ML101620010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/09/2010
| issue date = 08/09/2010
| title = Final Safety Evaluation for Nuclear Energy Institute Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)
| title = Final Safety Evaluation for Nuclear Energy Institute Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)
| author name = Blount T B
| author name = Blount T
| author affiliation = NRC/NRR/DPR
| author affiliation = NRC/NRR/DPR
| addressee name = Riley J H
| addressee name = Riley J
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket = PROJ0669, PROJ0689
| docket = PROJ0669, PROJ0689
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 9, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708  
{{#Wiki_filter:August 9, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708


==SUBJECT:==
==SUBJECT:==
FINAL SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD8005)  
FINAL SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD8005)


==Dear Mr. Riley:==
==Dear Mr. Riley:==


By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S. Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRC's review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.
By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S.
By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staff's RAIs and provided supplemental information in support of the NRC staff's review of TR MRP-169.
Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRCs review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.
By letter dated March 25, 2010, an NRC draft safety evaluation (SE) regarding our approval of TR MRP-169, Revision 1, was provided for your review and comment. By letters dated April 23, 2010 and June 9, 2010, NEI commented on the draft SE. The NRC staff's disposition of NEI's comments on the draft SE are discussed in the attachment to the final SE enclosed with this letter.
By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staffs RAIs and provided supplemental information in support of the NRC staffs review of TR MRP-169.
The NRC staff has found that TR MRP-169, Revision 1, is acceptable for referencing in licensing applications for pressurized water reactors to the extent specified and under the limitations delineated in the TR and in the enclosed final SE. The final SE defines the basis for our acceptance of the TR
By letter dated March 25, 2010, an NRC draft safety evaluation (SE) regarding our approval of TR MRP-169, Revision 1, was provided for your review and comment. By letters dated April 23, 2010 and June 9, 2010, NEI commented on the draft SE. The NRC staff's disposition of NEIs comments on the draft SE are discussed in the attachment to the final SE enclosed with this letter.
 
The NRC staff has found that TR MRP-169, Revision 1, is acceptable for referencing in licensing applications for pressurized water reactors to the extent specified and under the limitations delineated in the TR and in the enclosed final SE. The final SE defines the basis for our acceptance of the TR.
Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.  


J. Riley                                        Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.  
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
: 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
: 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely,
                                              /RA/
Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689


As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:  
==Enclosure:==
: 1. The RAIs and RAI responses can be included as an Appendix to the accepted version. 
: 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.


Sincerely,        /RA/  Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689
Final SE cc w/encl: See next page


==Enclosure:==
J. Riley                                              Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
Final SE  cc w/encl:  See next page Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.  
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.
 
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:  
: 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
: 1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
: 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
: 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely, /RA/ Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689  
Sincerely,
                                                        /RA/
Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689


==Enclosure:==
==Enclosure:==
Final SE cc w/encl:  See next page DISTRIBUTION
: PUBLIC PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley  RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao  T Lupold  H Rathbun R Hardies  J Collins  A Csontos DRudland EXTERNAL DISTRIBUTION:
vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.:      NRR-043 ML101620010 (Cover Letter); ML101660468 (Enclosure)
OFFICE PLPB/PM PLPB /LA DCI/CPNB PLPB/BC DPR/DD NAME TMensah EHylton TLupold JJoliceur TBlount DATE 6/ 24/10 6/ 23/10 7/27/10 8/5/10 8/9/10    OFFICIAL RECORD COPY Nuclear Energy Institute      Project No. 689 Electric Power Research Institute                                                      Project No. 669 cc:Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Nuclear Generation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708 arp@nei.org


Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708 jwr@nei.org Mr. Charles B. Brinkman  Washington Operations  ABB-Combustion Engineering, Inc.
Final SE cc w/encl: See next page DISTRIBUTION:
12300 Twinbrook Parkway, Suite 330 Rockville, MD  20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC  20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute  1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 cblarsen@epri.com
PUBLIC PLPB Reading File RidsNrrDpr            RidsNrrDprPlpb          RidsNrrPMTMensah RidsNrrLADBaxley              RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb      J Tsao            T Lupold          H Rathbun R Hardies          J Collins          A Csontos        DRudland EXTERNAL DISTRIBUTION:
vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.:          NRR-043 ML101620010 (Cover Letter); ML101660468 (Enclosure)
OFFICE        PLPB/PM            PLPB /LA          DCI/CPNB          PLPB/BC          DPR/DD NAME          TMensah            EHylton            TLupold          JJoliceur        TBlount DATE          6/ 24/10          6/ 23/10          7/27/10          8/5/10            8/9/10 OFFICIAL RECORD COPY


Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com
Nuclear Energy Institute                                  Project No. 689 Electric Power Research Institute                        Project No. 669 cc:
Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer        Mr. Chris Larsen Nuclear Generation                        Vice President and Chief Nuclear Officer Nuclear Energy Institute                  EPRI 1776 I Street, NW, Suite 400              3412 Hillview Avenue Washington, DC 20006-3708                Palo Alto, CA 94304-1338 arp@nei.org                              cblarsen@epri.com Mr. Jack Roe, Director                    Mr. David J. Modeen Security                                  Director, External Affairs Nuclear Energy Institute                  EPRI 1776 I Street, NW, Suite 400              1300 W. T. Harris Boulevard Washington, DC 20006-3708                Charlotte, NC 28262-8550 jwr@nei.org                              dmodeen@epri.com Mr. Charles B. Brinkman                  Dr. Sean Bushart Washington Operations                    EPRI ABB-Combustion Engineering, Inc.          3412 Hillview Avenue 12300 Twinbrook Parkway, Suite 330        Palo Alto, CA 94304-1338 Rockville, MD 20852                      sbushart@epri.com brinkmcb@westinghouse.com Mr. Kurt Edsinger Mr. James Gresham, Manager                EPRI Regulatory Compliance and Plant Licensing 3412 Hillview Avenue Westinghouse Electric Company            Palo Alto, CA 94304-1338 P.O. Box 355                              kedsinge@epri.com Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org


Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com}}
J. Riley                    Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com}}

Latest revision as of 17:11, 13 November 2019

Final Safety Evaluation for Nuclear Energy Institute Topical Report Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)
ML101620010
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 08/09/2010
From: Blount T
Division of Policy and Rulemaking
To: Jeffrey Riley
Nuclear Energy Institute
Mensah, Tanya NRR/DPR/PSPB 415-3610
References
MRP-169, TAC MD8005
Download: ML101620010 (5)


Text

August 9, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

FINAL SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD8005)

Dear Mr. Riley:

By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S.

Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRCs review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.

By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staffs RAIs and provided supplemental information in support of the NRC staffs review of TR MRP-169.

By letter dated March 25, 2010, an NRC draft safety evaluation (SE) regarding our approval of TR MRP-169, Revision 1, was provided for your review and comment. By letters dated April 23, 2010 and June 9, 2010, NEI commented on the draft SE. The NRC staff's disposition of NEIs comments on the draft SE are discussed in the attachment to the final SE enclosed with this letter.

The NRC staff has found that TR MRP-169, Revision 1, is acceptable for referencing in licensing applications for pressurized water reactors to the extent specified and under the limitations delineated in the TR and in the enclosed final SE. The final SE defines the basis for our acceptance of the TR.

J. Riley Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.

In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.

By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.

As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:

1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.

If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.

Sincerely,

/RA/

Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

Final SE cc w/encl: See next page

J. Riley Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.

In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.

By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.

As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:

1. The RAIs and RAI responses can be included as an Appendix to the accepted version.
2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.

If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.

Sincerely,

/RA/

Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689

Enclosure:

Final SE cc w/encl: See next page DISTRIBUTION:

PUBLIC PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao T Lupold H Rathbun R Hardies J Collins A Csontos DRudland EXTERNAL DISTRIBUTION:

vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.: NRR-043 ML101620010 (Cover Letter); ML101660468 (Enclosure)

OFFICE PLPB/PM PLPB /LA DCI/CPNB PLPB/BC DPR/DD NAME TMensah EHylton TLupold JJoliceur TBlount DATE 6/ 24/10 6/ 23/10 7/27/10 8/5/10 8/9/10 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Mr. Chris Larsen Nuclear Generation Vice President and Chief Nuclear Officer Nuclear Energy Institute EPRI 1776 I Street, NW, Suite 400 3412 Hillview Avenue Washington, DC 20006-3708 Palo Alto, CA 94304-1338 arp@nei.org cblarsen@epri.com Mr. Jack Roe, Director Mr. David J. Modeen Security Director, External Affairs Nuclear Energy Institute EPRI 1776 I Street, NW, Suite 400 1300 W. T. Harris Boulevard Washington, DC 20006-3708 Charlotte, NC 28262-8550 jwr@nei.org dmodeen@epri.com Mr. Charles B. Brinkman Dr. Sean Bushart Washington Operations EPRI ABB-Combustion Engineering, Inc. 3412 Hillview Avenue 12300 Twinbrook Parkway, Suite 330 Palo Alto, CA 94304-1338 Rockville, MD 20852 sbushart@epri.com brinkmcb@westinghouse.com Mr. Kurt Edsinger Mr. James Gresham, Manager EPRI Regulatory Compliance and Plant Licensing 3412 Hillview Avenue Westinghouse Electric Company Palo Alto, CA 94304-1338 P.O. Box 355 kedsinge@epri.com Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org

J. Riley Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com