ML13339A961: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13339A961
| number = ML13339A961
| issue date = 12/05/2013
| issue date = 12/05/2013
| title = 12/18/13 Diablo Canyon Public Meeting Notice
| title = Public Meeting Notice
| author name = Walker W C
| author name = Walker W
| author affiliation = NRC/RGN-IV/DRP/RPB-A
| author affiliation = NRC/RGN-IV/DRP/RPB-A
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:December 5, 2013  
{{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NGTON , TEXAS 7 601 1- 4511 December 5, 2013


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING WITH PACIFIC GAS & ELECTRIC (PG&E)  
PUBLIC MEETING WITH PACIFIC GAS & ELECTRIC (PG&E)
 
FACILITY:     Diablo Canyon Power Plant DOCKET:       50-275, 50-323 DATE AND TIME: Wednesday, December 18, 2013 6:30 p.m. - 9:30 p.m. (PST)
FACILITY: Diablo Canyon Power Plant DOCKET: 50-275, 50-323  
LOCATION:     Embassy Suites San Luis Obispo 333 Madonna Road San Luis Obispo, CA 93405 PURPOSE:       This is the annual meeting to discuss the current operating performance for the Diablo Canyon Power Plant. This is a meeting between the Nuclear Regulatory Commission (NRC) and PG&E.
 
DATE AND TIME: Wednesday, December 18, 2013 6:30 p.m. - 9:30 p.m. (PST)
LOCATION: Embassy Suites San Luis Obispo 333 Madonna Road San Luis Obispo, CA 93405  
 
PURPOSE: This is the annual meeting to discuss the current operating performance for the Diablo Canyon Power Plant. This is a meeting between the Nuclear Regulatory Commission (NRC) and PG&E.
This meeting was rescheduled from October 16, 2013.
This meeting was rescheduled from October 16, 2013.
CATEGORY 1: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion but before the meeting is adjourned, the public will have one or more opportunities to communicate with the NRC.
CATEGORY 1:   This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion but before the meeting is adjourned, the public will have one or more opportunities to communicate with the NRC.
This meeting will be recorded and made available on the local area public access channel and online at www.nrc.gov.
This meeting will be recorded and made available on the local area public access channel and online at www.nrc.gov.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need an accommodation to participate in this meeting, or need this meeting notice, or the transcript or other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis.


The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need an accommodation to participate in this meeting, or need this meeting notice, or the transcript or other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commission's meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis. 
Diablo Canyon Power Plant                 PARTICIPANTS:             NRC Troy Pruett, Deputy Director, Division of Reactor Projects Neil OKeefe, Chief, Reactor Projects Branch B Wayne Walker, Chief, Reactor Projects Branch A Tom Hipschman, Senior Resident Inspector John Reynoso, Resident Inspector LICENSEE Ed Halpin, Senior Vice President and Chief Nuclear Officer Barry Allen, Site Vice President Jeff Summy, Senior Director Engineering and Projects MEETING CONTACT:         Wayne Walker, NRC, RIV (817) 320-3675 Wayne.Walker@nrc.gov}}
 
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 Diablo Canyon Power Plant  
 
PARTICIPANTS: NRC Troy Pruett, Deputy Director, Division of Reactor Projects Neil O'Keefe, Chief, Reactor Projects Branch B Wayne Walker, Chief, Reactor Projects Branch A Tom Hipschman, Senior Resident Inspector John Reynoso, Resident Inspector
 
LICENSEE Ed Halpin, Senior Vice President and Chief Nuclear Officer Barry Allen, Site Vice President Jeff Summy, Senior Director Engineering and Projects  
 
MEETING CONTACT: Wayne Walker, NRC, RIV (817) 320-3675 Wayne.Walker@nrc.gov}}

Latest revision as of 09:12, 5 December 2019

Public Meeting Notice
ML13339A961
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/05/2013
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To:
References
Download: ML13339A961 (2)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NGTON , TEXAS 7 601 1- 4511 December 5, 2013

SUBJECT:

PUBLIC MEETING WITH PACIFIC GAS & ELECTRIC (PG&E)

FACILITY: Diablo Canyon Power Plant DOCKET: 50-275, 50-323 DATE AND TIME: Wednesday, December 18, 2013 6:30 p.m. - 9:30 p.m. (PST)

LOCATION: Embassy Suites San Luis Obispo 333 Madonna Road San Luis Obispo, CA 93405 PURPOSE: This is the annual meeting to discuss the current operating performance for the Diablo Canyon Power Plant. This is a meeting between the Nuclear Regulatory Commission (NRC) and PG&E.

This meeting was rescheduled from October 16, 2013.

CATEGORY 1: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion but before the meeting is adjourned, the public will have one or more opportunities to communicate with the NRC.

This meeting will be recorded and made available on the local area public access channel and online at www.nrc.gov.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need an accommodation to participate in this meeting, or need this meeting notice, or the transcript or other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis.

Diablo Canyon Power Plant PARTICIPANTS: NRC Troy Pruett, Deputy Director, Division of Reactor Projects Neil OKeefe, Chief, Reactor Projects Branch B Wayne Walker, Chief, Reactor Projects Branch A Tom Hipschman, Senior Resident Inspector John Reynoso, Resident Inspector LICENSEE Ed Halpin, Senior Vice President and Chief Nuclear Officer Barry Allen, Site Vice President Jeff Summy, Senior Director Engineering and Projects MEETING CONTACT: Wayne Walker, NRC, RIV (817) 320-3675 Wayne.Walker@nrc.gov