| number = ML14101A197
| number = ML14101A197
| issue date = 04/11/2014
| issue date = 04/11/2014
| title = 05/01/2014 Notice of Regulatory Conference with Entergy Operations, Inc. to Discuss an Apparent Violation Affecting Both Units at Arkansas Nuclear One, Related to the Drop of the Unit 1 Main Generator Stator
| title = Notice of Regulatory Conference with Entergy Operations, Inc. to Discuss an Apparent Violation Affecting Both Units at Arkansas Nuclear One, Related to the Drop of the Unit 1 Main Generator Stator
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 11, 2014  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 11, 2014


==SUBJECT:==
==SUBJECT:==
REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC.
REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC.
FACILITY:   Arkansas Nuclear One, Units 1 and 2 DOCKETS:
FACILITY:     Arkansas Nuclear One, Units 1 and 2 DOCKETS:       50-313 and 50-368 DATE & TIME:   Thursday, May 1, 2014 1:00 p.m. - 5:00 p.m. (CDT)
50-313 and 50-368 DATE & TIME: Thursday, May 1, 2014 1:00 p.m. 5:00 p.m. (CDT)   LOCATION: Region IV Office , Conference Room 1 1600 E. Lamar Blvd.
LOCATION:     Region IV Office, Conference Room 1 1600 E. Lamar Blvd.
Arlington, TX 76011 PURPOSE: The purpose of this meeting is to discuss an apparent violation affecting both units at Arkansas Nuclear One, related to the drop of the Unit 1 main generator stator. The focus of the Regulatory Conference is to discuss the significance of the findings. The findings and the associated apparent violation are discussed in NRC Inspection Report 05000313/2013012 and 05000368/2013012 (ML14083A409).
Arlington, TX 76011 PURPOSE:       The purpose of this meeting is to discuss an apparent violation affecting both units at Arkansas Nuclear One, related to the drop of the Unit 1 main generator stator. The focus of the Regulatory Conference is to discuss the significance of the findings. The findings and the associated apparent violation are discussed in NRC Inspection Report 05000313/2013012 and 05000368/2013012 (ML14083A409).
 
CATEGORY:     This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion, but before the meeting is adjourned, the public will have one or more opportunities to communicate with the Nuclear Regulatory Commission.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion, but before the meeting is adjourned, the public will have one or more opportunities to communicate with the Nuclear Regulatory Commission.
A telecommunications bridge will be available for the public. The number of lines is limited. Interested parties should call 1-800-857-5304 and enter participant code 5898411 to participate in this meeting.
A telecommunications bridge will be available for the public. The number of lines is limited. Interested parties should call 1-800-857-5304 and enter participant code 5898411 to participate in this meeting
 
Entergy Operations, Inc. PARTICIPANTS:
NRC  M. Dapas, Regional Administrator, Region IV  K. Kennedy, Director, Division of Reactor Projects (DRP) T. Pruett, Deputy Director, DRP J. Clark, Acting Director, Division of Reactor Safety  G. Werner, Acting Chief, Reactor Projects Branch E, DRP  V. Campbell, Chief, Allegation Coordination and Enforcement  Staff R. Browder, Senior Enforcement Specialist, Allegation  Coordination and Enforcement Staff  B. Tindell, Senior Resident Inspector, Arkansas Nuclear One P. Bamford, Project Manager, Office of Nuclear Reactor  Regulation ENTERGY  J. Kowaleski, Senior Vice President, Entergy J. Browning, Site Vice President, ANO  D. James, Director, Regulatory and Performance Improvement  Department, ANO S. Pyle, Manager, Regulatory Assurance, ANO B. Ford, Senior Manager, Fleet Regulatory Assurance, Entergy J. McCann, Vice President, Regulatory Assurance, Entergy MEETING CONTACT:  Gregory Werner, Acting Branch Chief  Reactor Projects Branch E (817) 320-3984  Greg.Werner@nrc.gov T he NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
enclosures will be available electronica Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of http://www.nrc.gov/readingrm/adams.html.


Entergy Operations, Inc.                        PARTICIPANTS:                  NRC M. Dapas, Regional Administrator, Region IV K. Kennedy, Director, Division of Reactor Projects (DRP)
T. Pruett, Deputy Director, DRP J. Clark, Acting Director, Division of Reactor Safety G. Werner, Acting Chief, Reactor Projects Branch E, DRP V. Campbell, Chief, Allegation Coordination and Enforcement Staff R. Browder, Senior Enforcement Specialist, Allegation Coordination and Enforcement Staff B. Tindell, Senior Resident Inspector, Arkansas Nuclear One P. Bamford, Project Manager, Office of Nuclear Reactor Regulation ENTERGY J. Kowaleski, Senior Vice President, Entergy J. Browning, Site Vice President, ANO D. James, Director, Regulatory and Performance Improvement Department, ANO S. Pyle, Manager, Regulatory Assurance, ANO B. Ford, Senior Manager, Fleet Regulatory Assurance, Entergy J. McCann, Vice President, Regulatory Assurance, Entergy MEETING CONTACT:                Gregory Werner, Acting Branch Chief Reactor Projects Branch E (817) 320-3984 Greg.Werner@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:
http://www.nrc.gov/readingrm/adams.html.
To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.}}
To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.}}

Latest revision as of 06:54, 5 December 2019

Notice of Regulatory Conference with Entergy Operations, Inc. to Discuss an Apparent Violation Affecting Both Units at Arkansas Nuclear One, Related to the Drop of the Unit 1 Main Generator Stator
ML14101A197
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/11/2014
From:
NRC Region 4
To:
Werner G
References
Download: ML14101A197 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 11, 2014

SUBJECT:

REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC.

FACILITY: Arkansas Nuclear One, Units 1 and 2 DOCKETS: 50-313 and 50-368 DATE & TIME: Thursday, May 1, 2014 1:00 p.m. - 5:00 p.m. (CDT)

LOCATION: Region IV Office, Conference Room 1 1600 E. Lamar Blvd.

Arlington, TX 76011 PURPOSE: The purpose of this meeting is to discuss an apparent violation affecting both units at Arkansas Nuclear One, related to the drop of the Unit 1 main generator stator. The focus of the Regulatory Conference is to discuss the significance of the findings. The findings and the associated apparent violation are discussed in NRC Inspection Report 05000313/2013012 and 05000368/2013012 (ML14083A409).

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion, but before the meeting is adjourned, the public will have one or more opportunities to communicate with the Nuclear Regulatory Commission.

A telecommunications bridge will be available for the public. The number of lines is limited. Interested parties should call 1-800-857-5304 and enter participant code 5898411 to participate in this meeting.

Entergy Operations, Inc. PARTICIPANTS: NRC M. Dapas, Regional Administrator, Region IV K. Kennedy, Director, Division of Reactor Projects (DRP)

T. Pruett, Deputy Director, DRP J. Clark, Acting Director, Division of Reactor Safety G. Werner, Acting Chief, Reactor Projects Branch E, DRP V. Campbell, Chief, Allegation Coordination and Enforcement Staff R. Browder, Senior Enforcement Specialist, Allegation Coordination and Enforcement Staff B. Tindell, Senior Resident Inspector, Arkansas Nuclear One P. Bamford, Project Manager, Office of Nuclear Reactor Regulation ENTERGY J. Kowaleski, Senior Vice President, Entergy J. Browning, Site Vice President, ANO D. James, Director, Regulatory and Performance Improvement Department, ANO S. Pyle, Manager, Regulatory Assurance, ANO B. Ford, Senior Manager, Fleet Regulatory Assurance, Entergy J. McCann, Vice President, Regulatory Assurance, Entergy MEETING CONTACT: Gregory Werner, Acting Branch Chief Reactor Projects Branch E (817) 320-3984 Greg.Werner@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/readingrm/adams.html.

To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.