ML17107A338: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17107A338
| number = ML17107A338
| issue date = 04/13/2017
| issue date = 04/13/2017
| title = 04/13/2017 Nei/Industry'S Presentation for the Modernization Plan #4 Regulatory Infrastructure Public Meeting
| title = Nei/Industry'S Presentation for the Modernization Plan #4 Regulatory Infrastructure Public Meeting
| author name =  
| author name =  
| author affiliation = Nuclear Energy Institute (NEI)
| author affiliation = Nuclear Energy Institute (NEI)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:MODERNIZATION PLAN #
{{#Wiki_filter:MODERNIZATION PLAN #4 REGULATORY INFRASTRUCTURE PUBLIC MEETING Additional Input from NEI/Industry Preliminary, Unofficial, Partial Poll Results and MP 4Ab Deliverables for 2017 April 13, 2017 1
4 REGULATORY INFRASTRUCTURE PUBLIC MEETING Additional Input from NEI/Industry Preliminary, Unofficial, Partial Poll Results and MP 4Ab Deliverables for 2017 April 13, 2017 1
 
MP4a SuccessThen What?
MP4a Success Then What?
MP4a Success =  
* MP4a Success =
-revised regulation that results in a more predictable, quantifiable, lower risk, scalable, path through the LAR process for safety digital upgrades Which Begs the Question:
  - revised regulation that results in a more predictable, quantifiable, lower risk, scalable, path through the LAR process for safety digital upgrades
-If MP4a is successful, what does industry estimate will result in terms of digital safety system upgrades, and specifically LAR submittals?
* Which Begs the Question:
2 Future Safety Related Upgrades So- we took a preliminary poll:
  - If MP4a is successful, what does industry estimate will result in terms of digital safety system upgrades, and specifically LAR submittals?
-Very Limited # of Utilities / Units
2
-N on-committal, Best Guess, Anonymous -Focused on LAR Submittals -Some (not all) Included 50.59
 
-Very Preliminary, Unofficial, Partial Poll Over the next 8 years, industry may begin-
Future Safety Related Upgrades
-LAR's for ~10 Protection Systems  
* So we took a preliminary poll:
-LAR's for ~10 Safety Support Systems
  - Very Limited # of Utilities / Units
-50.59's for  
  - Non-committal, Best Guess, Anonymous
~20+ Safety Support Systems 3
  - Focused on LAR Submittals
MP 4Ab Deliverables for 2017 Develop a DI&C LAR guidance document for licensees. Define the process for using the fundamental design principles. Add a wrapper that: -Use the fundamental design principles from the white paper
  - Some (not all) Included 50.59
-Define purpose for each section in the document -Suggest the regulatory findings for each section -Define the information to be provided in the LAR -Use standard LAR format from LIC-101 -Consider providing as an appendix to NEI 06-02, Rev. 2 -Industry pilot projects are under formal utility evaluation Generate a NEI/NRC project plan, including schedule milestones, that defines how this document will be applied and how pilot lessons learned will be incorporated The NRC to generate an endorsement letter for the document, with NRC to endorse in the longer term through the RG process 4}}
  - Very Preliminary, Unofficial, Partial Poll
* Over the next 8 years, industry may begin
  - LARs for ~10 Protection Systems
  - LARs for ~10 Safety Support Systems
  - 50.59s for ~20+ Safety Support Systems 3
 
MP 4Ab Deliverables for 2017
* Develop a DI&C LAR guidance document for licensees. Define the process for using the fundamental design principles. Add a wrapper that:
  - Use the fundamental design principles from the white paper
  - Define purpose for each section in the document
  - Suggest the regulatory findings for each section
  - Define the information to be provided in the LAR
  - Use standard LAR format from LIC-101
  - Consider providing as an appendix to NEI 06-02, Rev. 2
  - Industry pilot projects are under formal utility evaluation
* Generate a NEI/NRC project plan, including schedule milestones, that defines how this document will be applied and how pilot lessons learned will be incorporated
* The NRC to generate an endorsement letter for the document, with NRC to endorse in the longer term through the RG process 4}}

Latest revision as of 09:57, 4 December 2019

Nei/Industry'S Presentation for the Modernization Plan #4 Regulatory Infrastructure Public Meeting
ML17107A338
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/13/2017
From:
Nuclear Energy Institute
To:
Licensing Processes Branch (DPR)
Wilkins L
References
Download: ML17107A338 (4)


Text

MODERNIZATION PLAN #4 REGULATORY INFRASTRUCTURE PUBLIC MEETING Additional Input from NEI/Industry Preliminary, Unofficial, Partial Poll Results and MP 4Ab Deliverables for 2017 April 13, 2017 1

MP4a Success Then What?

  • MP4a Success =

- revised regulation that results in a more predictable, quantifiable, lower risk, scalable, path through the LAR process for safety digital upgrades

  • Which Begs the Question:

- If MP4a is successful, what does industry estimate will result in terms of digital safety system upgrades, and specifically LAR submittals?

2

Future Safety Related Upgrades

  • So we took a preliminary poll:

- Very Limited # of Utilities / Units

- Non-committal, Best Guess, Anonymous

- Focused on LAR Submittals

- Some (not all) Included 50.59

- Very Preliminary, Unofficial, Partial Poll

  • Over the next 8 years, industry may begin

- LARs for ~10 Protection Systems

- LARs for ~10 Safety Support Systems

- 50.59s for ~20+ Safety Support Systems 3

MP 4Ab Deliverables for 2017

  • Develop a DI&C LAR guidance document for licensees. Define the process for using the fundamental design principles. Add a wrapper that:

- Use the fundamental design principles from the white paper

- Define purpose for each section in the document

- Suggest the regulatory findings for each section

- Define the information to be provided in the LAR

- Use standard LAR format from LIC-101

- Consider providing as an appendix to NEI 06-02, Rev. 2

- Industry pilot projects are under formal utility evaluation

  • Generate a NEI/NRC project plan, including schedule milestones, that defines how this document will be applied and how pilot lessons learned will be incorporated
  • The NRC to generate an endorsement letter for the document, with NRC to endorse in the longer term through the RG process 4