gov (Johanna Thibault)  
 
Tracking Status: None Kimberly.Sexton@nrc.gov (Kimberly Sexton)  
 
Tracking Status: None James.Adler@nrc.gov (James Adler)  
 
Tracking Status: None david.lewis@pillsburylaw.com (David Lewis)  
 
Tracking Status: None nord@town.duxbury.ma.us (Fire Chief, Duxbury)  
 
Tracking Status: None  
 
Hearing.Docket@nrc.gov (Hearing Docket)  
 
Tracking Status: None tburke@entergy.com (Terence Burke)
Tracking Status: None tburke@entergy.com (Terence Burke)
Tracking Status: None msylvia@townhall.plymouth.ma/us (Mark Silvia)
Tracking Status: None msylvia@townhall.plymouth.ma/us (Mark Silvia)
Tracking Status: None mary.lampert@comcast.net (Mary Lampert)  
Tracking Status: None mary.lampert@comcast.net (Mary Lampert)
 
Tracking Status: None OCAAMAIL.Resource@nrc.gov (OCAAMAIL Resource)
Tracking Status: None  
Tracking Status: None sshollis@duanemorris.com (Sheila Hollis)
 
Tracking Status: None paul.gaukler@pillsburylaw.com (Paul Gaukler)
OCAAMAIL.Resource@nrc.gov (OCAAMAIL Resource)  
Tracking Status: None macdonald@town.duxbury.ma.us (Richard MacDonald)
 
Tracking Status: None Post Office:
Tracking Status: None sshollis@duanemorris.com (Sheila Hollis)  
HQCLSTR02.nrc.gov Files          Size      Date & Time MESSAGE          91211      4/7/2008


Tracking Status: None
Final Exhibit List.pdf    62599 Options Expiration Date:
Priority:              olImportanceNormal ReplyRequested:        False Return Notification:      False Sensitivity:    olNormal Recipients received:


paul.gaukler@pillsburylaw.com (Paul Gaukler)  
April 7, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                          )
                                          )
Entergy Nuclear Generation Co. and        )
Entergy Nuclear Operations, Inc.           )        Docket No. 50-293-LR
                                          )
                                          )          ASLBP No. 06-848-02-LR (Pilgrim Nuclear Power Station)            )
NRC STAFF EXHIBIT LIST EXHIBIT TITLE                                                      EXHIBIT #
NRC STAFF TESTIMONY OF DR. JAMES A. DAVIS CONCERNING                    1 PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)
NRC STAFF TESTIMONY OF TERENCE L. CHAN AND ANDREA T. KEIM              2 CONCERNING PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)
REBUTTAL TESTIMONY AND RESPONSES TO BOARD QUESTIONS OF                  3 DR. JAMES A. DAVIS, TERENCE L. CHAN AND ANDREA T. KEIM CONCERNING PILGRIM WATCH CONTENTION 1 (MARCH 6, 2008)
NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT -                              4 XI.M34 BURIED PIPING AND TANKS INSPECTION NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT -                              5 XI.M20 OPEN-CYCLE COOLING WATER SYSTEM 07/18/1989 GENERIC LETTER RE SERVICE WATER SYSTEM                      6 PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (GENERIC LETTER 89-13)
PILGRIM LICENSE RENEWAL APPLICATION EXCERPT -                          7 B.1.2 BURIED PIPING AND TANKS INSPECTION PILGRIM LICENSE RENEWAL APPLICATION EXCERPT -                          8 B.1.28 SERVICE WATER INTEGRITY NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -                  9 3.0.3.2.16 SERVICE WATER INTEGRITY PROGRAM PDC No. 99-21 EXCAVATION FOR SSW PIPE REPLACEMENT                    10 (RFO #12 SCOPE)


Tracking Status: None macdonald@town.duxbury.ma.us (Richard MacDonald)
EXHIBIT TITLE                                             EXHIBIT #
 
NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -       11 3.0.3.1.13 WATER CHEMISTRY CONTROL BWR PROGRAM NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -       12 3.0.3.1.8 ONE-TIME INSPECTION PROGRAM 12/06/2002 LETTER FROM ENTERGY TO NRC RE PILGRIM NUCLEAR   13 POWER STATION FOURTH TEN-YEAR INSERVICE TESTING (IST)
Tracking Status: None
PROGRAM AND REQUEST FOR APPROVAL OF IST RELIEF REQUESTS AMENDMENT NO. 176 EXCERPT (3/4.5 3/4.5-8)               14 PNPS-FSAR EXCERPT - 11.9 CONDENSATE STORAGE SYSTEM         15 PNPS-FSAR REV. 26 EXCERPT - QUALITY ASSURANCE PROGRAM     16 06/29/2005 LETTER FROM ENTERGY TO NRC RE PILGRIM FOURTH     17 TEN-YEAR INSERVICE INSPECTION PROGRAM PLAN, AND THE ASSOCIATED RELIEF REQUESTS FOR NRC APPROVAL ATTACHMENT 71111.07 (ISSUE DATE 05/25/2006) HEAT SINK       18 PERFORMANCE 05/12/2006 LETTER FROM CLIFFORD ANDERSON (NRC) TO ENTERGY   19 RE PILGRIM NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000293/2006002 PNPS-FSAR - EXCERPT - 10.7 SALT SERVICE WATER SYSTEM       20 11/07/1991 GENERIC LETTER (GENERIC LETTER 91-18) RE         21 INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTOIN OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY NRC REGULATORY ISSUE  
 
Post Office:
 
HQCLSTR02.nrc.gov
 
Files                Size        Date & Time
 
MESSAGE        91211        4/7/2008 Final Exhibit List.pdf        62599
 
Options Expiration Date:
Priority:                        olImportanceNormal
 
ReplyRequested:        False Return Notification:        False
 
Sensitivity:        olNormal Recipients received:
April 7, 2008 UNITED STATES OF AMERICA  NUCLEAR REGULATORY COMMISSION
 
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the Matter of )  ) Entergy Nuclear Generation Co. and ) Entergy Nuclear Operations, Inc. ) Docket No. 50-293-LR  )  ) ASLBP No. 06-848-02-LR (Pilgrim Nuclear Power Station) )  NRC STAFF EXHIBIT LIST
 
EXHIBIT TITLE        EXHIBIT #
NRC STAFF TESTIMONY OF DR. JAMES A. DAVIS CONCERNING  1                  PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)
 
NRC STAFF TESTIMONY OF TERENCE L. CHAN AND ANDREA T. KEIM      2 CONCERNING PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)
 
REBUTTAL TESTIMONY AND RESPONSES TO BOARD QUESTIONS OF      3  DR. JAMES A. DAVIS, TERENCE L. CHAN AND ANDREA T. KEIM CONCERNING PILGRIM WATCH CONTENTION 1 (MARCH 6, 2008)
 
NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT -  4                      XI.M34 "BURIED PIPING AND TANKS INSPECTION" NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT -
5 XI.M20 "OPEN-CYCLE COOLING WATER SYSTEM"
 
07/18/1989 GENERIC LETTER RE SERVICE WATER SYSTEM 6 PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (GENERIC LETTER 89-13)
 
PILGRIM LICENSE RENEWAL APPLICATION EXCERPT -
7 B.1.2 "BURIED PIPING AND TANKS INSPECTION" PILGRIM LICENSE RENEWAL APPLICATION EXCERPT -
8 B.1.28 "SERVICE WATER INTEGRITY"
 
NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -
9 3.0.3.2.16 "SERVICE WATER INTEGRITY PROGRAM"
 
PDC No. 99-21 "EXCAVATION FOR SSW PIPE REPLACEMENT 10  (RFO #12 SCOPE)
 
EXHIBIT TITLE       EXHIBIT #
NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -
11 3.0.3.1.13 "WATER CHEMISTRY CONTROL BWR PROGRAM"
 
NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -
12 3.0.3.1.8 "ONE-TIME INSPECTION PROGRAM"
 
12/06/2002 LETTER FROM ENTERGY TO NRC RE "PILGRIM NUCLEAR 13 POWER STATION FOURTH TEN-YEAR INSERVICE TESTING (IST)
PROGRAM AND REQUEST FOR APPROVAL OF IST RELIEF REQUESTS AMENDMENT NO. 176 EXCERPT (3/4.5 3/4.5-8) 14 PNPS-FSAR EXCERPT - 11.9 "CONDENSATE STORAGE SYSTEM" 15  
 
PNPS-FSAR REV. 26 EXCERPT - "QUALITY ASSURANCE PROGRAM" 16  
 
06/29/2005 LETTER FROM ENTERGY TO NRC RE PILGRIM FOURTH 17 TEN-YEAR INSERVICE INSPECTION PROGRAM PLAN, AND THE ASSOCIATED RELIEF REQUESTS FOR NRC APPROVAL
 
ATTACHMENT 71111.07 (ISSUE DATE 05/25/2006) "HEAT SINK 18 PERFORMANCE"
 
05/12/2006 LETTER FROM CLIFFORD ANDERSON (NRC) TO ENTERGY 19 RE PILGRIM NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000293/2006002  
 
PNPS-FSAR - EXCERPT - 10.7 "SALT SERVICE WATER SYSTEM" 20 11/07/1991 GENERIC LETTER (GENERIC LETTER 91-18) RE 21 "INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTOIN OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY NRC REGULATORY ISSUE  


==SUMMARY==
==SUMMARY==
2005-20: REVISION TO 22 GUIDANCE FORMERLY CONTAINED IN NRC GENERIC LETTER 91-18, "INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTION OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY" NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -
2005-20: REVISION TO           22 GUIDANCE FORMERLY CONTAINED IN NRC GENERIC LETTER 91-18, INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTION OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT -       23 3.0.2 STAFFS REVIEW PROCESS NRC BULLETIN NO. 87-01: THINNING OF PIPE WALLS IN NUCLEAR   24 POWER PLANTS (JULY 9, 1987)
23 3.0.2 "STAFF'S REVIEW PROCESS"
CORROSION INDUCED BY LOW-ENERGY RADIONUCLIDES (2004)         25 EXCERPT - STRATEGY FOR CONTROLLING CORROSION
 
NRC BULLETIN NO. 87-01: THINNING OF PIPE WALLS IN NUCLEAR 24 POWER PLANTS (JULY 9, 1987)
CORROSION INDUCED BY LOW-ENERGY RADIONUCLIDES (2004)         25 EXCERPT - "STRATEGY FOR CONTROLLING CORROSION"         
 
EXHIBIT TITLE        EXHIBIT #
NRC INSPECTION MANUAL - INSPECTION PROCEDURE 35101 -  26 QA PROGRAM IMPLEMENTATION INSPECTION FOR OPERATIONAL PROGRAMS (10/03/2007)


AFFIDAVIT OF DR. JAMES A. DAVIS AND ANDREA T. KEIM IN RESPONSE TO LICENSING BOARD QUESTIONS IN ORDER (BOARD         27 QUESTIONS FOR THE NRC STAFF AND APPLICANT)
EXHIBIT TITLE                                            EXHIBIT #
NRC REGION III REPORT EXCERPT - SERVICE WATER (SX) SYSTEM 28}}
NRC INSPECTION MANUAL - INSPECTION PROCEDURE 35101 -        26 QA PROGRAM IMPLEMENTATION INSPECTION FOR OPERATIONAL PROGRAMS (10/03/2007)
AFFIDAVIT OF DR. JAMES A. DAVIS AND ANDREA T. KEIM IN RESPONSE TO LICENSING BOARD QUESTIONS IN ORDER (BOARD       27 QUESTIONS FOR THE NRC STAFF AND APPLICANT)
NRC REGION III REPORT EXCERPT - SERVICE WATER (SX) SYSTEM   28}}

Latest revision as of 08:30, 7 December 2019

Pilgrim - Email from Susan Uttal to the Board and Parties, Attaching NRC Staff'S Exhibit List
ML080990454
Person / Time
Site: Pilgrim
Issue date: 04/07/2008
From: Uttal S
NRC/OGC
To: Abramson P, Cole R, Thibault J, Austin Young
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS J-28
Download: ML080990454 (6)


Text

From: Susan Uttal Sent: Monday, April 07, 2008 3:02 PM To: Ann Young; Paul Abramson; Richard Cole; Johanna Thibault Cc: Kimberly Sexton; James Adler; David Lewis; Fire Chief, Duxbury; Hearing Docket; Terence Burke; Mark Silvia; Mary Lampert; OCAAMAIL Resource; Sheila Hollis; Paul Gaukler; Richard MacDonald

Subject:

NRC Staff Exhibit List Attachments: Final Exhibit List.pdf April 7, 2008 Administrative Judge Administrative Judge Ann Marshall Young, Chair Paul B. Abramson Atomic Safety and Licensing Board Atomic Safety and Licensing Board Administrative Judge Richard F. Cole Atomic Safety and Licensing Board In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

Pursuant to the Licensing Boards March 24, 2008 Order, the NRC staff hereby serves an electronic copy of the NRC staffs Exhibit List. A copy of this e-mail with attachment is being served on the service list.

Sincerely, Susan L. Uttal Counsel for the NRC Staff cc w/ attachment: Service List E-mail Properties Mail Envelope Properties (BAA05516ED14F646811ABACA61C7AD103732D57667)

Subject:

NRC Staff Exhibit List Sent Date: 4/7/2008 3:02:16 PM Received Date: 4/7/2008 3:02:16 PM From: Susan Uttal Created By: Susan.Uttal@nrc.gov Recipients:

Ann.Young@nrc.gov (Ann Young)

Tracking Status: None Paul.Abramson@nrc.gov (Paul Abramson)

Tracking Status: None Richard.Cole@nrc.gov (Richard Cole)

Tracking Status: None Johanna.Thibault@nrc.gov (Johanna Thibault)

Tracking Status: None Kimberly.Sexton@nrc.gov (Kimberly Sexton)

Tracking Status: None James.Adler@nrc.gov (James Adler)

Tracking Status: None david.lewis@pillsburylaw.com (David Lewis)

Tracking Status: None nord@town.duxbury.ma.us (Fire Chief, Duxbury)

Tracking Status: None Hearing.Docket@nrc.gov (Hearing Docket)

Tracking Status: None tburke@entergy.com (Terence Burke)

Tracking Status: None msylvia@townhall.plymouth.ma/us (Mark Silvia)

Tracking Status: None mary.lampert@comcast.net (Mary Lampert)

Tracking Status: None OCAAMAIL.Resource@nrc.gov (OCAAMAIL Resource)

Tracking Status: None sshollis@duanemorris.com (Sheila Hollis)

Tracking Status: None paul.gaukler@pillsburylaw.com (Paul Gaukler)

Tracking Status: None macdonald@town.duxbury.ma.us (Richard MacDonald)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 91211 4/7/2008

Final Exhibit List.pdf 62599 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:

April 7, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

Entergy Nuclear Generation Co. and )

Entergy Nuclear Operations, Inc. ) Docket No. 50-293-LR

)

) ASLBP No. 06-848-02-LR (Pilgrim Nuclear Power Station) )

NRC STAFF EXHIBIT LIST EXHIBIT TITLE EXHIBIT #

NRC STAFF TESTIMONY OF DR. JAMES A. DAVIS CONCERNING 1 PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)

NRC STAFF TESTIMONY OF TERENCE L. CHAN AND ANDREA T. KEIM 2 CONCERNING PILGRIM WATCH CONTENTION 1 (JANUARY 29, 2008)

REBUTTAL TESTIMONY AND RESPONSES TO BOARD QUESTIONS OF 3 DR. JAMES A. DAVIS, TERENCE L. CHAN AND ANDREA T. KEIM CONCERNING PILGRIM WATCH CONTENTION 1 (MARCH 6, 2008)

NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT - 4 XI.M34 BURIED PIPING AND TANKS INSPECTION NUREG-1801, Rev. 1 (Sept. 2005) EXCERPT - 5 XI.M20 OPEN-CYCLE COOLING WATER SYSTEM 07/18/1989 GENERIC LETTER RE SERVICE WATER SYSTEM 6 PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT (GENERIC LETTER 89-13)

PILGRIM LICENSE RENEWAL APPLICATION EXCERPT - 7 B.1.2 BURIED PIPING AND TANKS INSPECTION PILGRIM LICENSE RENEWAL APPLICATION EXCERPT - 8 B.1.28 SERVICE WATER INTEGRITY NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT - 9 3.0.3.2.16 SERVICE WATER INTEGRITY PROGRAM PDC No. 99-21 EXCAVATION FOR SSW PIPE REPLACEMENT 10 (RFO #12 SCOPE)

EXHIBIT TITLE EXHIBIT #

NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT - 11 3.0.3.1.13 WATER CHEMISTRY CONTROL BWR PROGRAM NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT - 12 3.0.3.1.8 ONE-TIME INSPECTION PROGRAM 12/06/2002 LETTER FROM ENTERGY TO NRC RE PILGRIM NUCLEAR 13 POWER STATION FOURTH TEN-YEAR INSERVICE TESTING (IST)

PROGRAM AND REQUEST FOR APPROVAL OF IST RELIEF REQUESTS AMENDMENT NO. 176 EXCERPT (3/4.5 3/4.5-8) 14 PNPS-FSAR EXCERPT - 11.9 CONDENSATE STORAGE SYSTEM 15 PNPS-FSAR REV. 26 EXCERPT - QUALITY ASSURANCE PROGRAM 16 06/29/2005 LETTER FROM ENTERGY TO NRC RE PILGRIM FOURTH 17 TEN-YEAR INSERVICE INSPECTION PROGRAM PLAN, AND THE ASSOCIATED RELIEF REQUESTS FOR NRC APPROVAL ATTACHMENT 71111.07 (ISSUE DATE 05/25/2006) HEAT SINK 18 PERFORMANCE 05/12/2006 LETTER FROM CLIFFORD ANDERSON (NRC) TO ENTERGY 19 RE PILGRIM NUCLEAR POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000293/2006002 PNPS-FSAR - EXCERPT - 10.7 SALT SERVICE WATER SYSTEM 20 11/07/1991 GENERIC LETTER (GENERIC LETTER 91-18) RE 21 INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTOIN OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY NRC REGULATORY ISSUE

SUMMARY

2005-20: REVISION TO 22 GUIDANCE FORMERLY CONTAINED IN NRC GENERIC LETTER 91-18, INFORMATION TO LICENSEES REGARDING TWO NRC INSPECTION MANUAL SECTIONS ON RESOLUTION OF DEGRADED AND NONCONFORMING CONDITIONS AND ON OPERABILITY NUREG-1891 (Sept. 2007, Published Nov. 2007) EXCERPT - 23 3.0.2 STAFFS REVIEW PROCESS NRC BULLETIN NO. 87-01: THINNING OF PIPE WALLS IN NUCLEAR 24 POWER PLANTS (JULY 9, 1987)

CORROSION INDUCED BY LOW-ENERGY RADIONUCLIDES (2004) 25 EXCERPT - STRATEGY FOR CONTROLLING CORROSION

EXHIBIT TITLE EXHIBIT #

NRC INSPECTION MANUAL - INSPECTION PROCEDURE 35101 - 26 QA PROGRAM IMPLEMENTATION INSPECTION FOR OPERATIONAL PROGRAMS (10/03/2007)

AFFIDAVIT OF DR. JAMES A. DAVIS AND ANDREA T. KEIM IN RESPONSE TO LICENSING BOARD QUESTIONS IN ORDER (BOARD 27 QUESTIONS FOR THE NRC STAFF AND APPLICANT)

NRC REGION III REPORT EXCERPT - SERVICE WATER (SX) SYSTEM 28