ML092430398: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2009
| issue date = 08/31/2009
| title = Acceptance Review for Clinton EP Changes (ME1727)
| title = Acceptance Review for Clinton EP Changes (ME1727)
| author name = Goodwin C S
| author name = Goodwin C
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Mathews M
| addressee name = Mathews M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Goodwin, Cameron Sent: Monday, August 31, 2009 7:10 AM To: Mitchel.Mathews@exeloncorp.com Cc: Campbell, Stephen  
{{#Wiki_filter:From:                       Goodwin, Cameron Sent:                       Monday, August 31, 2009 7:10 AM To:                         Mitchel.Mathews@exeloncorp.com Cc:                         Campbell, Stephen


==Subject:==
==Subject:==
Acceptance review for Clinton EP Changes (ME1727)
Acceptance review for Clinton EP Changes (ME1727)
August 31, 2009  
August 31, 2009 Mr. M. Mathews Clinton Power Station.
 
Mr. M. Mathews  
 
Clinton Power Station.  


==SUBJECT:==
==SUBJECT:==
Acceptance of Emergency Plan Change (TAC No. ME1727).  
Acceptance of Emergency Plan Change (TAC No. ME1727).
 
Mr. Mathews:
Mr. Mathews:
By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff
By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S.
=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719.  
Thank you, Cameron Goodwin Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties
 
Thank you,  
 
Cameron Goodwin  


Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7)  
Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7)


==Subject:==
==Subject:==
Acceptance review for Clinton EP Changes (ME1727)  
Acceptance review for Clinton EP Changes (ME1727)
 
Sent Date:     08/31/2009 7:10:24 AM Received Date:       08/31/2009 7:10:24 AM From:           Goodwin, Cameron Created By:       Cameron.Goodwin@nrc.gov Recipients:
Sent Date:       08/31/2009 7:10:24 AM Received Date:       08/31/2009 7:10:24 AM From:               Goodwin, Cameron  
Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com)
 
Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)
Created By:         Cameron.Goodwin@nrc.gov  
Tracking Status: None Post Office:
 
HQCLSTR01.nrc.gov Files         Size     Date & Time MESSAGE         15966     08/31/2009 Options Expiration Date:
Recipients:
Priority:               olImportanceNormal ReplyRequested:       True Return Notification:     False Sensitivity:     olNormal Recipients received:}}
Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com)                 Tracking Status: None  
 
Stephen.Campbell@nrc.gov (Campbell, Stephen)                 Tracking Status: None  
 
Post Office:
HQCLSTR01.nrc.gov  
 
Files               Size       Date & Time  
 
MESSAGE       15966       08/31/2009  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:       True Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 02:44, 14 November 2019

Acceptance Review for Clinton EP Changes (ME1727)
ML092430398
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/31/2009
From: Goodwin C
Division of Operating Reactor Licensing
To: Mathews M
Exelon Corp
Goodwin, Cameron S, NRR/DORL, 415-3719
References
TAC ME1727
Download: ML092430398 (2)


Text

From: Goodwin, Cameron Sent: Monday, August 31, 2009 7:10 AM To: Mitchel.Mathews@exeloncorp.com Cc: Campbell, Stephen

Subject:

Acceptance review for Clinton EP Changes (ME1727)

August 31, 2009 Mr. M. Mathews Clinton Power Station.

SUBJECT:

Acceptance of Emergency Plan Change (TAC No. ME1727).

Mr. Mathews:

By letter dated June 19, 2009, Clinton Power Station, Unit 1 (CPS) submitted a request for approval of changes to the CPS Emergency Plan. The purpose of this letter is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review of this request and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact the Clinton Project Manager, Cameron Goodwin at (301) 415-3719.

Thank you, Cameron Goodwin Mrs. Cameron Goodwin Division of Operating Reactor Licensing Clinton and LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties

Mail Envelope Properties (83F82891AF9D774FBBB39974B6CB134F948F1F13B7)

Subject:

Acceptance review for Clinton EP Changes (ME1727)

Sent Date: 08/31/2009 7:10:24 AM Received Date: 08/31/2009 7:10:24 AM From: Goodwin, Cameron Created By: Cameron.Goodwin@nrc.gov Recipients:

Mitchel.Mathews@exeloncorp.com (Mitchel.Mathews@exeloncorp.com)

Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 15966 08/31/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received: