{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 16, 2009 Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 DUANE ARNOLD ENERGY CENTER -CLOSEOUT OF GENERIC LETrER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7824)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 16, 2009 Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
 
==SUBJECT:==
DUANE ARNOLD ENERGY CENTER - CLOSEOUT OF GENERIC LETrER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7824)


==Dear Mr. Costanzo:==
==Dear Mr. Costanzo:==


On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759).
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.
The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.
GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:
GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL: A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
(a)      A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)    A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)    A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
In your letters dated October 13, 2008, April 27, 2009, and October 16, 2009, (ADAMS Accession Nos. ML082970263, ML091250298 and ML093000152 respectively), you provided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that for Duane Arnold your response to the GL is acceptable.
In your letters dated October 13, 2008, April 27, 2009, and October 16, 2009, (ADAMS Accession Nos. ML082970263, ML091250298 and ML093000152 respectively), you provided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that for Duane Arnold your response to the GL is acceptable.
Consequently, your GL response is considered closed and no further information or action is requested of you. Notwithstanding, the NRC's Region III staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, C. Costanzo -2"Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (!\IRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666).
Consequently, your GL response is considered closed and no further information or action is requested of you. Notwithstanding, the NRC's Region III staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177,
The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured. If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.
 
Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv C. Costanzo -2"Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666).
C. Costanzo                                 -2 "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (!\IRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured. If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.
Sincerely, IRA! Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv DISTRIBUTION:
Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv
PUBLIC LPL3-1 r/f RidsNrrDorlDpr Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnw
 
_MaiICTR Resource RidsNrrLATHarris Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn3MailCenter Resource MRazzaque, NRR RidsNrrPMDuaneArnold Resource WLyon, NRR DBeaulieu, NRR ADAMS ACCESSION NO.: ML093431085  
C. Costanzo                                   -2 "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
*Memo dated 12/4/09 OFFICE NRRlLPL3-1/
If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.
PM NRRlLPL3-1/
Sincerely, IRA!
LA NRRlSRXB/BC*
Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv DISTRIBUTION:
NRRlLPL3-1/
PUBLIC           LPL3-1 r/f               RidsNrrDorlDpr Resource           RidsNrrDorlLpl3-1 Resource RidsAcrsAcnw_MaiICTR Resource             RidsNrrLATHarris Resource         RidsOgcRp Resource RidsNrrDirsltsb Resource                 RidsRgn3MailCenter Resource       MRazzaque, NRR RidsNrrPMDuaneArnold Resource             WLyon, NRR                       DBeaulieu, NRR ADAMS ACCESSION NO.: ML093431085                             *Memo dated 12/4/09 OFFICE NRRlLPL3-1/ PM             NRRlLPL3-1/ LA NRRlSRXB/BC* NRRlLPL3-1/ BC NAME       KFeintuch             THarris           GCranston         RPascarelli DATE       12/14/09               12/10/09         12/04/09           12/16/09 OFFICIAL RECORD COPY}}
BC NAME KFeintuch THarris GCranston RPascarelli DATE 12/14/09 12/10/09 12/04/09 12/16/09 OFFICIAL RECORD}}

Latest revision as of 00:36, 14 November 2019

Closeout of Generic Letter 2008-01 Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML093431085
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/16/2009
From: Feintuch K
Plant Licensing Branch III
To: Costanzo C
Duane Arnold
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
GL-08-001, TAC MD7824
Download: ML093431085 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 16, 2009 Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER - CLOSEOUT OF GENERIC LETrER 2008-01 "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7824)

Dear Mr. Costanzo:

On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.

GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:

(a) A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b) A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c) A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.

In your letters dated October 13, 2008, April 27, 2009, and October 16, 2009, (ADAMS Accession Nos. ML082970263, ML091250298 and ML093000152 respectively), you provided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that for Duane Arnold your response to the GL is acceptable.

Consequently, your GL response is considered closed and no further information or action is requested of you. Notwithstanding, the NRC's Region III staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177,

C. Costanzo -2 "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (!\IRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.

Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv

C. Costanzo -2 "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented, or is in the process of acceptably implementing, the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01, and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3079.

Sincerely, IRA!

Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlDpr Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnw_MaiICTR Resource RidsNrrLATHarris Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn3MailCenter Resource MRazzaque, NRR RidsNrrPMDuaneArnold Resource WLyon, NRR DBeaulieu, NRR ADAMS ACCESSION NO.: ML093431085 *Memo dated 12/4/09 OFFICE NRRlLPL3-1/ PM NRRlLPL3-1/ LA NRRlSRXB/BC* NRRlLPL3-1/ BC NAME KFeintuch THarris GCranston RPascarelli DATE 12/14/09 12/10/09 12/04/09 12/16/09 OFFICIAL RECORD COPY