ML090630189: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML090630189
| number = ML090630189
| issue date = 03/04/2009
| issue date = 03/04/2009
| title = Vogtle, Enclosure Report 22 - Inspection / Activity Plan 03/01/2009 - 06/30/2010
| title = Enclosure Report 22 - Inspection / Activity Plan 03/01/2009 - 06/30/2010
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 2 03/04/2009 10:05:55 Report 22 03/01/2009
{{#Wiki_filter:Page 1 of 2                                                                                 Vogtle 03/04/2009     10:05:55                                                         Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                                               No. of Staff Number        Start     End     Inspection Activity                                                             Title                                       on Site OL EXAM       - INITIAL EXAM PREP                                                                                                 4 1         05/11/2009   05/14/2009     V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES OL EXAM       - INITIAL EXAM - WEEK 1                                                                                             4 1         06/01/2009   06/05/2009     V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES PSB1EP       - EMERGENCY PREPAREDNESS INSPECTION                                                                                 1 1, 2       06/01/2009  06/05/2009   IP 7111402              Alert and Notification System Testing 1, 2      06/01/2009   06/05/2009  IP 7111403              Emergency Response Organization Augmentation Testing 1, 2      06/01/2009   06/05/2009  IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2      06/01/2009   06/05/2009  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2      06/01/2009   06/05/2009  IP 71151                Performance Indicator Verification OL EXAM       - INITIAL EXAM - WEEK 2                                                                                             4 1         06/08/2009   06/12/2009     V23315              VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES OL RQ         - REQUAL INSPECTION                                                                                                 3 1, 2       07/13/2009   07/17/2009   IP 7111111B            Licensed Operator Requalification Program PSB1-RP       - RADIATION PROTECTION PUBLIC INSPECTION                                                                           3 1, 2       07/13/2009  07/17/2009   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1, 2      07/13/2009   07/17/2009  IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2      07/13/2009   07/17/2009  IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2      07/13/2009   07/17/2009  IP 71151                Performance Indicator Verification EB3ISI       - UNIT 1 INSERVICE INSPECTION                                                                                       2 1         09/28/2009   10/02/2009   IP 7111108P            Inservice Inspection Activities - PWR EB3TI172     - TI-172 RCS DM BUTT WELDS                                                                                         1 1         09/28/2009   10/02/2009   IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP       - RP ACCESS CONTROLS INSPECTION (OUTAGE)                                                                           1 1, 2       09/28/2009  10/02/2009   IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1, 2      09/28/2009   10/02/2009  IP 7112101              Access Control to Radiologically Significant Areas 1, 2      09/28/2009   10/02/2009  IP 71151                Performance Indicator Verification PSB1-RP       - RP GROUNDWATER PROTECTION                                                                                         1 1, 2       10/05/2009  10/07/2009   IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3SGISI     - UNIT 1 STEAM GENERATOR INSERVICE INSP                                                                             1 1         10/05/2009   10/09/2009   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                                                                   3 1, 2       03/08/2010  03/12/2010   IP 7112101              Access Control to Radiologically Significant Areas 1, 2      03/08/2010   03/12/2010  IP 7112102              ALARA Planning and Controls 1, 2      03/08/2010   03/12/2010  IP 7112202              Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Vogtle OL EXAM-INITIAL EXAM PREP 4 1     VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES V23315 05/11/2009 05/14/2009 OL EXAM-INITIAL EXAM - WEEK 1 4 1     VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES V23315 06/01/2009 06/05/2009 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 1, 2  IP A lert and Notification System Testing 7111402 06/01/2009 06/05/2009 1, 2   IP Emergency Response Organization Augmentation Testing 7111403 06/01/2009 06/05/2009 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 06/01/2009 06/05/2009 1, 2   IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/01/2009 06/05/2009 1, 2   IP Performance Indicator Verification 71151 06/01/2009 06/05/2009 OL EXAM-INITIAL EXAM - WEEK 2 4 1     VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES V23315 06/08/2009 06/12/2009 OL RQ-REQUAL INSPECTION 3 1, 2   IP Licensed Operator Requalification Program 7111111B 07/13/2009 07/17/2009 PSB1-RP-RADIATION PROTECTION PUBLIC INSPECTION 3 1, 2  IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/13/2009 07/17/2009 1, 2   IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/13/2009 07/17/2009 1, 2   IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/13/2009 07/17/2009 1, 2   IP Performance Indicator Verification 71151 07/13/2009 07/17/2009 EB3ISI-UNIT 1 INSERVICE INSPECTION 2 1     IP Inservice Inspection Activities - PWR 7111108P 09/28/2009 10/02/2009 EB3TI172-TI-172 RCS DM BUTT WELDS 1 1     IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/28/2009 10/02/2009 PSB1-RP-RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1, 2  IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 09/28/2009 10/02/2009 1, 2   IP A ccess Control to Radiologically Significant Areas 7112101 09/28/2009 10/02/2009 1, 2   IP Performance Indicator Verification 71151 09/28/2009 10/02/2009 PSB1-RP-RP GROUNDWATER PROTECTION 1 1, 2  IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 10/05/2009 10/07/2009 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1     IP Inservice Inspection Activities - PWR 7111108P 10/05/2009 10/09/2009 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 3 1, 2  IP A ccess Control to Radiologically Significant Areas 7112101 03/08/2010 03/12/2010 1, 2   IP A LARA Planning and Controls 7112102 03/08/2010 03/12/2010 1, 2   IP Radioactive Material Processing and Transportation 7112202 03/08/2010 03/12/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                         Enclosure
This report shows only on-site and announced inspection procedures.
 
Inspection / Activity Plan Page 2 of 2 03/04/2009 10:05:55 Report 22 03/01/2009
Page 2 of 2                                                                                 Vogtle 03/04/2009     10:05:55                                                       Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                           No. of Staff Number        Start     End     Inspection Activity                                                         Title     on Site PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK1                                               3 1, 2       03/08/2010   03/12/2010   IP 71151              Performance Indicator Verification EB3ISI       - UNIT 2 INSERVICE INSPECTION                                                 1 2       03/15/2010   03/19/2010   IP 7111108P            Inservice Inspection Activities - PWR PSB1-RP       - RP OCCUPATIONAL BASELINE WEEK 2                                             2 1, 2       03/22/2010  03/26/2010   IP 7112101            Access Control to Radiologically Significant Areas 1, 2      03/22/2010   03/26/2010  IP 7112102            ALARA Planning and Controls 1, 2      03/22/2010   03/26/2010  IP 7112202            Radioactive Material Processing and Transportation 1, 2      03/22/2010   03/26/2010  IP 71151              Performance Indicator Verification PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                             3 1, 2       05/17/2010  05/21/2010   IP 7111401            Exercise Evaluation 1, 2      05/17/2010   05/21/2010  IP 7111404            Emergency Action Level and Emergency Plan Changes 1, 2      05/17/2010   05/21/2010  IP 71151              Performance Indicator Verification EB1-CDBI     - COMPONENT DESIGN BASES INSPECTION                                           5 1, 2       05/31/2010   06/04/2010  IP 7111121            Component Design Bases Inspection 1, 2      06/14/2010   06/18/2010  IP 7111121            Component Design Bases Inspection 1, 2      06/28/2010   07/02/2010   IP 7111121            Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Vogtle PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 3 1, 2   IP Performance Indicator Verification 71151 03/08/2010 03/12/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 03/15/2010 03/19/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2  IP A ccess Control to Radiologically Significant Areas 7112101 03/22/2010 03/26/2010 1, 2   IP A LARA Planning and Controls 7112102 03/22/2010 03/26/2010 1, 2   IP Radioactive Material Processing and Transportation 7112202 03/22/2010 03/26/2010 1, 2   IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2  IP Exercise Evaluation 7111401 05/17/2010 05/21/2010 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 05/17/2010 05/21/2010 1, 2   IP Performance Indicator Verification 71151 05/17/2010 05/21/2010 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION 5 1, 2   IP Component Design Bases Inspection 7111121 05/31/2010 06/04/2010 1, 2   IP Component Design Bases Inspection 7111121 06/14/2010 06/18/2010 1, 2   IP Component Design Bases Inspection 7111121 06/28/2010 07/02/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 09:32, 14 November 2019

Enclosure Report 22 - Inspection / Activity Plan 03/01/2009 - 06/30/2010
ML090630189
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/04/2009
From:
Division Reactor Projects II
To:
Southern Nuclear Operating Co
Shared Package
ML090630182 List:
References
IR-09-001
Download: ML090630189 (2)


Text

Page 1 of 2 Vogtle 03/04/2009 10:05:55 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP 4 1 05/11/2009 05/14/2009 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 1 06/01/2009 06/05/2009 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 06/01/2009 06/05/2009 IP 7111402 Alert and Notification System Testing 1, 2 06/01/2009 06/05/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 06/01/2009 06/05/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/01/2009 06/05/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/01/2009 06/05/2009 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 2 4 1 06/08/2009 06/12/2009 V23315 VOGTLE\JUNE 2009 EXAM AT POWER FACILITIES OL RQ - REQUAL INSPECTION 3 1, 2 07/13/2009 07/17/2009 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RADIATION PROTECTION PUBLIC INSPECTION 3 1, 2 07/13/2009 07/17/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 07/13/2009 07/17/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 07/13/2009 07/17/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 07/13/2009 07/17/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 2 1 09/28/2009 10/02/2009 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 1 09/28/2009 10/02/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1, 2 09/28/2009 10/02/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1, 2 09/28/2009 10/02/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/28/2009 10/02/2009 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 10/05/2009 10/07/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3SGISI - UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1 10/05/2009 10/09/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 3 1, 2 03/08/2010 03/12/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/08/2010 03/12/2010 IP 7112102 ALARA Planning and Controls 1, 2 03/08/2010 03/12/2010 IP 7112202 Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Vogtle 03/04/2009 10:05:55 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 3 1, 2 03/08/2010 03/12/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/15/2010 03/19/2010 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 03/22/2010 03/26/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/22/2010 03/26/2010 IP 7112102 ALARA Planning and Controls 1, 2 03/22/2010 03/26/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/22/2010 03/26/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 05/17/2010 05/21/2010 IP 7111401 Exercise Evaluation 1, 2 05/17/2010 05/21/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/17/2010 05/21/2010 IP 71151 Performance Indicator Verification EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 5 1, 2 05/31/2010 06/04/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/14/2010 06/18/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/28/2010 07/02/2010 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure