ML15091A265: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML15091A265 | | number = ML15091A265 | ||
| issue date = 03/30/2015 | | issue date = 03/30/2015 | ||
| title = | | title = Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000254/2015002; 05000265/2015002 | ||
| author name = Lipa C | | author name = Lipa C | ||
| author affiliation = NRC/RGN-III/DRS/EB2 | | author affiliation = NRC/RGN-III/DRS/EB2 |
Latest revision as of 00:58, 17 November 2019
ML15091A265 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 03/30/2015 |
From: | Christine Lipa NRC/RGN-III/DRS/EB2 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2015002 | |
Download: ML15091A265 (8) | |
See also: IR 05000254/2015002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
March 30, 2015
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
SUBJECT: QUAD CITIES NUCLEAR POWER STATION-NOTIFICATION OF AN NRC
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
INFORMATION INSPECTION REPORT 05000254/2015002; 05000265/2015002
Dear Mr. Hanson:
On May 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
of the Triennial Heat Sink Performance Inspection at your Quad Cities Nuclear Power Station.
This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.07.
In order to minimize the impact that the inspection has on the site, and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
- The first group lists information necessary for our initial inspection scoping activities. This
information should be available to the lead inspector no later than April 20, 2015. By
April 27, 2015, the inspector will communicate the initial selected set of approximately
2-3 risk-significant heat exchangers.
- The second group is needed to support our in-office preparation activities. This set of
documents, including the calculations associated with the selected heat exchangers, should
be available at the Regional Office no later than May 4, 2015. This information should be
separated for each selected component, especially if provided electronically (e.g., folder with
component name that includes calculations, condition reports, maintenance history, etc.).
During the in-office preparation activities, the inspector may identify additional information
needed to support the inspection.
- The last group includes the additional information above, as well as plant-specific reference
material. This information should be available onsite to the inspector on May 18, 2015. It is
also requested that corrective action documents and/or questions developed during the
inspection be provided to the inspector as the documents are generated.
All requested documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to the
last applicable document in the previous time period. It is important that these documents be as
complete as possible, in order to minimize the number of documents requested during the
preparation week or during the onsite inspection.
B. Hanson -2-
The lead inspector for this inspection is Michael Jones. We understand that our regulatory
contact for this inspection is Tom Peterson of your organization. If there are questions about
the material requested, or the inspection, please call Mr. Jones at (630) 829-9745. Please send
the information to the following e-mail address Michael.Jones@nrc.gov. A hard-copy with the
required information is also an acceptable option.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA Benny Jose Acting for/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-254; 50-265
Enclosure:
Triennial Heat Sink Performance Inspection
Document Request
cc w/encl: Distribution via LISTSERV
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report: 05000254/2015002; 05000265/2015002
Inspection Dates: May 18-22, 2015
Inspection Procedure: IP 71111.07T, Heat Sink Performance
Lead Inspector: Michael A. Jones, Jr.
(630) 829-9745
Michael.Jones@nrc.gov
I. Information Requested By April 20, 2015:
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Safety-Related Equipment, heat exchangers in order of risk significance.
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
exchanger.
3. List of Corrective Action Program (CAP) documents (with a short description)
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or
heat exchanger testing, for the previous 3 years, or since the last CAP document list
was sent to the NRC for the previous Heat Sink Performance Inspection. The list
should include all CAP documents not on the last CAP document list.
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
5. Last two System Health Report(s) and maintenance rule system notebooks for all the
GL 89-13 heat exchangers.
6. List of engineering-related operator workarounds (with a short description)
associated with GL 89-13 heat exchangers. The requested documents are to be for
the time period from the onsite inspection period back to the documents that were
provided in response to the previous heat sink performance inspection.
7. List of permanent and temporary modifications (with a short description) associated
with GL 89-13 heat exchangers. The requested documents are to be for the time
period from the onsite inspection period back to the documents that were provided in
response to the previous Heat Sink Performance Inspection.
II. Information Requested By May 4, 2015
1. Copies of the GL 89-13 responses.
2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the
GL 89-13 Heat Exchanger Program.
3. Copies of procedures developed to implement the recommendations of GL 89-13
(e.g., the GL 89-13 Heat Exchanger Program description).
Enclosure
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
4. Copies of the selected CAP documents.
5. For the specific heat exchangers selected:
a. Copies of the UFSAR sections applicable for each heat exchanger.
b. Copy of system description and design basis document for the heat
exchangers (as applicable).
c. Provide a list of calculations (with a short description) which currently apply to
each heat exchanger.
i. establish the limiting design basis heat load required to be removed
by each of these heat exchangers;
ii. demonstrate the heat exchangers capacity to remove the limiting heat
load;
iii. correlate surveillance testing and/or inspection results from these heat
exchangers with design basis heat removal capability (e.g., basis for
surveillance test and/or inspection acceptance criteria);
iv. evaluate the potential for water hammer in each heat exchanger or
associated piping; and
v. evaluate excessive tube vibration in each heat exchanger.
d. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the
operation for the selected heat exchangers.
e. Copy of the construction code, Design Specification, heat exchanger data
sheets, and vendor documents including component drawings applicable for
the heat exchangers.
f. Copies of normal, abnormal, and emergency operating procedures
associated with the selected heat exchangers.
6. For the ultimate heat sink (UHS) and the safety-related service water system (or
equivalent):
a. Copies of the applicable UFSAR sections.
b. Copy of system description and design basis document (as applicable).
c. Copy of any operability determinations or other documentation of degradation
associated with the UHS, and the safety-related service water system.
d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
states the maximum cooling water system inlet temperature limit that still
allows full licensed power operation of the nuclear reactor.
e. Copy of system description and design basis document (as applicable).
2
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
f. Copy of the construction code and Design Specification.
g. Copies of normal, abnormal, and emergency operating procedures
associated with the UHS and safety-related service water systems including
procedures for loss of these systems.
h. Copy of any operability determinations or other documentation of degradation
associated with the UHS, and the safety-related service water system.
i. Copies of corrective action documents associated with water hammer or
hydraulic transients in the service water system since the last Heat Sink
Performance Inspection.
j. If available, provide an electronic copy of piping and instrumentation
diagrams (P&IDs) for the service water system, including the intake structure.
k. Provide a list of calculations (with a short description), which currently apply
to UHS, and service water system.
l. Provide a list of instruments (with a short description) associated with
automatic or alarm functions for the safety-related service water system
and/or UHS.
m. Provide a list of any design change (with a short description) performed on
the UHS or safety-related service water system since the last heat sink
performance inspection.
7. A schedule of all inspections, cleanings, maintenance, or testing of any
safety-related plant heat exchanger to be performed during the on-site portion of the
inspection.
III. Information Requested to be Available on First Day of Inspection, May 18, 2015
1. For the specific heat exchangers selected:
a. Copy of the calculation which correlates surveillance testing results from
these heat exchangers with design basis heat removal capability (e.g., basis
for surveillance test acceptance criteria).
b. Copies of the two most recent completed tests and evaluation data
confirming thermal performance for those heat exchangers which are
performance tested.
c. Documentation and procedures that identify the types, accuracy, and location
of any special instrumentation used for the two most recently completed
thermal performance tests for the heat exchangers (e.g., high accuracy
ultrasonic flow instruments or temperature instruments). Include calibration
records for the instruments used during these tests.
d. Information regarding any alarms which monitor on-line performance.
3
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
e. Copy of the document describing the inspection results of each heat
exchanger. The requested documents are to be for the time period from the
onsite inspection period back to the documents that were provided in
response to the previous Heat Sink Performance Inspection.
f. The cleaning and inspection maintenance schedule for each heat exchanger
for the next 5 years.
g. Copy of the design specification and heat exchanger data sheets for each
heat exchanger.
h. Copy of the vendor manuals including component drawings for each heat
exchanger.
i. Copy of the calculation which establishes the limiting (maximum) design
basis heat load which is required to be removed by each of these heat
exchangers.
j. Copy of the operating procedure that ensures that the maximum cooling
water system inlet temperature limit is not exceeded.
k. Copy of the calculations or documents which evaluate the potential for water
hammer in each heat exchanger or associated piping.
l. Copy of the calculations that evaluate excessive tube vibration in each heat
exchanger and the documents that describe the controls that prevent heat
exchanger degradation due to excessive flow induced vibration during
operation.
m. Copy of the periodic flow testing at or near maximum design flow. The
requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
Heat Sink Performance Inspection.
n. Copy of the document which identifies the current number of tubes in service
for each heat exchanger and the supporting calculation which establishes the
maximum number of tubes which can be plugged in each heat exchanger.
o. Copy of the document establishing the repair criteria (plugging limit) for
degraded tubes which are identified in each heat exchanger.
p. Copies of the documents that verify the structural integrity of the heat
exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and
visual inspection results).
q. Copies of those documents that describe the methods taken to control water
chemistry in the heat exchangers.
2. For the review of the performance testing of the safety-related service water system
(or equivalent) and the UHS:
a. Copies of the last two performance tests, such as the American Society of
Mechanical Engineers in-service test, for the pumps, valves, and, if
4
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
applicable, the towers fans in the safety-related service water system. If the
components are not performance tested, please provide documentation
verifying performance by the methods actually used.
b. Copies of the documents that demonstrate that flow balance testing was
performed during the last 3 years. If the last flow test was performed longer
than 3 years, then provide the last flow test.
c. Copies of the documents that demonstrate that flow balance testing will continue
to be periodically done in the future.
d. Copies of procedures used to monitor interface valves between the safety
related section of the service water system, and the non-safety related
section, and the associated results. The requested documents are to be for
the time period from the onsite inspection period back to the documents that
were provided in response to the previous Heat Sink Performance Inspection.
e. Copies of the procedures that verify the performance of risk significant non-
safety functions, and the associated results. The requested documents are
to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous Heat Sink
Performance Inspection.
3. For the review associated with the system walkdown of the service water system.
a. Copies of the Testing, Inspection, or Monitoring Program Procedures for
buried or inaccessible piping, and the associated results. The requested
documents are to be for the time period from the onsite inspection period
back to the documents that were provided in response to the previous Heat
Sink Performance Inspection.
b. Copies of the ultrasonic test results and/or visual inspections that verify the
structural integrity of the piping.
c. Copies of the procedures to monitor, assess, and disposition active thru wall
pipe leaks, including structural evaluations and/or planned corrective actions.
d. History of any through wall pipe leak on the system. The requested
documents are to be for the time period from the onsite inspection period
back to the documents that were provided in response to the previous Heat
Sink Performance Inspection.
e. Copies of the documents associated with the Periodic Inspection Program
used to detect protective coating failure, corrosion, and erosion.
f. Copies of the Inservice Test vibration monitoring results and operational
history for deep draft vertical pumps, if applicable. The requested documents
are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink
performance inspection.
If the information requested above will not be available, please contact Michael Jones as soon
as possible at (630) 829-9745, or e-mail Michael.Jones@nrc.gov.
2
B. Hanson -2-
The lead inspector for this inspection is Michael Jones. We understand that our regulatory contact for this
inspection is Tom Peterson of your organization. If there are questions about the material requested, or
the inspection, please call Mr. Jones at (630) 829-9745. Please send the information to the following e-
mail address Michael.Jones@nrc.gov. A hard-copy with the required information is also an acceptable
option.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The
NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or
an information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA Benny Jose Acting for/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-254; 50-265
Enclosure:
Triennial Heat Sink Performance Inspection
Document Request
cc w/encl: Distribution via LISTSERV
DISTRIBUTION:
Kimyata MorganButler
RidsNrrDorlLpl3-2 Resource
RidsNrrPMQuadCities Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML15091A265
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII
NAME MJones:cl BJose for CLipa
DATE 03/30/15 03/30/15
OFFICIAL RECORD COPY