{{#Wiki_filter:hnirit IH Pr D r)prn I U O bj ect.......v 1111* Initiate License Termination Plan (LTP) review process with the NRC" Provide overview of path forward-Schedule-Issues/Concerns
{{#Wiki_filter:hnirit IH   Pr D
* Methodology of Derived Concentration Guideline Levels (DCGLs)* Final Status Survey (FSS) release criteria Site Desc iptiOn..... .. .... .. .. .* ..." Humboldt Bay Power Plant.(HBPP)
r)prn I
Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor" HBPP Unit 3 operated commercially from August 1963 until July 1976" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS)3 i i .... a j .o ._.....Major Activte I'7,* HBGS completed construction and startup (2010)* Units I and 2 demolition (2010-2011)
U
* 60 Kv Switchyard (2012)* Reactor vessel removal (2012)* Removal and demolition of Unit 3 piping, components and structures (2010-2014)
 
* Site FSS (2015-2016) z-I W tFI Li ce nse Te r m i .n.atio Apply"lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders
1111 Obj ect.......v
§-r A strong foundation provides for defensible program a strong, 5
* Initiate License Termination Plan (LTP) review process with the NRC
__00 % -% '%6-A,-%0  
" Provide overview of path forward
.. %N I'----.......
  -   Schedule
i~ cense Term inati ion-Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA>Public Meeting>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6  
  -   Issues/Concerns
'LT F Sc.hedu I 'EkIVIi Develop DCGLs Complete LTP Meeting with NRC March 7, 2011 Write LTP In Progress I Submit LTP December 2011 7 3 LL&Issess M," Personal interviews of former HBPP personnel employed during Unit 3 operations" Documents reviewed-Plant operating reports and logs-Licensee Event Reports-Construction and as-built drawings-Maps and photographs
* Methodology of Derived Concentration Guideline Levels (DCGLs)
-Environmental and radiological characterization reports" Submit with LTP 8 aracterizat.ons" Characterization performed in 1997-MARSSIM based sampling survey" A comprehensive characterization effort performed in 2007-2008-Surface scans and fixed-point measurements
* Final Status Survey (FSS) release criteria
-Soil sampling and gamma walkovers" Ongoing characterization of the site-Excavation soil sampling-Cross-Contamination Prevention  
 
& Monitoring Plan 9 Formulate an initial list of potential nuclides yes no 10 DCGLs* ~ýtl Site-Specific S uite of Nuclides H-3 1-129 Pu-241 C-14 Cs-137 Am-241 Ni-59 Eu-152 Cm-243 Co-60 Eu-I 54 Cm-244 Ni-63 Np-237 Cm-245 Sr-90 Pu-238 Cm-246 Nb-94 Pu-239 Tc-99 Pu-240 11 DCGLs" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)* Humboldt Bay site essential to electrical needs in the area* No better site available in the region to locate generating stations-Infrastructure in place-Remote location-California Coastal Commission
Site Desc           . .   .. .* ..
-Environmental impact-Active Switchyard
                                ...       ..
-Transmission/Distribution
iptiOn
-Natural Gas 12 DCGLs... : .. :. ... :. , : ...... : :: ..-'I Scenarios 0 Building Surfaces-Industrial Worker-Parameters
                                              .... . ..
* Soils-Industrial Worker-Parameters 13 "evel op F S S .Proga.m rX 11* Develop HBPP Site-Specific FSS Procedures
" Humboldt Bay Power Plant.(HBPP) Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor
* Develop Technical Basis Documents as necessary to support FSS effort* Compi I e Su rvey Unit FSS Survey Packages for each Survey Area* Identify fin* Perform nE a I classifications for Survey Units.cessary reviews and approvals of FSS Survey Packages 14 I I Perftorm ..... F* Take isolation and controls of units* Perform FSS* Perform any investigations
" HBPP Unit 3 operated commercially from August 1963 until July 1976
* Perform Data Quality Assessment (DQA) on data* Formulate decision based on Data Quality Objectives (DQOs)* Archive data 15 Submit Final eports i t- a i .........  
" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS) 3
.... ...... .....m ' " " ' " "~1 e Write"Pilot Report"* Compile records when all Survey Units in a Survey Area complete* Write and submit Final Report for each Survey Area* Archive the report 16 u:Lture Interacti ons!II" Teleconference Meetings" Correspondence" Public Meeting(s) 17 NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company" PURPOSE and AGENDA rDiscuss results of first exe mption request*1 r;-Discuss proposed seco nd exe mption request 2 FIRST EXEMPTION REQUEST go- -- -bApril 1, 2010-PG&E Submits Request for 200,000 cu. ft.July 16, 2010-NRC Submits Questions rt July 29, 2010-NRC/PG&E Public Meeting r;7 August 1 2, 2010-PG&E Submits Revised Request v-, November 2, 2010-r December 16, 2010 NRC Approves-State of Idaho Concurs 3 FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date)4 SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.Basis for VolumeSimilar to First RequestConcentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/DisposalDose Estimates for Second Request.Submittal Expected in Mid-2011 5 CONCLUSIONS Con mments/Questions 6}}
 
i i Major Activte
            ....a j .o ._.....
I'7,
* HBGS completed construction and startup (2010)
* Units I and 2 demolition (2010-2011)
* 60 Kv Switchyard (2012)
* Reactor vessel removal (2012)
* Removal and demolition of Unit 3 piping, components and structures (2010-2014)
* Site FSS (2015-2016)                     z-I
 
W Li ce nse Te r m i .n.atio tFI Apply "lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders
§-r A strong foundation provides for a strong, defensible program 5
 
__00 % -% '%6-A,-%0 .. %N I' i~  cense Term inatiion-
        ----.......
Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA
>Public Meeting
>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6
 
I 'EkIVIi
            'LT F Sc.hedu Develop DCGLs     Complete LTP Meeting with NRC March 7, 2011 Write LTP     In Progress               I Submit LTP     December 2011 7
 
3 LL&Issess M,
" Personal interviews of former HBPP personnel employed during Unit 3 operations
" Documents reviewed
  - Plant operating reports and logs
  - Licensee Event Reports
  - Construction and as-built drawings
  - Maps and photographs
  - Environmental and radiological characterization reports
" Submit with LTP 8
 
aracterizat.ons
" Characterization performed in 1997
  - MARSSIM based sampling survey
" A comprehensive characterization effort performed in 2007-2008
  - Surface scans and fixed-point measurements
  - Soil sampling and gamma walkovers
" Ongoing characterization of the site
  - Excavation soil sampling
  - Cross-Contamination Prevention & Monitoring Plan 9
 
Formulate an initial list of potential nuclides yes no 10
 
DCGLs
                                    *~
ýtl Site-Specific S uite of Nuclides H-3         1-129     Pu-241 C-14       Cs-137     Am-241 Ni-59       Eu-152     Cm-243 Co-60       Eu-I 54   Cm-244 Ni-63     Np-237     Cm-245 Sr-90       Pu-238     Cm-246 Nb-94       Pu-239 Tc-99       Pu-240 11
 
DCGLs
" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)
* Humboldt Bay site essential to electrical needs in the area
* No better site available in the region to locate generating stations
  - Infrastructure in place
  - Remote location
  - California Coastal Commission
  - Environmental impact
  - Active Switchyard
  - Transmission/Distribution
  - Natural Gas 12
 
                                  * : .. :.,*,* :. . * .. :. , : . .   .... : :: ..-
'I DCGLs Scenarios 0 Building Surfaces
    - Industrial Worker
    - Parameters
* Soils
    - Industrial Worker
    - Parameters 13
 
rX 11 "evel   op FSS Proga.m         .
* Develop HBPP Site-Specific FSS Procedures
* Develop Technical Basis Documents as necessary to support FSS effort
* Compi Ie Su rvey Unit FSS Survey Packages for each Survey Area
* Identify fin a I classifications for Survey Units
* Perform nE.cessary reviews and approvals of FSS Survey Packages 14
 
II        Perftorm     ... F
* Take isolation and controls of units
* Perform FSS
* Perform any investigations
* Perform Data Quality Assessment (DQA) on data
* Formulate decision based on Data Quality Objectives (DQOs)
* Archive data 15
 
Submiti t- Final a i eports
                                          ......... . ..............
m ' " * " ' -* ""
    ~1 e Write "Pilot Report"
* Compile records when all Survey Units in a Survey Area complete
* Write and submit Final Report for each Survey Area
* Archive the report 16
 
!II u:Lture Interacti ons
" Teleconference Meetings
" Correspondence
" Public Meeting(s) 17
 
NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company"
 
PURPOSE and AGENDA rDiscuss results of first exe mption
*1 request r;-Discuss proposed seco nd exe mption request 2
 
FIRST EXEMPTION REQUEST go-                                         -- -b
*. April 1, 2010 -   PG&E Submits Request for 200,000 cu. ft.
July 16, 2010   - NRC Submits Questions rt July 29, 2010 - NRC/PG&E Public Meeting r;7 August 12, 2010- PG&E Submits Revised Request v-, November 2, 2010- NRC Approves r December 16, 2010 - State of Idaho Concurs 3
 
FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date) 4
 
SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.
* Basis for Volume
* Similar to First Request
*- Concentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/Disposal
* Dose Estimates for Second Request
  .Submittal Expected in Mid-2011 5
 
CONCLUSIONS Con mments/Questions 6}}

Revision as of 03:21, 13 November 2019

Presentation Slides from March 7, 2011, Meeting with Humboldt Bay Power Plant Unit 3, on Decommissioning, License Termination, & Alternate Disposal Exemption Request
ML110670527
Person / Time
Site: Humboldt Bay
Issue date: 03/07/2011
From:
Pacific Gas & Electric Co
To:
NRC/FSME
References
Download: ML110670527 (23)


Text

hnirit IH Pr D

r)prn I

U

1111 Obj ect.......v

  • Initiate License Termination Plan (LTP) review process with the NRC

" Provide overview of path forward

- Schedule

- Issues/Concerns

  • Methodology of Derived Concentration Guideline Levels (DCGLs)
  • Final Status Survey (FSS) release criteria

Site Desc . . .. .* ..

... ..

iptiOn

.... . ..

" Humboldt Bay Power Plant.(HBPP) Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor

" HBPP Unit 3 operated commercially from August 1963 until July 1976

" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS) 3

i i Major Activte

....a j .o ._.....

I'7,

  • HBGS completed construction and startup (2010)
  • Units I and 2 demolition (2010-2011)
  • Reactor vessel removal (2012)
  • Removal and demolition of Unit 3 piping, components and structures (2010-2014)
  • Site FSS (2015-2016) z-I

W Li ce nse Te r m i .n.atio tFI Apply "lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders

§-r A strong foundation provides for a strong, defensible program 5

__00 % -% '%6-A,-%0 .. %N I' i~ cense Term inatiion-


.......

Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA

>Public Meeting

>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6

I 'EkIVIi

'LT F Sc.hedu Develop DCGLs Complete LTP Meeting with NRC March 7, 2011 Write LTP In Progress I Submit LTP December 2011 7

3 LL&Issess M,

" Personal interviews of former HBPP personnel employed during Unit 3 operations

" Documents reviewed

- Plant operating reports and logs

- Licensee Event Reports

- Construction and as-built drawings

- Maps and photographs

- Environmental and radiological characterization reports

" Submit with LTP 8

aracterizat.ons

" Characterization performed in 1997

- MARSSIM based sampling survey

" A comprehensive characterization effort performed in 2007-2008

- Surface scans and fixed-point measurements

- Soil sampling and gamma walkovers

" Ongoing characterization of the site

- Excavation soil sampling

- Cross-Contamination Prevention & Monitoring Plan 9

Formulate an initial list of potential nuclides yes no 10

DCGLs

  • ~

ýtl Site-Specific S uite of Nuclides H-3 1-129 Pu-241 C-14 Cs-137 Am-241 Ni-59 Eu-152 Cm-243 Co-60 Eu-I 54 Cm-244 Ni-63 Np-237 Cm-245 Sr-90 Pu-238 Cm-246 Nb-94 Pu-239 Tc-99 Pu-240 11

DCGLs

" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)

  • Humboldt Bay site essential to electrical needs in the area
  • No better site available in the region to locate generating stations

- Infrastructure in place

- Remote location

- California Coastal Commission

- Environmental impact

- Active Switchyard

- Transmission/Distribution

- Natural Gas 12

  • : .. :.,*,* :. . * .. :. , : . . .... : :: ..-

'I DCGLs Scenarios 0 Building Surfaces

- Industrial Worker

- Parameters

  • Soils

- Industrial Worker

- Parameters 13

rX 11 "evel op FSS Proga.m .

  • Develop HBPP Site-Specific FSS Procedures
  • Develop Technical Basis Documents as necessary to support FSS effort
  • Compi Ie Su rvey Unit FSS Survey Packages for each Survey Area
  • Identify fin a I classifications for Survey Units
  • Perform nE.cessary reviews and approvals of FSS Survey Packages 14

II Perftorm ... F

  • Take isolation and controls of units
  • Perform any investigations
  • Perform Data Quality Assessment (DQA) on data
  • Formulate decision based on Data Quality Objectives (DQOs)
  • Archive data 15

Submiti t- Final a i eports

......... . ..............

m ' " * " ' -* ""

~1 e Write "Pilot Report"

  • Compile records when all Survey Units in a Survey Area complete
  • Write and submit Final Report for each Survey Area
  • Archive the report 16

!II u:Lture Interacti ons

" Teleconference Meetings

" Correspondence

" Public Meeting(s) 17

NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company"

PURPOSE and AGENDA rDiscuss results of first exe mption

  • 1 request r;-Discuss proposed seco nd exe mption request 2

FIRST EXEMPTION REQUEST go- -- -b

  • . April 1, 2010 - PG&E Submits Request for 200,000 cu. ft.

July 16, 2010 - NRC Submits Questions rt July 29, 2010 - NRC/PG&E Public Meeting r;7 August 12, 2010- PG&E Submits Revised Request v-, November 2, 2010- NRC Approves r December 16, 2010 - State of Idaho Concurs 3

FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date) 4

SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.

  • Basis for Volume
  • Similar to First Request
  • - Concentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/Disposal
  • Dose Estimates for Second Request

.Submittal Expected in Mid-2011 5

CONCLUSIONS Con mments/Questions 6