ML082600224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082600224
| number = ML082600224
| issue date = 09/16/2008
| issue date = 09/16/2008
| title = 09/30/2008 Meeting Notice with Arizona Public Service Company, to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
| title = Meeting Notice with Arizona Public Service Company, to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:September 16, 2008  
{{#Wiki_filter:UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 September 16, 2008


==SUBJECT:==
==SUBJECT:==
MEETING WITH ARIZONA PUBLIC SERVICE COMPANY  
MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY:     Palo Verde Nuclear Generating Station DOCKET:       05000528, 05000529, 05000530 DATE & TIME: September 30, 2008 6:30 - 8:30 p.m. (MST)
 
LOCATION:     Tonopah Valley High School Auditorium 38201 W. Indian School Road Tonopah, AZ 85354 PURPOSE:     This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan.
FACILITY: Palo Verde Nuclear Generating Station DOCKET: 05000528, 05000529, 05000530  
CATEGORY:     This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.
 
The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
DATE & TIME: September 30, 2008   6:30 - 8:30 p.m. (MST)
LOCATION: Tonopah Valley High School   Auditorium   38201 W. Indian School Road   Tonopah, AZ 85354  
 
PURPOSE: This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan. CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.
The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commission's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).
PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).
NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D B. Singal, Senior Project Manager, NRR UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Arizona Public Service Company UTILITY  R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering M. Lacal, Director, Executive Projects and Plant Support MEETING  Don Allen CONTACT:  Senior Project Engineer    817-860-8100    Don.Allen@nrc.gov cc: Randall K. Edington, Executive  Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ  85072-2034
NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D B. Singal, Senior Project Manager, NRR
 
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ  85007
 
Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA  91770
 
Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003
 
Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ  85040


Arizona Public Service Company Scott Bauer, Director Regulatory Affairs  Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX  79901
Arizona Public Service Company                                   UTILITY R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering M. Lacal, Director, Executive Projects and Plant Support MEETING              Don Allen CONTACT:              Senior Project Engineer 817-860-8100 Don.Allen@nrc.gov cc:
Randall K. Edington, Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040


Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251  
Arizona Public Service Company            Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326


Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX  78701-3326 Arizona Public Service Company Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Arizona Public Service Company Electronic distribution by RIV: NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)
Arizona Public Service Company         Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052
Bruce Boger, ADRO OEMAIL, D/OE  John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator Paul Bonnett  Balwant Singal, Project Manager, NRR Michael Hay, Branch Chief, PBD Don Allen, Senior Project Engineer, PBD David Proulx, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO  Bill Maier, Region IV RSLO  Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor  Amy Powell, OCA


SUNSI Review Completed:     MH     ADAMS:   Yes G No   Initials:       MH__
Arizona Public Service Company            Electronic distribution by RIV:
Publicly Available         Non-Publicly Available         Sensitive         Non-Sensitive R:\_REACTORS\_PV\2008\PV Meeting Notice 9-30-08.doc         ADAMS ML082600224 RIV:SPE:DRP/D C:DRP/D PAO RSLO DAllen/amt MAHay VLDricks WAMaier /RA/ /RA/ /RA/ /RA/ 09/6/08 09/6/08 09/6/08 09/6/08 OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax}}
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)
Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator Paul Bonnett Balwant Singal, Project Manager, NRR Michael Hay, Branch Chief, PBD Don Allen, Senior Project Engineer, PBD David Proulx, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor Amy Powell, OCA SUNSI Review Completed: MH ADAMS: ; Yes                   G No Initials:   MH__
; Publicly Available       Non-Publicly Available     Sensitive     ; Non-Sensitive R:\_REACTORS\_PV\2008\PV Meeting Notice 9-30-08.doc                   ADAMS ML082600224 RIV:SPE:DRP/D           C:DRP/D                 PAO                   RSLO DAllen/amt               MAHay                   VLDricks               WAMaier
/RA/                     /RA/                     /RA/                   /RA/
09/6/08                 09/6/08                 09/6/08               09/6/08 OFFICIAL RECORD COPY                                   T=Telephone       E=E-mail     F=Fax}}

Latest revision as of 04:52, 7 December 2019

Meeting Notice with Arizona Public Service Company, to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan
ML082600224
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/16/2008
From:
NRC/RGN-IV/DRP
To:
References
Download: ML082600224 (5)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 September 16, 2008

SUBJECT:

MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKET: 05000528, 05000529, 05000530 DATE & TIME: September 30, 2008 6:30 - 8:30 p.m. (MST)

LOCATION: Tonopah Valley High School Auditorium 38201 W. Indian School Road Tonopah, AZ 85354 PURPOSE: This is a meeting between the Nuclear Regulatory Commission and Arizona Public Service Company to discuss the current status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.

The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).

NRC A. Vegel, Deputy Director, Division of Reactor Projects M. Hay, Chief, Reactor Projects Branch D B. Singal, Senior Project Manager, NRR

Arizona Public Service Company UTILITY R. Edington, Executive Vice President, Chief Nuclear Officer B. Bement, Vice President, Nuclear Operations D. Mims, Vice President, Regulatory Affairs and Plant Improvement J. Hesser, Vice President, Engineering M. Lacal, Director, Executive Projects and Plant Support MEETING Don Allen CONTACT: Senior Project Engineer 817-860-8100 Don.Allen@nrc.gov cc:

Randall K. Edington, Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040

Arizona Public Service Company Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President, Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Eric J. Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. D21 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326

Arizona Public Service Company Karen O' Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200 Oakland, CA 94607-4052

Arizona Public Service Company Electronic distribution by RIV:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Art Howell, D:DNMS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Ryan Lantz, C:DRS/OB Sue Bogle (OEWEB Resource)

Bruce Boger, ADRO OEMAIL, D/OE John Thorp Kevin Williams, NSIR/DRP/EP Chris Miller, NSIR/DRP/EP John Adams, RIV OEDO Coordinator Patricia Lougheed, RIV PEDO Coordinator Paul Bonnett Balwant Singal, Project Manager, NRR Michael Hay, Branch Chief, PBD Don Allen, Senior Project Engineer, PBD David Proulx, Senior Project Engineer, PBD Ryan Treadway, Senior Resident Inspector Michelle Catts, Resident Inspector Jim Melfi, Resident Inspector Joe Bashore, Resident Inspector Victor Dricks, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC/ACES Michael Vasquez, Region IV Enforcement Specialist Lucy Owen, Region IV RA Secretary Judy Kilcrease, Region IV RA Secretary Anita Tannebaum, Region IV DRP Secretary Lynn Berger, Region IV DRS Secretary Lenora Reyna, Region IV DRS Secretary Tracy Karl, Region IV DRS Secretary Sue Trifiletti, Region IV DNMS Secretary Bub Mueller, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor Amy Powell, OCA SUNSI Review Completed: MH ADAMS: ; Yes G No Initials: MH__

Publicly Available Non-Publicly Available Sensitive  ; Non-Sensitive R
\_REACTORS\_PV\2008\PV Meeting Notice 9-30-08.doc ADAMS ML082600224 RIV:SPE:DRP/D C:DRP/D PAO RSLO DAllen/amt MAHay VLDricks WAMaier

/RA/ /RA/ /RA/ /RA/

09/6/08 09/6/08 09/6/08 09/6/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax