ML060250618: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 01/25/2006
| issue date = 01/25/2006
| title = Licensee Response to - NRC Integrated Inspection Report Nos. 05000338, 339/2005004 - North Anna Power Station Units 1 & 2
| title = Licensee Response to - NRC Integrated Inspection Report Nos. 05000338, 339/2005004 - North Anna Power Station Units 1 & 2
| author name = Landis K D
| author name = Landis K
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Grecheck E S
| addressee name = Grecheck E
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339
| docket = 05000338, 05000339
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000338/2005004]]
See also: [[see also::IR 05000338/2005004]]


=Text=
=Text=
{{#Wiki_filter:January 25, 2006Virginia Electric and Power CompanyATTN:Mr. Eugene S. GrecheckVice President  
{{#Wiki_filter:January 25, 2006
Nuclear Support ServicesInnsbrook Technical Center - 2SW
Virginia Electric and Power Company
ATTN: Mr. Eugene S. Grecheck
        Vice President
        Nuclear Support Services
Innsbrook Technical Center - 2SW
5000 Dominion Boulevard
5000 Dominion Boulevard
Glen Allen, VA 23060-6711SUBJECT:LICENSEE RESPONSE TO - NRC INTEGRATED INSPECTION REPORT NOS.05000338, 339/2005004 - NORTH ANNA POWER STATION UNITS 1 & 2 Dear Mr. Grecheck:
Glen Allen, VA 23060-6711
This refers to your response dated December 9, 2005 to NRC Inspection Report Nos.05000338, 339/2005004, that was issued on October 28, 2005. Please be informed that we arereviewing your disagreement with some of the conclusions that were identified in the inspection
SUBJECT:       LICENSEE RESPONSE TO - NRC INTEGRATED INSPECTION REPORT NOS.
report. Specifically, you disagree with our conclusions that the issues associated with flood
                05000338, 339/2005004 - NORTH ANNA POWER STATION UNITS 1 & 2
Dear Mr. Grecheck:
This refers to your response dated December 9, 2005 to NRC Inspection Report Nos.
05000338, 339/2005004, that was issued on October 28, 2005. Please be informed that we are
reviewing your disagreement with some of the conclusions that were identified in the inspection
report. Specifically, you disagree with our conclusions that the issues associated with flood
protection measures and main turbine auto stop interface valve oil leakage contain aspects
protection measures and main turbine auto stop interface valve oil leakage contain aspects
relating to the cross-cutting area of problem identification and resolution. Also, you disagree
relating to the cross-cutting area of problem identification and resolution. Also, you disagree
with the issues associated with breaker 2-QS-P-1B and Solid State Protection System channel
with the issues associated with breaker 2-QS-P-1B and Solid State Protection System channel
testing containing aspects relating to the cross-cutting area of human performance.  
testing containing aspects relating to the cross-cutting area of human performance.
Additionally, you disagree with the minor violation associated with inadequate corrective actions
Additionally, you disagree with the minor violation associated with inadequate corrective actions
for the Unit 1 Turbine Driven Auxiliary Feedwater pump. The NRC is reviewing the basis for your disagreement, and upon completion of our review, willadvise you of our results by separate correspondence.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the
for the Unit 1 Turbine Driven Auxiliary Feedwater pump.
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS isaccessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).  
The NRC is reviewing the basis for your disagreement, and upon completion of our review, will
VEPCO2Should you have any additional questions, please contact me at (404) 562-4510.Sincerely,/RA/Kerry D. Landis, ChiefReactor Projects Branch 5
advise you of our results by separate correspondence.
Division of Reactor ProjectsDocket Nos.: 50-338/339License Nos.: NPF 4, NPF 7cc: C. L. Funderburk, ManagerNuclear Licensing and
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
  Operations Support
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
 
VEPCO                                        2
Should you have any additional questions, please contact me at (404) 562-4510.
                                          Sincerely,
                                            /RA/
                                          Kerry D. Landis, Chief
                                          Reactor Projects Branch 5
                                          Division of Reactor Projects
Docket Nos.: 50-338/339
License Nos.: NPF 4, NPF 7
cc: C. L. Funderburk, Manager                      Executive Vice President
Nuclear Licensing and                             Old Dominion Electric Cooperative
Operations Support                               Electronic Mail Distribution
Virginia Electric and Power Company
Virginia Electric and Power Company
Electronic Mail DistributionJack DavisSite Vice President
Electronic Mail Distribution                      County Administrator
                                                  Louisa County
Jack Davis                                        P. O. Box 160
Site Vice President                               Louisa, VA 23093
North Anna Power Station
North Anna Power Station
Virginia Electric and Power Company
Virginia Electric and Power Company               Lillian M. Cuoco, Esq.
Electronic Mail DistributionDonald JerniganSite Vice President
Electronic Mail Distribution                      Senior Nuclear Counsel
Surry Power Station
                                                  Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company
Donald Jernigan                                    Electronic Mail Distribution
Electronic Mail DistributionExecutive Vice PresidentOld Dominion Electric Cooperative
Site Vice President
Electronic Mail DistributionCounty AdministratorLouisa County
Surry Power Station                                Attorney General
 
Virginia Electric and Power Company                Supreme Court Building
P. O. Box 160
Electronic Mail Distribution                      900 East Main Street
Louisa, VA  23093Lillian M. Cuoco, Esq.Senior Nuclear Counsel
                                                  Richmond, VA 23219
Dominion Nuclear Connecticut, Inc.
Electronic Mail DistributionAttorney GeneralSupreme Court Building
900 East Main Street
Richmond, VA 23219  




_________________________OFFICEDRP:RIISIGNATUREBBDNAMEBDesaiDATE01/25/2006
_________________________
E-MAIL COPY?   YESNO     YESNO     YESNO     YESNO      YESNO      YESNO      YESNO
OFFICE            DRP:RII
SIGNATURE          BBD
NAME              BDesai
DATE                  01/25/2006
E-MAIL COPY?         YES     NO  YES  NO     YES    NO    YES     NO    YES    NO  YES  NO    YES NO
}}
}}

Latest revision as of 23:57, 23 November 2019

Licensee Response to - NRC Integrated Inspection Report Nos. 05000338, 339/2005004 - North Anna Power Station Units 1 & 2
ML060250618
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/25/2006
From: Landis K
NRC/RGN-II/DRP/RPB5
To: Grecheck E
Virginia Electric & Power Co (VEPCO)
References
IR-05-004
Download: ML060250618 (3)


See also: IR 05000338/2005004

Text

January 25, 2006

Virginia Electric and Power Company

ATTN: Mr. Eugene S. Grecheck

Vice President

Nuclear Support Services

Innsbrook Technical Center - 2SW

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: LICENSEE RESPONSE TO - NRC INTEGRATED INSPECTION REPORT NOS.

05000338, 339/2005004 - NORTH ANNA POWER STATION UNITS 1 & 2

Dear Mr. Grecheck:

This refers to your response dated December 9, 2005 to NRC Inspection Report Nos.

05000338, 339/2005004, that was issued on October 28, 2005. Please be informed that we are

reviewing your disagreement with some of the conclusions that were identified in the inspection

report. Specifically, you disagree with our conclusions that the issues associated with flood

protection measures and main turbine auto stop interface valve oil leakage contain aspects

relating to the cross-cutting area of problem identification and resolution. Also, you disagree

with the issues associated with breaker 2-QS-P-1B and Solid State Protection System channel

testing containing aspects relating to the cross-cutting area of human performance.

Additionally, you disagree with the minor violation associated with inadequate corrective actions

for the Unit 1 Turbine Driven Auxiliary Feedwater pump.

The NRC is reviewing the basis for your disagreement, and upon completion of our review, will

advise you of our results by separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

VEPCO 2

Should you have any additional questions, please contact me at (404) 562-4510.

Sincerely,

/RA/

Kerry D. Landis, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-338/339

License Nos.: NPF 4, NPF 7

cc: C. L. Funderburk, Manager Executive Vice President

Nuclear Licensing and Old Dominion Electric Cooperative

Operations Support Electronic Mail Distribution

Virginia Electric and Power Company

Electronic Mail Distribution County Administrator

Louisa County

Jack Davis P. O. Box 160

Site Vice President Louisa, VA 23093

North Anna Power Station

Virginia Electric and Power Company Lillian M. Cuoco, Esq.

Electronic Mail Distribution Senior Nuclear Counsel

Dominion Nuclear Connecticut, Inc.

Donald Jernigan Electronic Mail Distribution

Site Vice President

Surry Power Station Attorney General

Virginia Electric and Power Company Supreme Court Building

Electronic Mail Distribution 900 East Main Street

Richmond, VA 23219

_________________________

OFFICE DRP:RII

SIGNATURE BBD

NAME BDesai

DATE 01/25/2006

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO