| issue date = 09/13/2011
| issue date = 09/13/2011
| title = PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
| title = PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
| author name = Post J K, Repka D A
| author name = Post J, Repka D
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| author affiliation = Pacific Gas & Electric Co, Winston & Strawn, LLP
| addressee name = Abramson P B, Karlin A S, Trikouros N G
| addressee name = Abramson P, Karlin A, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 13, 2011 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel  
{{#Wiki_filter:September 13, 2011 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR RE: Status Report


U.S. Nuclear Regulatory Commission Two White Flint North
==Dear Administrative Judges:==


11545 Rockville Pike Mail Stop: T-3F23
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP. See Attached Schedule. PG&E appreciates that, in the absence of definite dates for completing the milestones related to the seismic studies, the Licensing Board is unable to establish a meaningful adjudicatory schedule pursuant to 10 C.F.R. § 2.332(c). For this reason, PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates will be modified as more accurate information becomes available.
 
PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process. For example, PG&E is working with the relevant State and federal agencies to accelerate efforts to obtain permits needed to complete the 3D seismic studies.
Rockville, MD  20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50-275-LR and 50-323-LR RE:  Status Report


==Dear Administrative Judges:==
As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP.
See Attached Schedule. PG&E appreciates that, in the absence of definite dates for completing the milestones related to the seismic studies, the Licensing Board is unable to establish a meaningful adjudicatory schedule pursuant to 10 C.F.R. § 2.332(c). For this reason, PG&E will continue to provide specific dates in the monthly reports to the extent practi cable, recognizing that these dates will be modified as more accurate information becomes available.
PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process. For example, PG&E is working with the relevant State and federal agencies to accelerate efforts to obtain permits needed to complete the 3D seismic studies.
While PG&E expects the seismic studies to be completed and a report issued no later than December 2015, any actual delay to this proceeding may be less than the 52 months referenced in the June 7, 2011 Order.
While PG&E expects the seismic studies to be completed and a report issued no later than December 2015, any actual delay to this proceeding may be less than the 52 months referenced in the June 7, 2011 Order.
Executed in accord with 10 CFR 2.304(d),  
Executed in accord with 10 CFR 2.304(d),
    /s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company  
                                                /s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com
 
                                                /s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc:   Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)
77 Beale St., B30A  
 
San Francisco, CA 94105  
 
(415) 973-9809 jklm@pge.com
 
    /s/ signed electronically by David A. Repka Winston & Strawn LLP  
 
1700 K Street, NW  
 
Washington, DC 20006  
 
(202) 282-5726  
 
drepka@winston.com
 
cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)  


Pacific Gas and Electric Company Best Estimate Schedule for Seismi c Studies as of September 1, 2011 Description of Activity Date Shoreline Fault Submit Final Report to the NRC January 2011 (a) NRC Review Complete December 2011 Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands Commission (CSLC)
Pacific Gas and Electric Company Best Estimate Schedule for Seismic Studies as of September 1, 2011 Description of Activity                         Date Shoreline Fault Submit Final Report to the NRC                                     January 2011(a)
May 6, 2011 (a) Permits Issued November 2011 Installation Complete December 2011 2D/3D Low Energy Marine Studies Permits Issued N/A Surveys Complete(b) December 2011 Seismic Data Processing Including Preliminary Report June 2012 2D Onshore High Energy Studies Permit Pre-Application Meeting May 4, 2011 (a) Use Permits Issued Not Required Surveys Complete December 2011 Seismic Data Processing/Preliminary Report June 2012 3D High Energy Marine Studies Permit Application Submitted to California State Lands Commission April 29, 2011 (a) CSLC Environmental Impact Report (EIR) Scoping Meeting July 21, 2011(a) Permits Issued August 2012 Surveys Complete December 2012 Preliminary Evaluation April 2013 Issue Final Seismic Report August 2013 CZMA or Coastal Consistency File Coastal Development Permit April 2013 Coastal Consistency Issued December 2014 Note: (a) - Actual Date Completed (b) - Activity is in Progress SF:316175.1}}
NRC Review Complete                                               December 2011 Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands May 6, 2011(a)
Commission (CSLC)
Permits Issued                                                     November 2011 Installation Complete                                             December 2011 2D/3D Low Energy Marine Studies Permits Issued                                                     N/A Surveys Complete(b)                                               December 2011 Seismic Data Processing Including Preliminary Report               June 2012 2D Onshore High Energy Studies Permit Pre-Application Meeting                                     May 4, 2011(a)
Use Permits Issued                                                 Not Required Surveys Complete                                                   December 2011 Seismic Data Processing/Preliminary Report                         June 2012 3D High Energy Marine Studies Permit Application Submitted to California State Lands April 29, 2011(a)
Commission CSLC Environmental Impact Report (EIR) Scoping Meeting             July 21, 2011(a)
Permits Issued                                                     August 2012 Surveys Complete                                                   December 2012 Preliminary Evaluation                                             April 2013 Issue Final Seismic Report                                         August 2013 CZMA or Coastal Consistency File Coastal Development Permit                                   April 2013 Coastal Consistency Issued                                         December 2014 (a)
Note:      - Actual Date Completed (b)
            - Activity is in Progress SF:316175.1}}

Latest revision as of 14:52, 12 November 2019

PG&E Monthly Report Specifying Its Current Best Estimate of the Dates on Which It Expects to Complete Milestones Related to 3D Seismic Studies for Diablo Canyon and Coastal Zone Consistency Certification Associated with NRC License Renewal
ML11256A210
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/13/2011
From: Post J, Repka D
Pacific Gas & Electric Co, Winston & Strawn, LLP
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21001, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML11256A210 (3)


Text

September 13, 2011 by Electronic Information Exchange Administrative Judge Alex S. Karlin Administrative Judge Nicholas G. Trikouros Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop: T-3F23 Rockville, MD 20852 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Status Report

Dear Administrative Judges:

As directed by the Licensing Board Order of June 7, 2011, Pacific Gas and Electric Company (PG&E) hereby provides its monthly report specifying its current best estimate of the dates on which it expects to complete milestones related to 3D seismic studies for Diablo Canyon Power Plant (DCPP) and the coastal zone consistency certification associated with NRC license renewal for DCPP. See Attached Schedule. PG&E appreciates that, in the absence of definite dates for completing the milestones related to the seismic studies, the Licensing Board is unable to establish a meaningful adjudicatory schedule pursuant to 10 C.F.R. § 2.332(c). For this reason, PG&E will continue to provide specific dates in the monthly reports to the extent practicable, recognizing that these dates will be modified as more accurate information becomes available.

PG&E wishes to assure the Licensing Board that it is making every effort to minimize the extent of the delay in the NRC license renewal process. For example, PG&E is working with the relevant State and federal agencies to accelerate efforts to obtain permits needed to complete the 3D seismic studies.

While PG&E expects the seismic studies to be completed and a report issued no later than December 2015, any actual delay to this proceeding may be less than the 52 months referenced in the June 7, 2011 Order.

Executed in accord with 10 CFR 2.304(d),

/s/ signed electronically by Jennifer K. Post Attorney Pacific Gas and Electric Company 77 Beale St., B30A San Francisco, CA 94105 (415) 973-9809 jklm@pge.com

/s/ signed electronically by David A. Repka Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 (202) 282-5726 drepka@winston.com cc: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Service List (via Electronic Information Exchange)

Pacific Gas and Electric Company Best Estimate Schedule for Seismic Studies as of September 1, 2011 Description of Activity Date Shoreline Fault Submit Final Report to the NRC January 2011(a)

NRC Review Complete December 2011 Ocean Bottom Seismometer Study Permit Application Submitted to California State Lands May 6, 2011(a)

Commission (CSLC)

Permits Issued November 2011 Installation Complete December 2011 2D/3D Low Energy Marine Studies Permits Issued N/A Surveys Complete(b) December 2011 Seismic Data Processing Including Preliminary Report June 2012 2D Onshore High Energy Studies Permit Pre-Application Meeting May 4, 2011(a)

Use Permits Issued Not Required Surveys Complete December 2011 Seismic Data Processing/Preliminary Report June 2012 3D High Energy Marine Studies Permit Application Submitted to California State Lands April 29, 2011(a)

Commission CSLC Environmental Impact Report (EIR) Scoping Meeting July 21, 2011(a)

Permits Issued August 2012 Surveys Complete December 2012 Preliminary Evaluation April 2013 Issue Final Seismic Report August 2013 CZMA or Coastal Consistency File Coastal Development Permit April 2013 Coastal Consistency Issued December 2014 (a)

Note: - Actual Date Completed (b)

- Activity is in Progress SF:316175.1