ML11237A013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Saporito T
| author name = Saporito T
| author affiliation = Saprodani Associates
| author affiliation = Saprodani Associates
| addressee name = Jaczko G B
| addressee name = Jaczko G
| addressee affiliation = NRC/Chairman
| addressee affiliation = NRC/Chairman
| docket = 05000352, 05000353
| docket = 05000352, 05000353
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:EDO Principal Correspondence Control FROM: DUE: / /EDO CONTROL: G20110628 DOC DT: 08/20/11 FINAL REPLY: Thomas Saporito Saprodani Associates TO: Chairman Jaczko FOR SIGNATURE OF :** GRN **CRC NO: DESC: ROUTING: Follow-up to 2.206 -Limerick (EDATS: OEDO-2011-0582)
{{#Wiki_filter:EDO Principal Correspondence Control FROM:                   DUE:   /   /               EDO CONTROL: G20110628 DOC DT: 08/20/11 FINAL REPLY:
DATE: 08/24/11 Borchardt Weber Virgilio Ash Mamish OGC/GC Dean, RI Burns, OGC Mensah, NRR Banic, NRR Scott, OGC Bowman, OEDO ASSIGNED TO: NRR CONTACT: Leeds SPECIAL INSTRUCTIONS OR REMARKS: For Appropriate Action.Ref. G20110570.
Thomas Saporito Saprodani Associates TO:
fý ak 11 Lý00 -0 0 1 E-flb ~cxoED-EDATS Number: OEDO-2011-0582 Source: OEDO Ge neala Assigned To: NRR Other Assignees:
Chairman Jaczko FOR SIGNATURE OF :                 ** GRN **             CRC NO:
DESC:                                                   ROUTING:
Follow-up to 2.206 - Limerick                           Borchardt (EDATS: OEDO-2011-0582)                               Weber Virgilio Ash Mamish OGC/GC DATE:   08/24/11                                         Dean, RI Burns, OGC ASSIGNED TO:            CONTACT:                          Mensah, NRR Banic, NRR NRR            Leeds                        Scott, OGC Bowman, OEDO SPECIAL INSTRUCTIONS OR REMARKS:
For Appropriate Action.
Ref. G20110570.
f
        ýak 11 Lý00 -0 0 1                                           E-flb ~cxoED-
 
EDATS Number: OEDO-2011-0582                                                                 Source: OEDO Ge neala Assigned To: NRR                                                                       OEDO Due Date: NONE Other Assignees:                                                                       SECY Due Date: NONE


==Subject:==
==Subject:==
Follow-up to 2.206 -Limerick
Follow-up to 2.206 - Limerick


== Description:==
== Description:==


OEDO Due Date: NONE SECY Due Date: NONE CC Routing: Region[, OGC: Tanya..Mensahiinrc.gov; Merrilee.1Banic@nrc.gov; Catherine.Scort(tnrc.gov ADAMS Accession Numbers -Incoming:
CC Routing: Region[, OGC: Tanya..Mensahiinrc.gov; Merrilee.1Banic@nrc.gov; Catherine.Scort(tnrc.gov ADAMS Accession Numbers - Incoming: NONE                                             Response/Package: NONE IOte
NONE Response/Package:
* Inor       atio Cross Reference Number: G20110628                                                             Staff Initiated: NO Related Task:                                                                              Recurring Item: NO File Routing: EDATS                                                                Agency Lesson Learned: NO OEDO Monthly Report Item: NO Prcs Ia         Infomaio Action Type: Appropriate Action                                                               Priority: Medium Sensitivity: None Signature Level: No Signature Required                                                             Urgency: NO Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: For Appropriate Action.
NONE I
Ref. G201 10570.
* Ote Inor atio Cross Reference Number: G20110628 Related Task: File Routing: EDATS Staff Initiated:
Doumn II         Ifration Originator Name: Thomas Saporito                                                   Date of Incoming: 8/20/20 11 Originating Organization: Saprodani Associates                  Document Received by OEDO Date: 8/24/201 I Addressee: Chairman Jaczko                                    Date Response Requested by Originator: NONE Incoming Task Received: Letter Page   1 ofI
NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO Ia Prcs Infomaio Action Type: Appropriate Action Signature Level: No Signature Required Approval Level: No Approval Required OEDO Concurrence:
 
NO OCM Concurrence:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Aug 22, 2011 15:2 7 PAPER NUMBER:     LTR-1 1-0499                             LOGGING DATE: 08/22/2011 ACTION OFFICE:    EDO 6&-fJ,         )ao AUTHOR:           Thomas Saporito AFFILIATION:     FL ADDRESSEE:       Gregory Jaczko
NO OCA Concurrence:
NO Special Instructions:
For Appropriate Action.Priority:
Medium Sensitivity:
None Urgency: NO Ref. G201 10570.II Doumn Ifration Originator Name: Thomas Saporito Originating Organization:
Saprodani Associates Addressee:
Chairman Jaczko Incoming Task Received:
Letter Date of Incoming:
8/20/20 11 Document Received by OEDO Date: 8/24/201 I Date Response Requested by Originator:
NONE Page 1 ofI OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Aug 22, 2011 15:2 7 PAPER NUMBER: ACTION OFFICE: LTR-1 1-0499 EDO LOGGING DATE: 08/22/2011 6&-fJ, )ao AUTHOR: AFFILIATION:
ADDRESSEE:


==SUBJECT:==
==SUBJECT:==
ACTION: DISTRIBUTION:
Limerick Generating Station 2.206 ACTION:           Appropriate DISTRIBUTION:
LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: Thomas Saporito FL Gregory Jaczko Limerick Generating Station 2.206 Appropriate 08/20/2011 No 2.206 Petition NOTES: FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:
LETTER DATE:     08/20/2011 ACKNOWLEDGED      No SPECIAL HANDLING: 2.206 Petition NOTES:
Post Office Box 8413 Telephone:  
FILE LOCATION:   ADAMS DATE DUE:                                         DATE SIGNED:
(561) 972-8363 Jupiter, Florida 33468-8413 thomas@saprodani-associates.com August 20th, 2011 Hon. Gregory B. Jaczko, Chairman U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 In re: NRC, Harold X Chernoff, Letter DatedAugust 17,2011 -2.206 Petition -Limerick Generating Station
 
Post Office Box 8413                                             Telephone: (561) 972-8363 Jupiter, Florida 33468-8413                                       thomas@saprodani-associates.com August 20th, 2011 Hon. Gregory B. Jaczko, Chairman U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 In re: NRC, HaroldX Chernoff,Letter DatedAugust17,2011 - 2.206 Petition - Limerick GeneratingStation


==Dear Chairman Jaczko:==
==Dear Chairman Jaczko:==
On this date, the undersigned received a letter dated August 17, 2011, authored by Harold K. Chernoff' (Chemoff), Chief, Plant Licensing Branch I-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation for the U.S. Nuclear Regulatory Commission (NRC). The Chernoff letter advises that the NRC staff refused to accept the undersigned's August 1st, 2011, 2.206 Petition filed with the NRC seeking enforcement action against the Limerick Generating Station (LGS) for the sole reason that::... The license renewal process contains an opportunity for hearing pursuant to 1O CFR 54.27, and hence provides you with a proceeding through which your concerns could be addressed For this reason, your request does not meet the criteria for acceptance." Id, at 1.However, the undersigned' 2.206 petition was filed with the NRC prior to the hearing process identified by the NRC staff. Moreover, the NRC staff is NOT correct in stating that the undersigned's concerns can be addressed via a hearing request under 10 CFR 54.27 -simply because the undersigned does not have requisite standing to intervene in such a proceeding.
 
Thus, the NRC is required under MD 8.11 to accept the undersigned's August 1st, 2011, petition filed under 10 C.F.R. 2.206 as a matter of law.Please ORDER your NRC staff to accept the above-referenced petition accordingly.
On this date, the undersigned received a letter dated August 17, 2011, authored by Harold K. Chernoff' (Chemoff), Chief, Plant Licensing Branch I-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation for the U.S. Nuclear Regulatory Commission (NRC). The Chernoff letter advises that the NRC staff refused to accept the undersigned's August 1st, 2011, 2.206 Petition filed with the NRC seeking enforcement action against the Limerick Generating Station (LGS) for the sole reason that:
Kind regards, Senior Consultant 1 A copy of the Chernoff letter is attached.EDO --G20110628 REQU 4 UNITED STATES o NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17, 2011 Mr. Thomas Saporito Post Office Box 8413 Jupiter, FL 33468-8413
:... The license renewalprocess contains an opportunityfor hearingpursuantto 10 CFR 54.27, and hence providesyou with a proceedingthrough which your concerns could be addressed For this reason,your request does not meet the criteriafor acceptance."
Id, at 1.
However, the undersigned' 2.206 petition was filed with the NRC prior to the hearing process identified by the NRC staff. Moreover, the NRC staff is NOT correct in stating that the undersigned's concerns can be addressed via a hearing request under 10 CFR 54.27 - simply because the undersigned does not have requisite standing to intervene in such a proceeding.
Thus, the NRC is required under MD 8.11 to accept the undersigned's August 1st, 2011, petition filed under 10 C.F.R. 2.206 as a matter of law.
Please ORDER your NRC staff to accept the above-referenced petition accordingly.
Kind regards, Senior Consultant 1 A copy of the Chernoff letter is attached.
EDO -- G20110628
 
REQU 4                                       UNITED STATES o                       NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17, 2011 Mr. Thomas Saporito Post Office Box 8413 Jupiter, FL 33468-8413


==Dear Mr. Saporito:==
==Dear Mr. Saporito:==
Your petition request dated August 1, 2011, and addressed to the Chairman, U.S. Nuclear Regulatory Commission (NRC or the Commission), was referred to the Office of Nuclear Reactor Regulation.
 
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.206 of the Commission's regulations, you requested that the NRC take escalated enforcement action against Exelon Generation Company, LLC, the licensee for Limerick Generating Station (LGS), Units 1 and 2, and deny the licensee's application for renewal of Operating Licenses NPF-39 and NPF-85. As a basis for your request, you indicated the following:
Your petition request dated August 1, 2011, and addressed to the Chairman, U.S. Nuclear Regulatory Commission (NRC or the Commission), was referred to the Office of Nuclear Reactor Regulation. Pursuant to Title 10 of the Code of FederalRegulations (10 CFR), Section 2.206 of the Commission's regulations, you requested that the NRC take escalated enforcement action against Exelon Generation Company, LLC, the licensee for Limerick Generating Station (LGS), Units 1 and 2, and deny the licensee's application for renewal of Operating Licenses NPF-39 and NPF-85. As a basis for your request, you indicated the following:
Petitioner contends here that the LGS Units 1 and 2 employ nuclear reactor vessels which have been in operation for a period of years sufficient to cause the metal in the nuclear reactor vessels to become dangerously brittle and subject to cracking or shattering from continued operations and stresses during an extended 20-year period beyond the original safety design basis for which the NRC granted the primary operating licenses identified above. Petitioner contends here that the licensee has not and cannot provide the NRC with sufficient and reliable test data to show that the material condition of the nuclear reactor vessels in question has not degraded and become dangerously brittle; or that continued operations of the nuclear reactors for 20-years beyond the initial 40-year license period will not cause the reactor vessels to crack or shatter and result in a Loss-of-Coolant Accident (LOCA) and cause harm to the health and safety of the public and to the environment at large.The NRC staff reviewed your request and in accordance with Management Directive (MD) 8.11,'Review Process for 10 CFR 2.206 Petitions," the staff has concluded that your request does not meet the criteria for review under 10 CFR 2.206. Per MD 8.11, the NRC will not review a request where there is a proceeding through which a petitioner is, or could be, a party, and through which the petitioners concerns could be addressed.
Petitioner contends here that the LGS Units 1 and 2 employ nuclear reactor vessels which have been in operation for a period of years sufficient to cause the metal in the nuclear reactor vessels to become dangerously brittle and subject to cracking or shattering from continued operations and stresses during an extended 20-year period beyond the original safety design basis for which the NRC granted the primary operating licenses identified above. Petitioner contends here that the licensee has not and cannot provide the NRC with sufficient and reliable test data to show that the material condition of the nuclear reactor vessels in question has not degraded and become dangerously brittle; or that continued operations of the nuclear reactors for 20-years beyond the initial 40-year license period will not cause the reactor vessels to crack or shatter and result in a Loss-of-Coolant Accident (LOCA) and cause harm to the health and safety of the public and to the environment at large.
More specifically, MD 8.11 also states that requests to deny a license application or amendment should initially be addressed in the context of the relevant licensing action, not under 10 CFR 2.206. The license renewal process contains an opportunity for hearing pursuant to 10 CFR 54.27, and hence provides you with a proceeding through which your concerns could be addressed.
The NRC staff reviewed your request and in accordance with Management Directive (MD) 8.11,
For this reason, your request does not meet the criteria for acceptance.
'Review Process for 10 CFR 2.206 Petitions,"the staff has concluded that your request does not meet the criteria for review under 10 CFR 2.206. Per MD 8.11, the NRC will not review a request where there is a proceeding through which a petitioner is, or could be, a party, and through which the petitioners concerns could be addressed. More specifically, MD 8.11 also states that requests to deny a license application or amendment should initially be addressed in the context of the relevant licensing action, not under 10 CFR 2.206. The license renewal process contains an opportunity for hearing pursuant to 10 CFR 54.27, and hence provides you with a proceeding through which your concerns could be addressed. For this reason, your request does not meet the criteria for acceptance.
T. Saporito Thank you for bringing this matter to the attention of the NRC. Please contact Peter Bamford, Project Manager for LGS, Units 1 and 2, if you have any questions regarding this action. Mr.Bamford may be reached at 301-415-2833.
 
Sincerely, a.rold K. C/hernoff, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv Jaegers, Cathy From: Sent: To: Cc:  
T. Saporito                                     Thank you for bringing this matter to the attention of the NRC. Please contact Peter Bamford, Project Manager for LGS, Units 1 and 2, if you have any questions regarding this action. Mr.
Bamford may be reached at 301-415-2833.
Sincerely, a.rold K. C/hernoff, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv
 
Jaegers, Cathy From:                     saporito3@gmail.com on behalf of Thomas Saporito [thomas@saprodani-associates.com]
Sent:                     Saturday, August 20, 2011 3:25 PM To:                       Jaczko, Gregory Cc:                       Bamford, Peter; DeMiranda, Oscar; Evans, Carolyn; Checkle, Melanie; NRCExecSec Resource


==Subject:==
==Subject:==
Attachments:
(Appeal) Limerick Generating Station - 2.206 petition Attachments:              2011.08.20 Letter to Jaczko.pdf
saporito3@gmail.com on behalf of Thomas Saporito [thomas@saprodani-associates.com]
Saturday, August 20, 2011 3:25 PM Jaczko, Gregory Bamford, Peter; DeMiranda, Oscar; Evans, Carolyn; Checkle, Melanie; NRCExecSec Resource (Appeal) Limerick Generating Station -2.206 petition 2011.08.20 Letter to Jaczko.pdf


==Dear Chairman Jaczko:==
==Dear Chairman Jaczko:==
Please find the attached letter in response to NRC Chernoff's letter in connection with the Limerick Generating Station and an enforcement petition filed with the NRC under 10 C.F.R. 2.206 Kind regards, Thomas Saporito, Senior Consultant Email: thomas(d~saprodani-associates.coiim Web: http://Saprodani-Associates.comn Post Office Box 8413, Jupiter, Florida 33468 Phone: (561) 972-8363 Fax: (561) 972-8363 We are an Advocate of GreenPeace USA 1}}
Please find the attached letter in response to NRC Chernoff's letter in connection with the Limerick Generating Station and an enforcement petition filed with the NRC under 10 C.F.R. 2.206 Kind regards, Thomas Saporito, Senior Consultant Email: thomas(d~saprodani-associates.coiim Web: http://Saprodani-Associates.comn Post Office Box 8413, Jupiter, Florida 33468 Phone: (561) 972-8363 Fax: (561) 972-8363 We are an Advocate of GreenPeace USA 1}}

Latest revision as of 16:34, 12 November 2019

G20110628/EDATS: OEDO-2011-0582 - Thomas Saporito Ltr. Re Follow-Up to 2.206 - Limerick
ML11237A013
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/20/2011
From: Saporito T
Saprodani Associates
To: Jaczko G
NRC/Chairman
References
G20110628, OEDO-2011-0582
Download: ML11237A013 (7)


Text

EDO Principal Correspondence Control FROM: DUE: / / EDO CONTROL: G20110628 DOC DT: 08/20/11 FINAL REPLY:

Thomas Saporito Saprodani Associates TO:

Chairman Jaczko FOR SIGNATURE OF : ** GRN ** CRC NO:

DESC: ROUTING:

Follow-up to 2.206 - Limerick Borchardt (EDATS: OEDO-2011-0582) Weber Virgilio Ash Mamish OGC/GC DATE: 08/24/11 Dean, RI Burns, OGC ASSIGNED TO: CONTACT: Mensah, NRR Banic, NRR NRR Leeds Scott, OGC Bowman, OEDO SPECIAL INSTRUCTIONS OR REMARKS:

For Appropriate Action.

Ref. G20110570.

f

ýak 11 Lý00 -0 0 1 E-flb ~cxoED-

EDATS Number: OEDO-2011-0582 Source: OEDO Ge neala Assigned To: NRR OEDO Due Date: NONE Other Assignees: SECY Due Date: NONE

Subject:

Follow-up to 2.206 - Limerick

Description:

CC Routing: Region[, OGC: Tanya..Mensahiinrc.gov; Merrilee.1Banic@nrc.gov; Catherine.Scort(tnrc.gov ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE IOte

  • Inor atio Cross Reference Number: G20110628 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Prcs Ia Infomaio Action Type: Appropriate Action Priority: Medium Sensitivity: None Signature Level: No Signature Required Urgency: NO Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: For Appropriate Action.

Ref. G201 10570.

Doumn II Ifration Originator Name: Thomas Saporito Date of Incoming: 8/20/20 11 Originating Organization: Saprodani Associates Document Received by OEDO Date: 8/24/201 I Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 ofI

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Aug 22, 2011 15:2 7 PAPER NUMBER: LTR-1 1-0499 LOGGING DATE: 08/22/2011 ACTION OFFICE: EDO 6&-fJ, )ao AUTHOR: Thomas Saporito AFFILIATION: FL ADDRESSEE: Gregory Jaczko

SUBJECT:

Limerick Generating Station 2.206 ACTION: Appropriate DISTRIBUTION:

LETTER DATE: 08/20/2011 ACKNOWLEDGED No SPECIAL HANDLING: 2.206 Petition NOTES:

FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:

Post Office Box 8413 Telephone: (561) 972-8363 Jupiter, Florida 33468-8413 thomas@saprodani-associates.com August 20th, 2011 Hon. Gregory B. Jaczko, Chairman U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 In re: NRC, HaroldX Chernoff,Letter DatedAugust17,2011 - 2.206 Petition - Limerick GeneratingStation

Dear Chairman Jaczko:

On this date, the undersigned received a letter dated August 17, 2011, authored by Harold K. Chernoff' (Chemoff), Chief, Plant Licensing Branch I-1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation for the U.S. Nuclear Regulatory Commission (NRC). The Chernoff letter advises that the NRC staff refused to accept the undersigned's August 1st, 2011, 2.206 Petition filed with the NRC seeking enforcement action against the Limerick Generating Station (LGS) for the sole reason that:

... The license renewalprocess contains an opportunityfor hearingpursuantto 10 CFR 54.27, and hence providesyou with a proceedingthrough which your concerns could be addressed For this reason,your request does not meet the criteriafor acceptance."

Id, at 1.

However, the undersigned' 2.206 petition was filed with the NRC prior to the hearing process identified by the NRC staff. Moreover, the NRC staff is NOT correct in stating that the undersigned's concerns can be addressed via a hearing request under 10 CFR 54.27 - simply because the undersigned does not have requisite standing to intervene in such a proceeding.

Thus, the NRC is required under MD 8.11 to accept the undersigned's August 1st, 2011, petition filed under 10 C.F.R. 2.206 as a matter of law.

Please ORDER your NRC staff to accept the above-referenced petition accordingly.

Kind regards, Senior Consultant 1 A copy of the Chernoff letter is attached.

EDO -- G20110628

REQU 4 UNITED STATES o NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17, 2011 Mr. Thomas Saporito Post Office Box 8413 Jupiter, FL 33468-8413

Dear Mr. Saporito:

Your petition request dated August 1, 2011, and addressed to the Chairman, U.S. Nuclear Regulatory Commission (NRC or the Commission), was referred to the Office of Nuclear Reactor Regulation. Pursuant to Title 10 of the Code of FederalRegulations (10 CFR), Section 2.206 of the Commission's regulations, you requested that the NRC take escalated enforcement action against Exelon Generation Company, LLC, the licensee for Limerick Generating Station (LGS), Units 1 and 2, and deny the licensee's application for renewal of Operating Licenses NPF-39 and NPF-85. As a basis for your request, you indicated the following:

Petitioner contends here that the LGS Units 1 and 2 employ nuclear reactor vessels which have been in operation for a period of years sufficient to cause the metal in the nuclear reactor vessels to become dangerously brittle and subject to cracking or shattering from continued operations and stresses during an extended 20-year period beyond the original safety design basis for which the NRC granted the primary operating licenses identified above. Petitioner contends here that the licensee has not and cannot provide the NRC with sufficient and reliable test data to show that the material condition of the nuclear reactor vessels in question has not degraded and become dangerously brittle; or that continued operations of the nuclear reactors for 20-years beyond the initial 40-year license period will not cause the reactor vessels to crack or shatter and result in a Loss-of-Coolant Accident (LOCA) and cause harm to the health and safety of the public and to the environment at large.

The NRC staff reviewed your request and in accordance with Management Directive (MD) 8.11,

'Review Process for 10 CFR 2.206 Petitions,"the staff has concluded that your request does not meet the criteria for review under 10 CFR 2.206. Per MD 8.11, the NRC will not review a request where there is a proceeding through which a petitioner is, or could be, a party, and through which the petitioners concerns could be addressed. More specifically, MD 8.11 also states that requests to deny a license application or amendment should initially be addressed in the context of the relevant licensing action, not under 10 CFR 2.206. The license renewal process contains an opportunity for hearing pursuant to 10 CFR 54.27, and hence provides you with a proceeding through which your concerns could be addressed. For this reason, your request does not meet the criteria for acceptance.

T. Saporito Thank you for bringing this matter to the attention of the NRC. Please contact Peter Bamford, Project Manager for LGS, Units 1 and 2, if you have any questions regarding this action. Mr.

Bamford may be reached at 301-415-2833.

Sincerely, a.rold K. C/hernoff, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: Distribution via Listserv

Jaegers, Cathy From: saporito3@gmail.com on behalf of Thomas Saporito [thomas@saprodani-associates.com]

Sent: Saturday, August 20, 2011 3:25 PM To: Jaczko, Gregory Cc: Bamford, Peter; DeMiranda, Oscar; Evans, Carolyn; Checkle, Melanie; NRCExecSec Resource

Subject:

(Appeal) Limerick Generating Station - 2.206 petition Attachments: 2011.08.20 Letter to Jaczko.pdf

Dear Chairman Jaczko:

Please find the attached letter in response to NRC Chernoff's letter in connection with the Limerick Generating Station and an enforcement petition filed with the NRC under 10 C.F.R. 2.206 Kind regards, Thomas Saporito, Senior Consultant Email: thomas(d~saprodani-associates.coiim Web: http://Saprodani-Associates.comn Post Office Box 8413, Jupiter, Florida 33468 Phone: (561) 972-8363 Fax: (561) 972-8363 We are an Advocate of GreenPeace USA 1