{{#Wiki_filter:10CFR50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Kay 4, 2009 u.s.NuclearRegulatoryCommissionAttention:DocumentControlDeskWashington,D.C.20555SerialNo.NL&OS/ETSDocketNo.LicenseNo.
{{#Wiki_filter:10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA   23261 Kay 4, 2009 u.s. Nuclear Regulatory Commission                                  Serial No. 09-265 Attention: Document Control Desk                                    NL&OS/ETS RO Washington, D.C. 20555                                              Docket No. 50-338 License No. NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
09-265 RO 50-338 NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 1 FOURTH INTERVAL lSI PROGRAM RESPONSE TO REQUEST FOR INFORMATION REGARDING NDE-OOS In a letter dated October 17, 2008 (Serial No. 08-0595), Dominion submitted the North Anna Power Station Unit 1 inservice inspection (lSI) program for the fourth inservice inspection (lSI) interval applicable to Class 1, 2, and 3 components and component supports. The lSI Plan described the programmatic aspects of lSI examinations of components and component supports. Included with the program were requests for alternatives or relief from the specific code requirements in accordance with 10 CFR 50.55a (a)(3)(i) and/or (ii) or 10 CFR 50.55a(g)(5)(iii). In an April 15, 2009 letter the NRC staff requested additional information regarding relief request NDE-005 to complete their review. The attachment to this letter provides the information requested by the NRC staff.
NORTH ANNA POWER STATIONUNIT1 FOURTH INTERVAL lSI PROGRAM RESPONSE TO REQUEST FOR INFORMATION REGARDING NDE-OOSInaletterdatedOctober17,2008(SerialNo.08-0595),DominionsubmittedtheNorthAnnaPowerStationUnit1inserviceinspection(lSI)programforthefourthinserviceinspection(lSI)intervalapplicabletoClass1,2,and3componentsandcomponentsupports.ThelSIPlandescribedtheprogrammaticaspectsoflSI examinationsofcomponentsandcomponentsupports.Includedwiththeprogramwererequestsforalternativesorrelieffromthespecificcoderequirementsinaccordancewith10CFR50.55a(a)(3)(i)and/or(ii)or10CFR50.55a(g)(5)(iii).InanApril15,2009lettertheNRCstaffrequestedadditionalinformationregardingreliefrequestNDE-005tocompletetheirreview.The attachment tothisletterprovidestheinformationrequestedbytheNRCstaff.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMr.ThomasShaubat(804)273-2763.
If you have any questions or require              additional  information,   please  contact Mr. Thomas Shaub at (804) 273-2763.
Sincerly,J.anPrice.iePresident-NuclearEngineering AttachmentResponsetoRequestforAdditionalInformationRegardingNDE-005Commitmentsmadeinthisletter:1.None cc:U.S.NuclearRegulatoryCommissionRegionIISamNunn AtlantaFederalCenter 61ForsythStreet,SWSuite23T85 Atlanta, Georgia 30303 Mr.J.E.Reasor, Jr.OldDominionElectricCooperative Innsbrook Corporate Center4201DominionBlvd.Suite300GlenAllen,Virginia23060 NRC SeniorResidentInspectorNorthAnnaPowerStationMs.D.N.WrightNRCProject ManagerU.S.Nuclear Regulatory CommissionOneWhiteFlintNorthMaiIStop 0-8 H4A 11555RockvillePikeRockville,Maryland20852 Mr.J.F.Stang, Jr.NRCProject ManagerU.S.NuclearRegulatoryCommissionOneWhiteFlintNorthMaiIStop 0-8 G9A 11555RockvillePikeRockville,Maryland20852 Serial No.09-265 Docket No.50-338Requestfor Additional Information NDE-005 Page 2 of 2 SerialNo.09-265DocketNo.50-338 ATTACHMENT FOURTH INTERVAL lSI PLAN RESPONSETOREQUESTFOR INFORMATION REGARDING NDE-005 VIRGINIAELECTRICANDPOWER COMPANY NORTHANNAPOWER STATIONUNIT1 SerialNo.09-265DocketNo.50-338RequestforAdditional Information Regarding NDE-005 BackgroundByapplicationdatedOctober7,2008(AgencywideDocumentsAccessandManagementSystem(ADAMS)AccessionNumberML082880160),as supplementedbyletterdatedJanuary30,2009(ADAMSAccessionNo.ML090330392),VirginiaElectricandPowerCompany(thelicensee)submittedthefourthintervalinserviceinspection(lSI)planandassociatedproposedalternativesandreliefrequestsfromrequirementsofSectionXIoftheAmericanSocietyofMechanicalEngineers,BoilerandPressureVesselCode(ASMECode),forNorthAnnaPowerStationUnit No.1.Specifically,requestNDE-005pertainstosixweldoverlaysthatwereinstalledduringthethirdlSIinterval.TheNuclearRegulatoryCommission(NRC)staffdeterminedthatadditionalinformationisrequiredtocompletetheevaluationfortherequest.RequestNDE-005issimilartoapplicationstheNRCstaffhasreviewedthatrequesteduseofCodeCaseN-504-2asconditionedtoSectionXI,Appendix QinRegulatoryGuide1.147,"InserviceInspectionCodeCaseAcceptability,ASMESectionXI,Division1."Inaccordancewiththe gUidance,theNRCstaffidentifiedmissinginformationinyourrequestandareasinneedofclarification.Pleaseaddressthefollowingquestions:
: Sincerly,
NRC Question 1RequestNDE-005statesinPartAofthealternativethatthereliefistocontinueISisusingproceduresandpersonnelqualifiedtoAppendixVIII, Supplement11,asmodifiedbyAttachment1ofthesubmittal.Supplement 11isfortheexaminationof wroughtstainlesssteelpipingandweldoverlays.Provideadescriptionofthebasematerial, weld/buttermaterial,andoverlaymaterial(wroughtorcaststainlesssteel,Inconel,carbonsteel,etc.).
~
Dominion ResponseThefollowingmaterialsareincludedinthebasematerial, weld/buttermaterial,andoverlaymaterial:Nozzlesare(P-No.3Group No.3)LowAlloySteelSA-508CL2*SafeEnd-to-NozzleWeldandbutteringareAlloy82/182(F-No.43)*SafeEndsare(P-No.8)WroughtStainlessSteel(SS)SA-182GRF316LSurgeLinePipe,SafetyLineElbows,ReliefLineReducerandSprayLinePipeare(P-No.8)
      .~
WroughtSeamlessSSandWeldsareSS(A-NO.8)*WeldingofStructuralOverlaywasperformedusingERNiCrFe-7(Alloy52)orERNiCrFe-7A(Alloy52M)
J. an Price
Page 1 of 2 SerialNo.09-265DocketNo.50-338RequestforAdditional Information Regarding NDE-005NRCQuestion2 The alternative'sexaminationrequirementsaresimilartotheexaminationrequirementsofSectionXI,Appendix Q,forISis.Oneoftherequirementsisfor ultrasonicexaminationofoverlaysduringthefirstorsecondrefuelingoutagefollowinginstallation.DiscusswhethersuchexaminationshavebeenperformedorplanstodosointhefourthlSIinterval.
. i e President - Nuclear Engineering Attachment Response to Request for Additional Information Regarding NDE-005 Commitments made in this letter:
Dominion ResponseDuringtheUnit1fall2007refuelingoutage,fullstructuralmitigativePWOLsforthe pressurizersafety,spray,relief,andsurgenozzleswerecompleted.Examinationsofthesepressurizerweldoverlayswerecompletedduringthespring2009outageforUnit1.Examinationsinthe4thintervalwillbecompletedinaccordancewiththisrelief request.NRCQuestion3PartB,Paragraph(a)(3)ofNDE-005statesthat,"TheinserviceexaminationacceptancestandardsofTableIWB-3514-2shallbemetfortheweldoverlay.IftheacceptancecriteriaofTableIWB-3514-2cannotbemet,theacceptancecriteriaofIWB-3600shallbemetfortheweldoverlay.Cracksintheouter25%ofthebasemetalshallmeetthedesignanalysisrequirementsofAttachment2,CrackGrowthandDesign."AccordingtoMRP-139,"PrimarySystemPipingButtWeldInspectionandEvaluationGuide,"theweldoverlaymaterialmustberesistanttostresscorrosioncracking.Assuch,similarapplicationshaveincludedthephrase,"Anyindicationcharacterizedasstresscorrosioncrackingintheweldoverlaymaterialis unacceptable."Discusstheplansforaddressingstresscorrosioncracking.
: 1. None
Dominion ResponseIfflawgrowthintheweldoverlayoccursandtheacceptancestandardsofTableIWB-3514.2cannotbemet,adeterminationwillbemadetoproveiftheflawisnotPWSCC.IfthecauseisdeterminedtobePWSCCorthecauseoftheflawcannotbedetermined,NorthAnnawillrepairtheflawandwillnotuseIWB-3600ofASMECode,SectionXItoacceptthesetypesofflaws.
 
Page2of2}}
Serial No. 09-265 Docket No. 50-338 Request for Additional Information NDE-005 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Ms. D. N. Wright NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Mr. J. F. Stang, Jr.
NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852
 
Serial No. 09-265 Docket No. 50-338 ATTACHMENT FOURTH INTERVAL lSI PLAN RESPONSE TO REQUEST FOR INFORMATION REGARDING NDE-005 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1
 
Serial No. 09-265 Docket No. 50-338 Request for Additional Information Regarding NDE-005
 
===Background===
By application dated October 7, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML082880160), as supplemented by letter dated January 30, 2009 (ADAMS Accession No. ML090330392), Virginia Electric and Power Company (the licensee) submitted the fourth interval inservice inspection (lSI) plan and associated proposed alternatives and relief requests from requirements of Section XI of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code), for North Anna Power Station Unit No.1.
Specifically, request NDE-005 pertains to six weld overlays that were installed during the third lSI interval. The Nuclear Regulatory Commission (NRC) staff determined that additional information is required to complete the evaluation for the request.
Request NDE-005 is similar to applications the NRC staff has reviewed that requested use of Code Case N-504-2 as conditioned to Section XI, Appendix Q in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1." In accordance with the gUidance, the NRC staff identified missing information in your request and areas in need of clarification. Please address the following questions:
NRC Question 1 Request NDE-005 states in Part A of the alternative that the relief is to continue ISis using procedures and personnel qualified to Appendix VIII, Supplement 11, as modified by Attachment 1 of the submittal. Supplement 11 is for the examination of wrought stainless steel piping and weld overlays. Provide a description of the base material, weld/butter material, and overlay material (wrought or cast stainless steel, Inconel, carbon steel, etc.).
Dominion Response The following materials are included in the base material, weld/butter material, and overlay material:
Nozzles are (P-No. 3 Group No.3) Low Alloy Steel SA-508 CL2
* Safe End-to-Nozzle Weld and buttering are Alloy 82/182 (F-No. 43)
* Safe Ends are (P-No. 8) Wrought Stainless Steel (SS) SA-182 GR F316L Surge Line Pipe, Safety Line Elbows, Relief Line Reducer and Spray Line Pipe are (P-No. 8) Wrought Seamless SS and Welds are SS (A-NO.8)
* Welding of Structural Overlay was performed using ERNiCrFe-7 (Alloy 52) or ERNiCrFe-7A (Alloy 52M)
Page 1 of 2
 
Serial No. 09-265 Docket No. 50-338 Request for Additional Information Regarding NDE-005 NRC Question 2 The alternative's examination requirements are similar to the examination requirements of Section XI, Appendix Q, for ISis. One of the requirements is for ultrasonic examination of overlays during the first or second refueling outage following installation.
Discuss whether such examinations have been performed or plans to do so in the fourth lSI interval.
Dominion Response During the Unit 1 fall 2007 refueling outage, full structural mitigative PWOLs for the pressurizer safety, spray, relief, and surge nozzles were completed. Examinations of these pressurizer weld overlays were completed during the spring 2009 outage for Unit 1. Examinations in the 4th interval will be completed in accordance with this relief request.
NRC Question 3 Part B, Paragraph (a)(3) of NDE-005 states that, "The inservice examination acceptance standards of Table IWB-3514-2 shall be met for the weld overlay. If the acceptance criteria of Table IWB-3514-2 cannot be met, the acceptance criteria of IWB-3600 shall be met for the weld overlay. Cracks in the outer 25% of the base metal shall meet the design analysis requirements of Attachment 2, Crack Growth and Design." According to MRP-139, "Primary System Piping Butt Weld Inspection and Evaluation Guide," the weld overlay material must be resistant to stress corrosion cracking. As such, similar applications have included the phrase, "Any indication characterized as stress corrosion cracking in the weld overlay material is unacceptable."
Discuss the plans for addressing stress corrosion cracking.
Dominion Response If flaw growth in the weld overlay occurs and the acceptance standards of Table IWB-3514.2 cannot be met, a determination will be made to prove if the flaw is not PWSCC. If the cause is determined to be PWSCC or the cause of the flaw cannot be determined, North Anna will repair the flaw and will not use IWB-3600 of ASME Code, Section XI to accept these types of flaws.
Page 2 of 2}}

Latest revision as of 07:21, 14 November 2019

Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005
ML091250357
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/04/2009
From: Price J
Dominion, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-265
Download: ML091250357 (5)


Text

10 CFR 50.55a VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Kay 4, 2009 u.s. Nuclear Regulatory Commission Serial No.09-265 Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket No. 50-338 License No. NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNIT 1 FOURTH INTERVAL lSI PROGRAM RESPONSE TO REQUEST FOR INFORMATION REGARDING NDE-OOS In a letter dated October 17, 2008 (Serial No. 08-0595), Dominion submitted the North Anna Power Station Unit 1 inservice inspection (lSI) program for the fourth inservice inspection (lSI) interval applicable to Class 1, 2, and 3 components and component supports. The lSI Plan described the programmatic aspects of lSI examinations of components and component supports. Included with the program were requests for alternatives or relief from the specific code requirements in accordance with 10 CFR 50.55a (a)(3)(i) and/or (ii) or 10 CFR 50.55a(g)(5)(iii). In an April 15, 2009 letter the NRC staff requested additional information regarding relief request NDE-005 to complete their review. The attachment to this letter provides the information requested by the NRC staff.

If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerly,

~

.~

J. an Price

. i e President - Nuclear Engineering Attachment Response to Request for Additional Information Regarding NDE-005 Commitments made in this letter:

1. None

Serial No.09-265 Docket No. 50-338 Request for Additional Information NDE-005 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Ms. D. N. Wright NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Mr. J. F. Stang, Jr.

NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 0-8 G9A 11555 Rockville Pike Rockville, Maryland 20852

Serial No.09-265 Docket No. 50-338 ATTACHMENT FOURTH INTERVAL lSI PLAN RESPONSE TO REQUEST FOR INFORMATION REGARDING NDE-005 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1

Serial No.09-265 Docket No. 50-338 Request for Additional Information Regarding NDE-005

Background

By application dated October 7, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML082880160), as supplemented by letter dated January 30, 2009 (ADAMS Accession No. ML090330392), Virginia Electric and Power Company (the licensee) submitted the fourth interval inservice inspection (lSI) plan and associated proposed alternatives and relief requests from requirements of Section XI of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code), for North Anna Power Station Unit No.1.

Specifically, request NDE-005 pertains to six weld overlays that were installed during the third lSI interval. The Nuclear Regulatory Commission (NRC) staff determined that additional information is required to complete the evaluation for the request.

Request NDE-005 is similar to applications the NRC staff has reviewed that requested use of Code Case N-504-2 as conditioned to Section XI, Appendix Q in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1." In accordance with the gUidance, the NRC staff identified missing information in your request and areas in need of clarification. Please address the following questions:

NRC Question 1 Request NDE-005 states in Part A of the alternative that the relief is to continue ISis using procedures and personnel qualified to Appendix VIII, Supplement 11, as modified by Attachment 1 of the submittal. Supplement 11 is for the examination of wrought stainless steel piping and weld overlays. Provide a description of the base material, weld/butter material, and overlay material (wrought or cast stainless steel, Inconel, carbon steel, etc.).

Dominion Response The following materials are included in the base material, weld/butter material, and overlay material:

Nozzles are (P-No. 3 Group No.3) Low Alloy Steel SA-508 CL2

  • Safe End-to-Nozzle Weld and buttering are Alloy 82/182 (F-No. 43)
  • Safe Ends are (P-No. 8) Wrought Stainless Steel (SS) SA-182 GR F316L Surge Line Pipe, Safety Line Elbows, Relief Line Reducer and Spray Line Pipe are (P-No. 8) Wrought Seamless SS and Welds are SS (A-NO.8)
  • Welding of Structural Overlay was performed using ERNiCrFe-7 (Alloy 52) or ERNiCrFe-7A (Alloy 52M)

Page 1 of 2

Serial No.09-265 Docket No. 50-338 Request for Additional Information Regarding NDE-005 NRC Question 2 The alternative's examination requirements are similar to the examination requirements of Section XI, Appendix Q, for ISis. One of the requirements is for ultrasonic examination of overlays during the first or second refueling outage following installation.

Discuss whether such examinations have been performed or plans to do so in the fourth lSI interval.

Dominion Response During the Unit 1 fall 2007 refueling outage, full structural mitigative PWOLs for the pressurizer safety, spray, relief, and surge nozzles were completed. Examinations of these pressurizer weld overlays were completed during the spring 2009 outage for Unit 1. Examinations in the 4th interval will be completed in accordance with this relief request.

NRC Question 3 Part B, Paragraph (a)(3) of NDE-005 states that, "The inservice examination acceptance standards of Table IWB-3514-2 shall be met for the weld overlay. If the acceptance criteria of Table IWB-3514-2 cannot be met, the acceptance criteria of IWB-3600 shall be met for the weld overlay. Cracks in the outer 25% of the base metal shall meet the design analysis requirements of Attachment 2, Crack Growth and Design." According to MRP-139, "Primary System Piping Butt Weld Inspection and Evaluation Guide," the weld overlay material must be resistant to stress corrosion cracking. As such, similar applications have included the phrase, "Any indication characterized as stress corrosion cracking in the weld overlay material is unacceptable."

Discuss the plans for addressing stress corrosion cracking.

Dominion Response If flaw growth in the weld overlay occurs and the acceptance standards of Table IWB-3514.2 cannot be met, a determination will be made to prove if the flaw is not PWSCC. If the cause is determined to be PWSCC or the cause of the flaw cannot be determined, North Anna will repair the flaw and will not use IWB-3600 of ASME Code,Section XI to accept these types of flaws.

Page 2 of 2