July 24, 2008 Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)
Dear Sir or Madam:
By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.
Sincerely,
/RA/
James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page July 24, 2008
Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF A RELIEF REQUEST (TAC NO. MD8145)
Dear Sir or Madam:
By letter dated February 14, 2008, you applied for a relief request to the Pilgrim Nuclear Power Station (PNPS). The relief request would have modified the 10-Year Inservice Inspection (ISI)
Program to allow the use of Boiling Water Reactor Vessel Internal Program (BWRVIP) guidelines as an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME Code) for ISI of reactor vessel internal components.
Subsequently, by letter dated July 2, 2008, you withdrew the relief request since the PNPS will continue to comply with the ASME required examinations, irrespective of BWRVIP guidelines.
The purpose of this letter is to advise that the above cited application is being treated as withdrawn.
Sincerely,
/RA/
James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 cc: See next page DISTRIBUTION:
PUBLIC LPLI-1 R/F RidsNrrDorlLplb1-1 RidsOgcRp RidsNrrDciCvib RidsAcrsAcnw&mMailCenter RidsRgn1MailCenter SLittle RidsNrrPMJKim GCheruvenki PPatnaik ADAMS Accession Number: ML081990064 OFFICE LPL1-1/PM LPL1-1/LA LPL1-1/BC NAME JKim SLittle MKowal DATE 7/21/08 7/24/08 7/24/08 OFFICIAL RECORD COPY
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 Massachusetts Emergency Management Agency Attn: John Giarrusso, Nuclear Preparedness Manager 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Site Vice President Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 General Manager, Plant Operations Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Director, Nuclear Safety Assurance Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Manager, Licensing Entergy Nuclear Operations Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Pilgrim Nuclear Power Station cc:
Senior Vice President Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS 39286-1995 Vice President, Oversight Entergy Nuclear Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Vice President, Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Michael Kansler President & CEO/CNO Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS 39268-1995 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
P.O. Box 31955 Jackson, MS 39268-1995 Assistant General Counsel Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 Mr. John Doering P.O. Box 189 Parker Ford, PA 19457