| number = ML15139A013
| number = ML15139A013
| issue date = 05/01/2015
| issue date = 05/01/2015
| title = ESEP Report Clarifications Corrected
| title = NRR E-mail Capture - LaSalle ESEP Report Clarifications Corrected
| author name = Clark J S
| author name = Clark J
| author affiliation = Exelon Corp
| author affiliation = Exelon Corp
| addressee name = Wyman S M
| addressee name = Wyman S
| addressee affiliation = NRC/NRR/JLD
| addressee affiliation = NRC/NRR/JLD
| docket = 05000373, 05000374
| docket = 05000373, 05000374
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Clark, Jeffrey S.:(GenCo-Nuc)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Clark, Jeffrey S.:(GenCo-Nuc) [Jeffrey.Clark2@exeloncorp.com]
[Jeffrey.Clark2@exeloncorp.com]
Sent:                       Friday, May 01, 2015 5:19 PM To:                         DiFrancesco, Nicholas; Wyman, Stephen Cc:                         Devlin-Gill, Stephanie; Behrend, Chuck L.:(GenCo-Nuc); Aggarwal, Vinod K:(GenCo-Nuc);
Sent: Friday, May 01, 2015 5:19 PM To: DiFrancesco, Nicholas; Wyman, Stephen Cc: Devlin-Gill, Stephanie; Behrend, Chuck L.:(G enCo-Nuc); Aggarwal, Vinod K:(GenCo-Nuc);
Distel, David J:(GenCo-Nuc); Hilton, William B:(GenCo-Nuc); Tanton, Sean:(GenCo-Nuc);
Distel, David J:(GenCo-Nuc); Hilton, Willia m B:(GenCo-Nuc); Tanton, Sean:(GenCo-Nuc);
Chouinard, Matthew:(GenCo-Nuc); Sanchez, Jorge L.:(GenCo-Nuc); Amway, Phillip M:(GenCo-Nuc); Trenka, Harold:(GenCo-Nuc); Schupp, David P:(GenCo-Nuc); Mokkapati, Sailaja:(GenCo-Nuc)
Chouinard, Matthew:(GenCo-Nuc); Sanchez, Jorge L.:(GenCo-Nuc); Amway, Phillip M:(GenCo-Nuc); Trenka, Harold:(GenCo-Nuc)
; Schupp, David P:(GenCo-Nuc); Mokkapati, Sailaja:(GenCo-Nuc)


==Subject:==
==Subject:==
RE: LaSalle ESEP Report Clarifications Corrected Attachments:
RE: LaSalle ESEP Report Clarifications Corrected Attachments:               Response to USNRC Questions for LaSalle ESEP Report FINAL 5-1-15.docx Mr. DiFrancesco/Mr. Wyman, In response to your email below, Exelon is pleased to provide you with the attached responses to your questions. Based on our previous discussions we are providing you this information on our mutually agreed upon extended request date of May 1, 2015. Please feel free to contact us with any further questions or clarifications needed to support the NRCs ESEP report reviews.
Response to USNRC Questions for LaS alle ESEP Report FINAL 5-1-15.docx Mr. DiFrancesco/Mr. Wyman, In response to your email below, Exelon is pleased to provide you with the attached responses to your questions. Based on our previous discussions we are providing you this information on our mutually agreed upon extended request date of May 1, 2015. Please feel free to contact us with any further questions or clarifications needed to support the NRC's ESEP report reviews.
Thank You, Jeff Clark Jeffrey S. Clark, PE Fukushima Response Seismic Lead 630-657-3876 (Work)
Thank You, Jeff Clark Jeffrey S. Clark, PE Fukushima Response Seismic Lead 630-657-3876 (Work)
 
From: Wyman, Stephen [mailto:Stephen.Wyman@nrc.gov]
From: Wyman, Stephen [mailto:Stephen.Wyman@nrc.gov
Sent: Wednesday, April 08, 2015 3:05 PM To: Clark, Jeffrey S.:(GenCo-Nuc)
Sent: Wednesday, April 08, 2015 3:05 PM To: Clark, Jeffrey S.:(GenCo-Nuc)
Cc: DiFrancesco, Nicholas; Devlin-Gill, Stephanie
Cc: DiFrancesco, Nicholas; Devlin-Gill, Stephanie  


==Subject:==
==Subject:==
LaSalle ESEP Report Clarifications Corrected Mr. Clark, In follow-up to my April 8 th voicemail, as part of the NRC review of the LaSalle ESEP report, the staff would appreciate clarification on the following technical items:
LaSalle ESEP Report Clarifications Corrected Mr. Clark, In follow-up to my April 8th voicemail, as part of the NRC review of the LaSalle ESEP report, the staff would appreciate clarification on the following technical items:
: 1. The ESEP submittal identifies the Fuel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
: 1. The ESEP submittal identifies the Fuel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
: 22. The "to-be installed" severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.
1
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
: 2. The to-be installed severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.
 
An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.
Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.  
Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.
 
: Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)
Thanks, Steve
Stephen.Wyman@nrc.gov This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.
 
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2
Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice)  


301-415-8333 (Fax)
Hearing Identifier:     NRR_PMDA Email Number:           2086 Mail Envelope Properties       (9717B5461B966646BAF3352111206D756C3DE5DC)
 
Stephen.Wyman@nrc.gov This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Ema il to the intended recipien t(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete th is Email and any copies.
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP Hearing Identifier: NRR_PMDA Email Number: 2086   Mail Envelope Properties   (9717B5461B966646BAF3352111206D756C3DE5DC)


==Subject:==
==Subject:==
RE: LaSalle ESEP Report Clarifications Corrected Sent Date:   5/1/2015 5:19:25 PM Received Date: 5/1/2015 5:19:29 PM From:   Clark, Jeffrey S.:(GenCo-Nuc)
RE: LaSalle ESEP Report Clarifications Corrected Sent Date:               5/1/2015 5:19:25 PM Received Date:           5/1/2015 5:19:29 PM From:                   Clark, Jeffrey S.:(GenCo-Nuc)
Created By:   Jeffrey.Clark2@exeloncorp.com Recipients:     "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov> Tracking Status: None "Behrend, Chuck L.:(GenCo-Nuc)" <chuck.behrend@exeloncorp.com> Tracking Status: None "Aggarwal, Vinod K:(GenCo-Nuc)" <Vinod.Aggarwal@exeloncorp.com> Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com> Tracking Status: None "Hilton, William B:(GenCo-Nuc)" <william.hilton@exeloncorp.com> Tracking Status: None "Tanton, Sean:(GenCo-Nuc)" <Sean.Tanton@exeloncorp.com> Tracking Status: None "Chouinard, Matthew:(GenCo-Nuc)" <Matthew.Chouinard@exeloncorp.com> Tracking Status: None "Sanchez, Jorge L.:(GenCo-Nuc)" <Jorge.Sanchez@exeloncorp.com> Tracking Status: None "Amway, Phillip M:(GenCo-Nuc)" <phillip.amway@exeloncorp.com> Tracking Status: None "Trenka, Harold:(GenCo-Nuc)" <Harold.Trenka@exeloncorp.com> Tracking Status: None "Schupp, David P:(GenCo-Nuc)" <David.Schupp@exeloncorp.com> Tracking Status: None "Mokkapati, Sailaja:(GenCo-Nuc)" <Sailaja.Mokkapati@exeloncorp.com> Tracking Status: None "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov> Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov> Tracking Status: None  
Created By:             Jeffrey.Clark2@exeloncorp.com Recipients:
"Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>
Tracking Status: None "Behrend, Chuck L.:(GenCo-Nuc)" <chuck.behrend@exeloncorp.com>
Tracking Status: None "Aggarwal, Vinod K:(GenCo-Nuc)" <Vinod.Aggarwal@exeloncorp.com>
Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com>
Tracking Status: None "Hilton, William B:(GenCo-Nuc)" <william.hilton@exeloncorp.com>
Tracking Status: None "Tanton, Sean:(GenCo-Nuc)" <Sean.Tanton@exeloncorp.com>
Tracking Status: None "Chouinard, Matthew:(GenCo-Nuc)" <Matthew.Chouinard@exeloncorp.com>
Tracking Status: None "Sanchez, Jorge L.:(GenCo-Nuc)" <Jorge.Sanchez@exeloncorp.com>
Tracking Status: None "Amway, Phillip M:(GenCo-Nuc)" <phillip.amway@exeloncorp.com>
Tracking Status: None "Trenka, Harold:(GenCo-Nuc)" <Harold.Trenka@exeloncorp.com>
Tracking Status: None "Schupp, David P:(GenCo-Nuc)" <David.Schupp@exeloncorp.com>
Tracking Status: None "Mokkapati, Sailaja:(GenCo-Nuc)" <Sailaja.Mokkapati@exeloncorp.com>
Tracking Status: None "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>
Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>
Tracking Status: None Post Office:            EXCHM-OMF-25.exelonds.com Files                            Size                    Date & Time MESSAGE                          3495                    5/1/2015 5:19:29 PM Response to USNRC Questions for LaSalle ESEP Report FINAL 5-1-15.docx        24840 Options Priority:                        Standard Return Notification:            No Reply Requested:                Yes Sensitivity:                    Normal Expiration Date:


Post Office:  EXCHM-OMF-25.exelonds.com Files    Size      Date & Time MESSAGE    3495      5/1/2015 5:19:29 PM Response to USNRC Questions for LaSalle ESEP Report FINAL 5-1-15.docx    24840 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    Yes  Sensitivity:    Normal  Expiration Date:
Recipients Received:
Recipients Received:
Exelon Response to USNRC Questions for LaSalleESEP Report In response to the email request dated April 8, 2015 from the USNRC's Mr. Stephen Wyman, Exelon is pleased to provide you wit h the responses below. Please feel free to contact us with any further questions or clarifications needed to support the NRC's ESEP report reviews.
Exelon Response to USNRC Questions for LaSalleESEP Report In response to the email request dated April 8, 2015 from the USNRCs Mr. Stephen Wyman, Exelon is pleased to provide you with the responses below. Please feel free to contact us with any further questions or clarifications needed to support the NRCs ESEP report reviews.
Question 1:
Question 1:
* The ESEP submittal identifies the F uel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow pat h are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited acti on as a part of t he FLEX strategies and the Sequence of Events.
* The ESEP submittal identifies the Fuel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.
Response to Question 1:
Response to Question 1:
* The sections of the Fuel Pool C ooling Emergency Makeup System (FC EMU System) that are used for Phase 2 Core Cooling consist of piping, manual valves and supports. The operator manual actions required to m anipulate the manual valves for the FC EMU system are credi ted as part of the FLEX implementation strategies and Sequence of Events.
* The sections of the Fuel Pool Cooling Emergency Makeup System (FC EMU System) that are used for Phase 2 Core Cooling consist of piping, manual valves and supports. The operator manual actions required to manipulate the manual valves for the FC EMU system are credited as part of the FLEX implementation strategies and Sequence of Events. There are no motor-operated valves required to be used in the FC EMU System for Phase 2 Core Cooling. In addition, there are no additional components in this flow path that are required to be evaluated per the ESEP guidance (EPRI 3002000704, Section 3).
There are no motor-operated valves required to be used in the FC EMU Syst em for Phase 2 Core Cooling. In addition, there are no additional components in this flow path that are required to be evaluated per the ESEP guidance (EPRI 3002000704, Section 3).
Question 2:
Question 2
* The to-be installed severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.
:
1
* The "to-be installed" severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.  
 
2  Response to Question 2:
* All SSC's associated with the HCVS/
SACV system (HCVS Order Phase I equipment) will, at a minimum, be des igned to the seismic qualification requirements defined in NEI 13-02, Rev 0, Section 5.2. In addition, all "non-portable" FLEX components associated wit h the HCVS/SACV system required to support EA-12-049 FLEX capabilit y, that meet the criteria to be included on the ESEL, per Section 3 of EPRI 3002000704, have been or will be evaluated to the


ESEP requirements. No te that Exelon's ESELs are based on the FLEX implementation strategy as of the 3 rd 6-month FLEX Update Submittals (August 2014).
Response to Question 2:
* NRC confirmation that the ESEP has been considered for the appropriate SSCs associated with the HCVS/SACV system required to support EA-12-049 FLEX capability can be achieved through revi ew of the HCVS/SACV modification documents. As allowed by the ESEP criteria, only a single success path for HCVS/SACV operation will be considered. Exelon will describe within the modification documentation the seismi c design bases for the SSCs of the HCVS/SACV system.}}
* All SSCs associated with the HCVS/SACV system (HCVS Order Phase I equipment) will, at a minimum, be designed to the seismic qualification requirements defined in NEI 13-02, Rev 0, Section 5.2. In addition, all non-portable FLEX components associated with the HCVS/SACV system required to support EA-12-049 FLEX capability, that meet the criteria to be included on the ESEL, per Section 3 of EPRI 3002000704, have been or will be evaluated to the ESEP requirements. Note that Exelons ESELs are based on the FLEX implementation strategy as of the 3rd 6-month FLEX Update Submittals (August 2014).
* NRC confirmation that the ESEP has been considered for the appropriate SSCs associated with the HCVS/SACV system required to support EA-12-049 FLEX capability can be achieved through review of the HCVS/SACV modification documents. As allowed by the ESEP criteria, only a single success path for HCVS/SACV operation will be considered. Exelon will describe within the modification documentation the seismic design bases for the SSCs of the HCVS/SACV system.
2}}

Latest revision as of 00:26, 5 December 2019

NRR E-mail Capture - LaSalle ESEP Report Clarifications Corrected
ML15139A013
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/01/2015
From: Clark J
Exelon Corp
To: Steve Wyman
Japan Lessons-Learned Division
References
Download: ML15139A013 (6)


Text

NRR-PMDAPEm Resource From: Clark, Jeffrey S.:(GenCo-Nuc) [Jeffrey.Clark2@exeloncorp.com]

Sent: Friday, May 01, 2015 5:19 PM To: DiFrancesco, Nicholas; Wyman, Stephen Cc: Devlin-Gill, Stephanie; Behrend, Chuck L.:(GenCo-Nuc); Aggarwal, Vinod K:(GenCo-Nuc);

Distel, David J:(GenCo-Nuc); Hilton, William B:(GenCo-Nuc); Tanton, Sean:(GenCo-Nuc);

Chouinard, Matthew:(GenCo-Nuc); Sanchez, Jorge L.:(GenCo-Nuc); Amway, Phillip M:(GenCo-Nuc); Trenka, Harold:(GenCo-Nuc); Schupp, David P:(GenCo-Nuc); Mokkapati, Sailaja:(GenCo-Nuc)

Subject:

RE: LaSalle ESEP Report Clarifications Corrected Attachments: Response to USNRC Questions for LaSalle ESEP Report FINAL 5-1-15.docx Mr. DiFrancesco/Mr. Wyman, In response to your email below, Exelon is pleased to provide you with the attached responses to your questions. Based on our previous discussions we are providing you this information on our mutually agreed upon extended request date of May 1, 2015. Please feel free to contact us with any further questions or clarifications needed to support the NRCs ESEP report reviews.

Thank You, Jeff Clark Jeffrey S. Clark, PE Fukushima Response Seismic Lead 630-657-3876 (Work)

From: Wyman, Stephen [1]

Sent: Wednesday, April 08, 2015 3:05 PM To: Clark, Jeffrey S.:(GenCo-Nuc)

Cc: DiFrancesco, Nicholas; Devlin-Gill, Stephanie

Subject:

LaSalle ESEP Report Clarifications Corrected Mr. Clark, In follow-up to my April 8th voicemail, as part of the NRC review of the LaSalle ESEP report, the staff would appreciate clarification on the following technical items:

1. The ESEP submittal identifies the Fuel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.

1

2. The to-be installed severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.

An email response will likely be sufficient to support the ESEP report review, however, please be aware that your email response will be made publicly available in ADAMS. A response around April 22, if practicable, would be greatly appreciated to support the planned review schedule.

Please let me or Nick DiFrancesco (at 301-415-1115) know if you would like to schedule a clarification call or have any questions and concerns.

Thanks, Steve Stephen M. Wyman USNRC/NRR/JLD/HMB Office: O-13G9 MS: O-13C5 301-415-3041 (Voice) 301-415-8333 (Fax)

Stephen.Wyman@nrc.gov This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.

Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2

Hearing Identifier: NRR_PMDA Email Number: 2086 Mail Envelope Properties (9717B5461B966646BAF3352111206D756C3DE5DC)

Subject:

RE: LaSalle ESEP Report Clarifications Corrected Sent Date: 5/1/2015 5:19:25 PM Received Date: 5/1/2015 5:19:29 PM From: Clark, Jeffrey S.:(GenCo-Nuc)

Created By: Jeffrey.Clark2@exeloncorp.com Recipients:

"Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>

Tracking Status: None "Behrend, Chuck L.:(GenCo-Nuc)" <chuck.behrend@exeloncorp.com>

Tracking Status: None "Aggarwal, Vinod K:(GenCo-Nuc)" <Vinod.Aggarwal@exeloncorp.com>

Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com>

Tracking Status: None "Hilton, William B:(GenCo-Nuc)" <william.hilton@exeloncorp.com>

Tracking Status: None "Tanton, Sean:(GenCo-Nuc)" <Sean.Tanton@exeloncorp.com>

Tracking Status: None "Chouinard, Matthew:(GenCo-Nuc)" <Matthew.Chouinard@exeloncorp.com>

Tracking Status: None "Sanchez, Jorge L.:(GenCo-Nuc)" <Jorge.Sanchez@exeloncorp.com>

Tracking Status: None "Amway, Phillip M:(GenCo-Nuc)" <phillip.amway@exeloncorp.com>

Tracking Status: None "Trenka, Harold:(GenCo-Nuc)" <Harold.Trenka@exeloncorp.com>

Tracking Status: None "Schupp, David P:(GenCo-Nuc)" <David.Schupp@exeloncorp.com>

Tracking Status: None "Mokkapati, Sailaja:(GenCo-Nuc)" <Sailaja.Mokkapati@exeloncorp.com>

Tracking Status: None "DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>

Tracking Status: None Post Office: EXCHM-OMF-25.exelonds.com Files Size Date & Time MESSAGE 3495 5/1/2015 5:19:29 PM Response to USNRC Questions for LaSalle ESEP Report FINAL 5-1-15.docx 24840 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received:

Exelon Response to USNRC Questions for LaSalleESEP Report In response to the email request dated April 8, 2015 from the USNRCs Mr. Stephen Wyman, Exelon is pleased to provide you with the responses below. Please feel free to contact us with any further questions or clarifications needed to support the NRCs ESEP report reviews.

Question 1:

  • The ESEP submittal identifies the Fuel Pool Cooling and Emergency Makeup System as a flow-path for Phase 2 Core Cooling; however, it appears that the ESEL does not contain components within this flow-path. Confirm that no additional components within this flow path are required to be evaluated per the ESEP guidance. For example, confirm if any motor-operated valves in the Fuel Pool Cooling and Emergency Makeup flow-path are required to change position and whether they are feasible to be operated manually and locally. In addition, if these motor operated valves can be operated manually, confirm that this operator manual action is the credited action as a part of the FLEX strategies and the Sequence of Events.

Response to Question 1:

  • The sections of the Fuel Pool Cooling Emergency Makeup System (FC EMU System) that are used for Phase 2 Core Cooling consist of piping, manual valves and supports. The operator manual actions required to manipulate the manual valves for the FC EMU system are credited as part of the FLEX implementation strategies and Sequence of Events. There are no motor-operated valves required to be used in the FC EMU System for Phase 2 Core Cooling. In addition, there are no additional components in this flow path that are required to be evaluated per the ESEP guidance (EPRI 3002000704, Section 3).

Question 2:

  • The to-be installed severe accident capable vent was not identified as a modification. Please describe how you plan to demonstrate, and allow the staff to confirm, that the SSCs supporting the severe accident capable vent will meet the ESEP guidance.

1

Response to Question 2:

  • All SSCs associated with the HCVS/SACV system (HCVS Order Phase I equipment) will, at a minimum, be designed to the seismic qualification requirements defined in NEI 13-02, Rev 0, Section 5.2. In addition, all non-portable FLEX components associated with the HCVS/SACV system required to support EA-12-049 FLEX capability, that meet the criteria to be included on the ESEL, per Section 3 of EPRI 3002000704, have been or will be evaluated to the ESEP requirements. Note that Exelons ESELs are based on the FLEX implementation strategy as of the 3rd 6-month FLEX Update Submittals (August 2014).
  • NRC confirmation that the ESEP has been considered for the appropriate SSCs associated with the HCVS/SACV system required to support EA-12-049 FLEX capability can be achieved through review of the HCVS/SACV modification documents. As allowed by the ESEP criteria, only a single success path for HCVS/SACV operation will be considered. Exelon will describe within the modification documentation the seismic design bases for the SSCs of the HCVS/SACV system.

2