| number = ML081990064
| number = ML081990064
| issue date = 07/24/2008
| issue date = 07/24/2008
| title = Pilgrim Nuclear Power Station, Withdrawal of a Relief Request (TAC No. MD8145)
| title = Withdrawal of a Relief Request
| author name = Kim J S
| author name = Kim J
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 24, 2008  
{{#Wiki_filter:July 24, 2008 Vice President, Operations Entergy Nuclear Operations, Inc.
 
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508  


==SUBJECT:==
==SUBJECT:==
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)  
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
 
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.  
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.
 
Sincerely,
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.  
                                                /RA/
 
James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page July 24, 2008
Sincerely,
/RA/ James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-293  
 
cc: See next page  
 
July 24, 2008  


Vice President, Operations Entergy Nuclear Operations, Inc.
Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508  
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508


==SUBJECT:==
==SUBJECT:==
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)  
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
 
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.  
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.
 
Sincerely,
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.  
                                                /RA/
 
James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:
Sincerely,
PUBLIC                 LPLI-1 R/F                       RidsNrrDorlLplb1-1 RidsOgcRp             RidsNrrDciCvib                   RidsAcrsAcnw&mMailCenter RidsRgn1MailCenter     SLittle                         RidsNrrPMJKim GCheruvenki           PPatnaik ADAMS Accession Number: ML081990064 OFFICE     LPL1-1/PM         LPL1-1/LA           LPL1-1/BC NAME       JKim               SLittle             MKowal DATE       7/21/08           7/24/08             7/24/08 OFFICIAL RECORD COPY
      /RA/ James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-293  
 
cc: See next page  
 
DISTRIBUTION
: PUBLIC LPLI-1 R/F   RidsNrrDorlLplb1-1 RidsOgcRp RidsNrrDciCvib RidsAcrsAcnw&mMailCenter RidsRgn1MailCenter SLittle   RidsNrrPMJKim GCheruvenki PPatnaik ADAMS Accession Number: ML081990064 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME JKim SLittle MKowal  
 
DATE 7/21/08 7/24/08 7/24/08 OFFICIAL RECORD COPY Pilgrim Nuclear Power Station
 
cc:
 
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA  19406-1415
 
Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA  02360
 
Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA  02360
 
Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA  02360
 
Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA  02332
 
Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA  02108
 
Office of the Attorney General One Ashburton Place 20th Floor Boston, MA  02108
 
MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129
 
Massachusetts Emergency Management Agency Attn:  John Giarrusso, Nuclear Preparedness Manager 400 Worcester Road Framingham, MA  01702-5399
 
Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA  01056-0426
 
Site Vice President Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508
 
General Manager, Plant Operations Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
 
Director, Nuclear Safety Assurance Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508
 
Manager, Licensing Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508
 
Pilgrim Nuclear Power Station
 
cc:
 
Senior Vice President Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS  39286-1995
 
Vice President, Oversight Entergy Nuclear Operations, Inc.
P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Vice President and COO Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
 
Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA  02360-5508
 
Mr. Michael Kansler President & CEO/CNO Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS  39268-1995
 
Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601
 
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS  39268-1995
 
Assistant General Counsel Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601
 
Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA  70113
 
Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD  21801-2490
 
Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306


Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA  19348 
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I    Massachusetts Emergency U. S. Nuclear Regulatory Commission  Management Agency 475 Allendale Road                  Attn: John Giarrusso, King of Prussia, PA 19406-1415      Nuclear Preparedness Manager 400 Worcester Road Senior Resident Inspector            Framingham, MA 01702-5399 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station        Mr. William D. Meinert Post Office Box 867                  Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman, Board of Selectmen        P.O. Box 426 11 Lincoln Street                    Ludlow, MA 01056-0426 Plymouth, MA 02360 Site Vice President Chairman                            Entergy Nuclear Operations Nuclear Matters Committee            Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 11 Lincoln Street                    Plymouth, MA 02360-5508 Plymouth, MA 02360 General Manager, Plant Operations Chairman, Duxbury Board of Selectmen Entergy Nuclear Operations Town Hall                            Pilgrim Nuclear Power Station 878 Tremont Street                  600 Rocky Hill Road Duxbury, MA 02332                    Plymouth, MA 02360-5508 Office of the Commissioner          Director, Nuclear Safety Assurance Massachusetts Department of          Entergy Nuclear Operations Environmental Protection            Pilgrim Nuclear Power Station One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Manager, Licensing One Ashburton Place                  Entergy Nuclear Operations 20th Floor                          Pilgrim Nuclear Power Station Boston, MA 02108                    600 Rocky Hill Road Plymouth, MA 02360-5508 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129


Mr. John Doering P.O. Box 189 Parker Ford, PA 19457}}
Pilgrim Nuclear Power Station cc:
Senior Vice President                Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
P.O. Box 31955                      P.O. Box 31955 Jackson, MS 39286-1995              Jackson, MS 39268-1995 Vice President, Oversight            Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations P.O. Box 31995                      440 Hamilton Avenue Jackson, MS 39286-1995              White Plains, NY 10601 Senior Vice President and COO        Ms. Stacey Lousteau Entergy Nuclear Operations, Inc. Treasury Department 440 Hamilton Avenue                  Entergy Services, Inc.
White Plains, NY 10601              639 Loyola Avenue New Orleans, LA 70113 Vice President, Operations Entergy Nuclear Operations, Inc. Mr. James Sniezek Pilgrim Nuclear Power Station        5486 Nithsdale Drive 600 Rocky Hill Road                  Salisbury, MD 21801-2490 Plymouth, MA 02360-5508 Mr. Michael D. Lyster Mr. Michael Kansler                  5931 Barclay Lane President & CEO/CNO                  Naples, FL 34110-7306 Entergy Nuclear Operations, Inc.
P.O. Box 31955                      Mr. Garrett D. Edwards Jackson, MS 39268-1995              814 Waverly Road Kennett Square, PA 19348 Mr. John F. McCann Director, Nuclear Safety & Licensing Mr. John Doering Entergy Nuclear Operations, Inc. P.O. Box 189 440 Hamilton Avenue                  Parker Ford, PA 19457 White Plains, NY 10601}}

Latest revision as of 15:54, 14 November 2019

Withdrawal of a Relief Request
ML081990064
Person / Time
Site: Pilgrim
Issue date: 07/24/2008
From: James Kim
NRC/NRR/ADRO/DORL/LPLI-1
To:
Entergy Nuclear Operations
kim j
References
TAC MD8145
Download: ML081990064 (5)


Text

July 24, 2008 Vice President, Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)

Dear Sir or Madam:

By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)

Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.

Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn.

Sincerely,

/RA/

James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page July 24, 2008

Vice President, Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)

Dear Sir or Madam:

By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)

Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.

Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.

The purpose of this letter is to advise that the above cited application is being treated as withdrawn.

Sincerely,

/RA/

James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:

PUBLIC LPLI-1 R/F RidsNrrDorlLplb1-1 RidsOgcRp RidsNrrDciCvib RidsAcrsAcnw&mMailCenter RidsRgn1MailCenter SLittle RidsNrrPMJKim GCheruvenki PPatnaik ADAMS Accession Number: ML081990064 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME JKim SLittle MKowal DATE 7/21/08 7/24/08 7/24/08 OFFICIAL RECORD COPY

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency 475 Allendale Road Attn: John Giarrusso, King of Prussia, PA 19406-1415 Nuclear Preparedness Manager 400 Worcester Road Senior Resident Inspector Framingham, MA 01702-5399 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Mr. William D. Meinert Post Office Box 867 Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman, Board of Selectmen P.O. Box 426 11 Lincoln Street Ludlow, MA 01056-0426 Plymouth, MA 02360 Site Vice President Chairman Entergy Nuclear Operations Nuclear Matters Committee Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 11 Lincoln Street Plymouth, MA 02360-5508 Plymouth, MA 02360 General Manager, Plant Operations Chairman, Duxbury Board of Selectmen Entergy Nuclear Operations Town Hall Pilgrim Nuclear Power Station 878 Tremont Street 600 Rocky Hill Road Duxbury, MA 02332 Plymouth, MA 02360-5508 Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Manager, Licensing One Ashburton Place Entergy Nuclear Operations 20th Floor Pilgrim Nuclear Power Station Boston, MA 02108 600 Rocky Hill Road Plymouth, MA 02360-5508 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129

Pilgrim Nuclear Power Station cc:

Senior Vice President Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

P.O. Box 31955 P.O. Box 31955 Jackson, MS 39286-1995 Jackson, MS 39268-1995 Vice President, Oversight Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations P.O. Box 31995 440 Hamilton Avenue Jackson, MS 39286-1995 White Plains, NY 10601 Senior Vice President and COO Ms. Stacey Lousteau Entergy Nuclear Operations, Inc. Treasury Department 440 Hamilton Avenue Entergy Services, Inc.

White Plains, NY 10601 639 Loyola Avenue New Orleans, LA 70113 Vice President, Operations Entergy Nuclear Operations, Inc. Mr. James Sniezek Pilgrim Nuclear Power Station 5486 Nithsdale Drive 600 Rocky Hill Road Salisbury, MD 21801-2490 Plymouth, MA 02360-5508 Mr. Michael D. Lyster Mr. Michael Kansler 5931 Barclay Lane President & CEO/CNO Naples, FL 34110-7306 Entergy Nuclear Operations, Inc.

P.O. Box 31955 Mr. Garrett D. Edwards Jackson, MS 39268-1995 814 Waverly Road Kennett Square, PA 19348 Mr. John F. McCann Director, Nuclear Safety & Licensing Mr. John Doering Entergy Nuclear Operations, Inc. P.O. Box 189 440 Hamilton Avenue Parker Ford, PA 19457 White Plains, NY 10601