ML18331A040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18331A040
| number = ML18331A040
| issue date = 11/21/2018
| issue date = 11/21/2018
| title = 11/21/2018 Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report
| title = Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report
| author name = Dacus E
| author name = Dacus E
| author affiliation = NRC/OCA
| author affiliation = NRC/OCA
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:/RA/}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2018 The Honorable William R. Keating Member, United States House of Representatives 170 Court Street Plymouth, MA 02360
 
==Dear Congressman Keating:==
 
This is to acknowledge receipt of your letter dated November 20, 2018, regarding the inspections performed at Pilgrim Nuclear Power Station.
Please be assured that we are working on a response, and a reply will be forwarded to you as soon as possible.
Sincerely,
                                              /RA/
Eugene Dacus, Director Office of Congressional Affairs}}

Latest revision as of 07:48, 30 November 2019

Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report
ML18331A040
Person / Time
Site: Pilgrim, Holtec
Issue date: 11/21/2018
From: Eugene Dacus
Office of Congressional Affairs
To: Keating W
US HR (House of Representatives)
Shared Package
ML18325A026 List:
References
LTR-18-0454 IR 2018001, IR 2018003
Download: ML18331A040 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2018 The Honorable William R. Keating Member, United States House of Representatives 170 Court Street Plymouth, MA 02360

Dear Congressman Keating:

This is to acknowledge receipt of your letter dated November 20, 2018, regarding the inspections performed at Pilgrim Nuclear Power Station.

Please be assured that we are working on a response, and a reply will be forwarded to you as soon as possible.

Sincerely,

/RA/

Eugene Dacus, Director Office of Congressional Affairs