ML12181A286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 28, 2012 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:   Northern States Power Company, Minnesota Name of Facility: Prairie Island Nuclear Generating Plant, Unit 1 and Unit 2  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 28, 2012 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:                   Northern States Power Company, Minnesota Name of Facility:                   Prairie Island Nuclear Generating Plant, Unit 1 and Unit 2 Docket No:                          50-282, 50-306, and 72-010 Date and Time of Meeting:          Tuesday, July 17, 2012, 6:00 p.m. to 9:00 p.m. (CDT)
Location of Meeting:                Red Wing High School 2451 Eagle Ridge Drive Red Wing, MN 55089 Purpose of Meeting:                Discuss NRC end-of-cycle assessment of Prairie Island Nuclear Generating Plant, Unit 1 and 2, performance for the 2011 calendar year. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Category:                          This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees:
K. Riemer, Chief, DRP Branch 2 K. Stoedter, Senior Resident Inspector P. Zurawski, Resident Inspector Licensee Attendees:
J. Molden, Site Vice President K. Davison, Site Director P. Huffman, Site Engineering Director


Docket No: 50-282, 50-306, and 72-010 Date and Time of Meeting: Tuesday, July 17, 2012, 6:00 p.m. to 9:00 p.m. (CDT)
Notice of Significant                              Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, July 12, 2012.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.
Approved By: /RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact:     Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov


Location of Meeting:  Red Wing High School  2451 Eagle Ridge Drive  Red Wing, MN  55089 Purpose of Meeting: Discuss NRC end-of-cycle assessment of Prairie Island Nuclear Generating Plant, Unit 1 and 2, performance for the 2011 calendar year. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.
Notice of Significant                                                           Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, July 12, 2012.
Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact.
NRC Attendees
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
: K. Riemer, Chief, DRP Branch 2 K. Stoedter, Senior Resident Inspector P. Zurawski, Resident Inspector Licensee Attendees
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.
: J. Molden, Site Vice President K. Davison, Site Director P. Huffman, Site Engineering Director Notice of Significant   Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, July 12, 2012.
Approved By: /RA/
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact:                     Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov DISTRIBUTION:
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. Approved By: /RA/
See next page DOCUMENT NAME: Prairie Island 2011 EOC Public Meeting Notice.docx Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII NAME                NShah:rj                            KRiemer DATE                06/28/12                            06/28/12 OFFICIAL RECORD COPY
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact: Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov


Notice of Significant   Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday,  July 12, 2012.
Notice of Significant Licensee Meeting                           DISTRIBUTION:
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Michael McCoppin, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-1 Resource RidsNrrPMPrairieIsland Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Kenneth OBrien, Acting Deputy Director, Division of Reactor Projects, RIII Richard Skokowski, Acting Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Prairie Island DRS Branch Chiefs:
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact. Approved By:  /RA/
Mel Holmberg Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP}}
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact: Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov DISTRIBUTION
: See next page
 
DOCUMENT NAME:  Prairie Island 2011 EOC Public Meeting Notice.docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII    NAME NShah:rj KRiemer  DATE 06/28/12 06/28/12  OFFICIAL RECORD COPY
 
Notice of Significant  Licensee Meeting DISTRIBUTION
: Michael McCoppin, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-1 Resource RidsNrrPMPrairieIsland Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Kenneth O'Brien, Acting Deputy Director, Division of Reactor Projects, RIII Richard Skokowski, Acting Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Prairie Island DRS Branch Chiefs: Mel Holmberg Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP}}

Revision as of 01:26, 12 November 2019

07/17/2012, Notice of Meeting with Prairie Island Nuclear Generating Plant Units 1 and 2, Performance for 2011 Calendar Year
ML12181A286
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/28/2012
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To:
References
Download: ML12181A286 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 28, 2012 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Northern States Power Company, Minnesota Name of Facility: Prairie Island Nuclear Generating Plant, Unit 1 and Unit 2 Docket No: 50-282, 50-306, and 72-010 Date and Time of Meeting: Tuesday, July 17, 2012, 6:00 p.m. to 9:00 p.m. (CDT)

Location of Meeting: Red Wing High School 2451 Eagle Ridge Drive Red Wing, MN 55089 Purpose of Meeting: Discuss NRC end-of-cycle assessment of Prairie Island Nuclear Generating Plant, Unit 1 and 2, performance for the 2011 calendar year. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

K. Riemer, Chief, DRP Branch 2 K. Stoedter, Senior Resident Inspector P. Zurawski, Resident Inspector Licensee Attendees:

J. Molden, Site Vice President K. Davison, Site Director P. Huffman, Site Engineering Director

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, July 12, 2012.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.

Approved By: /RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact: Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, July 12, 2012.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.

Approved By: /RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Meeting Contact: Kenneth Riemer, Chief Branch 2 630-829-9628 Kenneth.Riemer@nrc.gov DISTRIBUTION:

See next page DOCUMENT NAME: Prairie Island 2011 EOC Public Meeting Notice.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME NShah:rj KRiemer DATE 06/28/12 06/28/12 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting DISTRIBUTION:

Michael McCoppin, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-1 Resource RidsNrrPMPrairieIsland Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Kenneth OBrien, Acting Deputy Director, Division of Reactor Projects, RIII Richard Skokowski, Acting Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Prairie Island DRS Branch Chiefs:

Mel Holmberg Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP