| issue date = 05/02/2008 | | issue date = 05/02/2008 | ||
| title = Er 05000280-08-301, 05000281-08-301, 03/17-27/2008 and 04/09/2008; Surry Power Station; Licensed Operator Examinations | | title = Er 05000280-08-301, 05000281-08-301, 03/17-27/2008 and 04/09/2008; Surry Power Station; Licensed Operator Examinations | ||
| author name = Widmann M | | author name = Widmann M | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Christian D | | addressee name = Christian D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
Line 15: | Line 15: | ||
| page count = 13 | | page count = 13 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000280/2008301]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES | ||
REGION II SAM NUNN ATLANTA FEDERAL CENTER | NUCLEAR REGULATORY COMMISSION | ||
REGION II | |||
SAM NUNN ATLANTA FEDERAL CENTER | |||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 | 61 FORSYTH STREET, SW, SUITE 23T85 | ||
ATLANTA, GEORGIA 30303-8931 | |||
May 2, 2008 | |||
Mr. David A. Christian | |||
Senior Vice President and Chief Nuclear Officer | |||
examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. | Virginia Electric and Power Company | ||
Innsbrook Technical Center | |||
both the written and operating examinations. | 5000 Dominion Boulevard | ||
Glen Allen, VA 23060 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS.) | SUBJECT: SURRY POWER STATION - NRC EXAMINATION REPORT 05000280/2008301 | ||
AND 05000281/2008301 | |||
Dear Mr. David A. Christian: | |||
During the period of March 17-27, 2008, the Nuclear Regulatory Commission (NRC) | |||
administered operating examinations to employees of your company who had applied for | |||
licenses to operate the Surry Power Station. At the conclusion of the examination, the | |||
examiners discussed the examination questions and preliminary findings with those members of | |||
your staff identified in the enclosed report. The written examination was administered by your | |||
staff on April 9, 2008. | |||
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator applicants passed | |||
both the written and operating examinations. One RO applicant failed the written examination. | |||
There were two post examination comments. These comments and the NRC resolution of | |||
these comments are summarized in Enclosure 2. A Simulation Facility Report is included in this | |||
report as Enclosure 3. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter | |||
and its enclosures will be available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS.) | |||
VEPCO 2 | |||
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the | |||
Public Electronic Reading Room). Should you have any questions concerning this letter, please | |||
contact me at (404) 562-4550. | |||
Sincerely, | |||
/RA/ | |||
Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-280, 50-281 | |||
License Nos.: DPR-32, DPR-37 | |||
Enclosures: 1. Report Details | |||
2. NRC Post Examination Comment Resolution | |||
3. Simulation Facility Report | |||
cc: (See page 3) | |||
VEPCO 3 | |||
cc w/encl: | |||
Chris L. Funderburk | |||
Director | |||
Nuclear Licensing and Operations Support | |||
Virginia Electric and Power Company | |||
Electronic Mail Distribution | |||
Donald E. Jernigan | |||
Site Vice President | |||
Surry Power Station | |||
Virginia Electric & Power Company | |||
Electronic Mail Distribution | |||
Virginia State Corporation Commission | |||
Division of Energy Regulation | |||
P.O. Box 1197 | |||
Richmond, VA 23209 | |||
Lillian M. Cuoco, Esq. | |||
Senior Counsel | |||
Dominion Resources Services, Inc. | |||
Millstone Power Station | |||
Electronic Mail Distribution | |||
Attorney General | |||
Supreme Court Building | |||
900 East Main Street | |||
Richmond, VA 23219 | |||
Senior Resident Inspector | |||
Surry Power Station | |||
U.S. NRC | |||
5850 Hog Island Rd | |||
Surry, VA 23883 | |||
Mr. Andy T. Barbee | |||
Manager of Nuclear Training | |||
Surry Power Station | |||
5570 Hog Island Road | |||
Surry, VA 23883 | |||
Letter to David A. Christian from Malcolm T. Widmann dated May 2, 2008 | |||
SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT | |||
05000280/2008 AND 05000281/2008 | |||
Distribution w/encl: | |||
RIDSNRRDIRS | |||
PUBLIC | |||
S. P. Lingam, NRR (PM: NA, SUR) | |||
Richard Jervey, NRR | |||
May 2, 2008 | |||
Mr. David A. Christian | |||
Senior Vice President and Chief Nuclear Officer | |||
Virginia Electric and Power Company | |||
Innsbrook Technical Center | |||
5000 Dominion Boulevard | |||
Glen Allen, VA 23060 | |||
SUBJECT: SURRY POWER STATION - NRC EXAMINATION REPORT 05000280/2008301 | |||
AND 05000281/2008301 | |||
Dear Mr. David A. Christian: | |||
During the period of March 17-27, 2008, the Nuclear Regulatory Commission (NRC) | |||
administered operating examinations to employees of your company who had applied for | |||
licenses to operate the Surry Power Station. At the conclusion of the examination, the | |||
examiners discussed the examination questions and preliminary findings with those members of | |||
your staff identified in the enclosed report. The written examination was administered by your | |||
staff on April 9, 2008. | |||
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator applicants passed | |||
both the written and operating examinations. One RO applicant failed the written examination. | |||
There were two post examination comments. These comments and the NRC resolution of | |||
these comments are summarized in Enclosure 2. A Simulation Facility Report is included in this | |||
report as Enclosure 3. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter | |||
and its enclosures will be available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS.) | |||
2 | |||
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the | |||
Public Electronic Reading Room.) Should you have any questions concerning this letter, please | |||
contact me at (404) 562-4550. | |||
Sincerely, | |||
/RA/ | |||
Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-280, 50-281 | |||
License Nos.: DPR-32, DPR-37 | |||
Enclosures: 1. Report Details | |||
2. NRC Post Examination Comment Resolution | |||
3. Simulation Facility Report | |||
cc: (See page 3) | |||
XG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X G NON-SENSITIVE | |||
ADAMS: XG Yes ACCESSION NUMBER:_________________________ | |||
OFFICE RII:DRS RII:DRS RII:DRS | |||
SIGNATURE | |||
NAME F. Ehrhardt M. Widmann G.Guthrie/Shaeffer | |||
DATE 05/2/2008 05/2/2008 05/2/2008 | |||
E-MAIL COPY? YES NO YES NO YES NO YES N YES NO YES NO YES NO | |||
OFFICIAL RECORD COPY DOCUMENT NAME: O:\SURRY EXAMINATIONS\INITIAL EXAM 2008- | |||
301\CORRESPONDENCE\SURRY EXAM REPORT 2008-301 REV 0 (FJE).DOC | |||
3 | |||
Distribution w/encl: | |||
RIDSNRRDIRS | |||
PUBLIC | |||
S. P. Lingam, NRR (PM: NA, SUR) | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
Docket No.: 50-280, 50-281 | |||
License No.: DPR-32, DPR-37 | |||
Report No.: 05000280/2008301, 05000281/2008301 | |||
Licensee: Virginia Electric and Power Company | |||
Facility: Surry Power Station, Units 1 & 2 | |||
Location: 5850 Hog Island Rd. | |||
Surry, VA 23883 | |||
Dates: Operating Test - March 17-27, 2008 | |||
Written Examination - April 9, 2008 | |||
Examiners: F. Ehrhardt, Chief Examiner, Senior Operations Engineer | |||
P. Capehart, Operations Engineer | |||
C. Kontz, Operations Engineer | |||
Approved by: Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Enclosure 1 | |||
SUMMARY OF FINDINGS | |||
ER 05000280/2008301, 05000281/2008301, 03/17-27/2008 and 04/09/2008; Surry Power | |||
Station; Licensed Operator Examinations. | |||
The NRC examiners conducted operator licensing initial examinations in accordance with the | |||
guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power | |||
Reactors. This examination implemented the operator licensing requirements of 10 CFR | |||
§55.41, §55.43, and §55.45. | |||
The NRC administered the operating tests during the period of March 17-27, 2008. Members of | |||
the Surry Power Station training staff administered the written examination on April 9, 2008. | |||
The written examinations were developed by the NRC and the operating tests were developed | |||
by the Surry Power Station training staff. | |||
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator (RO) applicants | |||
passed both the written and operating examinations. One RO applicant failed the written | |||
examination. Four SRO and eight RO applicants were issued operating licenses. | |||
There were two post examination comments. | |||
REPORT DETAILS | |||
4. OTHER ACTIVITIES | |||
4OA5 Operator Licensing Initial Examinations | |||
a. Inspection Scope | |||
The Surry Power Station training staff developed the operating test. NRC regional | |||
examiners reviewed the proposed examination material to determine whether it was | |||
developed in accordance with NUREG-1021, Operator Licensing Examination | |||
Standards for Power Reactors, Revision 9. Examination changes agreed upon | |||
between the NRC and the licensee were made according to NUREG-1021 and | |||
incorporated into the final version of the examination materials. | |||
The examiners reviewed the licensees examination security measures while preparing | |||
and administering the examinations to ensure examination security and integrity | |||
complied with 10 CFR 55.49, Integrity of Examinations and Tests. | |||
The examiners evaluated four SRO applicants and nine RO applicants who were being | |||
assessed under the guidelines specified in NUREG-1021. The examiners administered | |||
the operating tests during the period of March 17-27, 2008. Members of the Surry | |||
Power Station training staff administered the written examination on April 9, 2008. The | |||
evaluations of the applicants and review of documentation were performed to determine | |||
if the applicants, who applied for licenses to operate the Surry Power Station, met | |||
requirements specified in 10 CFR Part 55, Operators Licenses. | |||
b. Findings | |||
between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials. | The NRC determined that the details provided by the licensee for the walkthrough and | ||
simulator tests were within the range of acceptability expected for a proposed | |||
examination. | |||
if the applicants, who applied for licenses to operate the Surry Power Station, met requirements specified in 10 CFR Part 55, | Four SRO applicants and eight RO applicants passed both the operating test and written | ||
examination. One RO applicant failed the written examination. | |||
The final RO and SRO written examinations with knowledge and abilities (K/As) question | |||
references/answers, examination references, and licensees post examination | |||
examination. | comments may be accessed in the ADAMS system (ADAMS Accession Numbers, | ||
ML081220355, ML081220359 and ML081220322.) | |||
Copies of all individual examination reports were sent to the facility Training Manager for | |||
evaluation and determination of appropriate remedial training. | |||
Enclosure 1 | |||
4 | |||
4OA6 Meetings | |||
Exit Meeting Summary | |||
On March 27, 2008, the examination team discussed generic issues associated with the | |||
operating test with Mr. J. Dillich, Assistant Plant Manager, and members of the Surry | |||
Power Station staff. The examiners asked the licensee whether any materials examined | |||
during the inspection should be considered proprietary. No proprietary information was | |||
identified. | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
Licensee personnel | |||
L. Baker, Superintendent, Shift Operations | |||
A. Barbee, Manager, Training | |||
J. Dillich, Assistant Plant Manager | |||
K. Grover, Manager, Operations | |||
P. Kershner, Station Licensing | |||
W. Marshall, Nuclear Training | |||
D. Wilson, Supervisor, Nuclear Training | |||
NRC personnel | |||
P. Capehart, Operations Engineer | |||
C. Kontz, Operations Engineer | |||
C. Welch, Senior Resident Inspector | |||
Enclosure 1 | |||
NRC RESOLUTION TO THE SURRY POST EXAMINATION COMMENT(S) | |||
A complete text of the licensees post-exam comments can be found in ADAMS under | |||
Accession Number ML 081220322. | |||
Test Item | |||
Administrative JPM G2.1.7, Quadrant Power Tilt Calculation | |||
Facility Comment | |||
The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The | |||
correct answer should have been .9858. This was not a critical task in this JPM. | |||
Recommend replacing .9895 with .9858 in the answer key for the N-44 Upper Tilt Calculation. | |||
NRC Resolution | |||
Recommendation accepted. The facility comment corrects an error in the answer key. | |||
Test Item | |||
Administrative JPM G2.4.43, Transmit Report of Emergency to State and Local Governments | |||
Facility Comment | |||
Item 5 of the transmittal form had the critical task listed as Unit 1 reactor failed to trip. The | |||
reactor is now tripped (or words to this effect). | |||
After conferring with the Emergency Preparedness group, only notifying the State that the | |||
reactor failed to trip is required to meet the minimum requirements for this task (i.e. this is the | |||
minimum required for a satisfactory Performance Indicator). This evaluation criterion was | |||
subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators). | |||
Attachment 2 of this procedure only requires a description of the event, which is meant to | |||
indicate the reason for entering the emergency plan. As such, the critical task should state, at a | |||
minimum, The reactor failed to trip. | |||
Recommend replacing the critical task for item #5 to read as follows: The reactor failed to trip | |||
(or words to this effect). | |||
NRC Resolution | |||
Recommendation accepted. Per DNAP-2605, Attachment 2, the description of the event (Item | |||
5 of the transmittal form) is adequate when the description of the event sufficiently describes the | |||
plant conditions that caused the facility to enter into the classification that is being reported. | |||
Additionally, a description of the event that is sufficient to explain the plant conditions that | |||
caused the facility to enter the event classification being reported is sufficient to accomplish the | |||
JPM task consistent with the initiating cues provided to the applicants. | |||
Enclosure 1 | |||
SIMULATION FACILITY REPORT | |||
Facility Licensee: Surry Power Station | |||
Facility Docket Nos.: 05000280/05000281 | |||
Operating Tests Administered on: March 17-27, 2008 | |||
This form is to be used only to report observations. These observations do not constitute audit | |||
or inspection findings and, without further verification and review in accordance with IP | |||
71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is | |||
required in response to these observations. | |||
During performance of a simulator JPM the examiner noticed that 1-SI-FI-1932, HHSI Flow to | |||
Hot Leg Loop C meter, was reading low. The facility generated Simulator Modification Record # | |||
This form is to be used only to report observations. | |||
200803251315 to document the condition and subsequently replaced the meter. | 200803251315 to document the condition and subsequently replaced the meter. | ||
Enclosure 3 | |||
}} | }} |
Latest revision as of 18:11, 14 November 2019
ML081260262 | |
Person / Time | |
---|---|
Site: | Surry ![]() |
Issue date: | 05/02/2008 |
From: | Widmann M Division of Reactor Safety II |
To: | Christian D Virginia Electric & Power Co (VEPCO) |
References | |
50-280/08-301, 50-281/08-301 50-280/08-301, 50-281/08-301 | |
Download: ML081260262 (13) | |
See also: IR 05000280/2008301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
May 2, 2008
Mr. David A. Christian
Senior Vice President and Chief Nuclear Officer
Virginia Electric and Power Company
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060
SUBJECT: SURRY POWER STATION - NRC EXAMINATION REPORT 05000280/2008301
AND 05000281/2008301
Dear Mr. David A. Christian:
During the period of March 17-27, 2008, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the Surry Power Station. At the conclusion of the examination, the
examiners discussed the examination questions and preliminary findings with those members of
your staff identified in the enclosed report. The written examination was administered by your
staff on April 9, 2008.
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator applicants passed
both the written and operating examinations. One RO applicant failed the written examination.
There were two post examination comments. These comments and the NRC resolution of
these comments are summarized in Enclosure 2. A Simulation Facility Report is included in this
report as Enclosure 3.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosures will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS.)
VEPCO 2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). Should you have any questions concerning this letter, please
contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
Enclosures: 1. Report Details
2. NRC Post Examination Comment Resolution
3. Simulation Facility Report
cc: (See page 3)
VEPCO 3
cc w/encl:
Chris L. Funderburk
Director
Nuclear Licensing and Operations Support
Virginia Electric and Power Company
Electronic Mail Distribution
Donald E. Jernigan
Site Vice President
Surry Power Station
Virginia Electric & Power Company
Electronic Mail Distribution
Virginia State Corporation Commission
Division of Energy Regulation
P.O. Box 1197
Richmond, VA 23209
Lillian M. Cuoco, Esq.
Senior Counsel
Dominion Resources Services, Inc.
Millstone Power Station
Electronic Mail Distribution
Attorney General
Supreme Court Building
900 East Main Street
Richmond, VA 23219
Senior Resident Inspector
Surry Power Station
U.S. NRC
5850 Hog Island Rd
Surry, VA 23883
Mr. Andy T. Barbee
Manager of Nuclear Training
Surry Power Station
5570 Hog Island Road
Surry, VA 23883
Letter to David A. Christian from Malcolm T. Widmann dated May 2, 2008
SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT
05000280/2008 AND 05000281/2008
Distribution w/encl:
RIDSNRRDIRS
PUBLIC
S. P. Lingam, NRR (PM: NA, SUR)
May 2, 2008
Mr. David A. Christian
Senior Vice President and Chief Nuclear Officer
Virginia Electric and Power Company
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060
SUBJECT: SURRY POWER STATION - NRC EXAMINATION REPORT 05000280/2008301
AND 05000281/2008301
Dear Mr. David A. Christian:
During the period of March 17-27, 2008, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the Surry Power Station. At the conclusion of the examination, the
examiners discussed the examination questions and preliminary findings with those members of
your staff identified in the enclosed report. The written examination was administered by your
staff on April 9, 2008.
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator applicants passed
both the written and operating examinations. One RO applicant failed the written examination.
There were two post examination comments. These comments and the NRC resolution of
these comments are summarized in Enclosure 2. A Simulation Facility Report is included in this
report as Enclosure 3.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosures will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS.)
2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room.) Should you have any questions concerning this letter, please
contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
Enclosures: 1. Report Details
2. NRC Post Examination Comment Resolution
3. Simulation Facility Report
cc: (See page 3)
XG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X G NON-SENSITIVE
ADAMS: XG Yes ACCESSION NUMBER:_________________________
OFFICE RII:DRS RII:DRS RII:DRS
SIGNATURE
NAME F. Ehrhardt M. Widmann G.Guthrie/Shaeffer
DATE 05/2/2008 05/2/2008 05/2/2008
E-MAIL COPY? YES NO YES NO YES NO YES N YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: O:\SURRY EXAMINATIONS\INITIAL EXAM 2008-
301\CORRESPONDENCE\SURRY EXAM REPORT 2008-301 REV 0 (FJE).DOC
3
Distribution w/encl:
RIDSNRRDIRS
PUBLIC
S. P. Lingam, NRR (PM: NA, SUR)
NUCLEAR REGULATORY COMMISSION
REGION II
Docket No.: 50-280, 50-281
Report No.: 05000280/2008301, 05000281/2008301
Licensee: Virginia Electric and Power Company
Facility: Surry Power Station, Units 1 & 2
Location: 5850 Hog Island Rd.
Surry, VA 23883
Dates: Operating Test - March 17-27, 2008
Written Examination - April 9, 2008
Examiners: F. Ehrhardt, Chief Examiner, Senior Operations Engineer
P. Capehart, Operations Engineer
C. Kontz, Operations Engineer
Approved by: Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Enclosure 1
SUMMARY OF FINDINGS
ER 05000280/2008301, 05000281/2008301, 03/17-27/2008 and 04/09/2008; Surry Power
Station; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the
guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power
Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of March 17-27, 2008. Members of
the Surry Power Station training staff administered the written examination on April 9, 2008.
The written examinations were developed by the NRC and the operating tests were developed
by the Surry Power Station training staff.
Four Senior Reactor Operator (SRO) applicants and eight Reactor Operator (RO) applicants
passed both the written and operating examinations. One RO applicant failed the written
examination. Four SRO and eight RO applicants were issued operating licenses.
There were two post examination comments.
REPORT DETAILS
4. OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a. Inspection Scope
The Surry Power Station training staff developed the operating test. NRC regional
examiners reviewed the proposed examination material to determine whether it was
developed in accordance with NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, Revision 9. Examination changes agreed upon
between the NRC and the licensee were made according to NUREG-1021 and
incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing
and administering the examinations to ensure examination security and integrity
complied with 10 CFR 55.49, Integrity of Examinations and Tests.
The examiners evaluated four SRO applicants and nine RO applicants who were being
assessed under the guidelines specified in NUREG-1021. The examiners administered
the operating tests during the period of March 17-27, 2008. Members of the Surry
Power Station training staff administered the written examination on April 9, 2008. The
evaluations of the applicants and review of documentation were performed to determine
if the applicants, who applied for licenses to operate the Surry Power Station, met
requirements specified in 10 CFR Part 55, Operators Licenses.
b. Findings
The NRC determined that the details provided by the licensee for the walkthrough and
simulator tests were within the range of acceptability expected for a proposed
examination.
Four SRO applicants and eight RO applicants passed both the operating test and written
examination. One RO applicant failed the written examination.
The final RO and SRO written examinations with knowledge and abilities (K/As) question
references/answers, examination references, and licensees post examination
comments may be accessed in the ADAMS system (ADAMS Accession Numbers,
ML081220355, ML081220359 and ML081220322.)
Copies of all individual examination reports were sent to the facility Training Manager for
evaluation and determination of appropriate remedial training.
Enclosure 1
4
4OA6 Meetings
Exit Meeting Summary
On March 27, 2008, the examination team discussed generic issues associated with the
operating test with Mr. J. Dillich, Assistant Plant Manager, and members of the Surry
Power Station staff. The examiners asked the licensee whether any materials examined
during the inspection should be considered proprietary. No proprietary information was
identified.
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
L. Baker, Superintendent, Shift Operations
A. Barbee, Manager, Training
J. Dillich, Assistant Plant Manager
K. Grover, Manager, Operations
P. Kershner, Station Licensing
W. Marshall, Nuclear Training
D. Wilson, Supervisor, Nuclear Training
NRC personnel
P. Capehart, Operations Engineer
C. Kontz, Operations Engineer
C. Welch, Senior Resident Inspector
Enclosure 1
NRC RESOLUTION TO THE SURRY POST EXAMINATION COMMENT(S)
A complete text of the licensees post-exam comments can be found in ADAMS under
Accession Number ML 081220322.
Test Item
Administrative JPM G2.1.7, Quadrant Power Tilt Calculation
Facility Comment
The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The
correct answer should have been .9858. This was not a critical task in this JPM.
Recommend replacing .9895 with .9858 in the answer key for the N-44 Upper Tilt Calculation.
NRC Resolution
Recommendation accepted. The facility comment corrects an error in the answer key.
Test Item
Administrative JPM G2.4.43, Transmit Report of Emergency to State and Local Governments
Facility Comment
Item 5 of the transmittal form had the critical task listed as Unit 1 reactor failed to trip. The
reactor is now tripped (or words to this effect).
After conferring with the Emergency Preparedness group, only notifying the State that the
reactor failed to trip is required to meet the minimum requirements for this task (i.e. this is the
minimum required for a satisfactory Performance Indicator). This evaluation criterion was
subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators).
Attachment 2 of this procedure only requires a description of the event, which is meant to
indicate the reason for entering the emergency plan. As such, the critical task should state, at a
minimum, The reactor failed to trip.
Recommend replacing the critical task for item #5 to read as follows: The reactor failed to trip
(or words to this effect).
NRC Resolution
Recommendation accepted. Per DNAP-2605, Attachment 2, the description of the event (Item
5 of the transmittal form) is adequate when the description of the event sufficiently describes the
plant conditions that caused the facility to enter into the classification that is being reported.
Additionally, a description of the event that is sufficient to explain the plant conditions that
caused the facility to enter the event classification being reported is sufficient to accomplish the
JPM task consistent with the initiating cues provided to the applicants.
Enclosure 1
SIMULATION FACILITY REPORT
Facility Licensee: Surry Power Station
Facility Docket Nos.: 05000280/05000281
Operating Tests Administered on: March 17-27, 2008
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is
required in response to these observations.
During performance of a simulator JPM the examiner noticed that 1-SI-FI-1932, HHSI Flow to
Hot Leg Loop C meter, was reading low. The facility generated Simulator Modification Record #
200803251315 to document the condition and subsequently replaced the meter.
Enclosure 3