|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Goodwin, Cameron Sent: Monday, August 31, 2009 7:10 AM To: Mitchel.Mathews@exeloncorp.com Cc: Campbell, Stephen | | {{#Wiki_filter:From: Goodwin, Cameron Sent: Monday, August 31, 2009 7:10 AM To: Mitchel.Mathews@exeloncorp.com Cc: Campbell, Stephen |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance review for Clinton EP Changes (ME1727) | | Acceptance review for Clinton EP Changes (ME1727) |
| August 31, 2009 | | August 31, 2009 Mr. M. Mathews Clinton Power Station. |
| | |
| Mr. M. Mathews | |
| | |
| Clinton Power Station. | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Acceptance of Emergency Plan Change (TAC No. ME1727). | | Acceptance of Emergency Plan Change (TAC No. ME1727). |
| | |
| Mr. Mathews: | | Mr. Mathews: |
| By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff | | By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S. |
| =s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719. | | Thank you, Cameron Goodwin Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties |
| | |
| Thank you, | |
| | |
| Cameron Goodwin | |
|
| |
|
| Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7)
| | Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance review for Clinton EP Changes (ME1727) | | Acceptance review for Clinton EP Changes (ME1727) |
| | | Sent Date: 08/31/2009 7:10:24 AM Received Date: 08/31/2009 7:10:24 AM From: Goodwin, Cameron Created By: Cameron.Goodwin@nrc.gov Recipients: |
| Sent Date: 08/31/2009 7:10:24 AM Received Date: 08/31/2009 7:10:24 AM From: Goodwin, Cameron | | Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com) |
| | | Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen) |
| Created By: Cameron.Goodwin@nrc.gov | | Tracking Status: None Post Office: |
| | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 15966 08/31/2009 Options Expiration Date: |
| Recipients: | | Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received:}} |
| Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com) Tracking Status: None | |
| | |
| Stephen.Campbell@nrc.gov (Campbell, Stephen) Tracking Status: None | |
| | |
| Post Office: | |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 15966 08/31/2009 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: True Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24222A4092024-05-0303 May 2024 NRR E-mail Capture - Request for Additional Information Regarding Reactor Water Cleanup (RWCU) Pump Rooms - L-2023-LLA-0118 ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23338A0402023-12-0404 December 2023 NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261A0032023-09-15015 September 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23219A2142023-08-0404 August 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release ML23194A1102023-07-13013 July 2023 NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23087A0122023-03-28028 March 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Technical Specifications 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air (L-2023-LLA-0034) ML23033A0332023-02-0101 February 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Adopt TSTF-332 (L-2023-LLA-0007) ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22165A1902022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-230 (L-2022-LLA-0076) ML22165A1912022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-269 (L-2022-LLA-0077) ML23089A0182022-05-24024 May 2022 NRR E-mail Capture - Clinton Power Station Acceptance Review Results - Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan ML22116A0422022-04-26026 April 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Secondary Containment Design Basis ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3062021-07-21021 July 2021 NRR E-mail Capture - NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21182A0722021-06-29029 June 2021 SUNSI and Proprietary Review Determination Email Regarding: Tn CoC 1042 (Eos) Amendment 3 Rsi Responses ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21041A5442021-02-10010 February 2021 NRR E-mail Capture - NRC Acceptance Review for Clinton Request for License Amendment to Revise Degraded Voltage Relay Allowable Values (L-2021-LLA-0005) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML20350B5602020-12-15015 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-582 and TSTF-583-T (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) 2024-09-06
[Table view] |
Text
From: Goodwin, Cameron Sent: Monday, August 31, 2009 7:10 AM To: Mitchel.Mathews@exeloncorp.com Cc: Campbell, Stephen
Subject:
Acceptance review for Clinton EP Changes (ME1727)
August 31, 2009 Mr. M. Mathews Clinton Power Station.
SUBJECT:
Acceptance of Emergency Plan Change (TAC No. ME1727).
Mr. Mathews:
By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719.
Thank you, Cameron Goodwin Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties
Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7)
Subject:
Acceptance review for Clinton EP Changes (ME1727)
Sent Date: 08/31/2009 7:10:24 AM Received Date: 08/31/2009 7:10:24 AM From: Goodwin, Cameron Created By: Cameron.Goodwin@nrc.gov Recipients:
Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com)
Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 15966 08/31/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received: