{{#Wiki_filter:July 1, 2008  
{{#Wiki_filter:July 1, 2008 Mr. David A. Baxter Vice President, Oconee Site Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672
 
Mr. David A. Baxter Vice President, Oconee Site Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672  


==SUBJECT:==
==SUBJECT:==
GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE - OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (TAC NOS. MC4698, MC4699, AND MC4700)
GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE - OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (TAC NOS. MC4698, MC4699, AND MC4700)


==Dear Mr. Baxter:==
==Dear Mr. Baxter:==


By letter dated February 29, 2008, you submitted a supplemental response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," for Oconee Nuclear Station, Units 1, 2, and 3 (Oconee). We have reviewed your submittal with a process that involved a detailed review by a team of 10 subject matter experts, with focus on the review areas described in the U.S. Nuclear Regulatory Commission's (NRC's) "Content Guide for Generic Letter 2004-02 Supplemental Responses" (ML073110389). The review process also included a separate "holistic" review of your submittal informed by inputs from the subject matter experts that focused on whether you have demonstrated overall that your corrective actions for Generic Letter 2004-02 are adequate.  
By letter dated February 29, 2008, you submitted a supplemental response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors, for Oconee Nuclear Station, Units 1, 2, and 3 (Oconee). We have reviewed your submittal with a process that involved a detailed review by a team of 10 subject matter experts, with focus on the review areas described in the U.S. Nuclear Regulatory Commissions (NRC's) "Content Guide for Generic Letter 2004-02 Supplemental Responses" (ML073110389). The review process also included a separate "holistic" review of your submittal informed by inputs from the subject matter experts that focused on whether you have demonstrated overall that your corrective actions for Generic Letter 2004-02 are adequate.
We have no further questions at this time regarding your completion of corrective actions for Generic Letter (GL) 2004-02. In large part this conclusion is based on the very low potential debris loading at Oconee, as discussed in your supplemental response.
As you may be aware, we have not yet issued a final safety evaluation (SE) on WCAP 16793 NP, Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid." We believe that the likelihood of unacceptable in-vessel debris impact for Oconee is very low because of the low debris loading. However, because your GL 2004-02 response refers to and relies on this topical report, we plan to defer issuance of a closure letter to Oconee for the GL until uncertainties regarding the remaining issues with WCAP-16793 are reduced. You may wait for the issue to be resolved through the WCAP process or may demonstrate that in-vessel downstream effects issues are resolved for Oconee by demonstrating without reference to WCAP-16793 or the NRC staff SE that in-vessel downstream effects have been addressed at Oconee. We are developing a Regulatory Issue Summary to inform the industry of our expectations and plans regarding resolution of this remaining aspect of GSI-191.


We have no further questions at this time regarding your completion of corrective actions for Generic Letter (GL) 2004-02. In large part this conclusion is based on the very low potential debris loading at Oconee, as discussed in your supplemental response.
D. Baxter                                  In addition, you have committed to certain corrective actions that have not yet been performed.
As you may be aware, we have not yet issued a final safety evaluation (SE) on WCAP 16793 NP, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid."  We believe that the likelihood of unacceptable in-vessel debris impact for Oconee is very low because of the low debris loading. However, because your GL 2004-02 response refers to and relies on this topical report, we plan to defer issuance of a closure letter to Oconee for the GL until uncertainties regarding the remaining issues with WCAP-16793 are reduced. You may wait for the issue to be resolved through the WCAP process or may demonstrate that in-vessel downstream effects issues are resolved for Oconee by demonstrating without reference to WCAP-16793 or the NRC staff SE that in-vessel downstream effects have been addressed at Oconee. We are developing a Regulatory Issue Summary to inform the industry of our expectations and plans regarding resolution of this remaining aspect of GSI-191.
We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.
In addition, you have committed to certain corrective actions that have not yet been performed. We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.
If you have any further questions on this matter, please contact me at 301-415-1419.
If you have any further questions on this matter, please contact me at 301-415-1419.
Sincerely, /RA/
Sincerely,
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page In addition, you have committed to certain corrective actions that have not yet been performed. We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.
                                                  /RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page
 
D. Baxter                                  In addition, you have committed to certain corrective actions that have not yet been performed.
We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.
If you have any further questions on this matter, please contact me at 301-415-1419.
If you have any further questions on this matter, please contact me at 301-415-1419.
Sincerely,   /RA/
Sincerely,
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page  
                                                  /RA/
 
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page Distribution:
Distribution
PUBLIC LPL2-1 R/F RidsNrrDorlLpl2-1 (MWong)
: PUBLIC LPL2-1 R/F RidsNrrDorlLpl2-1 (MWong) RidsNrrLAMO'Brien (hard copy)
RidsNrrLAMOBrien (hard copy)
RidsNrrPMLOlshan (hard copy) RidsOgcRp RidsAcrsAcnw_MailCenter RidsRgn2MailCenter (JMoorman) RidsNrrDorlDpr M. Scott, NRR Accession Number: ML081750635 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA DSS/SSIB/BC NRR/LPL2-1/BC NAME LOlshan MO'Brien MScott MWong DATE 06/30/08 06/30/08 06/30/08 07/01/08 OFFICIAL RECORD COPY
RidsNrrPMLOlshan (hard copy)
 
RidsOgcRp RidsAcrsAcnw_MailCenter RidsRgn2MailCenter (JMoorman)
Oconee Nuclear Station, Units 1, 2, and 3 cc:  Mr. Dave Baxter Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway  Seneca, SC  29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina  28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL  34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC  29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St. Columbia, SC  29201-1708
RidsNrrDorlDpr M. Scott, NRR Accession Number: ML081750635 OFFICE     NRR/LPL2-1/PM NRR/LPL2-1/LA   DSS/SSIB/BC       NRR/LPL2-1/BC NAME       LOlshan       MOBrien        MScott             MWong DATE       06/30/08       06/30/08         06/30/08           07/01/08 OFFICIAL RECORD COPY
 
Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC  29672 Ronnie L. Gardner, PMP Manager, Site Operations and Corporate  Regulatory Affairs AREVA NP Inc. An AREVA AND Siemens Company 3315 Old Forest Road OF -16 Lynchburg, VA  24501 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC  27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory    Issues and Industry Affairs Duke Power Company LLC 526 S. Church St. Mail Stop EC05P Charlotte, NC  28202
 
Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr. Raleigh, NC  27609-7721


Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202}}
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Dave Baxter                          Mr. Leonard G. Green Vice President, Oconee Site              Assistant Attorney General Duke Power Company LLC                    NC Department of Justice 7800 Rochester Highway                    P.O. Box 629 Seneca, SC 29672                          Raleigh, NC 27602 Ms. Lisa F. Vaughn                        Mr. R. L. Gill, Jr.
Associate General Counsel and Managing    Manager - Nuclear Regulatory Attorney                                    Issues and Industry Affairs Duke Energy Carolinas, LLC                Duke Power Company LLC 526 South Church Street - EC07H          526 S. Church St.
Charlotte, North Carolina 28202          Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation                          Division of Radiation Protection 2650 McCormick Dr., 3rd Floor            NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035                Resources 3825 Barrett Dr.
Senior Resident Inspector                Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway                  Mr. Peter R. Harden, IV Seneca, SC 29672                          VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director                6000 Fairview Road Division of Radioactive Waste Management  12th Floor Bureau of Land and Waste Management      Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St.                            Mr. Henry Barron Columbia, SC 29201-1708                  Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. B. G. Davenport                      P.O. Box 1006-EC07H Regulatory Compliance Manager            Charlotte, NC 28201-1006 Oconee Nuclear Site Duke Energy Corporation                  Mr. Charles Brinkman ON03RC                                    Director, Washington Operations 7800 Rochester Highway                    Westinghouse Electric Company Seneca, SC 29672                          12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ronnie L. Gardner, PMP Manager, Site Operations and Corporate    Ms. Kathryn B. Nolan Regulatory Affairs                      Senior Counsel AREVA NP Inc.                            Duke Energy Carolinas, LLC An AREVA AND Siemens Company              526 South Church Street - EC07H 3315 Old Forest Road OF -16              Charlotte, NC 28202 Lynchburg, VA 24501}}

Latest revision as of 15:37, 14 November 2019

Generic Letter 2004-02, Supplemental Response
ML081750635
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/01/2008
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Baxter D
Duke Energy Carolinas
Olshan L N, NRR/DLPM, 415-1419
References
GL-04-002, TAC MC4698, TAC MC4699, TAC MC4700
Download: ML081750635 (4)


Text

July 1, 2008 Mr. David A. Baxter Vice President, Oconee Site Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

GENERIC LETTER 2004-02 SUPPLEMENTAL RESPONSE - OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (TAC NOS. MC4698, MC4699, AND MC4700)

Dear Mr. Baxter:

By letter dated February 29, 2008, you submitted a supplemental response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors, for Oconee Nuclear Station, Units 1, 2, and 3 (Oconee). We have reviewed your submittal with a process that involved a detailed review by a team of 10 subject matter experts, with focus on the review areas described in the U.S. Nuclear Regulatory Commissions (NRC's) "Content Guide for Generic Letter 2004-02 Supplemental Responses" (ML073110389). The review process also included a separate "holistic" review of your submittal informed by inputs from the subject matter experts that focused on whether you have demonstrated overall that your corrective actions for Generic Letter 2004-02 are adequate.

We have no further questions at this time regarding your completion of corrective actions for Generic Letter (GL) 2004-02. In large part this conclusion is based on the very low potential debris loading at Oconee, as discussed in your supplemental response.

As you may be aware, we have not yet issued a final safety evaluation (SE) on WCAP 16793 NP, Evaluation of Long-Term Cooling Considering Particulate, Fibrous, and Chemical Debris in the Recirculating Fluid." We believe that the likelihood of unacceptable in-vessel debris impact for Oconee is very low because of the low debris loading. However, because your GL 2004-02 response refers to and relies on this topical report, we plan to defer issuance of a closure letter to Oconee for the GL until uncertainties regarding the remaining issues with WCAP-16793 are reduced. You may wait for the issue to be resolved through the WCAP process or may demonstrate that in-vessel downstream effects issues are resolved for Oconee by demonstrating without reference to WCAP-16793 or the NRC staff SE that in-vessel downstream effects have been addressed at Oconee. We are developing a Regulatory Issue Summary to inform the industry of our expectations and plans regarding resolution of this remaining aspect of GSI-191.

D. Baxter In addition, you have committed to certain corrective actions that have not yet been performed.

We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.

If you have any further questions on this matter, please contact me at 301-415-1419.

Sincerely,

/RA/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page

D. Baxter In addition, you have committed to certain corrective actions that have not yet been performed.

We expect that you will report completion of these remaining items to the NRC after the last one has been implemented.

If you have any further questions on this matter, please contact me at 301-415-1419.

Sincerely,

/RA/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: See next page Distribution:

PUBLIC LPL2-1 R/F RidsNrrDorlLpl2-1 (MWong)

RidsNrrLAMOBrien (hard copy)

RidsNrrPMLOlshan (hard copy)

RidsOgcRp RidsAcrsAcnw_MailCenter RidsRgn2MailCenter (JMoorman)

RidsNrrDorlDpr M. Scott, NRR Accession Number: ML081750635 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA DSS/SSIB/BC NRR/LPL2-1/BC NAME LOlshan MOBrien MScott MWong DATE 06/30/08 06/30/08 06/30/08 07/01/08 OFFICIAL RECORD COPY

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Dave Baxter Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.

Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St.

Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.

Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. B. G. Davenport P.O. Box 1006-EC07H Regulatory Compliance Manager Charlotte, NC 28201-1006 Oconee Nuclear Site Duke Energy Corporation Mr. Charles Brinkman ON03RC Director, Washington Operations 7800 Rochester Highway Westinghouse Electric Company Seneca, SC 29672 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ronnie L. Gardner, PMP Manager, Site Operations and Corporate Ms. Kathryn B. Nolan Regulatory Affairs Senior Counsel AREVA NP Inc. Duke Energy Carolinas, LLC An AREVA AND Siemens Company 526 South Church Street - EC07H 3315 Old Forest Road OF -16 Charlotte, NC 28202 Lynchburg, VA 24501