| | issue date = 10/16/2006 | | | issue date = 10/16/2006 |
| | title = Yankee Atomic Electric Company - Submittal of YNPS-FSS-OOL09-00, Final Status Survey Report for Survey Area OOL-09 | | | title = Yankee Atomic Electric Company - Submittal of YNPS-FSS-OOL09-00, Final Status Survey Report for Survey Area OOL-09 |
| | author name = VanNoordennen G P | | | author name = Vannoordennen G |
| | author affiliation = Yankee Atomic Electric Co | | | author affiliation = Yankee Atomic Electric Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1YANKEE ATOMIC ELECTRIC COMPANY Yi E 49 Yankee Road, Rowe, Massachusetts 01367 October 16, 2006 BYR 2006-092 U.S. Nuclear Regulatory Commission Attention: | | {{#Wiki_filter:1YANKEE ATOMIC ELECTRIC COMPANY Yi E 49 Yankee Road, Rowe, Massachusetts 01367 October 16, 2006 BYR 2006-092 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-001 |
| Document Control Desk Washington, D.C. 20555-001 | |
|
| |
|
| ==References:== | | ==References:== |
| (a) License No. DPR-3 (Docket No. 50-29)(b) BYR 2004-133, Submittal of Revision 1 to the Yankee Nuclear Power Station's License Termination Plan (c) Yankee Nuclear Power Station -Issuance of Amendment 158 Re: License Termination Plan
| | (a) License No. DPR-3 (Docket No. 50-29) |
| | (b) BYR 2004-133, Submittal of Revision 1 to the Yankee Nuclear Power Station's License Termination Plan (c) Yankee Nuclear Power Station - Issuance of Amendment 158 Re: License Termination Plan |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Submittal of YNPS-FSS-OOL09-00, the Final Status Survey Report for Survey Area OOL-09 | | Submittal of YNPS-FSS-OOL09-00, the Final Status Survey Report for Survey Area OOL-09 |
|
| |
|
| ==Dear Madam/Sir:== | | ==Dear Madam/Sir:== |
|
| |
|
| This letter submits YNPS-FSS-OOL09-00, Final Status Survey Report for OOL-09. This report was written in accordance with Section 5 of the YNPS License Termination Plan,"Final Status Survey Plan," and is consistent with the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). | | This letter submits YNPS-FSS-OOL09-00, Final Status Survey Report for OOL-09. This report was written in accordance with Section 5 of the YNPS License Termination Plan, "Final Status Survey Plan," and is consistent with the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). |
| We trust that this information is satisfactory; however if you should have any questions or require any additional information, please contact Alice Carson at (301) 916-3995.Sincerely, YANKEE ATOMIC ELECTRIC COMPANY Gerry van Noordennen Regulatory Affairs Manager | | We trust that this information is satisfactory; however if you should have any questions or require any additional information, please contact Alice Carson at (301) 916-3995. |
| | Sincerely, YANKEE ATOMIC ELECTRIC COMPANY Gerry van Noordennen Regulatory Affairs Manager |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | YNPS-FSS-OOL09-00 (CD) |
|
| |
|
| YNPS-FSS-OOL09-00 (CD)
| | U.S. Nuclear Regulatory Commission BYR 2006-092, Page 2 cc (w/o encl): S. Collins, NRC Region I Administrator Marie Miller, Chief, Decommissioning Branch, NRC Region I L. Kauffman, Region I J. Kottan, Region I D. Everhart, Region I J. Hickman, NRC Project Manager E. Waterman, US Environmental Protection Agency, Region 1 R. Walker, Director, MA DPH W. Perlman, Executive Committee Chair, FRCOG T.W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Directory of Planning & Development, FRCOG cc (w/encl on CD) D. Howland, Regional Engineer, MA DEP M. Whalen, MA DPH D. Katz, CAN CAN Business Office}} |
| U.S. Nuclear Regulatory Commission BYR 2006-092, Page 2 cc (w/o encl): cc (w/encl on CD)S. Collins, NRC Region I Administrator Marie Miller, Chief, Decommissioning Branch, NRC Region I L. Kauffman, Region I J. Kottan, Region I D. Everhart, Region I J. Hickman, NRC Project Manager E. Waterman, US Environmental Protection Agency, Region 1 R. Walker, Director, MA DPH W. Perlman, Executive Committee Chair, FRCOG T.W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Directory of Planning & Development, FRCOG D. Howland, Regional Engineer, MA DEP M. Whalen, MA DPH D. Katz, CAN CAN Business Office}} | |
|
---|
Category:Letter
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) ML18136A5552018-04-10010 April 2018 Yankee Nuclear Power Station, and Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 2024-03-11
[Table view] |
Text
1YANKEE ATOMIC ELECTRIC COMPANY Yi E 49 Yankee Road, Rowe, Massachusetts 01367 October 16, 2006 BYR 2006-092 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-001
References:
(a) License No. DPR-3 (Docket No. 50-29)
(b) BYR 2004-133, Submittal of Revision 1 to the Yankee Nuclear Power Station's License Termination Plan (c) Yankee Nuclear Power Station - Issuance of Amendment 158 Re: License Termination Plan
Subject:
Submittal of YNPS-FSS-OOL09-00, the Final Status Survey Report for Survey Area OOL-09
Dear Madam/Sir:
This letter submits YNPS-FSS-OOL09-00, Final Status Survey Report for OOL-09. This report was written in accordance with Section 5 of the YNPS License Termination Plan, "Final Status Survey Plan," and is consistent with the guidance provided in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).
We trust that this information is satisfactory; however if you should have any questions or require any additional information, please contact Alice Carson at (301) 916-3995.
Sincerely, YANKEE ATOMIC ELECTRIC COMPANY Gerry van Noordennen Regulatory Affairs Manager
Enclosure:
YNPS-FSS-OOL09-00 (CD)
U.S. Nuclear Regulatory Commission BYR 2006-092, Page 2 cc (w/o encl): S. Collins, NRC Region I Administrator Marie Miller, Chief, Decommissioning Branch, NRC Region I L. Kauffman, Region I J. Kottan, Region I D. Everhart, Region I J. Hickman, NRC Project Manager E. Waterman, US Environmental Protection Agency, Region 1 R. Walker, Director, MA DPH W. Perlman, Executive Committee Chair, FRCOG T.W. Hutcheson, Chair, Franklin Regional Planning Board L. Dunlavy, Executive Director, FRCOG P. Sloan, Directory of Planning & Development, FRCOG cc (w/encl on CD) D. Howland, Regional Engineer, MA DEP M. Whalen, MA DPH D. Katz, CAN CAN Business Office