ML12270A431: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/02/2012
| issue date = 10/02/2012
| title = Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
| title = Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Walsh K
| addressee name = Walsh K
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 2, 2012 Mr. Kevin Walsh Vice President, Seabrook Nuclear Plant c/o Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 2, 2012 Mr. Kevin Walsh Vice President, Seabrook Nuclear Plant c/o Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
 
==SUBJECT:==
SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)


==Dear Mr. Walsh:==
==Dear Mr. Walsh:==
By letter dated September 20, 2012 (Agencywide Documents Access and Management System Accession No. ML 1271A276), NextEra Energy Seabrook, LLC (NextEra) submitted a response to a request for additional information (RAI) regarding license amendment request (LAR) 11-04 for Seabrook Station, Unit No.1 (Seabrook).
 
The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP). The proposed amendment would revise the TSs to (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (k eff) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV. By letter dated September 20,2012, NextEra submitted an affidavit dated September 14,2012, executed by Mr. Thomas V. Fitzpatrick of Holtec International requesting that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390: Attachment 1 of the letter from NextEra to the U.S. Nuclear Regulatory Commission (NRC) Document Control Desk dated September 20, 2012: "Holtec Document 2064-002, Response to Request for Technical Information (RRTI)." The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason: Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
By letter dated September 20, 2012 (Agencywide Documents Access and Management System Accession No. ML 1271A276), NextEra Energy Seabrook, LLC (NextEra) submitted a response to a request for additional information (RAI) regarding license amendment request (LAR) 11-04 for Seabrook Station, Unit No.1 (Seabrook). The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).
K. Walsh The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
The proposed amendment would revise the TSs to (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (keff) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV.
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
By letter dated September 20,2012, NextEra submitted an affidavit dated September 14,2012, executed by Mr. Thomas V. Fitzpatrick of Holtec International requesting that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:
If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
Attachment 1 of the letter from NextEra to the U.S. Nuclear Regulatory Commission (NRC) Document Control Desk dated September 20, 2012: "Holtec Document RRTI 2064-002, Response to Request for Technical Information (RRTI)."
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason:
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
* Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
 
K. Walsh                                         -2 The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3100.
If you have any questions, please contact me at (301) 415-3100.
G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv K. Walsh -2 The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
 
If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
' ML12270A431 OFFICE    LPL1-2/PM      LPL1-2/LAit  LPL1-2/LA    LPL 1-2/BC    LPL 1-2/PM   II NAME       JLamb          SLent        ABaxter
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
* MKhanna        JLamb DATE       9/28/12       9/28/12       10/1/12       10/2/12       10/2/12}}
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3100.
Sincerely, Ira! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 R/F RidsNrrLAABaxter Resource RidsNRRDor1Lp11-2 Resource RidsOgcRP Resource RidsNrrPMSeabrook Resource RidsNrrDorlDpr Resource RidsRgn'l MailCenter Resource RidsNrrDorlResource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No' ML 12270A431 OFFICE LPL 1-2/PM NAME JLamb DATE 9/28/12 LPL 1-2/LAit LPL 1-2/LA SLent ABaxter
* 9/28/12 10/1/12 LPL 1-2/BC MKhanna 10/2/12 LPL 1-2/PM II JLamb 10/2/12 OFFICIAL RECORD COPY}}

Latest revision as of 22:03, 11 November 2019

Request for Withholding Infomation from Public Disclosure Regarding License Amendment Request 11-04, Changes to Technical Specifications for New and Spent Fuel Storage
ML12270A431
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/02/2012
From: John Lamb
Plant Licensing Branch 1
To: Walsh K
NextEra Energy Seabrook
Lamb J G
References
TAC ME8688
Download: ML12270A431 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 2, 2012 Mr. Kevin Walsh Vice President, Seabrook Nuclear Plant c/o Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE REGARDING LICENSE AMENDMENT REQUEST 11-04, CHANGES TO TECHNICAL SPECIFICATIONS FOR NEW AND SPENT FUEL STORAGE (TAC NO. ME8688)

Dear Mr. Walsh:

By letter dated September 20, 2012 (Agencywide Documents Access and Management System Accession No. ML 1271A276), NextEra Energy Seabrook, LLC (NextEra) submitted a response to a request for additional information (RAI) regarding license amendment request (LAR) 11-04 for Seabrook Station, Unit No.1 (Seabrook). The proposed change revises the Technical Specifications (TSs) for new and spent fuel storage as a result of a new criticality analyses for the new fuel vault (NFV) and the spent fuel pool (SFP).

The proposed amendment would revise the TSs to (1) reflect elimination of the need to credit Boraflex neutron absorbing material for reactivity control in the SFP, (2) credit soluble boron, burnup, cooling time, peripheral leakage, and rod cluster control assemblies within the storage racks to maintain SFP reactivity within the effective neutron multiplication factor (keff) limits of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68(b)(4), and (3) revise the requirements for fuel storage within the NFV.

By letter dated September 20,2012, NextEra submitted an affidavit dated September 14,2012, executed by Mr. Thomas V. Fitzpatrick of Holtec International requesting that the information contained in the following document be withheld from public disclosure pursuant to 10 CFR 2.390:

Attachment 1 of the letter from NextEra to the U.S. Nuclear Regulatory Commission (NRC) Document Control Desk dated September 20, 2012: "Holtec Document RRTI 2064-002, Response to Request for Technical Information (RRTI)."

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reason:

  • Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

K. Walsh -2 The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the above listed document marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC staff may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at (301) 415-3100.

G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv

' ML12270A431 OFFICE LPL1-2/PM LPL1-2/LAit LPL1-2/LA LPL 1-2/BC LPL 1-2/PM II NAME JLamb SLent ABaxter

  • MKhanna JLamb DATE 9/28/12 9/28/12 10/1/12 10/2/12 10/2/12