ML12261A388: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFIC L USE LY -VES N INF TION" 4 UNITED S TATES NUCLEAR REGULATORY COMMISSION OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION IV 612 EAST LAMAR BLVD, SUITE 400 v¶,.e 4 ARLINGTON, TEXAS 7E011-4125 e)
{{#Wiki_filter:OFFIC     L USE       LY -       VES             N INF       TION
* 1 December 9, 2008 MEMORANDUM TO: Elmo E. Collins, Regional Administrator Region IV FROM: Crystal D. Holland, Director Office of Investigations Field Office, Region IV  
            " 4                                 UNITED S TATES NUCLEAR REGULATORY COMMISSION OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION IV 612 EAST LAMAR BLVD, SUITE 400 v¶,.e     4                               ARLINGTON, TEXAS 7E011-4125 e)
* 1 December 9, 2008 MEMORANDUM TO:               Elmo E. Collins, Regional Administrator Region IV FROM:                       Crystal D. Holland, Director Office of Investigations Field Office, Region IV


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION: ASSIST TO NRC STAFF -PROVIDE INVESTIGATIVE SUPPORT TO ENGINEERING BRANCH WITH INTERVIEW OF AN ALLEGER (CASE NO. 4-2009-005F/RIV-2008-A-0142)
PALO VERDE NUCLEAR GENERATING STATION: ASSIST TO NRC STAFF - PROVIDE INVESTIGATIVE SUPPORT TO ENGINEERING BRANCH WITH INTERVIEW OF AN ALLEGER (CASE NO. 4-2009-005F/RIV-2008-A-0142)
On October 28, 2008, the Allegation Review Board (ARB), Nuclear Regulatory Commission, in Region IV (RIV), convened to discuss several technical concerns [Allegation Nos. RIV-2008-A-0106; RIV-2008-A-01 16; and RIV-2008-A-0126]
On October 28, 2008, the Allegation Review Board (ARB), Nuclear Regulatory Commission, in Region IV (RIV), convened to discuss several technical concerns [Allegation Nos. RIV-2008-A-0106; RIV-2008-A-01 16; and RIV-2008-A-0126] received from an alleger regarding safety issues and the quality of parts INFI] procured by the Palo Verde Nuclear Generating Station (PVNGS),
received from an alleger regarding safety issues and the quality of parts INFI] procured by the Palo Verde Nuclear Generating Station (PVNGS), Tonopah, Arizona.Due to the complex and highly technical nature of the issues raised by the alleger, the ARB requested that the Office of Investigations (01), RIV, assist the RIV staff with an interview of the alleger to obtain clarification of his/her concerns regarding safety and quality issues related to PVNGS' procurement of "parts." An interview with the alleger and RIV staff was scheduled for November 12, 2008. The ARB further requested that the OL:RIV coordinate this staff assist with Neil O'Keefe, Branch Chief, Engineering Branch 2, Division of Reactor Safety, RIV.On November 12, 2008, OI:RIV assisted the RIV staff with the interview o4 F hin Avondale, Arizona. On November 19, 2008, a transcript of the interview wihh()()(as provided to OI:RIV.No further action was required from 0I:RIV; therefore this assist to NRC staff is hereby closed.
Tonopah, Arizona.
Due to the complex and highly technical nature of the issues raised by the alleger, the ARB requested that the Office of Investigations (01), RIV, assist the RIV staff with an interview of the alleger to obtain clarification of his/her concerns regarding safety and quality issues related to PVNGS' procurement of "parts." An interview with the alleger and RIV staff was scheduled for November 12, 2008. The ARB further requested that the OL:RIV coordinate this staff assist with Neil O'Keefe, Branch Chief, Engineering Branch 2, Division of Reactor Safety, RIV.
On November 12, 2008, OI:RIV assisted the RIV staff with the interview o4             F   hin Avondale, Arizona. On November 19, 2008, a transcript of the interview wihh()()(as provided to OI:RIV.
No further action was required from 0I:RIV; therefore this assist to NRC staff is hereby closed.


==Enclosures:==
==Enclosures:==
Exhibit I cc w/enclosure:
C. Carpenter, OE M. Fahey, OI:HQ OR,-,.--,G 01                ESTIGTIO                  I R PUBLIC          LOSURE WITH                    OVAL OF Fl      FFICE


Exhibit I cc w/enclosure:
_ICI    SEON      00IN   SSTG     NN     RMA   ýN2 Elmo E.Collins                             2 cc wlo enclosure:
C. Carpenter, OE M. Fahey, OI:HQ R PUBLIC LOSURE WITH OVAL OF Fl FFICE OR,-,.--,G 01 ESTIGTIO I
C. Marco, OGC E. Leeds, NRR (Attn: G. Cwalina, OAC, NRR)
_ ICI S EON 00IN SSTG NN RMA ýN2 2 Elmo E.Collins cc wlo enclosure:
        \NOT FOR PUBLIC DI     LOSURE WITHOU7'A       ROVAL OF IEL OFFICE ECT R, 0 FICE OF INVE   IGATI   S, REGI N IV
C. Marco, OGC E. Leeds, NRR (Attn: G. Cwalina, OAC, NRR)\NOT FOR PUBLIC DI LOSURE WITHOU7'A ROVAL OF IEL OFFICE ECT R, 0 FICE OF INVE IGATI S, REGI N IV.OFFICIA USE ONLO -01 ESTIGATION ITF- RMATION}}
              . OFFICIA USE ONLO - 01       ESTIGATION ITF- RMATION}}

Latest revision as of 23:32, 11 November 2019

Memorandum, OI Case No. 4-2009-005F
ML12261A388
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/09/2008
From: Holland C
NRC Region 4
To: Collins E
NRC Region 4
References
FOIA-2012-0247, 4-2009-005F, RIV-2008-A-0142
Download: ML12261A388 (2)


Text

OFFIC L USE LY - VES N INF TION

" 4 UNITED S TATES NUCLEAR REGULATORY COMMISSION OFFICE OF INVESTIGATIONS FIELD OFFICE, REGION IV 612 EAST LAMAR BLVD, SUITE 400 v¶,.e 4 ARLINGTON, TEXAS 7E011-4125 e)

  • 1 December 9, 2008 MEMORANDUM TO: Elmo E. Collins, Regional Administrator Region IV FROM: Crystal D. Holland, Director Office of Investigations Field Office, Region IV

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION: ASSIST TO NRC STAFF - PROVIDE INVESTIGATIVE SUPPORT TO ENGINEERING BRANCH WITH INTERVIEW OF AN ALLEGER (CASE NO. 4-2009-005F/RIV-2008-A-0142)

On October 28, 2008, the Allegation Review Board (ARB), Nuclear Regulatory Commission, in Region IV (RIV), convened to discuss several technical concerns [Allegation Nos. RIV-2008-A-0106; RIV-2008-A-01 16; and RIV-2008-A-0126] received from an alleger regarding safety issues and the quality of parts INFI] procured by the Palo Verde Nuclear Generating Station (PVNGS),

Tonopah, Arizona.

Due to the complex and highly technical nature of the issues raised by the alleger, the ARB requested that the Office of Investigations (01), RIV, assist the RIV staff with an interview of the alleger to obtain clarification of his/her concerns regarding safety and quality issues related to PVNGS' procurement of "parts." An interview with the alleger and RIV staff was scheduled for November 12, 2008. The ARB further requested that the OL:RIV coordinate this staff assist with Neil O'Keefe, Branch Chief, Engineering Branch 2, Division of Reactor Safety, RIV.

On November 12, 2008, OI:RIV assisted the RIV staff with the interview o4 F hin Avondale, Arizona. On November 19, 2008, a transcript of the interview wihh()()(as provided to OI:RIV.

No further action was required from 0I:RIV; therefore this assist to NRC staff is hereby closed.

Enclosures:

Exhibit I cc w/enclosure:

C. Carpenter, OE M. Fahey, OI:HQ OR,-,.--,G 01 ESTIGTIO I R PUBLIC LOSURE WITH OVAL OF Fl FFICE

_ICI SEON 00IN SSTG NN RMA ýN2 Elmo E.Collins 2 cc wlo enclosure:

C. Marco, OGC E. Leeds, NRR (Attn: G. Cwalina, OAC, NRR)

\NOT FOR PUBLIC DI LOSURE WITHOU7'A ROVAL OF IEL OFFICE ECT R, 0 FICE OF INVE IGATI S, REGI N IV

. OFFICIA USE ONLO - 01 ESTIGATION ITF- RMATION