ML082460929: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082460929
| number = ML082460929
| issue date = 09/02/2008
| issue date = 09/02/2008
| title = Vogtle Report 22, Inspection/Activity Plan 09/01/2008 - 12/13/2009
| title = Report 22, Inspection/Activity Plan 09/01/2008 - 12/13/2009
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Vogtle Inspection / Activity Plan 09/01/2008
{{#Wiki_filter:Page 1 of 2                                                                                      Vogtle 09/02/2008      15:26:20                                                              Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                                      No. of Staff   Planned Dates          Inspection Number        Inspection Activity                                                  Title                                      on Site       Start    End            Type TI-176         - EDG SURVEILLANCE REQUIREMENTS                                                                         2 1, 2            IP 2515/176            Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin             07/01/2008 12/31/2008 Generic Safety Inspectio Testing EB3ISI         - UNIT 2 INSERVICE INSPECTION                                                                           1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                             09/22/2008 09/26/2008 Baseline Inspections PSB1-RP         - RADIATION PROTECTION OCCUPATIONAL WK1                                                                 2 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                 09/22/2008 09/26/2008 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                                       09/22/2008 09/26/2008 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                                 09/22/2008 09/26/2008 Baseline Inspections 1               IP 71151-OR01          Occupational Exposure Control Effectiveness                                                       09/22/2008 09/26/2008 Baseline Inspections 1               IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                   09/22/2008 09/26/2008 Baseline Inspections EB3SGISI       - UNIT 2 SG INSERVICE INSPECTION                                                                       1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                             09/29/2008 10/03/2008 Baseline Inspections PSB1-RP         - RADIATION PROTECTION OCCUPATIONAL WK2                                                                 2 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                 10/06/2008 10/10/2008 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                                       10/06/2008 10/10/2008 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                                 10/06/2008 10/10/2008 Baseline Inspections 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                       10/06/2008 10/10/2008 Baseline Inspections 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                   10/06/2008 10/10/2008 Baseline Inspections EB1-MODS - MODIFICATIONS - 10CFR50.59                                                                                   5 1, 2            IP 7111117              Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications                   10/27/2008 11/07/2008 Baseline Inspections PI&R           - PREP TRIP-PROBLEM ID AND RESOL                                                                       1 1, 2            IP 71152B              Identification and Resolution of Problems                                                         12/01/2008 12/05/2008 Baseline Inspections PSB1-EP         - EMERGENCY PREPAREDNESS EXERCISE                                                                       3 1, 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review             12/01/2008 12/05/2008 Baseline Inspections 1, 2           IP 7111401              Exercise Evaluation                                                                               12/01/2008 12/05/2008 EP Baseline Inspection 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                                 12/01/2008 12/05/2008 EP Baseline Inspection 1, 2           IP 71151-EP01          Drill/Exercise Performance                                                                         12/01/2008 12/05/2008 Baseline Inspections 1, 2           IP 71151-EP02          ERO Drill Participation                                                                           12/01/2008 12/05/2008 Baseline Inspections 1, 2           IP 71151-EP03          Alert & Notification System                                                                       12/01/2008 12/05/2008 Baseline Inspections PI&R           - PROBLEM IDENTIFIACTION AND RESOLUTION                                                                 5 1, 2            IP 71152B              Identification and Resolution of Problems                                                         02/09/2009 02/13/2009 Baseline Inspections 1, 2           IP 71152B               Identification and Resolution of Problems                                                         02/23/2009 02/27/2009 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                                     3 1                  V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES                                                         05/11/2009 05/14/2009 Not Applicable This report does not include INPO and OUTAGE activities.
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 15:26:20 Report 22 2 TI-176-EDG SURVEILLANCE REQUIREMENTS Generic Safety Inspecti o Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 07/01/2008 12/31/2008 1, 2  2515/176 IP 1 EB3ISI-UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/22/2008 09/26/2008 2  7111108P IP 2 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 09/22/2008 09/26/2008 1, 2   7112101 IP Baseline Inspections A LARA Planning and Controls 09/22/2008 09/26/2008 1, 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 09/22/2008 09/26/2008 1, 2  7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/22/2008 09/26/2008 1     71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/22/2008 09/26/2008 1    71151-PR01 IP 1 EB3SGISI-UNIT 2 SG INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/29/2008 10/03/2008 2  7111108P IP 2 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/06/2008 10/10/2008 1, 2   7112101 IP Baseline Inspections A LARA Planning and Controls 10/06/2008 10/10/2008 1, 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 1, 2   7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 2   71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 2  71151-PR01 IP 5 EB1-MODS-MODIFICATIONS - 10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 10/27/2008 11/07/2008 1, 2  7111117 IP 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 12/01/2008 12/05/2008 1, 2  71152B IP 3 PSB1-EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 12/01/2008 12/05/2008 1, 2   2515/175 IP EP Baseline Inspection Exercise Evaluation 12/01/2008 12/05/2008 1, 2   7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 12/01/2008 12/05/2008 1, 2   7111404 IP Baseline Inspections Drill/Exercise Performance 12/01/2008 12/05/2008 1, 2   71151-EP01 IP Baseline Inspections ERO Drill Participation 12/01/2008 12/05/2008 1, 2   71151-EP02 IP Baseline Inspections A lert & Notification System 12/01/2008 12/05/2008 1, 2  71151-EP03 IP 5 PI&R-PROBLEM IDENTIFIACTION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 02/09/2009 02/13/2009 1, 2   71152B IP Baseline Inspections Identification and Resolution of Problems 02/23/2009 02/27/2009 1, 2  71152B IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 05/11/2009 05/14/2009 1    V23315 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Vogtle Inspection / Activity Plan 09/01/2008
 
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 15:26:20 Report 22 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/01/2009 06/05/2009 1    V23315 3 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/08/2009 06/12/2009 1    V23315 1 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 06/22/2009 06/26/2009 1, 2   2515/175 IP EP Baseline Inspection A lert and Notification System Testing 06/22/2009 06/26/2009 1, 2   7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 06/22/2009 06/26/2009 1, 2   7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 06/22/2009 06/26/2009 1, 2   7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 06/22/2009 06/26/2009 1, 2   7111405 IP Baseline Inspections Drill/Exercise Performance 06/22/2009 06/26/2009 1, 2   71151-EP01 IP Baseline Inspections ERO Drill Participation 06/22/2009 06/26/2009 1, 2   71151-EP02 IP Baseline Inspections A lert & Notification System 06/22/2009 06/26/2009 1, 2  71151-EP03 IP 1 PSB1-RP-RP PUBLIC PREINSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 06/29/2009 07/01/2009 1, 2  7112101 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 07/13/2009 07/17/2009 1, 2  7111111B IP 3 PSB1-RP-RADIATION PROTECTION PUBLIC INSPECTION Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 07/13/2009 07/17/2009 1, 2   7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/13/2009 07/17/2009 1, 2   7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/13/2009 07/17/2009 1, 2   7112203 IP Baseline Inspections RETS/ODCM Radiological Effluent 07/13/2009 07/17/2009 1, 2  71151-PR01 IP 2 EB3ISI-UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/28/2009 10/02/2009 1    7111108P IP 1 EB3TI172-TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 09/28/2009 10/02/2009 1    2515/172 IP 1 PSB1-RP-RP ACCESS CONTROLS INSPECTION (OUTAGE)
Page 2 of 2                                                                                      Vogtle 09/02/2008      15:26:20                                                              Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number        Inspection Activity                                                  Title                                          on Site       Start    End            Type OL EXAM         - INITIAL EXAM - WEEK 1                                                                                   3 1                  V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES                                                             06/01/2009 06/05/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 2                                                                                   3 1                  V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES                                                             06/08/2009 06/12/2009 Not Applicable PSB1EP         - EMERGENCY PREPAREDNESS INSPECTION                                                                       1 1, 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review                 06/22/2009 06/26/2009 Baseline Inspections 1, 2           IP 7111402              Alert and Notification System Testing                                                                 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2           IP 7111403              Emergency Response Organization Augmentation Testing                                                 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                                     06/22/2009 06/26/2009 EP Baseline Inspection 1, 2           IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                     06/22/2009 06/26/2009 EP Baseline Inspection 1, 2           IP 71151-EP01          Drill/Exercise Performance                                                                           06/22/2009 06/26/2009 Baseline Inspections 1, 2           IP 71151-EP02          ERO Drill Participation                                                                               06/22/2009 06/26/2009 Baseline Inspections 1, 2           IP 71151-EP03          Alert & Notification System                                                                           06/22/2009 06/26/2009 Baseline Inspections PSB1-RP         - RP PUBLIC PREINSPECTION VISIT                                                                           1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   06/29/2009 07/01/2009 Baseline Inspections OL RQ           - REQUAL INSPECTION                                                                                       2 1, 2            IP 7111111B            Licensed Operator Requalification Program                                                             07/13/2009 07/17/2009 Baseline Inspections PSB1-RP         - RADIATION PROTECTION PUBLIC INSPECTION                                                                   3 1, 2            IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                         07/13/2009 07/17/2009 Baseline Inspections 1, 2           IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             07/13/2009 07/17/2009 Baseline Inspections 1, 2           IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program         07/13/2009 07/17/2009 Baseline Inspections 1, 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                       07/13/2009 07/17/2009 Baseline Inspections EB3ISI         - UNIT 1 INSERVICE INSPECTION                                                                             2 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                 09/28/2009 10/02/2009 Baseline Inspections EB3TI172       - TI-172 RCS DM BUTT WELDS                                                                                 1 1              IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                   09/28/2009 10/02/2009 Generic Safety Inspectio PSB1-RP         - RP ACCESS CONTROLS INSPECTION (OUTAGE)                                                                   1 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   09/28/2009 10/02/2009 Baseline Inspections 1, 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                           09/28/2009 10/02/2009 Baseline Inspections EB3SGISI       - UNIT 1 STEAM GENERATOR INSERVICE INSP                                                                   1 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                 10/05/2009 10/09/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
Baseline Inspections A ccess Control to Radiologically Significant Areas 09/28/2009 10/02/2009 1, 2   7112101 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/28/2009 10/02/2009 1, 2  71151-OR01 IP 1 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 10/05/2009 10/09/2009 1    7111108P IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:27, 14 November 2019

Report 22, Inspection/Activity Plan 09/01/2008 - 12/13/2009
ML082460929
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/02/2008
From:
Division Reactor Projects II
To:
Shared Package
ML082460884 List:
References
Download: ML082460929 (2)


Text

Page 1 of 2 Vogtle 09/02/2008 15:26:20 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI-176 - EDG SURVEILLANCE REQUIREMENTS 2 1, 2 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 07/01/2008 12/31/2008 Generic Safety Inspectio Testing EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/22/2008 09/26/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/22/2008 09/26/2008 Baseline Inspections EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/29/2008 10/03/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2008 10/10/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/06/2008 10/10/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 Baseline Inspections EB1-MODS - MODIFICATIONS - 10CFR50.59 5 1, 2 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 10/27/2008 11/07/2008 Baseline Inspections PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 1, 2 IP 71152B Identification and Resolution of Problems 12/01/2008 12/05/2008 Baseline Inspections PSB1-EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 12/01/2008 12/05/2008 Baseline Inspections 1, 2 IP 7111401 Exercise Evaluation 12/01/2008 12/05/2008 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/01/2008 12/05/2008 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 12/01/2008 12/05/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 12/01/2008 12/05/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 12/01/2008 12/05/2008 Baseline Inspections PI&R - PROBLEM IDENTIFIACTION AND RESOLUTION 5 1, 2 IP 71152B Identification and Resolution of Problems 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 02/23/2009 02/27/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 05/11/2009 05/14/2009 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Vogtle 09/02/2008 15:26:20 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/01/2009 06/05/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES 06/08/2009 06/12/2009 Not Applicable PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 06/22/2009 06/26/2009 Baseline Inspections 1, 2 IP 7111402 Alert and Notification System Testing 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/22/2009 06/26/2009 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 06/22/2009 06/26/2009 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 06/22/2009 06/26/2009 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 06/22/2009 06/26/2009 Baseline Inspections PSB1-RP - RP PUBLIC PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/29/2009 07/01/2009 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 07/13/2009 07/17/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC INSPECTION 3 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/13/2009 07/17/2009 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/13/2009 07/17/2009 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/13/2009 07/17/2009 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 07/13/2009 07/17/2009 Baseline Inspections EB3ISI - UNIT 1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 09/28/2009 10/02/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 09/28/2009 10/02/2009 Generic Safety Inspectio PSB1-RP - RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/28/2009 10/02/2009 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/28/2009 10/02/2009 Baseline Inspections EB3SGISI - UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/05/2009 10/09/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.