| issue date = 02/24/2012 | | issue date = 02/24/2012 | ||
| title = IR 05000083-12-202 on January 30 Thru February 2, 2012 at the University of Florida - Transmittal Letter for NRC Security-Related | | title = IR 05000083-12-202 on January 30 Thru February 2, 2012 at the University of Florida - Transmittal Letter for NRC Security-Related | ||
| author name = Eads J | | author name = Eads J | ||
| author affiliation = NRC/NRR/DPR/PRTB | | author affiliation = NRC/NRR/DPR/PRTB | ||
| addressee name = Jordan K | | addressee name = Jordan K | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ary 24, 2012 | ||
==SUBJECT:== | |||
UNIVERSITY OF FLORIDA TEST REACTOR - NRC SECURITY INSPECTION REPORT NO. 50-083/2012-202 | |||
SUBJECT: UNIVERSITY OF FLORIDA TEST REACTOR - NRC SECURITY INSPECTION REPORT NO. 50-083/2012-202 | |||
==Dear Dr. Jordan:== | ==Dear Dr. Jordan:== | ||
The U.S. Nuclear Regulatory Commission (NRC, the Commission) conducted a routine announced security inspection on January 30, 2012 thru February 3, 2012, at your University of Florida Test Reactor facility (Inspection Report No. 50-083/2012-202). The enclosed report documents the inspection results, which were discussed on February 3, 2012, with you and other members of your staff. | The U.S. Nuclear Regulatory Commission (NRC, the Commission) conducted a routine announced security inspection on January 30, 2012 thru February 3, 2012, at your University of Florida Test Reactor facility (Inspection Report No. 50-083/2012-202). The enclosed report documents the inspection results, which were discussed on February 3, 2012, with you and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, implementation of certain compensatory measures, and compliance with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection, no findings of significance were identified. No response to this letter is required. | Based on the results of this inspection, no findings of significance were identified. No response to this letter is required. | ||
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, | In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)). | ||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of the enclosure will not be available for public inspection. Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.Donohue@nrc.gov. | ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of the enclosure will not be available for public inspection. Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.Donohue@nrc.gov. | ||
Sincerely,/RA/ | Sincerely, | ||
Johnny H. Eads, Jr., Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-083 License No. R-56 | /RA/ | ||
Johnny H. Eads, Jr., Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-083 License No. R-56 NOTICE: The attachment contains Security-Related Information. Upon separation of the attachment, this Enclosure: NRC Security Inspection Report letter and enclosure are DECONTROLLED. | |||
Dean Cammy Abernathy University of Florida College of Engineering PO Box 116550 Gainesville, FL 32611 February 24, 2012 D | No. 50-083/2012-202 cc: w/o encl: See next page University of Florida Docket No. 50-83 cc: | ||
Dr. David Hintenlang, Chairman Nuclear & Radiological Engineering Department University of Florida 202 Nuclear Sciences Center PO Box 118300 Gainesville, FL 32601-8300 Administrator Department of Environmental Regulation Power Plant of Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 Chief, Bureau of Radiation Control Department of Health 4052 Bald Cypress Way Tallahassee, FL 32399-1741 Test, Research and Training Reactor Newsletter Director of Nuclear Facilities University of Florida 202 Nuclear Science Building Gainesville, FL 32611-8300 Brian Shea, Reactor Manager University of Florida Nuclear & Radiological Engineering Dept 202 Nuclear Sciences Center P.O. Box 118300 Gainesville, FL 32611-8300 Dean Cammy Abernathy University of Florida College of Engineering PO Box 116550 Gainesville, FL 32611 February 24, 2012 D | |||
}} | }} |
Latest revision as of 08:55, 12 November 2019
ML120540011 | |
Person / Time | |
---|---|
Site: | 05000083 |
Issue date: | 02/24/2012 |
From: | Johnny Eads Research and Test Reactors Branch B |
To: | Jordan K Univ of Florida |
Donohue, J N, NRR/DPR, 4153163 | |
Shared Package | |
ML120540010 | List: |
References | |
IR-12-202 | |
Download: ML120540011 (3) | |
Text
ary 24, 2012
SUBJECT:
UNIVERSITY OF FLORIDA TEST REACTOR - NRC SECURITY INSPECTION REPORT NO. 50-083/2012-202
Dear Dr. Jordan:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) conducted a routine announced security inspection on January 30, 2012 thru February 3, 2012, at your University of Florida Test Reactor facility (Inspection Report No. 50-083/2012-202). The enclosed report documents the inspection results, which were discussed on February 3, 2012, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, implementation of certain compensatory measures, and compliance with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of the enclosure will not be available for public inspection. Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.Donohue@nrc.gov.
Sincerely,
/RA/
Johnny H. Eads, Jr., Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-083 License No. R-56 NOTICE: The attachment contains Security-Related Information. Upon separation of the attachment, this Enclosure: NRC Security Inspection Report letter and enclosure are DECONTROLLED.
No. 50-083/2012-202 cc: w/o encl: See next page University of Florida Docket No. 50-83 cc:
Dr. David Hintenlang, Chairman Nuclear & Radiological Engineering Department University of Florida 202 Nuclear Sciences Center PO Box 118300 Gainesville, FL 32601-8300 Administrator Department of Environmental Regulation Power Plant of Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 Chief, Bureau of Radiation Control Department of Health 4052 Bald Cypress Way Tallahassee, FL 32399-1741 Test, Research and Training Reactor Newsletter Director of Nuclear Facilities University of Florida 202 Nuclear Science Building Gainesville, FL 32611-8300 Brian Shea, Reactor Manager University of Florida Nuclear & Radiological Engineering Dept 202 Nuclear Sciences Center P.O. Box 118300 Gainesville, FL 32611-8300 Dean Cammy Abernathy University of Florida College of Engineering PO Box 116550 Gainesville, FL 32611 February 24, 2012 D