| title = Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 4.6.5.1.b.1,2 & 3 to Change Ice Condenser Bed SR Interval from 9 Months to 18 Months
| title = Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 4.6.5.1.b.1,2 & 3 to Change Ice Condenser Bed SR Interval from 9 Months to 18 Months
| author name = FITZPATRICK E
| author name = Fitzpatrick E
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = MURLEY T E
| addressee name = Murley T
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 20
| page count = 20
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:ACCEIERAEDDOCUMENTDIST'TION SYSTEMREGULORYINFORMATION DISTRIBUT~
{{#Wiki_filter:ACCEI ERA ED DOCUMENT DIST'TION SYSTEM REGUL    ORY INFORMATION        DISTRIBUT~ . SYSTEM (RIDS)
.SYSTEM(RIDS)ACCESSION NBR:9311190293 DOC.DATE:
ACCESSION NBR:9311190293             DOC.DATE:   93/11/15    NOTARIZED: YES          DOCKET        ¹ FACIL:50-315 Donald C. Cook Nuclear Power- Plant, Unit 1, Indiana                  M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                  M 05000316'UTH.
93/11/15NOTARIZED:
NAME            AUTHOR AFFILIATION FITZPATRICK,R.       Indiana Michigan Power Co. (formerly Indiana            6  Michigan Ele RECIP.NAME           RECIPIENT AFFILIATION MURLEY,T.E.             Document Control Branch (Document           Control Desk)
YESDOCKET¹FACIL:50-315 DonaldC.CookNuclearPower-Plant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316'UTH.
I
NAMEAUTHORAFFILIATION FITZPATRICK,R.
IndianaMichiganPowerCo.(formerly Indiana6MichiganEleRECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
DocumentControlBranch(Document ControlDesk)I


==SUBJECT:==
==SUBJECT:==
Application foramendstolicensesDPR-586DPR-74,modifying TS4.6.5.l.b.l,2 63tochangeicecondenser bedSRintervalfrom9monthsto18months.DISTRIBUTION CODE:ROOIDCOPIESRECEIVED:LTR gENCLfSIZE:/37STITLE:ORSubmittal:
Application for amends to licenses DPR-58 6 DPR-74,modifying TS 4.6.5.l.b.l,2 6 3 to change ice condenser bed SR interval from 9 months to 18 months.
GeneralDistribution
DISTRIBUTION CODE: ROOID          COPIES RECEIVED:LTR       g  ENCL  f    SIZE: /3    7 S
.NOTES:RECIPIENT IDCODE/NAME PD3-1LAWETZEL,BINTERNAL:
TITLE: OR  Submittal: General Distribution            .
NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SRXB OCLEGF~01EXTERNAL:
NOTES:
NRCPDRCOPIESLTTRENCL1122111111101111RECIPIENT IDCODE/NAME PD3-1PDNRR/DORS/OTSB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS2NSICCOPIESLTTRENCL111111111011DDDDNOTETOALL"RIDS"RECIPIENTS:
RECIPIENT             COPIES              RECIPIENT          COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME       LTTR ENCL                  D PD3-1 LA                      1      1    PD3-1 PD                1    1 WETZEL,B                      2      2 D
PLEASEHELPUSTOREDUCEWASTEICONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)
INTERNAL: NRR/DE/EELB                   1      1    NRR/DORS/OTSB          1    1 NRR/DRCH/HICB                 1      1    NRR/DSSA/SPLB          1    1 NRR/DSSA/SRXB                1      1    NUDOCS-ABSTRACT         1    1 OC L                          1      0    OGC/HDS2                1    0 EG  F~          01          1      1 EXTERNAL: NRC PDR                        1      1    NSIC                    1    1 D
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:
D D
LTTR15ENCL13 IndianaMichig~~PowerCompa+P.O.Box1663<Columbus, OH43216gAEP:NRC:1193 DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74UNITS1AND2ICECONDENSER ICEBEDSURVEILLANCE REQUIREMENT TECHNICAL SPECIFICATION AMENDMENT REQUESTU.S.NuclearRegulatory Commission DocumentControlDeskMashington, D.C.20555Attn:T.E.MurleyNovember15,1993
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                15  ENCL    13


==DearDr.Murley:==
Indiana Michig~~
Thisletteranditsattachments constitute anapplication forTechnical Specifications (T/Ss)changesforDonaldC.CookNuclearPlantUnits1and2.Specifically, weareproposing tomodifyUnit1T/S4.6.5.1.b.l, 2,and3andUnit2T/S4.6.5.1.b.l, 2,and3tochangethesurveillance requirement intervalfrom9monthsto18months.Attachment 1providesa.detailed description oftheproposedchanges,thejustification forthechanges,andourproposeddetermination ofnosignificant hazardsconsideration performed pursuantto10CFR50.92(c).
Power Compa+
Attachment 2containstheexistingT/Sspagesmarkedtoreflecttheproposedchanges.Attachment 3containstheproposedT/Sspages.TheproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee andbytheNuclearSafetyandDesignReviewCommittee.
P.O. Box 1663  <
Incompliance withtherequirements of10CFR50.91(b)(l),
Columbus, OH 43216 g
copiesofthisletteranditsattachments havebeentransmitted toMr.J.R.PadgettoftheMichiganPublicServiceCommission andtotheMichiganDepartment ofPublicHealth.3.80<"'89311190293 931115PDRADOCK05000315PPDRo4.
AEP:NRC:1193 Donald C. Cook Nuclear Plant Units          1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 UNITS 1 AND 2 ICE CONDENSER ICE BED SURVEILLANCE REQUIREMENT TECHNICAL SPECIFICATION AMENDMENT REQUEST U. S. Nuclear Regulatory Commission Document Control Desk Mashington, D. C. 20555 Attn:        T. E. Murley November 15, 1993
Dr.T.E.Murley-2-AEP:NRC:1193 Thisletterissubmitted pursuantto10CFR50.54(f)and,assuch,anoathstatement isattached.
Sincerely, VicePresident Attachments cc:A.A.Blind-BridgmanG.CharnoffJ.B.Martin-RegionIIINFEMSectionChiefNRCResidentInspector
-BridgmanJ.R.Padgett


Dr.T.E.MurleyAEP:NRC:1193 bc:S.J.Brewer/J.
==Dear Dr. Murley:==
B.Kingseed/S.
A.HoverD.H.Malin/K.J.TothM.L.Horvath-BridgmanJ.B.ShinnockW.G.Smith,Jr.B.A.Wetzel,NRC-Washington, D.C.AEP:NRC:1193 DC-N-6015,1 COUNTYOFFRANKLINE.E.Fitzpatrick, beingdulysworn,deposesandsaysthatheistheVicePresident oflicensee, IndianaMichiganPowerCompany,thathehasreadtheforgoingUnits1and2IceCondenser IceBedSurveillance Requirement Technical Specification Amendment Request,andknowsthecontentsthereof;andthatsaidcontentsaretruetothebestofhisknowledge andbelief.Subscribed andsworntobeforemethisdayof19WDNOTARYPUBLICDlANAL.EADSNotaryPublic,StateofOhioJ)ycommission expires22495 Attachment 1toAEP:NRC:1193 lOCFR50.92 Determination forProposedChangestotheDonaldC.CookNuclearPlantUnits1and2Technical Specifications Attachment 1toAEP:NRC:1193 Page11.0SECTIONSTOBECHANGEDUnit1:Technical Specification (T/S)4.6.5.l.b.l, 2,and3.Unit2:Technical Specification (T/S)4.6.5.1.b.l, 2,and3.2.0EXTENTOFCHANGESWeareproposing tochangethesurveillance requirement intervalfrom9monthsto18monthsonthereferenced Technical Specifications forchemicalanalysis,
: weighing, andflowpassageinspection oftheicecondenser.


==3.0 CHANGESREUESTEDIdentical==
This letter and its attachments constitute an application for Technical Specifications (T/Ss) changes for Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we are proposing to modify Unit 1 T/S 4.6.5.1.b.l, 2, and 3 and Unit 2 T/S 4.6.5.1.b.l, 2, and 3 to change the surveillance requirement interval from 9 months to 18 months.
changesarebeingsoughtforboththeUnit1andUnit2Technical Specifications.
Attachment          1 provides  a .detailed description of the proposed changes,          the justification for    the changes, and our proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92(c). Attachment 2 contains the existing T/Ss pages marked to reflect the proposed changes.          Attachment 3 contains the proposed T/Ss pages.
3.1UNIT1Weareproposing tomakethefollowing changestotheUnit1Technical Specifications.
The proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.
ReviseTS4651bSurveillance IntervalReuirements Currently, thereisaninemonthsurveillance requirement toperformchemicalanalysesoftheicebedtoensureaboronconcentration of1800ppmandapHof.9.0to9.5at'5'C,verifyata95Xconfidence levelthatadequateiceinventory isavailable anddistributed evenly,andensurethatadequateflowareaisavailable.
In compliance with the requirements of 10 CFR 50.91(b)(l), copies of this letter and its attachments have been transmitted to Mr. J. R. Padgett of the Michigan Public Service Commission and to the Michigan Department of Public Health.
Weareproposing tochangethisintervalto18months.3.2UNIT2Weareproposing tomakethefollowing changestotheUnit2Technical Specifications.
o4.
ReviseTS465.1bSurveillance IntervalReuirements Currently, thereisaninemonthsurveillance requirement toperformchemicalanalysesoftheicebedtoensureaboronconcentration of1800ppmandapHof9.0to9.5at25'C,verifyata95Xconfidence levelthatadequateiceinventory isavailable anddistributed evenly,andensurethatadequateflowareaisavailable.
: 3. 80<"'8 9311190293 931115 PDR  ADOCK 05000315 P                  PDR
Weareproposing tochangethisintervalto18months.
 
'II Attachment 1toAEP:NRC:1193 Page2ItshouldbenotedthatthebasesforT/S3/4.6.5.1 willneedtobeupdatedtoreflecttheincreased timeintervaliftheproposedamendment isapproved.
Dr. T. E. Murley                                      AEP:NRC:1193 This letter is submitted pursuant to      10 CFR 50.54(f) and, as such, an oath statement is attached.
4,0DISCUSSION SstemDescritionTheicecondenser isdesignedtoensurethattheoverallsystemwillbeavailable toprovidesufficient pressuresuppression capability tolimitthecontainment peakpressuretolessthan12psigduringLOCAconditions assumedintheaccidentanalysis.
Sincerely, Vice President Attachments cc:  A. A. Blind  -  Bridgman G. Charnoff J. B. Martin  -  Region  III NFEM Section  Chief NRC Resident  Inspector  - Bridgman J. R. Padgett
Inparticular, therequirements fortheicebedensurethattherequirediceinventory will1)bedistributed evenlythroughthecontainment.
 
bays,2)containsufficient borontoprecludedilutionofthecontainment sumpfollowing aLOCA,and3)containsufficient heatremovalcapability tocondensethereactorcoolantsystemvolumeduringaLOCA.Currently, theicebedisdetermined operablebymeetingvarioussurveillance requirements whichinclude1)verifying icebedtemperature islessthanorequalto27'Fatleastoncepertwelvehours,2)performing chemicalanalysesoftheicebedtoensureaboronconcentration of1800ppmandapHof9.0to9.5at25'Catleasteveryninemonths,3)verifying ata95Xconfidence levelthateachbasketcontainsatleast1220lbsoficeeveryninemonths,4)ensuringadequateflowareaisavailable atleastonceeveryninemonths,5)performing avisualinspection atleastonceper18monthsoftheinletplenumsupportstructures andturningvanestoensureicebuildupisnottothepointofindicating abnormaldegradation oftheicecondenser, and6)verifying thestructural integrity oftheicebasketsbyinspecting arepresentative sampleatleastonceevery40months.Allofthesesurveillance requirements aremetbyperformance ofapprovedplantprocedures.
Dr. T. E. Murley                            AEP:NRC:1193 bc:  S. J. Brewer/J. B. Kingseed/S. A. Hover D. H. Malin/K. J. Toth M. L. Horvath - Bridgman J. B. Shinnock W. G. Smith,  Jr.
Thefirstlineofdefensetodetermine theoperability oftheicecondenser lieswiththeoperator.
B. A. Wetzel,  NRC - Washington, D. C.
Asmentioned above,theicebedtemperature ismonitored atleastonceeverytwelvehourstoensuretemperatures arelessthanorequal-to27'F.Thisisaccomplished inaconservative mannerbyreviewing atleast18different pointsthroughout theicecondenser andensuringtheyarealllessthanorequalto27'F.Throughout theyeartheaverageicebedtemperature generally rangesbetween16'Fand21'F,wellbelowthe27'Fsetpoint.
AEP:NRC:1193 DC-N-6015,1
Inadditiontothesurveillance requirements, therearealarmsinthecontrolroomwhichwillindicatetotheoperatorifanyofthepointsbeingrecordedreach27'F.Also,weeklyoperatortoursrequiretheoperators towalkdowntherefrigeration systemtoevaluateitsabilitytofunction.
 
Thisincludeswalkingdownthe
COUNTY OF FRANKLIN E. E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee, Indiana Michigan Power Company, that he has read the forgoing Units 1 and 2 Ice Condenser  Ice  Bed  Surveillance      Requirement            Technical Specification Amendment Request, and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.
~g'Il'~off Attachment 1toAEP:NRC:1193 Page3chillers, airhandlingunits,andglycolpumpstoensurethattheyareinproperworkingorder.Thetoursalsorequiretheoperators toopenasampleoftheintermediate deckdoorstoensuretheyarenotfrozenshut.Thishelpstoensurethatnoabnormaldegradation oftheicecondenser isoccurring duetocondensation orfrozendrainlinesinlocalized areas.Thenextlineofdefenseistheperformance ofvariousprocedures toensuretheicebedisingoodphysicalcondition, consistent withtheassumptions usedintheaccidentanalysis.
Subscribed and sworn to before  me this day of                                  19 WD NOTARY PUBLIC DlANA L. EADS Notary Public, State of Ohio J)y commission expires 2 24 95
Duetotheninemonthsurveillance requirement, thesesurveillances arecurrently completed atleastonceduringafuelcyclewhilethereactorisonlineandonceduringtherefueling outage.Thesesurveillances arereferenced aboveandincludechemicalsampling, icebasketweighing, andflowpassageinspection.
 
Thereasonforthechemicalsamplingistoensuretheboronconcentration andpHrequirements aremettoprecludedilutionofthecontainment sumpfollowing aLOCA.Theminimumweightfigureof1220poundsoficeperbasketcontainsa10Xconservative allowance foricelossthroughsublimation.
Attachment  1 to AEP:NRC:1193 10CFR50.92 Determination for Proposed Changes to the Donald C. Cook Nuclear Plant Units 1 and 2 Technical Specifications to AEP:NRC:1193                                  Page 1 1.0    SECTIONS TO BE CHANGED Unit 1:    Technical Specification (T/S) 4.6.5.l.b.l, 2, and 3.
Flowpassageinspection isperformed toensuretheabsenceofabnormalicebeddegradation aswouldbeindicated ifaccumulations exceedthe3/8"specified inthetechnical specifications.
Unit 2:    Technical Specification (T/S) 4.6.5.1.b.l, 2, and 3.
Whenthesesurveillances areperformed whileinarefueling outage,as-founddataiscollected priortoperforming thelaborintensive maintenance routine.Themaintenance routinetypically includesweighingasmanybasketsaspossiblewithinanallottedtimeframeandemptyingthebasketsthatwouldnot,basedonoperating experience, weighgreaterthan1220poundsat'hestartofthenextrefueling outage.Thesubsequent maintenance includesrefilling theicebasketswithiceandperforming defrostsoftheicecondenser asnecessary toensuremaximumheattransfercapability duringtheupcomingfuelcycle.Also,significant effortisdedicated tocleaningupicethataccumulates duringtheemptying/refilling processoftheicebasketstoensurenoflowblockageoccursduringthesubsequent fuelcycle.Tworemaining surveillances areperformed toensurethatnoabnormaldegradation oftheicecondenser istakingplace.Thefirst,performed onan18monthfrequency;.
2.0     EXTENT OF CHANGES We  are proposing to change the surveillance requirement interval from 9  months to 18 months on the referenced Technical Specifications for chemical analysis, weighing, and flow passage inspection of the ice condenser.
is-aninspection oftheinletplenumandturningvanesforfrostoriceaccumulation.
3.0    CHANGES RE UESTED Identical changes are being sought for both the Unit      1 and Unit  2 Technical Specifications.
Thesecond,performed ona40monthfrequency isavisualstructural inspection oftheicebasketstoensurethattheyarefreeofdetrimental structural wear,cracks,corrosion orotherdamage.  
3.1    UNIT 1 We  are proposing to make the following changes        to the Unit    1 Technical Specifications.
~y1L.a Attachment 1toAEP:NRC:1193 Page4ReasonforProosedTechnical Secification ChaneReuestTherequesttoincreasethesurveillance intervalfromninemonthsto18monthswoulddecreasethenumberofevolutions necessary toentercontainment duringoperation oftheunittoverifyicebasketboronconcentrations, weights,andflowareablockage.
Revise T  S 4 6 5 1 b  Surveillance Interval Re uirements Currently, there is a nine month surveillance requirement to perform chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of. 9.0 to 9.5 at'5'C, verify at a 95X confidence level that adequate ice inventory is available and distributed evenly, and ensure that adequate flow area is available.        We are proposing to change this interval to 18 months.
Therevisedsurveillance intervalwouldrequiretheperformance ofsuchicebedmonitoring duringrefueling outages.Webelievethatimprovements inicebedinspection resultsduetomodifiedmaintenance techniques anddesignchangesthathavebeenimplemented since1984provideadequateassurance thattheicecondenser canmeetandevenexceeditsdesignfunctionwithoutperforming thesurveillances onaninemonthfrequency.
3.2    UNIT 2 We  are proposing to make the following changes      to the Unit    2 Technical Specifications.
Also,increasing thesurveillance intervalwouldreducethestressesputonthebasketsandtheirsupportsduetorepeatedweighingevolutions'ustification forProosedTechnical Secification ChanesAnincreased surveillance intervalforthechemicalanalysisrequiredbyT/S4.6.5.1.b.l isjustified forthefollowing reasons,First,priortorefilling basketsduringrefueling outagemaintenance activities, theboratedwatersourceusedtomakeiceissampledtoverifythattheboronconcentration andpHlevelsaremet.Areviewoflicenseeeventreportsdatingbackthrough1978revealednooccurrences offailingtomeetthesurveillance requirements ofthisspecification.
Revise T  S 4  6 5.1 b Surveillance Interval Re uirements Currently, there is a nine month surveillance requirement to perform chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of 9.0 to 9.5 at 25'C, verify at a 95X confidence level that adequate ice inventory is available and distributed evenly, and ensure that adequate flow area is available.        We are proposing to change this interval to 18 months.
Also,areviewoficecondenser basketboronconcentration andpHsampledatabetweenAugust,1986andSeptember, 1992forUnit1andbetweenAugust,1986andJanuary,1993forUnit2wasreviewed, andotherthanafewproblemsduetothesamplingtechniques, noproblemswereapparentinmeetingthesurveillance requirements ofthisspecification.
 
Also,itshouldbenotedthatanincreasetothe18monthfrequency hasalreadybeenapprovedinthenewstandardtechnical specifications forWestinghouse plantsissuedinSeptember 1992bytheNRC.Thefrequency of18monthswasdeveloped considering thesefacts:-1)Longtermicestoragetestshavedetermined thatthechemicalcomposition ofthestorediceisextremely stable,2)Operating experience hasdemonstrated thatmeetingtheboronconcentration andpHrequirements hasneverbeenaproblem,and3)Someonewouldhavetoenterthecontainment totakethesample,and,iftheunitisatpower,thatpersonwouldreceivearadiation dose.
'I I  to AEP:NRC:1193                                     Page 2 It  should be noted that the bases    for  T/S  3/4.6.5.1 will need  to be updated to reflect the increased        time  interval  if the proposed amendment is approved.
Attachment 1toAEP:NRC:1193 Page5TS4.6.51b2Areviewoflicenseeeventreportsregarding icebasketweighingdatingbackthrough1978forT/S4.6.5.1.b.2 wasperformed.
4,0    DISCUSSION S  stem Descri  tion The  ice condenser is designed to ensure that the overall system will be  available to provide sufficient pressure suppression capability to limit the containment peak pressure to less than 12 psig during LOCA conditions assumed in the accident analysis.           In particular, the requirements for the ice bed ensure that the required ice inventory will    1) be  distributed evenly through the containment. bays,       2) contain sufficient boron to preclude dilution of the containment sump following a LOCA, and 3) contain sufficient heat removal capability to condense the reactor coolant system volume during a LOCA.
Duringthistimeframe,therewerethreeoccurrences inUnit1andfiveoccurrences inUnit2whensomeofthesurveillance requirements werenotmet.T/S4.6.5.l.b.2 requiresthefollowing threecriteriabemettomeeticeinventory requirements.
Currently, the ice bed is determined operable by meeting various surveillance requirements which include 1) verifying ice bed temperature is less than or equal to 27'F at least once per twelve hours, 2) performing chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of 9.0 to 9.5 at 25'C at least every nine months, 3) verifying at a 95X confidence level that each basket contains at least 1220 lbs of ice every nine months, 4) ensuring adequate flow area is available at least once every nine months, 5) performing a visual inspection at least once per 18 months of the inlet plenum support structures and turning vanes to ensure ice buildup is not to the point of indicating abnormal degradation of the ice condenser, and 6) verifying the structural integrity of the ice baskets by inspecting a representative sample at least once every 40 months.       All of these surveillance requirements are met by performance of approved plant procedures.
1)Arepresentative sampleofatleast144icebasketsmustbeweighedanddetermined tocontainatleast1220poundsoficeata95percentlevelofconfidence, 2)Theminimumaverageiceweightsofthesamplebasketsfromradialrows1,2,4,6,8and9ineachofthreegroupsshallnotbelessthan1220poundsoficeata95percentlevelofconfidence, and3)Minimumtotalicecondenser weightata95percentlevelofconfidence shallnotbelessthan2,371,450 pounds.Theoccurrences occurredin1982,1983,and1985inUnit1andin1982,1983,1984,and1986inUnit2.Asaresultoftheproblemsencountered, anicecondenser taskforcewasformedcomposedofplantengineers, AEPSCengineers, andconsulting specialists inrefrigeration.
The  first line of defense to determine the operability of the ice condenser lies with the operator.     As mentioned above, the ice bed temperature is monitored at least once every twelve hours to ensure temperatures are less than or equal-to 27'F. This is accomplished in a conservative manner by reviewing at least 18 different points throughout the ice condenser and ensuring they are all less than or equal to 27'F. Throughout the year the average ice bed temperature generally ranges between 16'F and 21'F,             well below the 27'F setpoint. In addition to the surveillance requirements, there are alarms in the control room which will indicate to the operator      if any of the points being recorded reach 27'F. Also, weekly operator tours require the operators to walkdown the refrigeration system to evaluate  its ability  to function. This includes walking down the
Thistaskforceprovidednumerousrecommendations toimprovethecoolingcapability oftheicecondenser refrigeration systemanddeveloped bettermaintenance techniques toimproveiceweights.Someoftherecommendations whichhavebeenincorporated asdesignchangesincludeinstalling aprogrammable defrostcontroller forairhandlingunitstoensurethatheatloadsaredistributed evenlythroughout theicecondenser toreduceexcessive sublimation inlocalized areas.Duringrefueling outageicereplenishment activities, toolsandvariousothermaterials hadaccumulated intheductwork,whichcreatedhotspotsintheicebedandincreased sublimation rateswheretheductworkwasblocked.Debrisscreenswereinstalled overwallpanelopeningstoprecludecloggingofductworkusedtocooltheicebed.Also,aflowbalanceoftheductworkwasperformed inbothunitstodistribute coolingmoreevenlytothecranewallinordertoreducesublimation ratesthatwereoccurring inrows8and9.Manyotherdesignchangeshavebeeninstalled toimprovethereliability andperformance oftheicecondenser refrigeration.
 
system.Maintenance techniques developed includedusingvibrators toemptybasketsanddeveloping toolstoreplacecruciforms inthebaskets.Thistaskforceisstillintactandconvenesperiodically toreviewthestatusoficecondenser issues.Asrecommended bythetaskforce,maintenance techniques werealsoenhancedtoincreasetheiceweightsinbasketstoensureminimumtechnical specification requirements wouldbemetwithouthavingtoshutdownthereactormid-cycle toreplenish iceinventory.
        ~ g
Thiswas
'I l'
,)
    ~
Attachment 1toAEP:NRC:1193 Page6accomplished bydeveloping techniques toemptythebasketcompletely andthenrefilling itwithnewiceinsteadofaddingwatertoexistingiceorpackingicebyhandtoincreaseiceweight.Thesetechniques, aswellastheabovedesignchangeimplementations, haveledtoanincreaseintheaverageas-foundicebasketweightsofatleast90poundsinUnit1sinceSeptember of1985andinUnit2sinceDecemberof1984.Itshouldbenotedthatthethirdrequirement fortotalminimumicecondenser weighthasalwaysbeensatisfied andhasneverbeenanissueofconcern.Thedeficiencies haveoccurredwhencalculating averageindividual andgroupbasketweights.Recommendations alsoresultedinaheightened awareness oftheimportance oftherefrigeration systemanditsassociated maintenance practices whichhavebeenimprovedtoensurethatairhandlingunitsarerepairedinatimelymanner.Weeklytoursbyoperations personnel havealsobeenincorporated toidentifyrefrigeration systemdeficiencies beforetheyhaveanadverseeffectonthecondition oftheicecondenser.
off to AEP:NRC:1193                                     Page 3 chillers, air handling units, and glycol pumps to      ensure that they are in proper working order. The tours also require      the operators to open a sample of the intermediate deck doors to ensure they are not frozen shut. This helps to ensure that no abnormal degradation of the ice condenser is occurring due to condensation or frozen drain lines in localized areas.
TheactionsrequiredbyT/S4.6.5.l.a, whichisperformed ona12hourinterval, aswellasassociated alarmsofferadequateindication foricebedandrefrigeration systemstatuspriortoanyabnormaldegradation oftheicecondenser.
The  next line of defense is the performance of various procedures to ensure the ice bed is in good physical condition, consistent with the assumptions used in the accident analysis.       Due to the nine month surveillance requirement, these surveillances are currently completed at least once during a fuel cycle while the reactor is on line and once during the refueling outage. These surveillances are referenced above and include chemical sampling, ice basket weighing, and flow passage inspection.     The reason for the chemical sampling is to ensure the boron concentration and pH requirements are met to preclude dilution of the containment sump following a LOCA. The minimum weight  figure of 1220 pounds of ice per basket contains a 10X conservative allowance for ice loss through sublimation.             Flow passage inspection is performed to ensure the absence of abnormal ice bed degradation as would be indicated      if accumulations exceed the 3/8" specified in the technical specifications.               When these surveillances are performed while in a refueling outage, as-found data is collected prior to performing the labor intensive maintenance routine. The maintenance routine typically includes weighing as many baskets as possible within an allotted time frame and emptying the baskets that would not, based on operating experience, weigh greater than 1220 pounds at'he start of the next refueling outage.             The subsequent  maintenance includes refilling  the  ice baskets  with  ice and performing defrosts of the ice condenser as necessary to ensure maximum heat transfer capability during the upcoming fuel cycle.
Basedonthepreviousdiscussion, weproposethatthesurveillance intervalofninemonthsforT/S4.6.5.1.b.2 beincreased to18months.Asimilarrequest,published intheFederalRegisteronFebruary20,1991wasmadebyDukePowerCompanyfortheirCatawbaNuclearStation,Units1and2,andwassubsequently approvedbytheNRC.DukePowerCompanyincreased theirminimumrequirediceweightsapproximately fivepercenttoaccountforexpectedsublimation.
Also, significant effort is dedicated to cleaning up ice that accumulates during the emptying/refilling process of the ice baskets to ensure no flow blockage occurs during the subsequent fuel cycle.
Webelievethisisnotnecessary fortheCookNuclearPlantrequestbecausethepreviousweighings duringtheUnit1andUnit2refueling outagesdatingbackthrough1986havemetallsurveillance requirements withoutanyiceadditions beingmademid-cycle.
Two  remaining surveillances are performed to ensure that no abnormal degradation of the ice condenser is taking place.             The first, performed on an 18 month frequency;. is- an inspection of the inlet plenum and turning vanes for frost or ice accumulation. The second, performed on a 40 month frequency is a visual structural inspection of the ice baskets to ensure that they are free of detrimental structural wear, cracks, corrosion or other damage.
TS4.6.5.1.b.3 Withrespecttotheflowpassageinspections requiredbyTechnical Specification 4.6.5.1.b.3, licenseeeventreporthistories werereviewedbackthrough1978.Inthattimeframe,thereweresevenoccurrences between1983and1988whichindicated thattherequirements ofthespecification hadnotbeenmet.Ineachofthecases,however,itwasconcluded thattheflowpassageswerenotdegradedtosuchadegreethatwouldhaveprohibited theice
 
'
      ~ y 1
Attachment 1toAEP:NRC:1193 Page7condenser fromperforming itsdesignfunctionasassumedintheshort-term containment integrity analysis.
L. a to AEP:NRC:1193                                   Page 4 Reason    for          Pro osed Technical            S ecification  Chan e Re  uest The  request to increase the surveillance interval from nine months to 18 months would decrease                        the number of evolutions necessary to enter containment during operation of the unit to verify ice basket boron concentrations, weights, and flow area blockage.                                 The revised surveillance interval would require the performance of such ice bed monitoring during refueling outages. We believe that improvements in ice bed inspection results due to modified maintenance techniques and design changes that have been implemented since 1984 provide adequate assurance that the ice condenser can meet and even exceed its design function without performing the surveillances on a nine month frequency. Also, increasing the surveillance interval would reduce the stresses put on the baskets and their supports due to repeated weighing evolutions'ustification for Pro osed Technical  S  ecification  Chan es An  increased surveillance interval                      for the chemical analysis required by    T/S  4.6.5.1.b.l is justified for the following reasons, First, prior to refilling baskets during refueling outage maintenance activities, the borated water source used to make ice is sampled to verify that the boron concentration and pH levels are met. A review of licensee event reports dating back through 1978 revealed no occurrences of failing to meet the surveillance requirements of this specification.                           Also, a review of ice condenser basket boron concentration and pH sample data between August, 1986 and September, 1992 for Unit 1 and between August, 1986 and January, 1993 for Unit 2 was reviewed, and other than a few problems due to the sampling techniques, no problems were apparent in meeting the surveillance requirements of this specification. Also,                         it should be noted that an increase to the 18 month frequency has already been approved in the new standard technical specifications for Westinghouse plants issued in September 1992 by the NRC. The frequency of 18 months was developed considering these facts: -1) Long term ice storage tests have determined that the chemical composition of the stored ice is extremely stable,                         2) Operating experience has demonstrated that meeting the boron concentration and pH requirements has never been a problem, and 3) Someone would have to enter the containment to take the sample, and, a radiation dose.
Since1988therehasbeennoindication ofabnormalicebeddegradation withrespecttomeetingtherecpxirements ofT/S4.6.5.1.b.3.
if the unit is at power, that person would receive to AEP:NRC:1193                                     Page 5 T  S 4.6.5  1 b 2 A  review of licensee event reports regarding ice basket weighing dating back through 1978 for T/S 4.6.5.1.b.2 was performed. During this time frame, there were three occurrences in Unit 1 and five occurrences in Unit 2 when some of the surveillance requirements were not met. T/S 4.6.5.l.b.2 requires the following three criteria be met to meet ice inventory requirements.     1) A representative sample of at least 144 ice baskets must be weighed and determined to contain at least 1220 pounds of ice at a 95 percent level of confidence, 2)
Webelievethatthesurveillances performed perT/S4.6.5.1.a ona,twelvehourintervalandtheaddedtoursperformed ontheicecondenser refrigeration systembyoperations personnel providesufficient indication ofabnormaldegradation oftheicecondenser priortoitbecomingaconcern.ItshouldbenotedthatthefailuresthatoccurredperT/S4.6.5.1.b.2 alsooccurredduringasimilartimeframe(1982through1986),andwebelievethedesignchangesimplemented andtheenhancedmaintenance techniques discussed abovehavecontributed toreducingtheamountoficebuild-upintheflowpassages.
The minimum average ice weights of the sample baskets from radial rows 1, 2, 4, 6, 8 and 9 in each of three groups shall not be less than 1220 pounds of ice at a 95 percent level of confidence, and
Alsotobeconsidered aretheextensive effortsthatareputforthtoensureflowpassagesarecleanedoutfollowing maintenance activities duringarefueling outage.New,methodsweredeveloped in1992toperformlocalized defrosting oftheicecondenser bayswhichhavereducedfrostbuildupontheicecondenser latticeframework alongthecraneandcontainment walls.Basedonthefactthatthesurveillance requirements fortheprocedures havebeenmetsince1988,throughthreemid-cycle inspections, inbothUnit1andUnit2,werequestthattheintervalforinspection beincreased to18months.5'NOSIGNIFICANT HAZARDSDETERMINATION Wehaveevaluated theproposedT/Ssexemption andhavedetermined thatitshouldnotrecpxireasignificant hazardsconsideration basedonthecriteriaestablished in10CFR50.92(c).
: 3) Minimum total ice condenser weight at a 95 percent level of confidence shall not be less than 2,371,450 pounds. The occurrences occurred in 1982, 1983, and 1985 in Unit 1 and in 1982, 1983, 1984, and 1986 in Unit 2.
Operation oftheCookNuclearPlantinaccordance withtheproposedamendment willnot:(1)Involveasinificantincreaseintherobabilit orconseencesofanaccidentreviouslevaluated.
As a result  of the problems encountered, an ice condenser task force was formed    composed of plant engineers,     AEPSC engineers,     and consulting specialists in refrigeration. This task force provided numerous recommendations to improve the cooling capability of the ice condenser refrigeration system and developed better maintenance techniques to improve ice weights. Some of the recommendations which have been incorporated as design        changes include installing a programmable defrost controller for  air handling units to ensure that heat loads are distributed evenly throughout the ice condenser to reduce excessive sublimation in localized areas.       During refueling outage ice replenishment activities, tools and various other materials had accumulated in the duct work, which created hot spots in the ice bed and increased sublimation rates where the duct work was blocked. Debris screens were installed over wall panel openings to preclude clogging of duct work used to cool the ice bed. Also, a flow balance of the duct work was performed in both units to distribute cooling more evenly to the crane wall in order to reduce sublimation rates that were occurring in rows 8 and 9. Many other design changes have been installed to improve the reliability and performance of the ice condenser refrigeration. system. Maintenance techniques developed included using vibrators to empty baskets and developing tools to replace cruciforms in the baskets.         This task force is still intact and convenes periodically to review the status of ice condenser issues.
Theincreaseinthesurveillance intervaldoesnotcreateasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
As recommended    by the task force, maintenance techniques were also enhanced  to increase the ice weights in baskets to ensure minimum technical specification requirements would be met without having to shut down the reactor mid-cycle to replenish ice inventory. This was
Recentoperating experience withtheicecondenser indicates thatallrequiredboronconcentrations, pHlevels,iceweights,andfrostoriceaccumulation criteriaestablished intheT/Sshavebeenmetwithoutanycorrective orpreventive actionbeingtakenduringthemid-cycle inspections.
 
Thisprovidesconfidence thattheicecondenser willcontinuetobeabletoperformasassumedinthesafetyanalysis.
,)   to AEP:NRC:1193                                     Page 6 accomplished by developing techniques to empty the basket completely and then refilling      it  with new ice instead of adding water to existing ice or packing ice by hand to increase ice weight. These techniques, as well as the above design change implementations, have led to an increase in the average as-found ice basket weights of at least 90 pounds in Unit 1 since September of 1985 and in Unit 2 since December of 1984.     It  should be noted that the third requirement for total minimum ice condenser weight has always been satisfied and has never been an issue of concern. The deficiencies have occurred when calculating average individual and group basket weights.
Therefore, weconcludethattheproposedT/Sschangesdonotinvolveasignificant increaseintheprobability orconsequences ofanaccidentpreviously evaluated.
Recommendations     also resulted    in  a  heightened awareness of the importance of the refrigeration system and its associated maintenance practices which have been improved to ensure that air handling units are repaired in a timely manner.             Weekly tours by operations personnel have also been incorporated to identify refrigeration system deficiencies before they have an adverse effect on the condition of the ice condenser.             The actions required by T/S 4.6.5.l.a, which    is  performed  on  a  12 hour interval, as well as associated alarms offer adequate indication for ice bed and refrigeration system status prior to any abnormal degradation of the ice condenser.
Attachment 1toAEP:NRC:1193 Page8(2)Createtheossibilit ofanewordifferent kindofaccidentfromanreviouslanalzedTheincreaseinthesurveillance intervalfortheicecondenser from9to18monthswillnotaffectthefunctionality orrequiredperformance capability oftheicecondenser.
Based on the previous discussion, we propose        that the surveillance interval of nine months for T/S 4.6.5.1.b.2           be increased to 18 months. A similar request, published in the Federal Register on February 20, 1991 was made by Duke Power Company for their Catawba Nuclear Station, Units 1 and 2, and was subsequently approved by the NRC. Duke Power Company increased their minimum required ice weights approximately five percent to account for expected sublimation. We believe this is not necessary for the Cook Nuclear Plant request because the previous weighings during the Unit 1 and Unit 2 refueling outages dating back through 1986 have met all surveillance requirements without any ice additions being made mid-cycle.
Theabovereviewfoundnopossibility ofanewordifferent kindofaccidentfromanypreviously analyzed.
T S  4.6.5.1.b.3 With respect to the flow passage inspections required by Technical Specification 4.6.5.1.b.3, licensee event report histories were reviewed back through 1978. In that time frame, there were seven occurrences    between 1983 and 1988 which indicated that the requirements of the specification had not been met. In each of the cases, however,     it  was concluded that the flow passages were not prohibited the ice degraded  to  such a degree    that would  have
(3)Involveasinificantreduction inamarinofsafetTheproposedT/Sschangesonlychangethesurveillance frequency requirements whichwebelievewillnotchallenge theabilityoftheicecondenser toperformitsfunctionasdefinedinthesafetyanalysis.
 
OtherT/Ssandplantindications areinplacetowarntheoperatorofrefrigeration systemproblemspriortopossibleicebeddegradation.
'   to  AEP:NRC:1193                                   Page 7 condenser    from performing its design function as assumed in the short-term containment integrity analysis. Since 1988 there has been no indication of abnormal ice bed degradation with respect to meeting the recpxirements of T/S 4.6.5.1.b.3.
Therefore, weconcludethattheT/Schangedoesnotinvolveasignificant reduction inamarginofsafety.6.0PENDINGTSsPROPOSALS IMPACTING THISSUBMITTAL Therearecurrently nootherT/Ssproposals underreviewthatwouldimpactthissubmittal,}}
We  believe that the surveillances performed per T/S 4.6.5.1.a on a, twelve hour interval and the added tours performed on the ice condenser refrigeration system by operations personnel provide sufficient indication of abnormal degradation of the ice condenser it prior to becoming a concern. It should be noted that the failures that occurred per T/S 4.6.5.1.b.2 also occurred during a similar time frame (1982 through 1986), and we believe the design changes implemented and the enhanced maintenance techniques discussed above have contributed to reducing the amount of ice build-up in the flow passages.     Also to be considered are the extensive efforts that are put forth to ensure flow passages are cleaned out following maintenance activities during a refueling outage. New, methods were developed in 1992 to perform localized defrosting of the ice condenser bays which have reduced frost buildup on the ice condenser lattice framework along the crane and containment walls. Based on the fact that the surveillance requirements for the procedures have been met since 1988, through three mid-cycle inspections, in both Unit 1 and Unit 2, we request that the interval for inspection be increased to 18 months.
5 '     NO  SIGNIFICANT HAZARDS DETERMINATION We  have evaluated      the proposed T/Ss exemption and have determined that  it should    not recpxire a significant hazards consideration based on the criteria established in 10CFR50.92(c). Operation of the Cook Nuclear Plant in accordance with the proposed amendment will not:
(1) Involve    a  si nificant increase in the robabilit or    conse  ences of  an  accident      reviousl  evaluated.
The    increase      in the surveillance interval      does not create a significant increase in the probability or            consequences  of an accident previously evaluated. Recent operating experience with the ice condenser indicates that all required boron concentrations, pH levels, ice weights, and frost or ice accumulation criteria established in the T/Ss have been met without any corrective or preventive action being taken during the mid-cycle inspections. This provides confidence that the ice condenser will continue to be able to perform as assumed in the safety analysis. Therefore, we conclude that the proposed T/Ss changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
to AEP:NRC:1193                                   Page 8 (2) Create the ossibilit of a new or different kind of accident from an      reviousl anal zed The  increase in the surveillance interval for the ice condenser from 9  to  18 months will not affect the functionality or required performance capability of the ice condenser. The above review found no possibility of a new or different kind of accident from any previously analyzed.
(3) Involve    a  si nificant reduction in  a mar  in of safet The proposed      T/Ss changes  only change the surveillance frequency requirements which      we believe will not challenge the ability of the ice condenser to perform its function as defined in the safety analysis. Other T/Ss and plant indications are in place to warn the operator of refrigeration system problems prior to possible ice bed degradation.       Therefore, we conclude that the T/S change does not involve a significant reduction in a margin of safety.
6.0    PENDING T Ss PROPOSALS IMPACTING THIS SUBMITTAL There are    currently no other    T/Ss proposals under review  that would impact    this submittal,}}

Latest revision as of 05:14, 16 November 2019

Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 4.6.5.1.b.1,2 & 3 to Change Ice Condenser Bed SR Interval from 9 Months to 18 Months
ML17331B068
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/15/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17331B069 List:
References
AEP:NRC:1193, NUDOCS 9311190293
Download: ML17331B068 (20)


Text

ACCEI ERA ED DOCUMENT DIST'TION SYSTEM REGUL ORY INFORMATION DISTRIBUT~ . SYSTEM (RIDS)

ACCESSION NBR:9311190293 DOC.DATE: 93/11/15 NOTARIZED: YES DOCKET ¹ FACIL:50-315 Donald C. Cook Nuclear Power- Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316'UTH.

NAME AUTHOR AFFILIATION FITZPATRICK,R. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk)

I

SUBJECT:

Application for amends to licenses DPR-58 6 DPR-74,modifying TS 4.6.5.l.b.l,2 6 3 to change ice condenser bed SR interval from 9 months to 18 months.

DISTRIBUTION CODE: ROOID COPIES RECEIVED:LTR g ENCL f SIZE: /3 7 S

TITLE: OR Submittal: General Distribution .

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD3-1 LA 1 1 PD3-1 PD 1 1 WETZEL,B 2 2 D

INTERNAL: NRR/DE/EELB 1 1 NRR/DORS/OTSB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC L 1 0 OGC/HDS2 1 0 EG F~ 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 13

Indiana Michig~~

Power Compa+

P.O. Box 1663 <

Columbus, OH 43216 g

AEP:NRC:1193 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 UNITS 1 AND 2 ICE CONDENSER ICE BED SURVEILLANCE REQUIREMENT TECHNICAL SPECIFICATION AMENDMENT REQUEST U. S. Nuclear Regulatory Commission Document Control Desk Mashington, D. C. 20555 Attn: T. E. Murley November 15, 1993

Dear Dr. Murley:

This letter and its attachments constitute an application for Technical Specifications (T/Ss) changes for Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we are proposing to modify Unit 1 T/S 4.6.5.1.b.l, 2, and 3 and Unit 2 T/S 4.6.5.1.b.l, 2, and 3 to change the surveillance requirement interval from 9 months to 18 months.

Attachment 1 provides a .detailed description of the proposed changes, the justification for the changes, and our proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92(c). Attachment 2 contains the existing T/Ss pages marked to reflect the proposed changes. Attachment 3 contains the proposed T/Ss pages.

The proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.

In compliance with the requirements of 10 CFR 50.91(b)(l), copies of this letter and its attachments have been transmitted to Mr. J. R. Padgett of the Michigan Public Service Commission and to the Michigan Department of Public Health.

o4.

3. 80<"'8 9311190293 931115 PDR ADOCK 05000315 P PDR

Dr. T. E. Murley AEP:NRC:1193 This letter is submitted pursuant to 10 CFR 50.54(f) and, as such, an oath statement is attached.

Sincerely, Vice President Attachments cc: A. A. Blind - Bridgman G. Charnoff J. B. Martin - Region III NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett

Dr. T. E. Murley AEP:NRC:1193 bc: S. J. Brewer/J. B. Kingseed/S. A. Hover D. H. Malin/K. J. Toth M. L. Horvath - Bridgman J. B. Shinnock W. G. Smith, Jr.

B. A. Wetzel, NRC - Washington, D. C.

AEP:NRC:1193 DC-N-6015,1

COUNTY OF FRANKLIN E. E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee, Indiana Michigan Power Company, that he has read the forgoing Units 1 and 2 Ice Condenser Ice Bed Surveillance Requirement Technical Specification Amendment Request, and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

Subscribed and sworn to before me this day of 19 WD NOTARY PUBLIC DlANA L. EADS Notary Public, State of Ohio J)y commission expires 2 24 95

Attachment 1 to AEP:NRC:1193 10CFR50.92 Determination for Proposed Changes to the Donald C. Cook Nuclear Plant Units 1 and 2 Technical Specifications to AEP:NRC:1193 Page 1 1.0 SECTIONS TO BE CHANGED Unit 1: Technical Specification (T/S) 4.6.5.l.b.l, 2, and 3.

Unit 2: Technical Specification (T/S) 4.6.5.1.b.l, 2, and 3.

2.0 EXTENT OF CHANGES We are proposing to change the surveillance requirement interval from 9 months to 18 months on the referenced Technical Specifications for chemical analysis, weighing, and flow passage inspection of the ice condenser.

3.0 CHANGES RE UESTED Identical changes are being sought for both the Unit 1 and Unit 2 Technical Specifications.

3.1 UNIT 1 We are proposing to make the following changes to the Unit 1 Technical Specifications.

Revise T S 4 6 5 1 b Surveillance Interval Re uirements Currently, there is a nine month surveillance requirement to perform chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of. 9.0 to 9.5 at'5'C, verify at a 95X confidence level that adequate ice inventory is available and distributed evenly, and ensure that adequate flow area is available. We are proposing to change this interval to 18 months.

3.2 UNIT 2 We are proposing to make the following changes to the Unit 2 Technical Specifications.

Revise T S 4 6 5.1 b Surveillance Interval Re uirements Currently, there is a nine month surveillance requirement to perform chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of 9.0 to 9.5 at 25'C, verify at a 95X confidence level that adequate ice inventory is available and distributed evenly, and ensure that adequate flow area is available. We are proposing to change this interval to 18 months.

'I I to AEP:NRC:1193 Page 2 It should be noted that the bases for T/S 3/4.6.5.1 will need to be updated to reflect the increased time interval if the proposed amendment is approved.

4,0 DISCUSSION S stem Descri tion The ice condenser is designed to ensure that the overall system will be available to provide sufficient pressure suppression capability to limit the containment peak pressure to less than 12 psig during LOCA conditions assumed in the accident analysis. In particular, the requirements for the ice bed ensure that the required ice inventory will 1) be distributed evenly through the containment. bays, 2) contain sufficient boron to preclude dilution of the containment sump following a LOCA, and 3) contain sufficient heat removal capability to condense the reactor coolant system volume during a LOCA.

Currently, the ice bed is determined operable by meeting various surveillance requirements which include 1) verifying ice bed temperature is less than or equal to 27'F at least once per twelve hours, 2) performing chemical analyses of the ice bed to ensure a boron concentration of 1800 ppm and a pH of 9.0 to 9.5 at 25'C at least every nine months, 3) verifying at a 95X confidence level that each basket contains at least 1220 lbs of ice every nine months, 4) ensuring adequate flow area is available at least once every nine months, 5) performing a visual inspection at least once per 18 months of the inlet plenum support structures and turning vanes to ensure ice buildup is not to the point of indicating abnormal degradation of the ice condenser, and 6) verifying the structural integrity of the ice baskets by inspecting a representative sample at least once every 40 months. All of these surveillance requirements are met by performance of approved plant procedures.

The first line of defense to determine the operability of the ice condenser lies with the operator. As mentioned above, the ice bed temperature is monitored at least once every twelve hours to ensure temperatures are less than or equal-to 27'F. This is accomplished in a conservative manner by reviewing at least 18 different points throughout the ice condenser and ensuring they are all less than or equal to 27'F. Throughout the year the average ice bed temperature generally ranges between 16'F and 21'F, well below the 27'F setpoint. In addition to the surveillance requirements, there are alarms in the control room which will indicate to the operator if any of the points being recorded reach 27'F. Also, weekly operator tours require the operators to walkdown the refrigeration system to evaluate its ability to function. This includes walking down the

~ g

'I l'

~

off to AEP:NRC:1193 Page 3 chillers, air handling units, and glycol pumps to ensure that they are in proper working order. The tours also require the operators to open a sample of the intermediate deck doors to ensure they are not frozen shut. This helps to ensure that no abnormal degradation of the ice condenser is occurring due to condensation or frozen drain lines in localized areas.

The next line of defense is the performance of various procedures to ensure the ice bed is in good physical condition, consistent with the assumptions used in the accident analysis. Due to the nine month surveillance requirement, these surveillances are currently completed at least once during a fuel cycle while the reactor is on line and once during the refueling outage. These surveillances are referenced above and include chemical sampling, ice basket weighing, and flow passage inspection. The reason for the chemical sampling is to ensure the boron concentration and pH requirements are met to preclude dilution of the containment sump following a LOCA. The minimum weight figure of 1220 pounds of ice per basket contains a 10X conservative allowance for ice loss through sublimation. Flow passage inspection is performed to ensure the absence of abnormal ice bed degradation as would be indicated if accumulations exceed the 3/8" specified in the technical specifications. When these surveillances are performed while in a refueling outage, as-found data is collected prior to performing the labor intensive maintenance routine. The maintenance routine typically includes weighing as many baskets as possible within an allotted time frame and emptying the baskets that would not, based on operating experience, weigh greater than 1220 pounds at'he start of the next refueling outage. The subsequent maintenance includes refilling the ice baskets with ice and performing defrosts of the ice condenser as necessary to ensure maximum heat transfer capability during the upcoming fuel cycle.

Also, significant effort is dedicated to cleaning up ice that accumulates during the emptying/refilling process of the ice baskets to ensure no flow blockage occurs during the subsequent fuel cycle.

Two remaining surveillances are performed to ensure that no abnormal degradation of the ice condenser is taking place. The first, performed on an 18 month frequency;. is- an inspection of the inlet plenum and turning vanes for frost or ice accumulation. The second, performed on a 40 month frequency is a visual structural inspection of the ice baskets to ensure that they are free of detrimental structural wear, cracks, corrosion or other damage.

~ y 1

L. a to AEP:NRC:1193 Page 4 Reason for Pro osed Technical S ecification Chan e Re uest The request to increase the surveillance interval from nine months to 18 months would decrease the number of evolutions necessary to enter containment during operation of the unit to verify ice basket boron concentrations, weights, and flow area blockage. The revised surveillance interval would require the performance of such ice bed monitoring during refueling outages. We believe that improvements in ice bed inspection results due to modified maintenance techniques and design changes that have been implemented since 1984 provide adequate assurance that the ice condenser can meet and even exceed its design function without performing the surveillances on a nine month frequency. Also, increasing the surveillance interval would reduce the stresses put on the baskets and their supports due to repeated weighing evolutions'ustification for Pro osed Technical S ecification Chan es An increased surveillance interval for the chemical analysis required by T/S 4.6.5.1.b.l is justified for the following reasons, First, prior to refilling baskets during refueling outage maintenance activities, the borated water source used to make ice is sampled to verify that the boron concentration and pH levels are met. A review of licensee event reports dating back through 1978 revealed no occurrences of failing to meet the surveillance requirements of this specification. Also, a review of ice condenser basket boron concentration and pH sample data between August, 1986 and September, 1992 for Unit 1 and between August, 1986 and January, 1993 for Unit 2 was reviewed, and other than a few problems due to the sampling techniques, no problems were apparent in meeting the surveillance requirements of this specification. Also, it should be noted that an increase to the 18 month frequency has already been approved in the new standard technical specifications for Westinghouse plants issued in September 1992 by the NRC. The frequency of 18 months was developed considering these facts: -1) Long term ice storage tests have determined that the chemical composition of the stored ice is extremely stable, 2) Operating experience has demonstrated that meeting the boron concentration and pH requirements has never been a problem, and 3) Someone would have to enter the containment to take the sample, and, a radiation dose.

if the unit is at power, that person would receive to AEP:NRC:1193 Page 5 T S 4.6.5 1 b 2 A review of licensee event reports regarding ice basket weighing dating back through 1978 for T/S 4.6.5.1.b.2 was performed. During this time frame, there were three occurrences in Unit 1 and five occurrences in Unit 2 when some of the surveillance requirements were not met. T/S 4.6.5.l.b.2 requires the following three criteria be met to meet ice inventory requirements. 1) A representative sample of at least 144 ice baskets must be weighed and determined to contain at least 1220 pounds of ice at a 95 percent level of confidence, 2)

The minimum average ice weights of the sample baskets from radial rows 1, 2, 4, 6, 8 and 9 in each of three groups shall not be less than 1220 pounds of ice at a 95 percent level of confidence, and

3) Minimum total ice condenser weight at a 95 percent level of confidence shall not be less than 2,371,450 pounds. The occurrences occurred in 1982, 1983, and 1985 in Unit 1 and in 1982, 1983, 1984, and 1986 in Unit 2.

As a result of the problems encountered, an ice condenser task force was formed composed of plant engineers, AEPSC engineers, and consulting specialists in refrigeration. This task force provided numerous recommendations to improve the cooling capability of the ice condenser refrigeration system and developed better maintenance techniques to improve ice weights. Some of the recommendations which have been incorporated as design changes include installing a programmable defrost controller for air handling units to ensure that heat loads are distributed evenly throughout the ice condenser to reduce excessive sublimation in localized areas. During refueling outage ice replenishment activities, tools and various other materials had accumulated in the duct work, which created hot spots in the ice bed and increased sublimation rates where the duct work was blocked. Debris screens were installed over wall panel openings to preclude clogging of duct work used to cool the ice bed. Also, a flow balance of the duct work was performed in both units to distribute cooling more evenly to the crane wall in order to reduce sublimation rates that were occurring in rows 8 and 9. Many other design changes have been installed to improve the reliability and performance of the ice condenser refrigeration. system. Maintenance techniques developed included using vibrators to empty baskets and developing tools to replace cruciforms in the baskets. This task force is still intact and convenes periodically to review the status of ice condenser issues.

As recommended by the task force, maintenance techniques were also enhanced to increase the ice weights in baskets to ensure minimum technical specification requirements would be met without having to shut down the reactor mid-cycle to replenish ice inventory. This was

,) to AEP:NRC:1193 Page 6 accomplished by developing techniques to empty the basket completely and then refilling it with new ice instead of adding water to existing ice or packing ice by hand to increase ice weight. These techniques, as well as the above design change implementations, have led to an increase in the average as-found ice basket weights of at least 90 pounds in Unit 1 since September of 1985 and in Unit 2 since December of 1984. It should be noted that the third requirement for total minimum ice condenser weight has always been satisfied and has never been an issue of concern. The deficiencies have occurred when calculating average individual and group basket weights.

Recommendations also resulted in a heightened awareness of the importance of the refrigeration system and its associated maintenance practices which have been improved to ensure that air handling units are repaired in a timely manner. Weekly tours by operations personnel have also been incorporated to identify refrigeration system deficiencies before they have an adverse effect on the condition of the ice condenser. The actions required by T/S 4.6.5.l.a, which is performed on a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval, as well as associated alarms offer adequate indication for ice bed and refrigeration system status prior to any abnormal degradation of the ice condenser.

Based on the previous discussion, we propose that the surveillance interval of nine months for T/S 4.6.5.1.b.2 be increased to 18 months. A similar request, published in the Federal Register on February 20, 1991 was made by Duke Power Company for their Catawba Nuclear Station, Units 1 and 2, and was subsequently approved by the NRC. Duke Power Company increased their minimum required ice weights approximately five percent to account for expected sublimation. We believe this is not necessary for the Cook Nuclear Plant request because the previous weighings during the Unit 1 and Unit 2 refueling outages dating back through 1986 have met all surveillance requirements without any ice additions being made mid-cycle.

T S 4.6.5.1.b.3 With respect to the flow passage inspections required by Technical Specification 4.6.5.1.b.3, licensee event report histories were reviewed back through 1978. In that time frame, there were seven occurrences between 1983 and 1988 which indicated that the requirements of the specification had not been met. In each of the cases, however, it was concluded that the flow passages were not prohibited the ice degraded to such a degree that would have

' to AEP:NRC:1193 Page 7 condenser from performing its design function as assumed in the short-term containment integrity analysis. Since 1988 there has been no indication of abnormal ice bed degradation with respect to meeting the recpxirements of T/S 4.6.5.1.b.3.

We believe that the surveillances performed per T/S 4.6.5.1.a on a, twelve hour interval and the added tours performed on the ice condenser refrigeration system by operations personnel provide sufficient indication of abnormal degradation of the ice condenser it prior to becoming a concern. It should be noted that the failures that occurred per T/S 4.6.5.1.b.2 also occurred during a similar time frame (1982 through 1986), and we believe the design changes implemented and the enhanced maintenance techniques discussed above have contributed to reducing the amount of ice build-up in the flow passages. Also to be considered are the extensive efforts that are put forth to ensure flow passages are cleaned out following maintenance activities during a refueling outage. New, methods were developed in 1992 to perform localized defrosting of the ice condenser bays which have reduced frost buildup on the ice condenser lattice framework along the crane and containment walls. Based on the fact that the surveillance requirements for the procedures have been met since 1988, through three mid-cycle inspections, in both Unit 1 and Unit 2, we request that the interval for inspection be increased to 18 months.

5 ' NO SIGNIFICANT HAZARDS DETERMINATION We have evaluated the proposed T/Ss exemption and have determined that it should not recpxire a significant hazards consideration based on the criteria established in 10CFR50.92(c). Operation of the Cook Nuclear Plant in accordance with the proposed amendment will not:

(1) Involve a si nificant increase in the robabilit or conse ences of an accident reviousl evaluated.

The increase in the surveillance interval does not create a significant increase in the probability or consequences of an accident previously evaluated. Recent operating experience with the ice condenser indicates that all required boron concentrations, pH levels, ice weights, and frost or ice accumulation criteria established in the T/Ss have been met without any corrective or preventive action being taken during the mid-cycle inspections. This provides confidence that the ice condenser will continue to be able to perform as assumed in the safety analysis. Therefore, we conclude that the proposed T/Ss changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

to AEP:NRC:1193 Page 8 (2) Create the ossibilit of a new or different kind of accident from an reviousl anal zed The increase in the surveillance interval for the ice condenser from 9 to 18 months will not affect the functionality or required performance capability of the ice condenser. The above review found no possibility of a new or different kind of accident from any previously analyzed.

(3) Involve a si nificant reduction in a mar in of safet The proposed T/Ss changes only change the surveillance frequency requirements which we believe will not challenge the ability of the ice condenser to perform its function as defined in the safety analysis. Other T/Ss and plant indications are in place to warn the operator of refrigeration system problems prior to possible ice bed degradation. Therefore, we conclude that the T/S change does not involve a significant reduction in a margin of safety.

6.0 PENDING T Ss PROPOSALS IMPACTING THIS SUBMITTAL There are currently no other T/Ss proposals under review that would impact this submittal,